CHAPTER 2 SUMMARY 1. PROJECT SUMMARY DATA

Similar documents
CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.1 STAFF REPORT February 21, 2012 BRIGHTON LANDING SPECIFIC PLAN & DEVELOPMENT PROJECT

Notice of Preparation and Notice of Public Scoping Meeting. At Dublin Project

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

Glenborough at Easton Land Use Master Plan

NOTICE OF PREPARATION

SECTION 2.0 INTRODUCTION

Planning Commission Staff Report March 15, 2007

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

Staff Report and Recommendation

SPECIFIC PLAN Requirements

Planning Commission Staff Report June 5, 2008

CHAPTER 3 PROJECT DESCRIPTION

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

DISCUSSION ON VACAVILLE S2 INVESTORS PROPERTY IN URBAN RESERVE

5.13 RECREATION / OPEN SPACE

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

3.10 LAND USE SETTING PROJECT SITE EXISTING LAND USE DESIGNATIONS AND ZONING. General Plan Land Use Designations.

COLVER ROAD INDUSTRIAL CONCEPT PLAN

3.0 PROJECT DESCRIPTION

TABLE OF CONTENTS. Tables Table UC Davis Park and Open Space Resources

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project

Planning Commission Staff Report Project Plan Approval Hearing Date: June 14, 2017

2 Project Description

PLANNING COMMISSION. Submitted

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

OP Council Resolution June 16, Planning and Development Services

3.0 Cumulative Scenario and Methodology. 3.0 Cumulative Scenario and Methodology

Report to City Council

NOTICE OF PREPARATION

Prepared by: Casey Kempenaar, Senior Planner

ENVIRONMENTAL INITIAL STUDY BERKELEY CITYWIDE POOLS MASTER PLAN

TO: CITY COUNCIL DATE: MARCH 23,2009

ADMINISTRATION RECOMMENDATION(S) 2017 February 09. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued.

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No 7.A STAFF REPORT October 17, 2017 Staff Contact: Barton Brierley

NOTICE OF PREPARATION

ENVIRONMENTAL SETTING

City of Grande Prairie Development Services Department

CITY OF VACAVILLE PLANNING COMMISSION Item No. 8.A STAFF REPORT July 18, 2016 STAFF CONTACT: Amy Feagans, Contract Planner (707)

III. PROJECT DESCRIPTION

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

PG&E WINTERS GAS OPERATIONS AND TECHNICAL TRAINING CENTER

2. INTRODUCTION 2.1 AUTHORITY 2.2 PURPOSE AND INTENT 2.3 SITE LOCATION

12.0 LAND USE AND PLANNING

City Of Sparks Planning Commission Item

AVANTI SOUTH. SPECIFIC PLAN June Prepared for: Applicant: Royal Investors Group, LLC

SAN FRANCISCO PLANNING DEPARTMENT

CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE LAND PARK COMMERCIAL CENTER PROJECT

COUNTY OF SACRAMENTO Inter-Departmental Correspondence

STAFF REPORT TO THE CITY COUNCIL. Conduct Public Hearing to vacate certain public right of way adjacent to Sycamore Avenue and San Pablo Avenue

Appendix E Preliminary Location Hydraulic Study

Bylaw C-1262 Adopted February 6, Planning and Development Department

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Planning Districts INTRODUCTION

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

NOTICE OF PREPARATION

WASHINGTON COUNTY OREGON

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Appendix I-A8 SALIDA COMMUNITY PLAN

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

3. Project Description

VANDEN MEADOWS SPECIFIC PLAN TABLE OF CONTENTS Page 1.0 INTRODUCTION SUMMARY Schools Foxboro Parkway

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA (707)

Notice of Completion Form A See NOTE BELOW Mail to: State Clearinghouse, 1400 Tenth Street, Sac., CA / SCH #

Right-of-Way Acquisitions and Relocations Technical Memorandum

LOS ANGELES CITY PLANNING DEPARTMENT STAFF REPORT

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

DRAFT MAP AMENDMENT FLU 04-4

Watertown City Council

PLANNING & DEVELOPMENT DEPARTMENT OFFICE OF LONG RANGE PLANNING

Subject: 30 Otis Street, Evaluation of Shadow on Proposed 11th and Natoma Park

CITY OF ALAMEDA PLANNING BOARD Draft RESOLUTION

Chesapeake Bay Critical Area Conservation Plan

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

Major Subdivision Sketch Plan Checklist

ADMINISTRATION RECOMMENDATION(S) 2017 June 15. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

