- Data Brochure Addendum

Similar documents
- Data Brochure Addendum

- Data Brochure Boiler Control 268

- Data Brochure Boiler Control 264

DHW / Setpoint Demand WWSD Modulation Boiler Output (x10,000 BTU/hr) External Input Signal Offset / Priority Override

- Data Brochure Boiler Control 264e

Boiler Demand Mix 1 Demand Mix 2 Demand DHW Demand Setpoint Demand

- Data Brochure D 260. Boiler Control /09

- Data Brochure Boiler Control 274

- Data Brochure Universal Reset Module 423

Installation & Operation Manual

- Data Brochure Universal Reset Module 422

SC-3 Controller INSTALLATION AND OPERATING INSTRUCTIONS FOR GAS-FIRED, OIL FIRED AND DUAL FUEL HOT WATER HEATING PLANTS. SC-3 Applications CONTENTS

The Universal Reset Control 363 is a microprocessor based control designed to maximize the comfort and efficiency provided by a hydronic

- Application Boiler Control 260

MODEL SF-10 CONTROL OPERATION AND INSTRUCTION MANUAL

- Data Brochure Universal Reset Control 364

- Data Brochure Mixing Control 360

- Application A Boiler Control 262 & One Stage Setpoint Control 150. Mechanical Remote Display Module (D1) 040 MODE 1

MODEL EM-10 ELECTRIC BOILER CONTROL OPERATION AND INSTRUCTION MANUAL

- Data Brochure Mixing Control 361

- Data Brochure Steam Control 279

SC-9 Controller INSTALLATION AND OPERATING INSTRUCTIONS. SC-9 Applications CONTENTS

- Data Brochure Mixing Control 360e

552_U 09/14. tekmarnet Thermostat 552 Zoning Replaces: 08/11. User Manual. 1 of 12. A Watts Water Technologies Company _U - 09/14

- Data Brochure D 261. Boiler Control 261

WWSD. Power. DHW Demand. Maximum. Supply. Minimum Boiler DHW. Zone 1 / Cooling. Pump / Vlv. System Pump. UnOccupied. of full output NRTL/C LR 58223

B-40/B-41 Modulating Temperature Controller

Instruction Sheet. Press & Hold: Item, to view settings, to test. 24 V ±10% 50/60 Hz 3 VA 120 V (ac) 5 A 1/6 hp pilot 240 VA 20 to 260 V (ac) 2 VA

- Data Brochure Mixing Reset Module 421

U538 12/11. Zoning. Replaces: 08/10. tekmarnet 4 Thermostat 538. User Manual. 1 of U /11

- Essay Control Functions and Benefits

- Data Brochure Snow Detector & Melting Control 665

Melt Demand. Idle Demand. WWSD Water. Melting. Stop. Do not apply power. Do not apply power. 5 Brn/ Slab. Com tn2. Input. Melt/Idle.

Installation & Operation Manual

Installation & Operation Manual

Better Design, Better Control, Better Systems.

c0094 form 2. Project Identification Year: 2001 Project nº: 910

Melt Demand. Idle Demand WWSD. Minimum Maximum Water Melting. Do not apply power. 27 Zn 2. Melt/Idle. Slab. Demand. Input Universal Sensor Included

- Data Brochure Snow Detector & Melting Control 667

Installation & Operation Manual

- User Brochure tekmarnet 4 Setpoint Control 161

Zoning Solutions. Thermostats & Wiring Centers Designed to Maximize Indoor Comfort. A Watts Water Technologies Company

Installation & Operation Manual

Advanced Snow Melt Control Installation Manual

Heatronic 4000 IO Heatronic /04 en-us. Features. 4 boiler control, DHW, BACnet and Modbus. Installation/Operating instructions (IO)

Installation & Operation Manual

Installation & Operation Manual

- Data Brochure tekmarnet 4 Thermostat 542e

- Brochure D 542. Introduction. Features. tekmarnet 4 Thermostat /05. 5 Data Brochure Control settings wiring instructions

Radiant Mixing Block

- Data Brochure. This brochure is for Thermostats 510 and 511 (with sensor). The section on the 079 slab sensor installation is for the 511 only!

