Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Similar documents
BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Pine Flat Lake Master Plan Update FACT SHEET September 2014

Ashbridges Bay Erosion and Sediment Control Project

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Public Information Meeting

The Napa River Flood Protection Project

River Mile 10.9 Removal Action Overview

Joe Pool Lake Lake Master Plan Public Information Meeting Presentation of Final Draft Revision July 31, 2018

Balancing Conservation and Development on the Jordan River

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Improvement of the Atlantic Coast of New York City,

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

BEACH AND INLET PROJECTS UPDATE

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

5 TH ANNUAL CAPE COASTAL CONFERENCE COONAMESSETT RIVER RESTORATION PROJECT. Elizabeth H. Gladfelter, Ph.D. Conservation Commission Town of Falmouth

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Introduction to the Seahurst Park Ecosystem Restoration Project: A Process of Transformation. Presented by Peter Hummel, ASLA, LEED AP

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES

Chapter PROJECT AUTHORIZATIONS

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

PUBLIC SPACE/AMENITY PROJECTS

Corridor Management Committee. September 29, 2017

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

ANDERSON RIVER PARK SIDE CHANNEL HABITAT RESTORATION PROJECT. Public Outreach Meeting June 5, 2017

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Improving an Urban Watershed The Past, Present and Future of Addison Creek

Nine Mile Creek Regional Trail Update. Edina City Council Workshop March 4, 2014

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

edmonton.ca/ribbonofgreen #ribbonofgreen

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Lake and Stream Restoration Project

Green Infrastructure. NYS Department of Environmental Conservation

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

OYSTER LAKE RESTORATION PROJECT

Enhance the High Line Canal Projects

The Trinity River Corridor Project Update

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

MPO UPDATE. Metro Advisory Committee. August 8, 2017

Fall 2017 Construction Update

2013 Summer Recap. Rockaway Beach

Grand River Ravines Georgetown Township

4/8/2015 Item #10D Page 1

Shoreline Master Program Town of La Conner, Washington

Post Construction BMPs

Town of Vershire Road Erosion Inventory Report

FOR AGENCY MEETING OF: AGENDA ITEM NO.: URBAN RENEWAL AGENCY BOARD STEVEN POWERS, EXECUTIVE DIRECTO#

Upper St. Croix & Eau Claire Rivers Watershed. Bony Lake

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Middle Mississippi River. Regional Corridor

Joe Pool Lake Master Plan Revision Public Information Meeting May 23, 2017

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Once Upon a Gravel Pit: Reconnecting Floodplain through Aggregate Extraction

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Town of Peru Comprehensive Plan Executive Summary

Iowa 100 Extension Project Visualizations for Design and Public Involvement ASCE Transportation Conference November 6, 2013 Ames, Iowa

Constructed Stormwater Wetlands

Mississippi Skyway Preliminary Engineering Report

PROPOSED DRAINAGE PATTERNS

Louisiana Lawmakers Approve Historic Hurricane Protection Plan

Minot City Council -Special Meeting- Friday, July 21, :00 PM Minot City Council Chambers- City Hall

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

REQUEST FOR QUALIFICATIONS

Lake O the Pines Master Plan Revision Public Information Meeting April 25 & 27, 2017

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Lake Nokomis Shoreline Enhancement Project

RESOLUTIO REGARDI G A THREE YEAR MOWI G SERVICES AGREEME T FOR THE HARTFORD LA DFILL

Farmers Investment Co. (FICO) Continental Farms

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Chapter 5: Recreation

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate

The Benefits and Challenges Associated with Green Infrastructure Practices

Scarborough Waterfront Project

APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION

17 Jul 2002 PUBLIC NOTICE

Information for File # ARC

Transportation Committee

City of Meriden Harbor Brook Flood Control Project Overview

Colorado Watershed Protection Fund - Project Grant Application Fountain Creek Restoration Shryver Park Reach Including Shryver Pond

For personal use only

THE COMMUNITY-DRIVEN DESIGN PROCESS

Coffey Neighborhood Park Master Plan/Design/Rebuild Workshop. August 4, :00pm 4:00pm

INTER-AGENCY COORDINATION MEETING

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Transcription:

