Riverwalk Park and Boardwalk Feasibility/Concept Design Study Project Number: 17-2-CD Public Meeting - May 30, 2017

Similar documents
Preferred Riverwalk Alternative Components August 17, 2017:

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Bourne Downtown Site Planning

Summary Report. 15 Dec The Lynch Park Master Plan, Beverly, MA. Tappé Associates, Inc. Geller Associates, Inc.

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

Redevelopment Plan for the Former South Gifford Road Landfill

CAPE COD COMMISSION MAIN STREET P.O. BOX226 BARNSTABLE, MA (508) FAX (508)

Town of Millbury Department of Public Works

OTHERS Alex Jaegerman, Director of Planning & Development Wendy L. Simmons, Administrative Assistant, Recording Secretary

Winter Island Park Public Meeting #1 Salem, Massachusetts

VIRGINIA KEY CONSENSUS MASTER PLAN

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Environmental Consulting & Restoration, LLC Specializing in Wetland and Coastal Resource Area Delineation & Permitting

SECTION 9 PUBLIC FORUM DRAFT 5/31/2017 SEVEN YEAR ACTION PLAN

Cohasset Municipal Harbor Plan Public Meeting #1. Harriman GEI Consultants FXM Associates May 31, 2018

Shoreline Master Program Town of La Conner, Washington

Provide and maintain sufficient public parks, recreation facilities, and open space to meet the recreational needs of County residents and visitors.

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

alum creek park public workshop January 16, 2014

1. Golf Course Residential Single Family and Townhome Community

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Pittsfield Action Plan (West Branch of the Housatonic River)

MAYFIELD VILLAGE GREENWAY TRAIL

CROWN POINT SUBDIVISION

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

PEQUITSIDE FARM ONE PROPERTY, MANY USES

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

LOW IMPACT DEVELOPMENT (LID) SAMPLER

MONTGOMERY COUNTY PLANNING DEPARTMENT

Las Colonias Park Master Plan

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

SEMSWA s Role in the Land Development Process

Long-Range Transportation Plan

Interpreting and Using the RI Site Specific Soil Mapping Standards and Procedures

Riverfront Development Plan

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

Appendix C Agency Correspondence

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Variance Staff Report St. Croix County Board of Adjustment Ben Hanke / Calda Donna LLC Hearing Date: January 20 & 21, 2016

Final Master Plan and Development Control Regulations

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Environmental Review Part 55 Floodplain Management Subpart C. 8-Step Decision Making Process

Green Infrastructure Recommendations For Parks and Public Spaces

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

From and

Beachside Redevelopment Committee

The following principles guide the development of goals and strategies to protect and promote these amenities:

Importance of Master Planning Marcy Colclough

Town of Borden-Carleton

Project phasing plan (if applicable) 12 copies of site plan

ARTICLE 3. LARGE-SCALE SOLAR PHOTOVOLTAIC INSTALLATIONS SECTION XXI

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

State Parks and Wildlife Conservation Trust Fund Act

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

SECTION FOUR: MISSION STATEMENT, GOALS & OBJECTIVES

Silverwood Masterplan Kickoff Meeting. Jim Neidhart Dane County Parks Planning

IV. Development in the Rural Overlay District

Implementation plan. 3.1 Staging

Chapter 4 - Preparation of Stormwater Site Plans

The DCR Neponset River Trail Central Avenue to Mattapan Square

Westside Creeks. Elmendorf Lake Park and Linear Creekway Trails Project

TOWN OF EASTON. MASSACHUSETTS CJffiCE Of the fjown c4dminiit'tato't

OWNER/APPLICANT: VARSITY WIRELESS INVESTORS, LCC AND BELL ATLANTIC MOBILE OF MASSACHUSETTS CORP ( APPLICANTS )

OPEN SPACE CHAPTER 7: OVERVIEW. Preserve open space to protect natural resources, enhance character and provide passive recreation opportunities

New Development Stormwater Guidelines

Save it To Spade it Food Waste Composting Program

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Please read the entire document

process of the Land Development Code to assure regional parks are available County-wide.

Introduction Your committee:

PORT ST. JOE WATERFRONT PARTNERSHIP WATERFRONT STRATEGIC PLAN. Land Design Innovations, Inc.

