QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

Similar documents
QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

Adaptation and Resilience at the City of Fort Lauderdale

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

CITY OF HOLLY SPRINGS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

Rosemont SGA virginia beach, va

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE

Stormwater Master Plan Update. City Council Briefing January 8, 2019

STORMWATER UTILITY PRESENTATION November 18, 2014

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

City of East Point Comprehensive Floodplain Management Program

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

BEACH AND INLET PROJECTS UPDATE

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

City of Manassas Park Proposed Stormwater Management Funding

Functional Areas of Practice AICP EXAM REVIEW. February 20, 2009 Georgia Tech Student Center

Descriptive Summary of the Comprehensive Plan Amendment

October 26, :00 pm

Preparing Hudson River Waterfronts for an Era of Rapid Sea Level Rise

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

Centerville SGA. virginia beach, va. Prepared for the City of Virginia Beach February,

Portage County Parks, Trails and Greenways Plan

Ashbridges Bay Erosion and Sediment Control Project

A G E N D A Council Update Training Room September 26, :45 p.m.

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

ions nts July 1, 2019 The utility answers to some increase: Q: A: rainwater Q: A: areas any the total by

Courthouse Planning Area

Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program. June 6, 2018

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

CRITICALFACILITIESASSESSMENT IN SOUTHEASTERN CONNECTICUT STRATEGIES FOR ALL HAZARDS RESILIENCE

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

Burton Station Village Community Meeting February 26, 2014

Little Neck Planning Area

ITA and Vicinity Master Plan Update

Catherine Bray John Buss Manager City of Tallahassee/Stormwater Management

Virginia Beach and Sea Level Rise: Where Do We Go From Here?

Level 1 Downstream Analysis

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field

Ci.ty e>f -V--:1rgi.rria Beach

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

STORM WATER MANAGEMENT SYSTEMS

Planning Commission Report

Outflow to Saw Mill Run

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

Mitigation + Adaptation Strategies for Historic Structures and Sites

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

NJ Department of Environmental Protection

Florida Stormwater Association 2015 Annual Conference June 17 19, 2015

10.0 Open Space and Public Realm

Davis Shores Tide Check Valve Program Project Maps and Photos

South Bismarck Watershed Model Update and Stormwater Improvement Project

2011 VIRGINIA BEACH STEWARDSHIP AWARDS. City Council Briefing September 27, 2011 Clay Bernick / Environment and Sustainability Office

Jack Creek Park Capital Improvement Project

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Planning and New Starts Development Committee. February 25, 2016

Folly Beach Planning Commission

Introducing Green Infrastructure for Coastal Resilience

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD

Towards a Resilient Stormwater Future: Building Back from Hurricane Irene and Tropical Storm Lee. October 15, 2015 VUSP Symposium

PUBLIC NOTIFICATION PLAN

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department. Proposed Storm Water Pond Maintenance Fee

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

FURTHER TO EXECUTIVE COMMITTEE MEETING #11/12 To be held on Friday, January 11, 2013

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Why a new Food & Farm Ordinance?

MUNICIPAL RESILIENCE PLANNING ASSISTANCE PROJECT

Planning for Historic/Cultural Resources Coastal Resiliency in Connecticut. Presented to CAFM s 3 rd Annual Conference

Stafford County Strategic Plans

B. Contact Information: Hannah K. Morgan Sustainability Coordinator 202 Netzer Administration Building

EEA Capital Investment in Green Infrastructure

Physical Approaches to Flood Mitigation

Floodplain Management Plan 2016 Progress Report

City of Elyria. Frequently Asked Questions

City of Waco Stormwater Management Regulations

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Update for City Council 7 Years of Progress. May 2013

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

CITY OF URBANA STORMWATER UTILITY FEE FREQUENTLY ASKED QUESTIONS

SECTION 4(f) DE MINIMIS DOCUMENTATION

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole.