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Description The Corps of Engineers, Rock Island District (District) and the Illinois Department of Natural Resources (IL DNR) completed the feasibility study phase of the Peoria Riverfront Project (Project) in 2003; the Planning, Engineering, and Design Phase was initiated in January 2004 following receipt of State of Illinois funds. The principal goals of the Project are to improve depth diversity and enhance aquatic habitat in Peoria Lake. The recommended plan includes dredging approximately 200 acres within Lower Peoria Lake to create deepwater habitats and constructing three islands with a total area of 75 acres. In September 2004, approval was given to construct the Upper Mid-sized Island (55 acres of dredging with a 21-acre island) as a Critical Restoration Project under the Illinois River Basin Restoration Authority [Section 519, Water Resources Development Act (WRDA) 2000, as amended]. The State of Illinois provided construction funds in 2006 with Federal funds provided in late 2008. The WRDA of 2007 authorized the construction of the Lower Islands (145 acres of dredging with a 54-acre island). This Project initiated the construction phase of the Illinois River Basin Restoration Program. In November 2010, construction was completed on the Waubonsie Creek Fish Passage Critical Restoration Project in Kane and Kendall Counties. Fourteen additional Critical Restoration Projects are in various stages of planning and design, including two projects waiting construction at Pekin Lake. Section 519 of WRDA 2000 authorized: (1) a Comprehensive Plan to develop and implement a restoration program and a long-term resource monitoring program, and to evaluate new technologies and innovative approaches; and (2) construction of critical restoration projects. These efforts relate to the state's Illinois Rivers 2020 initiative, a proposed 20-year Federal/State effort to restore and enhance the 30,000 square-mile Illinois River Basin. The Comprehensive Plan was approved by HQUSACE in May 2007 and forwarded to Congress. History/Significance Peoria Lake, the largest bottomland lake in the Illinois River valley, reflects changes similar to other lakes. There are 60 backwater lakes along the Illinois River. The Illinois State Water Survey has estimated that average volumetric loss due to sedimentation of all backwater lakes since 1903 is 70%, with several approaching 100% loss. The oldest complete survey of the Illinois River system was done in 1903. This loss of aquatic habitat is viewed as the greatest threat to the Illinois River as concluded through a state-wide planning process that resulted in the Integrated Management Plan for the Illinois River in 1997. Since 1903, the volume of Peoria Lake below elevation 440 feet has decreased by approximately 61%. Elevation 440 is considered flat pool for Peoria Lake. The elevation is a function of the height of Peoria Lock and Dam. Areas

outside of the navigation channel have experienced sedimentation that is even more rapid. The loss of backwater lake depth and volume has severely impacted off-channel overwintering, spawning, and nursery habitats for fish. Shallow water areas are subject to wave action that re-suspends sediment, further limiting fish, aquatic vegetation, macro invertebrate, and mussel production. In Peoria Lake, sedimentation has resulted in the loss of deeper, off-channel parts of the lake from an estimated maximum of 8 feet to 1 to 2 feet in recent years. Off-channel areas will remain shallow and subject to re-suspension of sediment by waves if no action is taken. This transformation of Peoria Lake into a narrow navigation channel with bordering shallow, wind-swept areas will negatively impact fish and wildlife habitat and also reduce aesthetic values and recreation opportunities. Project Timeline 1996 - United States House of Representatives Resolution 2500 of the Committee on Transportation and Infrastructure requests a feasibility study of the Peoria Lake area. 1997 A Section 905(b) Reconnaissance Report is completed which recommends a feasibility study to assess measures to reduce existing sedimentation in Peoria Lake to create and restore aquatic habitats and reduce future sediment deposition in the Farm Creek Delta. May 2000 A study newsletter notifying residents of the study s initiation and upcoming open house was mailed to nearly 700 addresses. June 2000 A public open house was held in Peoria to execute the Feasibility Cost Sharing Agreement between the IL DNR and the District. The IL DNR and the District provided Study information to the 70 members of the public who attended the open house. November 2000 - A study newsletter was mailed to over 700 addresses providing study background, purpose, a study update, a summary of the June open house, and an invitation to a November 29, 2000 Open House. The November Open House was held in Peoria with information regarding the study made available to 72 attendees June 2002 - A study newsletter was mailed to over 800 addresses announcing a public meeting to present the study results to the public. The public meeting was held in Peoria with 77 people attending. December 2002 Statement of Findings and Findings of No Significant Impact signed. July 2003 The Report of the Chief of Engineers is signed. April 25, 2006 A Project Cooperation Agreement between the IL DNR and the Corps, Rock Island District for construction of the Upper Mid-sized Island Critical Restoration Project was executed. April 24, 2009 - The public was invited to attend a ceremony held at the Peoria District Gateway Building to commemorate the initiation of construction and the contract award Construction The contract for the Peoria Riverfront Development, Illinois (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project, Stage I was awarded March 2009 to Midwest Foundation Corporation of Tremont, Illinois for $3,528,320. Stage II was awarded in March 2010 to Midwest Foundation Corporation for $4,634,521. The dredging and island construction is currently taking place immediately north of the McClugage Bridge. Construction is anticipated to be complete in 2013.