- Data Brochure D 665. Snow Detector & Melting Control /12

4 Wiring Brochure Wiring and

Melting Control Stk# Melt Demand Idle Demand WWSD Minimum Maximum Water Melting. Do not apply power. 15 Mix Com. Mix. Melt/Idle Demand.

Instruction Sheet X Pump Block (XPB)

INSTALLATION/OPERATING INSTRUCTIONS BCP-3. Hot Water Reset Control For up to 3 Boilers. How the BCP-3 operates... 1:4 1:3 1:2 1:1.

Installation & Operation Manual

- Installation & Operation Manual Boiler Control 256

Hydronic & HVAC Control Systems

- User Brochure Programmable Thermostat 510

MR3CCUHV Temperature/Defrost Control

ProRadiant Basic Heating Control Installation Manual 2013

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER

Control Application. Supplement - ACVMax

prestige Control Application Supplement - ACVMax

AQ475A Aquatrol Outdoor Temperature Compensator for Boilers

Instruction Sheet RMB - Radiant Mixing Block

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

OPERATION INSTRUCTIONS DEMAND DEFROST CONTROL BOARD MODEL FOR USE WITH MODELS: AFFINITY, ECHELON, ACCLIMATE HEAT PUMP SERIES

MR4PMUHV Electronic. Temperature/Defrost Control with Relay Pack

Heat Link. Technical Guide

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

AQUATROL Zone Synchronizing Universal Injection/Mixing Boiler Reset Controls AQ252

RMB - Radiant Mixing Block

Geothermal Programming Guide. Central Processing Unit 1000 Version 1.33 ECO HBX Control Systems Inc. Page 1

prestige Control Application Supplement - TriMax

Product Manual SZ1022/SZ1031/SZ1035/

Transfer Switch Features

Instruction Sheet. Variable Speed - Solar (00-VT) 00 and Load Match Cartridge Circulators

Installation & Operation Manual

prestige Control Application Supplement - TriMax

Safety & Installation Instructions

TWZ/CT/ODV Series. Oil-Fired Hot Water Boilers (Less Tankless Heater) These instructions must be affixed on or adjacent to the boiler

Variable Speed Outdoor Reset 00 Circulator (00-VR)

INSTALLATION/OPERATING INSTRUCTIONS SEQUENCING PANELS

VT8300 Series Installation Guide 24 Vac Low Voltage

DCS2000 DEMENTIA CARE SYSTEM USER GUIDE. For Software Version 1.2 1

Outdoor Reset IQ Option Card, p/n

Transfer Switch Features

MODEL FPT-130 SINGLE POINT FREEZE PROTECTION HEAT TRACE CONTROL

Product Manual SZ1009

HIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER

Instruction manual. WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules

CommStat 6. Controller for Redundant HVAC Systems PRODUCT DATA SHEET

Programmable Thermostat

PEERLESS PUREFIRE Installation, Operation, and Maintenance Instructions Supplement - PF-460 NOTICE. Exhaust Vent/Air Intake Size

LMR Electric Fire Pump Controllers Features

Multi Boiler Guide. Kit #

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP 100% OUTSIDE AIR

Installation & User s Instructions

Transcription:

- Data Brochure ddendum Control 268 - ddition of Modes and Setpoint Modes D 268 10/03 The tekmar Control 268 has been modified to include the following features: demand for loads alarm New Setpoint operation Relay 9 can be used for operation The changes are included in controls starting with Lot 10. The date code and lot number are listed on the right hand side of the 268. Menu Control 268 Nine Stage & / Setpoint Do not apply power Item Demand / Setpoint Demand WWSD External Signal Offset External dv C.. Off Installer Stand lone Rotate Fixed Last Fixed Lead First On / Last Off Off Exercise First On / First Off Signal wiring must be rated at least 300 V. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Com Boil Boil Out UnO Boil Com Setp/ Power Prim C.. / Relay Relay Relay Relay Relay Relay Relay Relay Relay 9/ Sup Ret + Sw Dem Dem N L P1 larm 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 C US larm Test Modes 1 Up to 9 On/Off s 2 Up to 4 On/Off s & 4 s 3 Up to 4 Lo/Hi s 4 Up to 3 Lo/Hi s & 3 s 5 Up to 3 Three Stage s 6 Up to 2 Three Stage s & 2 s 7 Up to 2 Four Stage s 8 1 Four Stage & 1 943-01 Made in Canada by tekmar Control Systems Ltd. Power 115 V ±10% 50/60 Hz 600 V Relays Demands 20 to 260 V (ac) 2 V 230 V (ac) 5 1/3 hp, pilot duty 240 V off not testing red testing red testing paused For maximum heat, press & hold Test for 3 seconds. Meets Class B: Canadian ICES FCC Part 15 Date Code H2026B M Universal Sensor Included Or Valve Or Universal Sensor Included Outdoor Sensor Included Or 0-10 V (dc) External Signal Or Or Timer or Switch Optional Demand / Setpoint Demand 115 V (ac) Power Supply Combustion ir Or larm 1 of 8 2003 D 268-10/03

dded Features Features listed below have been added to the 268 Control. The sections in this addendum now supersede the appropriate sections in the D268 brochure dated 11/02. Section : Domestic Hot Water () operation is available during Reset (Stand lone) and External operation. The operation requires the use of the Relay 9 / contact; therefore, the last boiler in MODE s 1, 4 and 5 must be set to OFF before the MODE item will be available. DEMND Demand is required in order for the control to provide heat to the system. aquastat or setpoint control is used as a switch in the demand circuit. Once the control detects a demand, the Demand pointer turns on in the LCD and the control operates the boiler to provide a sufficient boiler supply water temperature to the tank. The control operates the pumps as described below. The control registers a Demand when a voltage between 24 and 230 V (ac) is applied across the Setp / and Com Dem terminals (8 and 7). BOILER TRGET DURING GENERTION The boiler target temperature is at least as hot as the exchange setting ( XCHG). The demand overrides the boiler reset target temperature, except when the boiler reset target is higher than that of the exchange setting. MODE & PRIORITY OPERTION The control has five different settings available for MODE. The required MODE setting will depend on the piping arrangement of the tank. It is often desirable to have a priority for the allowing for quick recovery of the tank temperature. This is achieved by limiting or even stopping the flow of heat to the heating system when the tank calls for heat. MODE OFF No The feature is not selected. This allows for Setpoint operation as described in section B. MODE 1 in Parallel no Priority When a Demand is present, the Relay 9 / contact (terminals 30 and 31) closes with the demand. The primary pump does not turn on, but may operate based on a Demand. Refer to section C. It is assumed that the pump will provide adequate flow through the heat exchanger and the boiler. MODE 2 in Parallel with Priority When a Demand is present, the Relay 9 / contact (terminals 30 and 31) closes and the primary pump contact is opened. It is assumed that the pump will provide adequate flow through the heat exchanger and the boiler. MODE 3 - in / Secondary no Priority When a Demand is present, the Relay 9 / contact (terminals 30 and 31) is closed and the primary pump contact is closed. This mode can be used if a tank is piped in direct return and a valve is installed. 2003 D 268-10/03 2 of 8