01 PROJECT DESCRIPTION

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

NOTICE OF PREPARATION

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT. Single Family Residential, Townhomes

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

Washtenaw County Department of Planning & Environment

1.1 EXECUTIVE SUMMARY

CITY OF SIMI VALLEY MEMORANDUM

Bylaw C-1186 Adopted November 5, Planning and Development Services

DATE: PLANNING COMMISSION MEETING OF FEBRUARY 24, 2016

Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Appendix A: Notice of Preparation and Responses

Transcription:

CHAPTER 2 SUMMARY This is an Initial Study format used to determine, pursuant to CEQA Guidelines Section 15177, whether a project 1) is within the scope of a Master EIR (MEIR), 2) may result in additional significant environmental effects not previously examined in the MEIR, or 3) requires new, additional mitigation measures or alternatives. 1. PROJECT SUMMARY DATA Project Title: Mountain House Neighborhoods I and J Project Lead Agency Name and Address: San Joaquin County Community Development Department 1810 East Hazelton Ave. Stockton, CA 95205 Contact Person and Phone Number: Mr. Chandler Martin, Deputy Director of Planning (209) 468-3144. Project Location: Neighborhoods I and J are two (of 12 total) neighborhoods within the Mountain House community located in the southwestern portion of San Joaquin County (see Figures 2-1 and 2-2). Mountain House is located north of the City of Tracy. General boundaries of the project site include the Alameda County/San Joaquin County line to the west, Old River to the north, and other neighborhoods of the Mountain House community to the south and west. The only neighborhoods currently developed or under construction are Neighborhoods E, F and G, which are south of the project site. Project Sponsor's Name and Address: Shea Mountain House, LLC 2580 Shea Center Drive Livermore, CA 94551 Contact Person: Mr. Kevin Peters, Senior Vice President General Plan and Master Plan Designations: Very Low Density Residential (R/VL); Low and Medium Density Residential (R/L, R/M); Medium-High Density Residential (R/MH); Neighborhood Park; Community Park; Regional Park; Other Open Space (OS/O); Resource Conservation (OS/RC); Public; Recreation Commercial (R/C). (3/27/07) 2-1

N Not to Scale Neighborhood I Neighborhood GE Neighborhood J Neighborhood EG Neighborhood F LEGEND Mountain House New Community Specific Plan II Area (approximate) SOURCE: Carlson, Barbee & Gibson, Inc. Figure 2-1 REGIONAL AND PROJECT LOCATION

N Not to Scale GREAT VALLEY PARKWAY SOURCE: SWA Figure 2-2 NEIGHBORHOOD BOUNDARIES

Zoning: Very Low Density Residential (R-VL); Low Density Residential (R-L); Medium Density Residential (R-M); Medium-High Density Residential (R-MH); Recreation Commercial (C-R); Public Facilities (P-F). 2. OVERVIEW OF PROJECT DESCRIPTION Tentative Subdivision Maps for Neighborhoods I and J were approved in July 2005 by the San Joaquin County Planning Commission after the February 2005 approval of Specific Plan II (SP II) (see Figure 2-3) for the Mountain House community by the County Board of Supervisors. However, some changes have been proposed to the overall plan to improve circulation and access, to provide recreational and visual amenities, and to alter storm water drainage. The Revised I and J Map project includes the following components: San Joaquin County Community Development Department (SJCCDD) planning applications; Tentative Subdivision Maps for Neighborhoods I and J within the Specific Plan II area (Application No. PA-0600327); Amendments to Specific Plan II (text and land use maps that can be viewed at the County Community Development Department, 1810 E. Hazelton Avenue, Stockton) which would include: 1) rezoning of some parcels (2) the removal of the age restriction for Medium-High Density housing in Neighborhood H; and 3) changes to Neighborhood K that include a minor relocation of land uses to accommodate a road alignment to serve the existing home sites on Old River (Application No. PA-0600337); Amendments to the Mountain House Master Plan (Application No. PA- 0600335); Section 1602 agreements with the California Department of Fish and Game for road crossings of Dry Creek; and An Addendum to the Mountain House Storm Water Master Plan Update. The proposed project would allow development of 797 acres (17 percent) of the approximately 4,780 acres of Mountain House. A summary of the proposed uses and acreages for Neighborhoods I and J is provided in Table 2-1. A comparison with what was already approved for Neighborhoods I and J as part of the SP II and Tentative Map approvals is provided in Table 2-2. Infrastructure associated with Neighborhoods I and J would include water distribution lines, wastewater distribution lines, electrical and gas lines, roads, telephone lines, and drainage improvements. The water and wastewater facilities to serve this development would be located within Mountain House and would be maintained and operated by the Mountain House Community Services District (MHCSD). A more detailed description of the project can be found in Chapter 3 of this Initial Study. (3/27/07) 2-4