Lower Island Design The District and the IL DNR signed a Design Agreement in July 2011 for the Two Lower Islands with Flowing Side Channel. Approximately two-thirds of the funds necessary for the design effort have been provided by Congress. If the remaining funds are provided, design efforts could be completed by the summer of 2012. Construction will be subject to further appropriation of construction funds by Congress. Point of Contact U.S. Army Corps of Engineers Rock Island District Project Manager: Mr. Marshall B. Plumley Phone: 309-794-5447 E-Mail: Marshall.B.Plumley@usace.army.mil

1 1 DREDGE CHANNEL EL. 433.5 LEGEND: SITE PLAN GE C-201 C 100 C-202 D ESS. 434.0 B STACKED GEOTEXTILE CONTAINER TEST SECTION GEOTEXTILE CONTAINER ALIGNMENT B DREDGE ALIGNMENT A C-200 A ION STONE PTION 4) 1 C-200 D E F G H FORM ISLAND PERIMETER WITH 3 ROWS OF GEOTEXTILE CONTAINERS PLACE BERM INSIDE GEOTEXTILE CONTAINER RING (OPTIONS 1 AND 2) APPROXIMATE LOCATION OF TIRE REEF - (OPTION 3) - DREDGE CHANNEL - NAVIGATION CHANNEL - GEOTEXTILE CONTAINER - WORK LIMITS - BURIED FIBER OPTIC (APPROX. LOCATION) - OVERHEAD UTILITIES - BURIED GAS - BERM SLOPE - EROSION PROTECTION STONE AND SCOUR APRON D E F G H Sheet of 14 7 Sheet Reference Number: PEORIA RIVERFRONT ECOSYSTEM DEVELOPMENT PROJECT STAGE I SITE PLAN U.S. ARMY ENGINEER DISTRICT CORPS OF ENGINEERS ROCK ISLAND, ILLINOIS Designed By: RSK Drawn By: SDB Checked By: TNH Reviewed By: HLA Date: 20NOV2008 Scale: AS SHOWN Project Code: PA07 Solicitation Number: W912EK-09-R-0010 1 Symbol AMENDMENT #6 - TEXT CHANGES Description Revisions 25FEB09 TNH/HLA Date Approved Rock Island District of Engineers US Army Corps 6 5 4 3 2

D E F G H 200 200 0 400 SCALE IN FEET D E F G H (U.S. HIGHWAYS 24 AND 150) C C-301 B C-300 A C-300 OPTION G CONSTRUCT ROCK CLOSURE STRUCTURES (SEE C-104) OPTION E - DREDGE BACKWATER AREA 2 TO EL. 434.0 (SEE C-106) BASE BID DREDGE ALIGNMENT A TO EL. 430.0 AND CONSTRUCT POTHOLES. (SEE C-101) - BACKWATER AREA 2 ND RS ED 103) BACKWATER AREA 1 OPTION A - DREDGE ALIGNMENT B TO EL. 430.0 AND CONSTRUCT POTHOLES. (SEE C-102) EXISTING CHANNEL. (SEE C-300 AND C-301) APPROX. LOCATION OF EXISTING TIRE REEF (SEE C-104) OPTION D - DREDGE BACKWATER AREA 1 TO EL. 434.0 (SEE C-106) OPTION F CONSTRUCT ROCK JETTIES (TYPICAL) (SEE C-104) OPTION B - DREDGE ALIGNMENT C TO EL. 430.0 AND PLACE DREDGED MATERIAL ON INTERIOR OF ISLAND (SEE C-103) Sheet 9 of 22 Sheet Reference Number: ILLINOIS RIVER BASIN IL RIVER - RM 166.0-166.0 TAZEW ELL COUNTY, IL PEORIA RIVERFRONT ISLAND SECTION 519, STAGE I SITE PLAN U.S. ARMY ENGINEER DISTRICT CORPS OF ENGINEERS ROCK ISLAND, ILLINOIS Designed By: TNH Drawn By: JMF Checked By: HLA Reviewed By: KNM Date: 2010/01/29 Scale: AS SHOW N Project Code: IW 112 Solicitation Number: W 912EK-10-R-0029 Symbol Description Date Approved Revisions Rock Island District US Army Corps of Engineers fi 6 5 4 3 2 1