RESEARCH & DESIGN. The fusion of architecture and infrastructure in tomorrow s Megalopolis THE LOBBY OF THE METROPOLE

Similar documents
Context Integrated Infrastructure Planning. Key to attractive and competitive urban regions. POLIS Conference Urban Mobility in Transition

Cities are built for movement

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

City Introduction & Context

Plano Tomorrow Joint Work Session

Manchester. Vision for Manchester

Strategies/Actions Priority List

Victoria Bridge Municipal Class EA Civic Works Committee

milano santa giulia Our Project, Your Retail

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

Key Themes and Responses May 2016

The River Hub: NEW BUILDINGS

Sustainable Mobility as Essential Ingredient for Vibrant Cities: 3 Cases in Point Pierre Laconte

Regional Placemaking: Connecting Towns as Places

400 West Georgia Street Urban Design Panel. Public Realm

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

Important Forces. Distance Range. Design Features. Suspension Bridge. Truss Bridge. Beam Bridge. Bridge Type. Arch Bridge

THE NEIGHBORHOOD TODAY

ENVISIONING TOMORROW S FORT MYERS BEACH

THE 355/270 CORRIDOR:

Aquatics Center- Design and Precedents Essay Carolyn Fearman

PROPOSED DEVELOPMENT CONCEPTS

Sky-Terra - Project Narrative:

October 25 Downtown Partnership and Action Plan Workshop Record of Group Table Results

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

Inspiring Technovation

Design of Movable Bridges - selected examples

DOWNTOWN CHAPEL HILL SMALL AREA PLAN

Shifting Paradigms Urban Planning and Town Center Development in the United States

Design & Practical Application


OPTIONS QUESTIONNAIRE

13. London Bridge London Bridge Area Vision

Sustainable Transport and Mobility in the Metropolitan Area

TOWN COUNCIL / PLANNING COMMISSION

South 200 th Link Extension Open House April 3, 2013

Local Placemaking Opportunities

Activating the Urban Entertainment District: Signage in American Cities. YESTERDAY, TODAY, AND TOMORROW Activating the Urban Entertainment District 1

Online Survey Results 1 Port Street East

Chapter 4. Linking Land Use with Transportation. Chapter 4

Environmental Activity Nodes

Exeriencies from the Livable City and. Integrated Transport and. Carl-Johan Engström, prof KTH. Urban Planning. other projects

APPENDIX K WINDSOR OFFICIAL PLAN

Trafalgar Road Corridor Planning Study Open House

Walnut Creek BART Station

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Pointe-Claire Community Destination

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

The Master Plan Framework

3.1 Existing Land Use

REVIEW AND EVALUATION OF REGIONAL LAND USE

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

KCATA Transit Oriented Development Initiatives

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

Making Transit Oriented Development Work For Boonton, NJ

REPORT BACK BROADSHEET 3 May 2016

The Mitigation of UHI Intensity through an Improved Land-Use Plan in the Urban Central Area: Application to Osaka City, Japan

Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

The Five Components of the McLoughlin Area Plan

Workshop #3 June 13, 2016

G4 / Randstad Prof Greg Clark

Ross Thorne, Architecture; House design; Architectural history.

Niagara GO Hub and Transit Stations Study

BEST PRACTICES IN IMPROVING PORT/CITY RELATIONSHIP

Improving life on Megacities in developing countries through public interconnected spaces. David Fernandes Felício

Project Profile BAR HARBOR

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

Transportation. Strategies for Action

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

Field trip report. Field trip transport planning, , 2 ECTS, 2017S

CIVITAS PORTIS 5 EUROPEAN PORT CITIES. 5 LIVING LABORATORIES. 49 INNOVATIVE SOLUTIONS FOR MORE SUSTAINABLE URBAN MOBILITY.

Creating an integrated waterfront. Recommendations

Waterfront Place Precinct Design Guidelines

Making the case for Sustainable Transport Project Potential

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9

Millbrae TOD #2 Project Analysis

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Comprehensive Plan & Station Area Zoning

PLANNING ADVISORY BOARD AGENDA OCTOBER

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Regional Context Statement

Bus Rapid Transit Backgrounder. December 2016

ESTABLISH AN EFFICIENT TOWN CENTER

East Midtown Greenway

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Parcel 5. Level 1 Application March 12, Design Submittal POST ROAD RESIDENTIAL

This Review Is Divided Into Two Phases:

Port Moody Waterfront Boulevard

Moody Centre Station TOD Area Today

A detailed Access Guide to The Iron Bridge & Tollhouse


3.3. Urban Structure Defining a New Hierarchy of Routes and Spaces >Images

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Introduction. Community Outreach Approach. Sacramento Valley Station Master Plan. Online Questionnaire Summary of Feedback.

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

THE VISION. A refreshed and transformed Rossland Museum that will reinforce its position as the West Kootenay s leading museum and archives.