N Not to Scale NEIGHBORHOOD I NEIGHBORHOOD J SOURCE: SWA Figure 2-3 SPECIFIC PLAN BOUNDARIES

Table 2-1 PROPOSED ACREAGES BY LAND USE FOR NEIGHBORHOODS I AND J Land Use General Land Use Specific (Dwelling Units/Acre) Acres Residential Residential High Density (18-20) 0 Residential Medium-High Density (12-14) 28.0 Residential Medium Density (5.7-7.0) 177.7 Residential - Low Density (3.75-4.5) 257.4 Residential - Very Low Density (1-2) 5.0 Residential - Senior Housing High Density (18-20) 0 Residential - Senior Housing Medium High Density (12-14) 0 Commercial Subtotal 468.1 Neighborhood Commercial 0 Community Commercial 0 General Commercial 0 Office Commercial 0 Subtotal 0 Recreation Recreation (Golf, Club, Rec. Ctr.) 222.2 Subtotal 222.2 Industrial Limited Industrial 0 Open Space Neighborhood Park 12.8 Community Park 0 Creek Community Park 0 Regional Park 5.2 Dry Creek/Detention Basins 25.7 Wetland/Resource Conservation 15.4 Subtotal 59.1 Schools K-8 Schools 0 Public Public Facilities Public Lands Equity Program Streets 36.4 Public Facilities -Water Treatment Plant 11.1 Public Facilities Institutional 0 Subtotal 47.5 TOTAL 796.9 Source: Shea Mountain House, 2006. The following is a summary of the proposed land uses: Housing Two age-restricted, active adult neighborhoods; 2,070 detached homes and 336 attached homes (total of 2,406 dwelling units); 1 and 1 This does not include a potential second unit for Neighborhoods I and J. Assumes 28 acres of Residential Medium High Density is developed with 336 dwelling units, or an average density of 12.0 dwelling units per acre. (3/27/07) 2-6

Table 2-2 PROPOSED VS. APPROVED RESIDENTIAL USES FOR NEIGHBORHOODS I AND J Existing TM SP II (Approved 7/05) Proposed AC DU DU/AC AC DU DU/AC AC DU DU/AC Neighborhood I R-VLO 5.2 10 1.9 2.80 6 2.1 5.10 5 1.0 R-L 164 738 4.5 154.86 665 4.3 141.3 551 3.9 R-M 125 750 6.0 123.38 706 5.7 95.9 566 5.9 R-MH 15.5 186 12.0 Subtotal 294.2 1,494 281.04 1,377 257.71 1,308 Neighborhood J R-L 117 527 4.5 122.18 469 3.8 116,1 453 3.9 R-M 98.3 590 6.0 97.00 560 5.8 81.8 491 6.0 R-MH 12.5 150 12.0 Subtotal 215.3 1,117 219.18 1,029 210.4 1,094 Total 507.1 2,615 NA 500.22 2,406 NA 468.1 2,402 NA Notes: NA = Not applicable. Total units vary slightly from 2,406 due to rounding. SP II: Specific Plan II R-VL: Very Low Density Residential TM: Tentative Map R-L: Low Density Residential AC: Acres R-M: Medium Density Residential DU: Dwelling Units R-MH: Medium-High Density Residential Source: Shea Mountain House, 2006. Projected population of 4,338 persons. Jobs Estimated 168 jobs associated with recreational and other uses. Parks, Recreation, and Community Facilities 18 acres of regional and neighborhood parks, including a linear park/trail system through Neighborhoods I and J connecting the North Community Park located southeast of Neighborhood J to Old River Regional Park located east of Neighborhood I; 41.1 acres of preserved wetlands, jurisdictional waterways and storm water detention/open space; and One 18-hole golf course and clubhouse/recreation center totaling 222 acres, including storm water quality features. Transportation and Infrastructure Landscaped roadways to interconnect community; Extensions of bicycle/pedestrian trails; and (3/27/07) 2-7