MODE 4 in / Secondary with Priority When a Demand is present, the Relay 9 / contact (terminals 30 and 31) is closed and the primary pump contact is closed. Priority can only be obtained using external wiring. During a priority override, the Relay 9 / contact is opened until the heating system has recovered before returning to operation. This mode can be used if a tank is piped in direct return and a valve is installed. Disable Using External Wiring PRIORITY OVERRIDE The Priority Override applies to MODE 2 and 4. To prevent the building from cooling off too much or the possibility of a potential freeze up during priority, the control limits the amount of time for priority. The length of priority time is determined using the Priority Override setting. Once the allowed time for priority has elapsed, the control overrides the priority and resumes space heating. Power from Relay 9 / contact COIL L N.C. L N.O. MODE 4 External Priority Interlock To provide external priority in Mode 4, the space heating zones must be interlocked with the Relay 9 / contact. During demands, the Relay 9 / contact must remove any power to all space heating zone valves or zone pumps. N Power to External Zones N CONDITIONL PRIORITY The Conditional Priority Override applies to MODE 2 and 4. If the boiler supply temperature is maintained at or above the required temperature during generation, this indicates that the boiler(s) has enough capacity for and possibly heating as well. s long as the boiler supply temperature is maintained near its target and the heating and targets are similar, and heating occurs simultaneously. POST PURGE fter the Demand is removed, the control performs a purge on the boiler(s). The control shuts off the boiler(s) and continues to operate either the pump or the valve and the system and boiler pump if applicable. This purges the residual heat from the boiler(s) into the tank. The control continues this purge for a maximum of two minutes or until the boiler supply water temperature drops 20 F (11 C) below the boiler target temperature during the operation. The control also stops the purge if the boiler supply temperature is close to the current boiler target temperature. MIXING PURGE fter operation, the boiler(s) is extremely hot. t the same time, the heating zones may have cooled off considerably after being off for a period of time. To avoid thermally shocking the boiler(s) after in parallel with priority ( MODE 2), the control shuts off the boiler(s), but continues to operate the while restarting the heating system. This allows some of the return water to mix with the cool return water from the zones and temper the boiler return water. DURING UNOCCUPIED If the control receives a Demand during an unoccupied period, the control can either continue operation of the system as it would during the occupied period or the control can ignore a Demand for the duration of the unoccupied period. NUMBER OF BOILERS USED FOR GENERTION The number of boilers used for generation can be selected from one to the maximum number of boilers using the BOIL setting. This applies when only a Demand is present. If there are other demands present, the control does not limit the number of boilers operated. 3 of 8 2003 D 268-10/03

Section 2: with Low Temperature s If is to be incorporated into a low temperature system such as a radiant heating system, a mixing device is often installed to isolate the high supply temperature from the lower system temperature. If a mixing device is not installed, high temperature water could be supplied to the low temperature system while trying to satisfy the demand. This may result in damage to the low temperature heating system. The control is capable of providing in such a system while maximizing the chance that the temperature in the heating system does not exceed its allowed maximum setting. To prevent high temperature water from being introduced into the heating system, the primary pump (Prim P1) must be turned off during a call for. To do this, the control must be set to MODE 2 or MODE 4 and Boil MIN must be set to OFF. MODE 2 OPERTION On a call for, the control provides priority by shutting off the primary pump (Prim P1) for a period of time. This time is based on the Priority Override setting. However, if the Demand is not satisfied within the allotted time, the boiler(s) shuts off and the heat of the boiler is purged into the tank. Once the boiler supply temperature is sufficiently reduced, the Relay 9 / contact shuts off. The heating system is turned on for a period of time to prevent the building from cooling off. fter a period of heating, and if the Demand is still present, the control shuts off the heating system and provides heat to the tank once again. For correct operation, close attention must be paid to the mechanical layout of the system. When the control turns off the primary pump (Prim P1), flow to the heating system must stop. If flow is not stopped, the temperature in the heating system can exceed the maximum desired temperature and can result in damage to the heating system. MODE 4 OPERTION In MODE 4, the space heating zones must be prevented from coming on during demands using external wiring. This can be done using an external relay to remove power from zone pumps or zone valves while a Demand is present. During a Demand, the control closes the primary pump (Prim P1) contact and the Relay 9 / contact. Once the Demand is removed, or during a Priority Override, the Relay 9 / contact is opened, and the external wiring should allow the space heating zones to operate. There is no mixing purge available in MODE 4. fter priority, the boiler supply water temperature may exceed the design water temperature of the space heating system and can result in damage to the heating system. Section B: Setpoint Note: This replaces Section E on page 12 of the D 268 brochure dated 11/02. Setpoint operation is only available when MODE is set to OFF. SETPOINT The control can operate to satisfy the requirements of a setpoint load in addition to a space heating load. setpoint load overrides the current outdoor reset temperature and WWSD setting in order to provide heat to the setpoint load. SETPOINT DEMND setpoint demand is required in order for the control to provide heat to the setpoint load. The control registers a setpoint demand when a voltage between 24 and 230 V (ac) is applied across the Setp / and Com Dem terminals (8 and 7). Once voltage is applied, the Setpoint Demand pointer turns on in the LCD. The control operates the boiler(s) to maintain at least the setpoint setting. BOILER TRGET DURING SETPOINT The boiler target temperature during a setpoint demand is increased to at least the Setpoint setting. This temperature is maintained as long as the control has a setpoint demand. 2003 D 268-10/03 4 of 8