Transcription:

RESEARCH & DESIGN The fusion of architecture and infrastructure in tomorrow s Megalopolis THE LOBBY OF THE METROPOLE P5 Frank Loer - 5 July 2013

1. RESEARCH SUMMARY 2. DESIGN 3. STATEMENT PAST - PRESENT - FUTURE

1. RESEARCH SUMMARY PAST: METABOLISTS PRESENT: ICON FUTURE: HABITABLE BRIDGE

METABOLISTS / MAKI: Congestion as paradigm itself

RESEARCH QUESTION Is the notion of Collective Form compatible with the future of our cities and the production of its architecture?

LINKAGE MEDIATION DEFINITION REPETITION SEQUENCE

IMAGE FOR THE CITY, FUSING ARCHITECTURE WITH INFRASTRUCTURE The Rialto Bridge Ponte Luis, Porto

HISTORY 1600-1900 - 1930s London Bridge, 16 th century Edgar Chambless, Road town, 1910 Le Corbusier, Plan Obus, 1933 Rotterdam 1665 Rotterdam, Willemsbrug 1878 Rotterdam, Maastunnel 1937

ZENITH: GOLDEN AGE ROTTERDAM, 1960s JAPAN

INFRASTRUCTURAL HISTORY

BOOMPJES WAS A COLLECTIVE FORM

ROTTERDAM S TURNING POINT: DISSATISFACTION, THE CAR & THE WAR

POST-WAR: THE END OF A FUSION BETWEEN ARCHITECTURE AND INFRASTRUCTURE

1995 ERASMUSBRUG

RESEARCH QUESTION How can the interplay between architecture and infrastructure be exploited?

ARCHITECTURE AND INFRASTRUCTURE: EQUAL PLAYERS AS MEDIATORS IN THE CITY + =

URBAN DEVICES FOR THE ORCHESTRATION AND IMAGE OF OUR FUTURE CITIES

NEW HUBS WILL FUSE ARCHITECTURE AND INFRASTRUCTURE

2. DESIGN

REPLACEMENT AND RELOCATION WILLEMSBRUG

WILLEMSBRUG MUST BE INCREASED, NEW TRAM LINE IS INTRODUCED! 12.5 m 12.5 meter clearance River orientation

CITY AT THE RIVER, LIFE-CYCLE COST INFRASTRUCTURE SHOULD BE REDUCED PANTURA NEWSLETTER MARCH 2012 CONTENTS URBAN BRIDGES NEED ATTENTION

STRENGTHEN CONNECTION BETWEEN NORTH SOUTH SOUTH (FEIJENOORD) 330 meter 200 meter NORTH (CENTRE)

FLOWS OF THE CITY Tram GROUND FLOOR Bike Pedestrian Car Bus 1st FLOOR Ship

CORES, ESCALATORS EAST AND WEST WING EAST WEST 4 cores in 2 trunks Lobbies reached through escalators EAST WEST

REVITALIZE THE WATERFRONT

DIGNIFY THE ROAD

RETURN THE JAN ELEVATED PARK TO THE NOORDEREILAND

ACKNOWLEDGE THE IMPORTANCE OF THE HISTORIC LOCATION INDUSTRIAL PORT ROTTERDAM PORT FIRST PORT

CONNECTION TO CITY, METROPOLE, COUNTRY, WORLD AMSTERDAM WORLD RANDSTAD EUROPE NORTH SOUTH ANTWERP

URBAN DEVELOPMENT: SPIN-OFFS FOR NOORDEREILAND AND BOOMPJES NOORDEREILAND BOOMPJES

ALTERNATIVE FOR URBANISM BASED ON CLUSTERS POST-WAR URBANISM MIXED PROGRAM

ALTERNATIVE FOR URBANISM BASED ON CLUSTERS SECTION EAST Residential Village Park Museum cafés Main Lobby Restaurants Museum Station Cars Public transport Shops SECTION WEST Viewing platform data centre Theatre Lobby PLAZA orangerie Congress Galleries Cafés and restaurants EAST EAST WEST WEST

ALTERNATIVE FOR AN URBAN FABRIC DOMINATED BY HEAVY TRAFFIC

ALTERNATIVE FOR HIGH RISE (WITHOUT PLINTH) Shops Cafés and restaurants

ALTERNATIVE FOR URBANISM RELYING ON EVENTS

PUBLIC PROGRAM ON ALL FLOORS GROUND FLOOR Public program: tram, station, cafés, shops 1st FLOOR Public program: car lanes and plazas 2nd FLOOR Public Program: Theatre, Congress, University, Lobbies 5th FLOOR Public Program: Winter garden, Museum

SPANNING THE RIVER, CONSTRUCTING THE BUILDING 1 2 3 1 2 3

3 SEPARATE CONSTRUCTIONS 1 = Cantilever principle 2 = Cantilever principle = Public Building = Public Building 1 2 3 3 = Arch = Infrastructure

