APPENDIX E: CITY OF HAMILTON* STANDARD REQUIREMENTS FOR PARK OR OPEN SPACE DEVELOPMENT

Similar documents
North Oakville East Parks Facilities Distribution Plan. November, 2009

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual

Executive Summary.. 1. Introduction

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

Southward Community Recreation and Sports Park Southward Community Recreation and Sports Park Concept Design Images and Information.

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX F: DETAIL DRAWINGS

PARK DEVELOPMENT MANUAL. 2 nd EDITION

Attachment 1 TOWN OF NEW TECUMSETH. Manual for the Preparation of an Urban Design Report

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

Policy Statement. Purpose

Task Force on Harbourfront Developments on Hong Kong Island

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

2019 Development Charges Background Study Draft Local Service Policy (Draft Appendix E to D.C. Study)

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

A cknovvledgements. Table of Contents. Project Introduction...1

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Proposed Park Master Plan: The Master Plan has been revised to incorporate suggestions received in response to the Park Survey:

Florence County Small Commercial Land Disturbance Permit Application

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 16, 2016

TO BE COMPLETED BY APPLICANT

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

CHAPPLES PARK MASTER PLAN. Presentation to Council April 10, 2017

Park Types and Attributes

City of Yorba Linda Memorandum

Public Works and Infrastructure Committee Front Yard Parking Regulations. Transportation Services. June 8, 2017

Chapter Purpose and Intent. 7.2 Applicability. 7.3 General Provisions RECREATIONAL OPEN SPACE

SOIL EROSION AND SEDIMENT CONTROL

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

Eco-Roof Incentive Program application: 6 Curity Avenue

KANATA LAKES NORTH NEIGHBOURHOOD PARK FACILITIES PROGRAM UPDATE

HURON COMMUNITY PLAN

PARTF Scoring System for Grants

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

Community Gardens. Information. Handbook.

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

CHAPTER 22 Rural Open Space Community Developments

7.0 OPEN SPACE 7.1 OPEN SPACE DEDICATION CHAPTER 7: OPEN SPACE

Draft Environmental Assessment

FY Capital Improvement Program Arroyo Projects - Central Arroyo Summary

1120 Haist Street - Pelham Arena Community Co-Design Recommendation Report Haist Street - Pelham Arena Community Co-Design Recommendation Report

OP Council Resolution June 16, Planning and Development Services

Soil Erosion and Sediment Control

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

STORMWATER - GENERAL NOTES

THE CORPORATION OF THE TOWN OF ST. MARYS

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

DRIVEWAY REGULATIONS

Rezoning. Rezone from A-1 to RH to create 9 suburban single family residential lots. Approval to Proceed

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017

Burrus Old Mill Park

Landscape Design Guidelines For Site Planning. Corporation of the Municipality of Clarington Planning Services Department

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Queens Quay East East Bayfront, West Precinct, Phase 1 Draft Plan of Subdivision Application Final Report

FY Capital Improvement Program Arroyo Projects

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Little Neck Planning Area

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

PG18.2 REPORT FOR ACTION. Eco-Roof Incentive Program application: 50 Drummond Street SUMMARY

The Uplands Area Structure Plan. City of Cold Lake, NE & SE W4

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

Secondary Plan for the Samac Community

URBAN DESIGN GUIDELINES

VEHICULAR AND PEDESTRIAN CIRCULATION

Planning and Building Department, Development and Design Division

ARTICLE 3. LARGE-SCALE SOLAR PHOTOVOLTAIC INSTALLATIONS SECTION XXI

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

APPENDIX F: EXTERNAL APPROVALS

Sherwood Forest Park REVITALIZATION PLAN. Public Meeting (P.I.C) # 3 JUNE / 25 /2015

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Highlands Region Stormwater Management Program Guidance

OFFICE CONSOLIDATION By-law Number 30-92

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

Request for Decision. Recommendation. Presented: Monday, Jul 07, Report Date Friday, Jun 20, Type: Public Hearings

Report or technical documentations of the target areas in Siauliai

SITE PLAN REVIEW PROCESS

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

Planning Justification Report

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 26, 2017

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm

USA Addition of South & East Side Residential Parcels. USA Deletion of a Town of Christiana Parcel. Conversion from USA to Limited Service Area

KEIZER STATION PLAN INTRODUCTION

Authority. any changes required as a result of the approved CHMP.

A Guide to Open Space Design Development in Halifax Regional Municipality

MER BLEUE URBAN EXPANSION AREA

Urban Planning and Land Use

Planning & Development. Background. Subject Lands

BASIC SITE PLAN AND DESIGN PRINCIPLES FOR REDEVELOPMENT OF 114 RICHMOND ROAD

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Transcription:

* Standard Requirements by Open Space Development and Park Planning Section (OSD & PP) of Capital Planning and Implementation Division (CP&I) of Public Works. 1.1 Standard Comments at Draft Plan Approval At the Draft Plan submission step (Step #2), Open Space Development and Park Planning Section (OSD & PP) shall review and make comments. Aspects for review and comment include elements of the Parkland, and other Open Space considerations. For Parkland, OSD & PP will comment on: Park servicing: 50mm water service, 200mm sanitary sewer service, 250mm storm sewer service to property line of Park are minimum requirements. Park grading: Minimum slopes of 2%, graded in a manner to avoid ponding and maintain proper drainage. Park fencing: Minimum standard must adhere to the City of Hamilton s Public Works Details binder. Minimum street frontage: 120 metres Park turf: seeding is the minimum standard. Development construction: Undeveloped, disturbed blocks shall be graded, seeded, and maintained by the Developer until construction commences thereon. 1.2 Record of Site Condition If the Owner is conveying to the City of Hamilton naturalized open space blocks, tableland for parkland uses and any other lands for public usage, then the Owner shall submit a signed Record of Site Condition (RSC) to the City of Hamilton, and the Ministry of the Environment (MOE). This RSC must be completed to the satisfaction of the City of Hamilton, including an acknowledgement of receipt of the RSC by the MOE. A Letter of Reliance from the Developer s Environmental Consultant must accompany the RSC, to allow the City to use the studies conducted in the future. - E1 -

1.3 Guidelines for the Reimbursement of Park Development Works Through Development Charges: Traditional Park facilities are eligible for reimbursement through Development Charges (DC). An outline of traditional Park features is found in Appendix E. Upgraded features are at the Developer s cost, and may be subject to a Perpetual Maintenance Fee contribution by the Developer for future maintenance costs. More information on Perpetual Maintenance Funds is found in Appendix E. City standards for Park facilities construction are outlined in the City of Hamilton Standard Specifications (latest edition). Reimbursement of Park construction will be permitted according to the above guidelines and City approval of drawings and cost estimates, up to the maximum amount allocated by the DC By-law. This amount is calculated by City of Hamilton staff based on standard unit costs for Park Design and Open Space Design for the design and construction of the Park or Trail in question. The amount allocated to the Park by the DC By-law includes design fees for the Developer s consultant. All cost estimates must include the design consultant fees. 1.4 Soil Testing Soil testing is applicable for any Park development or redevelopment or open space development. Refer to Hamilton City Standard, as outlined in the City of Hamilton Standard Specifications (latest edition). 1.5 Approved Plant Material A list of approved plant material, by the Forestry and Horticulture Section of Public Works is found on the City Hamilton website (www.myhamilton.ca). This list should be used for all park development, redevelopment or open space development in the City of Hamilton. - E2 -

1.6 Servicing Design Criteria All Park servicing calculations shall follow the criteria outlined in the City of Hamilton s Engineering Guidelines for Servicing Land Under Development Applications (latest edition). 1.7 Tendering Process If the Developer has chosen Option II, whereby the Developer is to build the Park, tendering process requirements will follow the standard Capital Planning and Implementation (CP&I) Public Works tendering process. 1.8 Unauthorized Park Usage The Developer agrees not to dispose or stockpile any waste or surplus fill material on the Subdivision Plan lands except in a manner and in a location approved by the City of Hamilton. The Park Block shall not be used for topsoil or other construction material, equipment storage, or sales pavilions. 1.9 Development Adjacent to Park Property Where development abuts a Park or Open Space, whether or not the Developer is constructing the minimal requirements or the finished Park or Open Space, runoff from the development property shall not drain into the Park or Open Space unless approved by the Manager, Open Space Development and Park Planning, Public Works. A rear lot catch basin may be required. A grading plan showing the proposed drainage solution must be reviewed to the satisfaction of the Manager, Open Space Development and Park Planning, Public Works. 1.10 Warranty The City of Hamilton requires a two-year comprehensive warranty on all plant material, and all park works, whether new parkland development or redevelopment, or open space development. - E3 -

1.11 Perpetual Maintenance Fee The Perpetual Maintenance Fee relates to Gateway Features in subdivisions, or any upgraded facilities that the Developer proposes that is above the City s standard Parkland development. The fee is calculated based on the proposed design, and is a lump sum to be paid by the Developer to cover the future maintenance costs of the feature. 2.0 PARK AND OPEN SPACE FEATURES 2.1 Traditional Park Features (Include - But Not Limited To): Chain link fence to City standards where Park property is adjacent to private lots. Park frontage on streets is not fenced, nor is Park boundaries shared with schools, Open Space, or Storm Water Management facilities. Site furniture to City standards including benches and trash cans. Park walkways that are to be maintained in the winter must be 3m in width, asphalt surfaced constructed according to City of Hamilton Standard Specifications (latest edition). Park walkways that are not to be maintained may be constructed of other materials, and will be evaluated on a case-by-case basis. Another acceptable Park walkway material is stone dust. Paving stones are generally not permitted. Lighting of Park walkways in Neighbourhood Parks is generally not recommended. Lighting of sports facilities in Neighbourhood Parks is generally not recommended, unless premier facilities are proposed. These will be evaluated on a case-by-case basis. Supply of sports facilities, including soccer pitches, baseball diamonds, bocce facilities, and multi-purpose courts are determined through consultation with the Recreation staff of the City of Hamilton. Playgrounds must conform to the latest Canadian Standards Association (CSA) standards for play spaces and equipment. At least one (1) light standard must be provided at playgrounds for security. - E4 -

2.0 PARK AND OPEN SPACE FEATURES 2.2 Parking Supply Standards Parking Supply Standards for Community or City-wide parks: 16 spaces per ball field, 32 spaces if fields are lit 16 spaces per soccer field, 32 spaces if fields are lit 15 for general park users 12 (4 per court) per group of tennis courts Parking lots may be supplied for Neighbourhood Parks, if there is no adjacent school parking. - E5 -