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Envision Sustainable Infrastructure

Conservation Pages A Newsletter by Mecklenburg Soil and Water Conservation District

1.4 - PRINCESS ANNE COMMONS & TRANSITION AREA

3/22/2011. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers:

Maintaining Your Neighborhood Stormwater Facilities

Transcription:

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project PROJECT OVERVIEW Windsor Woods, Princess Anne Plaza and The Lakes are neighborhoods located in what was once the undeveloped headwaters of the Lynnhaven River. According to aerial photos from 1949, the area was originally forest surrounded by farmland. Much of the area has relatively low elevations. This coupled with increasing sea levels (approximately one-foot over the last 50 years) and the increasing frequency of storms with significant tides and rainfall amounts, has resulted in severe flooding of the neighborhood during these storm events. The City has funded a number of drainage improvements over the years (A number of drainage improvement projects are currently underway or will be starting soon). Beginning with the FY18 budget, the City Council has established initial funding to develop a multi-year program of projects to comprehensively address flooding in Windsor Woods, Princess Anne Plaza and The Lakes.

Q1. What is the history of the area? Aerial photos from 1949 shows the area was undeveloped and was not used for farming. Elevations in the area are very low and the area lies within FEMA s 100-year floodplain mapping. The infrastructure is approximately 50 years old. Princess Anne Plaza was developed in 1961, The Lakes (east of Plaza Park) in 1964, Windsor Woods in 1966 and The Lakes (west of Plaza Park) in 1976. Q2. Which neighborhoods experienced significant flooding in October 2016? Rainfall from Matthew caused numerous flooding throughout the City. Neighborhoods that experienced flooding include Ashville Park, Central Resort District, Sherwood Lakes, Chubb Lake/Lake Bradford, Eastern Shore Drive, Windsor Woods, Princess Anne Plaza and The Lakes. Q3. What caused the flooding in October 2016? Rainfall from Hurricane Matthew (October 2016) resulted in extreme flooding. This storm came on the heels of Hurricane Hermine (Labor Day weekend), which dropped an average of 10 inches of rain and the remnants of Tropical Depression Julia (Sept. 15 th -18 th ), which dropped an average of 11 inches of rain for our city. All this rain led to very high-water levels in the canals, ponds and lakes prior to the arrival of Matthew. Records indicate approximately 800 residences in the Windsor Woods-Princess Anne Plaza-The Lakes Project area had various levels of damage. Many streets were impassable. Q4. What are significant issues that cause flooding in the neighborhoods? Significant issues are: Low elevations Minimal capacity of stormwater conveyance systems High tides resulting in significant reduction of storage in Lake Trashmore and Lake Windsor Intense storm events have resulted in more frequent flooding and increased property damage Q5. Are these neighborhoods in the FEMA 100-year floodplain? Significant portions of Windsor Woods, Princess Anne Plaza and The Lakes are within the 100-year floodplain. Q6. What potential solutions are being considered? Potential solutions include: Increasing the conveyance capacity of the stormwater pipes Construction of barriers and gates to minimize tidal flooding Construction of stormwater pumping stations Additional lake storage capacity Additional retention ponds Q7. How much funding has been authorized by the City? The City has allocated $129 Million over a 15-year period. Q8. Where is the money coming from to pay for the projects? The stormwater utility fee provides revenues to pay the project cost. Also, bonds are issued to provide funds to build the projects like buying a house with a mortgage. The bonds are paid back with funds generated by stormwater fees. Q9. What is the status of the stormwater project? These projects have been combined for the detailed engineering analysis. The first phase of these projects is the preliminary engineering analysis to develop the specific program of flood mitigation measures. The analysis will identify the needed improvements, the cost of those improvements, an implementation and phasing plan and any environmental permitting that is required. The preliminary engineering analysis will be completed in the summer of 2018.