CANTILEVER PRINCIPLE (WEST) Tension cables 10 cm Tension cables 10 cm SUSPENDED FLOORS MAIN CONSTRUCTION 2 x 1 meter steel MAIN CONSTRUCTION 2 x 1 meter steel

CANTILEVER + ARCH PRINCIPLE (EAST) CANTILEVER ARCH CANTILEVER ARCH Public suspended from Cantilever CANTILEVER = PUBLIC Infrastructure suspended from Arch ARCH = INFRASTRUCTURE CANTILEVER + ARCH PRINCIPLE : DILATATION (15 cm)

CONSTRUCTION THEME: LEVITATION LEVITATED LOBBY LEVITATED LOBBY LEVITATED CENTRE LEVITATED DECK ELEVATION SECTION

HEAVY VERSUS LIGHT: DAY VERSUS NIGHT DAY: LIGHT STRUCTURE, HEAVY BOXES NIGHT: HEAVY STRUCTURE, LIGHT BOXES

FLEXIBILITY: CHANGE, APPROPRIATION AND TRANSFORMATION OVER TIME 1 2 3 1 2 3 1 2 3

FLEXIBLE ELEMENTS: RAATLIGGER AND STEEL PLATE Multiple Ventilation Systems for future divisions Steel plate ceilings with integrated ventilation and light

INTERPLAY OF HIDING AND REVEALING Inclined parts Construction revealed EXPRESSIVE STRUCTURE Suspended parts Construction covered ABSTRACT BOX

INTERPLAY OF CARRYING (HEAVY) AND HOVERING (LIGHT) 2 REVEAL Structure 1 2 1 HIDE Structure

UNDER AN ANGLE: CLOSED, OPEN IN FRONT SIDE: CLOSE FRONT: OPEN

PANORAMA

DIRECTIONALITY LONGITUDINAL Streams & speed (EXTERIOR) CROSS SECTIONAL Views & peace (INTERIOR)

SPECIFICITY PEAT / CLAY SWEET/SOLD HISTORICAL LOCATION

FROM CENTRE, TO RIVER (PAST), ONCE AGAIN FROM CENTRE TO RIVER PAST PAST 1300 1900 PRESENT FUTURE 2013 2030

FROM DETOUR TO STRAIGHT FORWARD

GENIUS LOCI - GENIUS LOGO - GENIUS LOCI GENIUS LOCI PAST GENIUS LOGO PRESENT GENIUS LOCI FUTURE

3. STATEMENT: WHY THE HUB? PAST: THE HARBOUR PRESENT: THE NETWORK ERA FUTURE: THE HUB

PAST: THE HARBOUR

ROTTERDAM: INCESSANT GROWTH: EMBODIMENT OF A TRANSITORY WORLD 1300 1900 2013

ACTIVITIES TRANSCEND BEYOND THE SCALE OF THE CITY

ROTTERDAM CHARACTERISTIC: METROPOLIS IN TRANSIT

HISTORY OF PUBLIC PRIVATE PARTNERSHIPS

ONGOING NEED FOR PUBLIC PRIVATE PARTNERSHIPS April 2013

DESTRUCTIVE ROLE OF PRAGMATIC INFRASTRUCTURE

PRESENT: THE NETWORK ERA

FUNDAMENTAL NATURE OF OUR WORK

THE WILL OF AN EPOCH

VILLAGER AND CITIZEN EQUALLY COSMOPOLITAN, THE WORLD OF THE COMMUTER

HOUSE STUDIED FOR CENTURIES, ARCHITECTURAL NODES UNTESTED

THE DOMESTICATION OF INFRASTRUCTURE

OPEN UP THE PUBLIC BUILDING, DIGNIFY THE ROAD

ROTTERDAM: TEST GROUND FOR THE HUMANIZATION OF INFRASTRUCTURE

FUTURE: THE HUB

MEGASTRUCTURE AFTER MIES

WHAT WILL RESTORE THE ICON?

SUPER CYCLES IN ECONOMY (AND ARCHITECTURE) MIES MEGASTRUCTURE ICON HUB?

THE HUB, THE MULTIFUNCTIONAL PARKING GARAGE

TECHNOLOGY, MOBILITY, ARCHITECTURE; INFRASTRUCTURE; GLOBALIZATION

WHAT S FLEXIBILITY BEYOND THE PLAN LIBRE

UTOPIAN, LIGHT, DELIRIOUS, PROFOUND

THE FUSION OF ARCHITECTURE AND INFRASTRUCTURE

PLANNING 1:500 May 15 - June 21 - MODEL 1:200 (Last technical and design consults parallel) 22-29 June - Final Drawings & Images 30 June - 4 July Booklet binding & presentation rehearsals P5 Final Presentation : Friday 5 July 2013

FIN