SETPOINT MODE SETP MODE 1 - Setpoint in Parallel Whenever a setpoint demand is present, the boiler(s) is operated to maintain the setpoint target. The primary pump does not turn on, but may operate based on a Demand or an External Signal. It is assumed that the Setpoint pump will provide adequate flow through the heat exchanger and the boiler. SETP MODE 2 - Setpoint in Parallel with Priority Whenever a setpoint demand is present, the boiler(s) is operated to maintain the setpoint target and the primary pump (Prim P1) contact is opened. It is assumed that the Setpoint pump will provide adequate flow through the heat exchanger and the boiler. SETP MODE 3 during Setpoint Whenever a setpoint demand is present, the primary pump (Prim P1) is turned on and the boiler(s) is operated to maintain the setpoint target. s SETPOINT PRIORITY OVERRIDE The setpoint has a Priority Override while in SETP MODE 2. In order to prevent the building from cooling off too much or the possibility of a potential freeze up during setpoint priority, the control limits the amount of time for setpoint priority. The length of Setpoint priority is determined by the Priority Override setting. Once the allowed time for priority has elapsed, the control overrides the setpoint priority and operates setpoint and heating simultaneously by turning on the primary pump (Prim P1). CONDITIONL SETPOINT PRIORITY If the boiler(s) supply temperature is maintained at or above the required temperature during setpoint generation, this indicates that the boiler(s) has enough capacity for setpoint and possibly heating as well. s long as the boiler target temperature is maintained and the heating and setpoint targets are similar, setpoint and heating occur at the same time. Section C: Operation Note: This replaces the Operation Section on page 8 and page 9 in the D 268 brochure dated 11/02. PRIMRY PUMP OPERTION The primary pump operates under the following conditions: The control receives a boiler demand and is not in warm weather shut down (WWSD). The control receives a demand when MODE is set to 3 or 4. The control receives a setpoint demand and setpoint MODE is set to 3. The control receives an external input signal. PRIMRY PUMP PURGE fter a demand is removed, the control continues to operate the primary pump for a period of time. The maximum length of time that the primary pump continues to run is adjustable using the Purge setting. The primary pump continues to run until either the purging time has elapsed or the boiler supply temperature drops more than a differential below the boiler minimum setting. Section D: larm Operation LRM When the DIP switch is set to larm, terminals 12 and 13 can be used as a switch to operate an alarm circuit. This contact closes whenever an error message is present on the control. When the alarm contact is activated, refer to the Error Messages section of this brochure to determine the cause of the alarm. Once the fault has been fixed, the alarm can be cleared by pressing either the Menu, Item, or button. larm The control can monitor the boiler supply temperature and provide an alarm if the temperature does not increase within a certain amount of time. The amount of time can be set using the larm setting. This alarm can be used to determine if the boilers have failed to fire. To reset the alarm, press and hold the and buttons for 5 seconds while in the VIEW menu. 5 of 8 2003 D 268-10/03