UNIVERSITY OF NORTHERN IOWA

Lowe Park Master Plan Update Marion, IA August 25 th, 2011

Part 5. Environmental Protection Overlay District Regulations

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

STAFF REPORT SAUSALITO CITY COUNCIL

Recreation, Open Space, Greenway Plan & Smart Agriculture Initiative

City of Waco Stormwater Management Regulations

Department of Planning & Development Planning Unit

MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

CITY OF BIDDEFORD PLANNING DEPARTMENT PLANNING BOARD REPORT. Larry Patoine, Chair & Members of the Biddeford Planning Board

M E M O R A N D U M February 21, 2018

Approved 8/18/94 Revised 3/21/02 Revised 5/14/09

Selecting Appropriate Stormwater Control Measures for Your Development Project

October 26,2006 CERTIFICATE OF THE SECRETARY OF ENVIRONMENTAL AFFAIRS ON THE ENVIRONMENTAL NOTIFICATION FORM

CALL TO ORDER Chair Tom Vance called the meeting of Sammamish Planning Commission to order at 6:00 p.m.

Transcription:

Town of Yarmouth Riverwalk Park and Boardwalk Feasibility/Concept Design Study Project Number: 17-2-CD Public Meeting - May 30, 2017

Introductions Drive-In Site Utilization Committee (DISUC): Jim Saben, Chairman Tom Roche Ken Driscoll Gerry Manning Peter Slovak Two vacancies Town Staff: Karen Greene, Director of Community Development Kathy Williams, Town Planner Kelly Grant, Conservation Administrator Karl von Hone, Director of Natural Resources Pat Armstrong, Director of Parks, Recreation & Cemeteries Bruce Murphy, Health Director Jeff Colby, DPW Director Mark Grylls, Building Commissioner Frank Frederickson, Police Chief

Drive-In Site History (669 Route 28) 22 Acres acquired in 1985 for Recreation Marine Park Concept for many years 2013 fiscal analysis showed a Marina was no longer financially viable

Formation of DISUC BOS formed DISUC in April 2015 Charge: Identify policy priorities Identify potential uses Identify relative benefits of various ownership Six Month process Conclusions: Energize Route 28/Create a destination location Open space/ecological restoration of drive-in site Access to water/boardwalk

DISUC Recommendations/BOS Directive First Phase - Investigate: Riverwalk Park & Boardwalk Interim Uses of Remainder of site Second Phase: TBD

Riverwalk Park/Boardwalk Feasibility Study Scope of Study New wetland delineation and site analysis Alternative designs for the Riverwalk Park & Boardwalk Public Outreach & Participation DISUC Public Meetings/Public Outreach Meetings Concept Plan Development Permit Analysis Cost Estimates Development costs, construction, and maintenance Summary Report Definitive Subdivision Subdivide Riverwalk Park Parcel Dependent upon results of Feasibility Study

Riverwalk Park Uses

Kayak Rental Options Vendor Trailer Kayak rental locker Lease storage space

Artist Shanty, Rental Huts

Food Trucks/Seating Areas

Public Art Displays

Educational Opportunities Existing Shellfish Upweller

Interpretive Signage

Interactive & Natural Playscapes

Events/Activities Outdoor Exercise Classes Weddings or reunions Small theatre productions Concerts in the Park series

Riverwalk Park Elements

Pavilion and Shade Structures/Seating

Restrooms - Composting Toilets Pre-fabricated/Composting restrooms Self-contained waste treatment systems Emit no pollution Site disturbance minimized to the footprint of the buildings Traditional looking buildings.

Portable Toilets Enclosure Dennis Pond

Traditional Restrooms

Landscape Restoration Butterfly Garden

Green Infrastructure/Parking Stormwater swales, rain gardens and pervious pavement

Riverwalk Park Layout Options

Riverwalk Park Options Option A Option B Option C

Park Questions

Boardwalk Options

Boardwalk Options Option 1 Option 2 Option 3

Trail/Path/Walkway Crushed stone path through woodland and landscape restoration areas

Low Profile Boardwalk Section Alternate to crushed stone path-considers raising sea level. No railing required. Higher Cost. Elevation

Raised Boardwalk Elevation Section Elevation

Crossing at Lewis Pond Channel Elevation

Wood Boardwalk and Railing Yarmouth, MA Vertical Railing Angled Railing can give the impression of more room Cape Cod National Seashore

Cable Railing Wood post and top rail Stainless steel or aluminum post and top rail

Boardwalk Decking Materials Grating at a Corner bump-out Donation Naming

Boardwalk Overlooks- Configurations Corner bump-out Extension bump-out Side bump-out Side bump-out

Boardwalk Overlooks Interpretation, Rest and Shade Extension bump-out

Permitting Needs Complex permitting environment with significant protected natural resources: Evaluate alternatives with respect to statutory & regulatory requirements/processes Develop permitting strategy Key permitting programs: Massachusetts Environmental Policy Act (MEPA) Wetlands Protection Act & Yarmouth Wetlands By-Law Chapter 91 Waterways Licensing Crossing of Lewis Pond inlet US Army Corps of Engineers boardwalk & navigation Cape Cod Commission Development of Regional Impact (DRI)

Questions?