Expansions of all required infrastructure and utilities (e.g., water and wastewater lines, etc.). Description of Project Changes as Compared to Approved Tentative Maps Shea Mountain House, LLC is proposing a new land plan for Neighborhoods I and J that maintains the types of land uses approved with the Tentative Maps for Neighborhoods I and J on July 7, 2005, but rearranges them in a manner intended to enhance the living experience, both within the neighborhoods and as viewed from the overall Mountain House community. The new land plan includes the same number of dwelling units as the existing Tentative Map while shifting some density from Residential Low and Residential Medium to the Residential Medium High zoning designation in order to increase product diversity and provide the land necessary to accommodate the neighborhood enhancements. The primary changes from the existing approved Tentative Map are: Creation of a new unloaded collector street (i.e., no driveway access onto the collector) linking the I and J neighborhoods that are bifurcated by the Great Valley arterial road. This new collector road would bridge Great Valley Parkway. Incorporation of resource agency preferences for total avoidance of discharges and fills within the jurisdictional waters of the U.S. and the associated separation and treatment of urbanized storm water flows within the golf course area (versus the previous plan to restore Dry Creek and use it as a storm water treatment and conveyance facility). Re-arrangement of the golf course so that more holes front the exterior boundary of the neighborhoods, creating a visual amenity for the public. Enlargement of the recreation amenity area, which is operated by the homeowners association serving Neighborhoods I and J, to accommodate a broad range of amenities and activities. Development of a linear narrow park system through Neighborhoods I and J through Neighborhoods I and J that creates a single continuous public connection between the North Community Park (on the east side of Central Parkway) and Old River Regional Park. This park/trail system abuts the unloaded collector road right-of-way, minimizing street crossings. This predominantly linear feature also provides access to small parks and focal points along its alignment. The park system though the I and J neighborhoods would be maintained by the homeowners association (or a financing/maintenance entity acceptable to the Mountain House Community Services District), but would be accessible to the public via a dedicated easement, and would be owned by the Mountain House Community Services District. (3/27/07) 2-8

3. SURROUNDING LAND USES AND SETTING Currently, land uses surrounding the boundaries of Neighborhoods I and J include vacant lands under agricultural production for alfalfa, corn, and irrigated farmland to the east and west. Lands to the west are within Alameda County. Old River forms the northern boundary of Neighborhood I. Neighborhoods E, F and G (currently under construction and portions recently completed in the last five years) are located to the south of Byron Road, which forms the southern boundary of Neighborhoods I and J. The Mountain House Community Services District water treatment plant, located at the south end of Neighborhood I, has been completed and is currently operating to serve existing neighborhoods within Mountain House. 4. OTHER AGENCIES WHOSE APPROVAL MAY BE REQUIRED The following is a list of federal, state, regional, and local agencies from whom permits may be required prior to construction and/or operation of the proposed project: Regional Water Quality Control Board: National Pollutant Discharge Elimination System (NPDES) permit. San Joaquin Valley Air Pollution Control District: applicable constructionrelated permits. California Department of Fish and Game: Section 1602 agreements for road crossings of Dry Creek. 5. INFORMATION SOURCES The following are some of the information sources used to complete this Initial Study: Final EIR (SCH# 90020776) Mountain House Master Plan and Specific Plan I, Vols. I and II (1994). San Joaquin County General Plan (Volumes I III) (1992). San Joaquin County Development Title (1992). Mountain House Master Plan (1994, amended 2000). Mountain House Specific Plan I (1994). Mountain House Specific Plan II, (February 2005). Mountain House Specific Plan II Initial Study (Draft), December 2004, approved February 2005. Natural Diversity Data Base (California Department of Fish and Game). On-site visits by staff and consultants. (3/27/07) 2-9

Application submittal material provided with Tentative Map applications. Mountain House Neighborhood F Project Initial Study and Mitigated Negative Declaration (SCH No. 900020776) (2000). Mountain House Villages E and G Expanded Initial Study (2003). California Energy Commission, East Altamont Energy Center Application for Certification (2003). A more detailed list of references can be found in Chapters 5 and 8. 6. PURPOSE OF INITIAL STUDY This Initial Study is intended to determine whether the proposed project 1) is within the scope of the Master EIR (MEIR) completed for the Mountain House New Community Master Plan and Specific Plan I in 1994, 2) may result in additional significant environmental effects not previously examined in the MEIR, or 3) requires new, additional mitigation measures or alternatives. The set of Environmental Checklist questions in Chapter 5 is intended to answer these questions. If the answer is yes to the first condition above, no Environmental Impact Report (EIR) is required for the project. If the answer is yes to the second or third condition, the County would determine that an EIR should be prepared for the project. The conclusions are addressed below and findings can be found in Appendix C. 7. SCOPE AND CONTENT OF THE INITIAL STUDY This Initial Study is divided into the following chapters: Chapter 1. Introduction: This chapter provides an overview of the project and previous environmental documents completed for the Mountain House community. Chapter 2. Summary: A summary of the project contacts, lead agency, and project characteristics is provided. Background information on this Master EIR Initial Study is provided to clarify the type of findings that must be made in determining whether or not an Environmental Impact Report is necessary. A summary of the project description is provided. In addition, the discretionary actions and permits associated with the project are described. Chapter 3. Project Description: This chapter identifies all the land uses, acreages, and infrastructure associated with proposed plans for Neighborhoods I and J. Relevant graphics are included to identify proposed future development within the project area. Chapter 4. Environmental Determination: This chapter identifies all the environmental topics for which there would be a potentially significant impact. Also, a determination regarding the required documentation in (3/27/07) 2-10