Installation STEP FOUR ELECTRICL CONNECTIONS TO THE CONTROL Powered Connections Demand To generate a Demand, a voltage between 24 V (ac) and 230 V (ac) must be applied across the Setp / and Com Dem terminals (8 and 7). If using, the last boiler in MODE 1, 4 or 5 must be set to OFF and MODE must also be set to 1 through 4. Setpoint Demand To generate a setpoint demand, a voltage between 24 V (ac) and 230 V (ac) must be applied across the Setp / and Com Dem terminals (8 and 7). The MODE must be set to OFF. Connections Relay 9 / The Relay 9 / terminals (30 and 31) are isolated outputs in the control. There is no power available on these terminals from the control. These terminals are to be used as a switch to either make or break power to a pump or valve. Since this is an isolated contact, it may switch a voltage between 24 V (ac) and 230 V (ac). STEP FIVE TESTING THE WIRING Test the Powered s 24 to 230 V (ac) 24 to 230 V (ac) 7 8 Com Dem Setp/ 30 31 Relay 9/ Demand If a demand is used, measure the voltage between the Setp / and the Com Dem terminals (8 and 7). When the demand device calls for heat, a voltage between 20 and 260 V (ac) should be measured at the terminals. When the demand device is off, less than 5 V (ac) should be measured. V 7 8 Com Dem Setp/ 20 to 260 V (ac) Setpoint Demand If a setpoint demand is used, measure the voltage between the Setp / and the Com Dem terminals (8 and 7). When the setpoint demand device calls for heat, you should measure between 20 and 260 V (ac) at the terminals. When the setpoint demand device is off, you should measure less than 5 V (ac). Test the s 30 31 Relay 9/ Relay 9 / If a pump or valve is connected to the Relay 9 / contact (30 and 31), make sure the power to the pump or valve circuit is off and install a jumper between those terminals. When the circuit is powered up, the pump should turn on or the valve should open completely. If the pump or valve fails to operate, check the wiring between the terminals and the pump or valve and refer to any installation or troubleshooting information supplied with these devices. If the pump or valve operates correctly, disconnect the power and remove the jumper. 24 to 230 V (ac) L N 2003 D 268-10/03 6 of 8

djust Menu (4 of 4) Note: The djust Menu items on page 24 of the D268 dated 11/02 are now replaced by the following items. Display Description Range Section Installer dv Mode Selects the mode of operation. This item is only available when the last boiler in MODES 1, 4 and 5 is set to OFF. Exchange Occupied The minimum boiler supply temperature to the heat exchanger during the Occupied period. (This item is only available when the last boiler in MODES 1, 4, and 5 is set to OFF and MODE is set to 1 through 4.) Exchange Unoccupied The minimum boiler supply temperature to the heat exchanger during the Unoccupied period. (This item is only available when the last boiler in MODES 1, 4, and 5 is set to OFF and MODE is set to 1 through 4.) OFF 1 (parallel, no priority), 2 (parallel, priority), 3 (pri-sec, no priority), 4 (pri-sec, priority) Default = OFF OFF, 100 to 220 F (OFF, 38 to 104 C) Default = 180 F OFF, On Default = OFF ctual Setting B B B B s Selects how many boilers are to be operated during generation. (This item is only available when the last boiler in MODES 1, 4, and 5 is set to OFF and MODE is set to 1 through 4.) Setpoint Mode Selects the Setpoint Mode of operation. (This item is only available when MODE is set to OFF.) Setpoint Occupied The minimum supply temperature when a setpoint demand is present during the Occupied period. (This item is only available when MODE is set to OFF.) Setpoint Unoccupied Selects whether or not a setpoint demand will be responded to during the Unoccupied period. (This item is only available when MODE is set to OFF.) Priority Override Sets the maximum amount of time the control provides or Setpoint priority before resuming space heating. (This item is only available when Setpoint MODE is set to 2, or when MODE is set to 2 or 4 and the last boiler in MODES 1, 4, and 5 are set to OFF.) 1 to Max number of boilers Default = Maximum number of boilers 1 (parallel, no priority), 2 (parallel, priority), 3 (primary pump), Default = 1 OFF, 60 to 220 F (OFF, 16 to 104 C) Default = 180 F OFF, On Default = OFF OFF, 0:20 to 4:00 hr (10 minute increments) Default = OFF WWSD Occupied The system s warm weather shut down temperature during the Occupied period. (This item is only available if the External / Stand lone DIP switch is set to Stand lone.) WWSD UnOccupied The system s warm weather shut down temperature during the UnOccupied period. (This item is only available if the External / Stand lone DIP switch is set to Stand lone.) OFF, 35 to 100 F (OFF, 2 to 38 C) Default = 70 F OFF, 35 to 100 F (OFF, 2 to 38 C) Default = 60 F C Purge The maximum length of time that the primary pump will continue to operate after the boiler demand has been removed. OFF, 0:10 to 19:55 min Default = 0:20 min menu continued on next page 7 of 8 2003 D 268-10/03

