APPLICATION SUBMITTAL CHECKLIST LAND USE PERMITS

Similar documents
SUBMITTAL REQUIREMENTS

Site Plan Review Residential Accessory Building

CIVIL ENGINEERING PERMIT APPLICATION

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

City of Fort Lupton Administrative Site Plan Process

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements.

City of Fort Lupton Site Plan Process

DECISION CRITICAL AREAS ALTERATION AND DETERMINATION OF NONSIGNIFICANCE (DNS)

Appendix I. Checklists

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

SEPA Modification Application

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Kitsap County Department of Community Development. Administrative Staff Report

Site Development Plan (SDP) Checklist

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS.

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Development Reviews. An overview of the Commission s review process, primarily in Klickitat County. March 13, 2018

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

Manchester. Vision for Manchester

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

SUBMITTAL REQUIREMENTS: PROJECT DEVELOPMENT PLAN (PDP)

NAPA COUNTY PUBLIC WORKS Standards & Specifications

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Essential Skills: Reading and Interpreting Maps and Plans

4. Contractor (and subcontractors if applicable) certification statement(s)

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Huntington Stormwater Utility

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) Fax: (651)

Erosion & Sediment Control Plan Application Form & Checklist

Application for a Site Plan Review

ZONING COMPLIANCE PERMIT APPLICATION

ENVIRONMENTAL ADVISORY COMMITTEE WEDNESDAY, JANUARY 11, 2017 AT 7:00 P.M. CITY HALL MEETING ROOM C MINUTES

Draft Rhode Island Stormwater Design and Installation Standards Manual

Chapter 4 - Preparation of Stormwater Site Plans

Drexel, Barrell & Co.

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

Skamania County Community Development Department

Major Subdivision Sketch Plan Checklist

Master Land Use Plan Application

STATUS OF REVIEW: ENGINEER WILL COMPLY

SPECIFIC PLAN Requirements

CRESCENT RESOURCES INC.

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

HOWELL TOWNSHIP PLANNING BOARD

Gloucester County PLAN SUBMITTER'S CHECKLIST

TO BE FILLED OUT BY APPLICANT

TREE REMOVAL PERMIT PACKET

Kitsap County Department of Community Development. Hearing Examiner Staff Report and Recommendation

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

DEPARTMENT OF PUBLIC WORKS & UTILITIES

Drexel, Barrell & Co.

Highway Oriented Commercial Development Criteria

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

310 East Main Street, Suite 4 Bartow, FL Phone:

Town of West Point Plan of Development

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

Note: Staff reports can be accessed at Zone: I-3. Tier:

Rural Land Use Designations Kittitas County December 6, 2007 Draft

2016 Comprehensive Plan Amendments C OMPREHENSIVE P LAN T EXT AND M AP A MENDMENT

Gadsden County Planning Commission Agenda Request

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Preliminary Subdivision Plan/ Site Development Order/Final Engineering Application

SEMSWA s Role in the Land Development Process

PLANNED UNIT DEVELOPMENT APPLICATION

Washington County, Maryland Division of Public Works Policy Manual

Gwinnett County Land Disturbing Permits. Presented by the Departments of Planning & Development Public Utilities October 2001

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

DP-2 Development Permit Application

STREAM BUFFERS

A/E REVIEW CHECKLIST SITE & LANDSCAPE

5. Would the proposed project require modifications to the existing regulations?

To: Planning Commission D.. June 3, 2009

LEGAL NOTICE. City of Tacoma Determination of Environmental Nonsignificance. Fred Wagner, Wagner Development. Demolition of Manitou school buildings

Colerain Township report to. Hamilton County Regional Planning Commission. December 2, 2010, 1:00PM. t a f f r e p o r t

CITY OF MOAB RESOLUTION #

Urban Planning and Land Use

The Development Review Process. Presentation to the GSSC IAC

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

Level 1 Downstream Analysis

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

WASHINGTON COUNTY OREGON

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

CITY OF MARIANNA. MUNCIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) Major Development Order Approval Process

Municipal Plan*Assessment

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

When planning stormwater management facilities, the following principles shall be applied where possible.