Q10. Tides are expected to rise in the future, can the flooding be controlled? The City hired Dewberry Consulting to study Sea Level Rise (SLR) impacts to Virginia Beach; public meetings have been held; forecasts are for 1.5 feet rise in 2050 and 3 feet rise by 2100. Michael Baker is aware of the SLR studies and is taking into consideration the SLR impacts. The focus of the current engineering is to develop an adaptable plan. Q11. Who can residents talk to with the City to help them understand their options with regard to FEMA and whether they should repair their home, or agree to let FEMA raise their home (if FEMA agrees). Additionally, where do they live while FEMA is deciding during the allotted 180 days? For now we are not entertaining any further home elevations until we find a way to successfully complete them. We can assist with information on things that folks can do around their house/property to help mitigate issues. Also Housing is beginning a program to offer some assistance in the future. For additional information please call the Office of Emergency Management at (757) 385-8585 or visit the following web page: https://www.vbgov.com/government/departments/emergency-management/pages/fema-floodmitigation.aspx Q12. The stormwater utility fee produces approximately $40 million plus a year. What is the money used for? The City s Storm Water Utility is responsible for the stormwater system which is comprised of pipes, lakes, canals, ditches and pump stations which manage and convey stormwater. Many undertakings are necessary for the management of the stormwater system such as: Operation and maintenance, Engineering and construction, Inspections and environmental spill responses, Street sweeping, Complying with state and federal stormwater quality regulations, Repayment of bonds issued to finance new lines, pump stations, etc. Q13. Can Lake Windsor and Lake Trashmore be lowered by 8 feet to provide storage for stormwater? Lowering Lake Windsor and Lake Trashmore by 8 feet is not practical. Lowering lake elevations by 8 feet would cause potential damage to nearby homes and cause the sides of the lakes to collapse. Initial engineering analysis indicates lowering the lake elevations from 1 to 2 feet provides additional storage without shoreline erosion. Q14. Does the City pursue grants and other funding to help pay for these storm drain improvements? Yes. The City pursues grants and other funding as they become available.

Q15. What is the status of the three FEMA reimbursement funded projects? The City funded 3 projects on February 6, 2018 using FEMA reimbursement funds. Project 1 is along South Plaza Trail from Rosemont Road to Presidential Boulevard, Presidential Blvd to Windsor Woods Canal; construction contract award anticipated summer 2020. Project 2 has been combined with Project 3 and is from Old Forge Court to Old Forge Road to Red Line Road to Windsor Woods Canal. Anticipated construction award is winter 2020. Q16. What is the status of the Club House Road project? The engineering design is in progress; survey and geo-tech work is underway. Construction contract award is anticipated in January 2019.

Q17. What is the schedule for installing new stormwater pipes in the neighborhoods? The project is currently scheduled to be phased over a 15-year period. A schedule of improvements to match funding availability is being developed. As more details become available, residents will be advised of the project timelines. Please refer to Q15 and Q16 which provides a description and schedule of four stormwater lines currently under design. Q18. Why are tidal gates/barriers/large stormwater pump stations needed? Significant issues for the service area are low elevations, minimal capacity of stormwater conveyance systems, high tides resulting in significant reduction of stormwater storage in Lake Trashmore and Lake Windsor, and intense storm events that result in more frequent flooding and increased property damage. Potential solutions include increasing the conveyance capacity of the stormwater pipes, construction of barriers and gates to minimize tidal flooding, construction of stormwater pumping stations, additional lake storage capacity and additional retention ponds. The tidal gates are necessary to stop the incoming tides from reducing available lake storage. When the tidal gates are closed (to stop the tides), pump stations are necessary to pump water (from rainfall) over the tidal gates and barriers to Thalia Creek and/or London Bridge Creek. Q19. How do residents in the project area contact the City? An e-mail address (papww@vbgov.com) and website (https://www.vbgov.com/government/departments/publicworks/storm-water/pages/plaza-drainage-12-15.aspx) have been established to provide an opportunity for residents to ask questions and to share their comments on the Project. City of Virginia Beach Stormwater Project Manager: Michael S. Bumbaco III, P.E. Department of Public Works Municipal Center - Building 2 2405 Courthouse Drive, Room 345 Virginia Beach, VA 23456 Phone: (757) 385-4131