Purge The length of time that the boiler pump will continue to run after the last stage in the boiler has turned off. (This item is only available in modes 2, 4, 6 and 8.) OFF, 0:10 to 19:55 min Default = 0:20 min D larm The alarm signal will be activated if the boiler supply temperature does not increase within the selected time. (This item is only available when the larm / C.. DIP switch is set to larm.) OFF, 3 to 40 min (1 minute increments) Default = 20 min Units The units of measure that all of the temperatures are to be displayed in by the control. F, C Default = F Testing the Control The control has a built-in test routine that is used to test the main control functions. The control continually monitors the sensors and displays an error message whenever a fault is found. See the following pages for a list of the control s error messages and possible causes. When the Test button is pressed, the test light is turned on. The individual outputs and relays are tested in the following test sequence. TEST SEQUENCE Each step in the test sequence lasts 10 seconds. During the test routine, if a demand from the system is present, the test sequence may be paused by pressing the Test button. If the Test button is not pressed again for 5 minutes while the test sequence is paused, the control exits the entire test routine. If the test sequence is paused, the Test button can be pressed again to advance to the next step. This can also be used to rapidly advance through the test sequence. To reach the desired step, repeatedly press and release the Test button until the appropriate device and segment in the display turn on. Step 1 The primary pump is turned on and remains on for the entire test routine. Step 2 If the larm / C.. DIP switch is set to larm, the larm contact is turned on for 10 seconds and then shuts off. If the larm / C.. DIP switch is set to C., the Combustion ir Damper contact is turned on and remains on for the entire test routine. Step 3 For each boiler that is set to uto, the following test sequence is used. If the mode indicates that a boiler pump is used, the boiler pump is turned on and remains on. Next, the first stage of the boiler is turned on and remains on. If a second stage is present, the second stage is turned on and remains on. If a third stage is present, the third stage is turned on and remains on. If a fourth stage is present, the fourth stage is turned on. fter ten seconds, all stages and the boiler pump are turned off. This step is repeated for each additional boiler that is set to uto. Step 4 If MODE is set to 1 or 2 and the last boiler in modes 1, 4, and 5 are set to OFF, the primary pump is shut off and the contact is closed. Step 5 If MODE is set to 3 or 4 and the last boiler in modes 1, 4, and 5 are set to OFF, the primary pump stays on and the contact is closed. Step 6 ll contacts are turned off. Error Messages The control has detected no increase in the supply water temperature within the BOIL larm time setting. Check to see if the boilers are operating properly using the Test button. To reset the alarm, press and hold the and buttons for 5 seconds while in the VIEW menu. tekmar Control Systems Ltd., Canada tekmar Control Systems, Inc., U.S.. Head Office: 5100 Silver Star Road Vernon, B.C. Canada V1B 3K4 (250) 545-7749 Fax. (250) 545-0650 Web Site: www.tekmarcontrols.com Product design, software and literature are Copyright 2003 by: tekmar Control Systems Ltd. and tekmar Control Systems, Inc. 8 of 8 ll specifications are subject to change without notice. Printed in Canada. D 268-10/03.