Major Development Order Approval Process. Introduction. In This Handout. Pre-Application Meeting. Meetings

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

STAFF REPORT and INFORMATION FOR THE HEARING EXAMINER. Project: Hogan Heights Preliminary Subdivision

Transcription:

730 33rd Avenue NE Woodinville, WA 98072 SEPA/Project Approval Critical Area Determination Critical Area Alteration/ Exception/ Reasonable Use Design Review Application Form Owner Authorization Form Project Narrative Statement on Decision Criteria Submittal Fees Water Availability Certificate Sewer Availability Certificate/ Septic Approval 4 4 Site and Parking Plans (max. 24 x 36) 3 4 Reduced Site and Parking Plans (max. x 7) Survey 3 4 Landscaping and Irrigation Plans 4 Reduced Landscaping Plan (max. x 7) Grading Calculations Geotechnical Report 4 3 4 SEPA Checklist 4 Critical Area Study (Wetland and Stream) 4 3 4 Wildlife Habitat Report 4 3 4 Traffic Study Noise Study 4 Title Report (less than 30 days old) 4 Electronic Set of All Plans and Reports Revised December 7, 205 Page of 5

730 33rd Avenue NE Woodinville, WA 98072 Conditional Use Permit Temporary Use Permit Shoreline Permits Shoreline Exemption Application Form Owner Authorization Form Project Narrative Statement on Decision Criteria Submittal Fees Water Availability Certificate Sewer Availability Certificate/ Septic Approval Site and Parking Plans (max. 24 x 36) Reduced Site and Parking Plans (max. x 7) Survey 4 Landscaping and Irrigation Plans Reduced Landscaping Plan (max. x 7) Grading Calculations Geotechnical Report SEPA Checklist Critical Area Study (Wetland and Stream) Wildlife Habitat Report Traffic Study Title Report (less than 30 days old) 4 Electronic Set of All Plans and Reports Page 2 of 5

730 33rd Avenue NE Woodinville, WA 98072 Boundary Line Adjustment Binding Site Plan Preliminary Plat Final Plat/ Short Plat Short Plat Application Form Owner Authorization Form Project Narrative Statement on Decision Criteria Submittal Fees Water Availability Certificate Sewer Availability Certificate/ Septic Approval Site and Parking Plans (max. 24 x 36) 3 4 Reduced Site and Parking Plans (max. x 7) Survey 3 4 Landscaping and Irrigation Plans 4 Reduced Landscaping Plan (max. x 7) 4 4 Grading Calculations Geotechnical Report SEPA Checklist 4 Critical Area Study (Wetland and Stream) 4 Wildlife Habitat Report Traffic Study 4 Noise Study Title Report (less than 30 days old) 3 Electronic Set of All Plans and Reports Page 3 of 5

730 33rd Avenue NE Woodinville, WA 98072 Special Use Permit Comprehensive Plan Zoning Code Zoning Map Variance Application Form Owner Authorization Form Project Narrative Statement on Decision Criteria Submittal Fees Water Availability Certificate Sewer Availability Certificate/ Septic Approval Site and Parking Plans (max. 24 x 36) Reduced Site and Parking Plans (max. x 7) Survey Landscaping and Irrigation Plans Reduced Landscaping Plan (max. x 7) Grading Calculations Geotechnical Report 4 SEPA Checklist Critical Area Study (Wetland and Stream) Wildlife Habitat Report Traffic Study Title Report (less than 30 days old) Electronic Set of All Plans and Reports Page 4 of 5

730 33rd Avenue NE Woodinville, WA 98072 Master Signage Plan Wireless Service Facility Permit - New Wireless Service Facility Permit - Existing Application Form Owner Authorization Form Project Narrative Statement on Decision Criteria Submittal Fees Water Availability Certificate Sewer Availability Certificate/ Septic Approval 4 3 4 3 3 3 Site and Parking Plans (max. 24 x 36) 3 4 3 Reduced Site and Parking Plans (max. x 7) Survey Landscaping and Irrigation Plans 3 4 3 Reduced Landscaping Plan (max. x 7) Clearing and Grading Plans 4 Road Plans 4 Drainage Plans Erosion Control Plans 4 3 4 Water/Sewer/Utility Plans Grading Calculations Drainage Study (TIR)/Calculations 4 Geotechnical Report 4 SEPA Checklist 4 Critical Area Study (Wetland and Stream) Mitigation Plans Wildlife Habitat Report Tree Plan Traffic Study 4 3 Title Report (less than 30 days old) Electronic Set of All Plans and Reports Page 5 of 5