compliance with the California Environmental Quality Act is made at the conclusion of this chapter. Chapter 5. Environmental Checklist: This chapter includes all the topics required to be evaluated as per Section 15063 of the California Environmental Quality Act (CEQA) Guidelines. Each topic (i.e., Air Quality, Hydrology, etc.) includes a specific set of questions relevant to evaluating a project for which a Master EIR has been prepared. The significant impacts identified in the 1994 MEIR and a summary of findings are provided for each topic. Chapter 6. Mandatory Findings of Significance: This chapter addresses the three mandatory findings of significance, which deal with 1) potential degradation of the environment as related to plants, animals, and historical resources; 2) cumulatively considerable impacts; and 3) substantial adverse effects on human beings. Chapter 7. Bibliography: This chapter identifies all references used in the Checklist analysis. Chapter 8. Preparers of the Initial Study: This chapter identifies the team of scientists and planners who completed the Initial Study. Chapter 9. Glossary: This chapter defines specific terms used in the Initial Study. Chapter 10. List of Acronyms: This chapter identifies acronyms used in the Initial Study and the full name for each acronym. 8. USE OF THE MEIR AND AUTHORITY FOR INITIAL STUDY A Master EIR (San Joaquin County, 1994) was adopted in 1994 for the Mountain House New Community Master Plan and Specific Plan I. The area within Specific Plan II, which includes Neighborhoods I and J, is included within the Master Plan area, and thus many of the topics relevant to this Initial Study were evaluated in the Master EIR in 1994. The Master EIR (hereinafter referred to as the 1994 MEIR ) included a number of mitigation measures that were applicable to the Master Plan and thus would apply to Neighborhoods I and J. Some mitigation measures were incorporated into the adopted Master Plan and others applied to future stages of permitting and development. A copy of the 1994 MEIR Mitigation Monitoring Program is included in Appendix A. The 1994 MEIR is incorporated herein by reference. A full copy of the 1994 MEIR can be viewed at the San Joaquin County Community Development Department offices, 1810 East Hazelton Avenue, Stockton, California. (3/27/07) 2-11

9. DETERMINATION OF CONTINUED APPLICABILITY OF THE MEIR AFTER THE FIVE-YEAR TIME PERIOD The 1994 MEIR was certified in 1994, or about 12 years ago. Section 15177 of the CEQA Guidelines addresses subsequent projects within the scope of the MEIR and states that new environmental documentation (except as stated in b below) or findings are not required when specific requirements are met. These requirements include the following: a. The lead agency for the MEIR is the same as for the subsequent project; b. The lead agency prepares an Initial Study on the subsequent project to determine if any additional significant effect on the environment could occur that was not addressed in MEIR; and c. The lead agency determines, on basis of written findings, that no additional significant environmental effect would result, that no new mitigation measures are needed, and that the project is within the scope of the MEIR. CEQA Guidelines Section 15179 states that the Initial Study done for a project that was the subject of a MEIR must make the following findings if more than five years have elapsed since certification of the MEIR: 1. There have been no substantial changes with respect to the circumstances under which the MEIR was certified; or 2. There is no new available information which was not known and could not have been known at the time the MEIR was certified. If this determination cannot be made, the standard initial study process will be used to determine the scope of an EIR for the project. The conclusion of this Initial Study is that all required findings can be made to determine that the MEIR adequately addresses all potentially significant impacts of the proposed project. No mitigation measures were found to be necessary because of measures incorporated into the text of Specific Plan II (of which Neighborhoods I and J are a part), or the fact that potential impacts were adequately addressed in the 1994 MEIR. (3/27/07) 2-12