Municipality of Anchorage, Alaska Parks & Recreation Department

Similar documents
Municipality of Anchorage, Alaska Parks & Recreation Department

Municipality of Anchorage, Alaska Parks & Recreation Department

REPORT TO COUNCIL City of Sacramento

McConnell Park Renovation

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project

City Commission Agenda Cover Memorandum

ADA Descriptions Website Posting 12/12/17

MUNICIPALITY OF ANCHORAGE

PLAYGROUND STANDARDS POLICY

Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services

City of Yorba Linda Memorandum

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

MINUTES OF THE SPECIAL PARKS, RECREATION AND TREE BOARD ADVISORY COMMITTEE LADY LAKE, FLORIDA. March 15, :30 p.m.

REPORT TO COUNCIL City of Sacramento

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

BUSINESS OF THE PLANNING COMMISSION OF THE CITY OF HALF MOON BAY AGENDA REPORT

As a public park, it is important to plan your community garden to ensure everyone can gain

FY Capital Improvement Program Parks and Landscaping. 8 - Summary

MUNICIPALITY OF ANCHORAGE

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

REPORT TO COUNCIL City of Sacramento

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

Village of Glenview Appearance Commission

100 Dix Drive Conceptual Master Plan. Wyatt Thompson, PLA, ASLA, Assistant Director Lindsay Stucki, Intern Park Planner

Proposed Park Master Plan: The Master Plan has been revised to incorporate suggestions received in response to the Park Survey:

Village of Glenview Appearance Commission

Monte Cecilia Park DRAFT CONCEPT PLAN FEBRUARY 2015 AUCKLAND COUNCIL

STAFF REPORT TO THE PLANNING COMMISSION April 30, Copper Creek of Nottingham 13 th Addition PUD Development Stage Plan and Final Plat

CITY OF ST. PAUL PARK ST. PAUL PARK, MINNESOTA

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

Design Alternatives Workshop. Hilfiker Park Master Plan Workshop #2

SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department

INTEGRATED PEST MANAGEMENT


Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Capital & Planning Division

Xeriscape Rebate Program Manual

The Corporation of Delta COMMISSION REPORT. Regular Meeting' To: Parks, Recreation & Culture Commission IFile No.

WILMETTE PARK DISTRICT Financial Planning & Policy Committee Meeting Monday, April 30, :30 p.m. Village Hall Committee Meeting Room AGENDA

PLAN: Special Exception Use Permit #

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

Montana Rail Link Park

BIRMINGHAM HISTORIC DISTRICT COMMISSION MINUTES OF SEPTEMBER 13, 2017 Municipal Building Commission Room 151 Martin, Birmingham, Michigan

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Table of Contents. To learn more about the Schools In Motion program, visit

#A -ille= O. Ciry Council Report. %-s. Item: Gategory: Meeting Date: New Business September 7,2010. err TITLE:

PLANNING FOR COMMUNITY GARDENS IN ANCHORAGE

Charles P. Johnson and Associates. Annapolis Landscape Architects

Maximo Park Master Plan. Public Forum 2 October 30, 2012

Tel: (705) Fax: (705)

MUNICIPALITY OF ANCHORAGE PARKS AND RECREATION COMMISSION MINUTES OF THE REGULAR MEETING. May 12, 2016

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Village Green Amenity Memorial Program

CITY OF GAINESVILLE PARKS, RECREATION AND CULTURAL AFFAIRS DEPARTMENT VISION 2020

Posted by Calgary Public Library on November 1, 2012

MUNICIPALITY OF ANCHORAGE

What is happening? OPENING. Goals for Today WE ARE HERE. STEP 1 Online Questionnaire. STEP 2 Preliminary Design. STEP 3 Public.

Cities are dynamic and ever changing places with buildings, infrastructure and outdoor spaces constantly being improved and buildings replaced.

Historic Ottawa Beach Waterfront Walkway Park Township

17 th and Folsom Future Park Community Meeting #1

April Showers Bring Linac 3 to the May Flowers

CITY COUNCIL STAFF REPORT

PHASE I BUDGET FOR THE GREATER DES MOINES BOTANICAL GARDEN IMPROVEMENTS

CITY of NOVI CITY COUNCIL

Pony Barn Recreation Area Working Group November 10, 2014 DRAFT Meeting Minutes

Equipment Festge County Park

I-70/71 Innerbelt Project

D E S I G N R E V I E W B OA R D

MUNICIPALITY OF ANCHORAGE

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

Recreation Facility Evaluation - Conclusions

The Corporation of Delta. COUNC~L REPORT Regular Meeting. Burnsview Secondary School/Chalmers Park Memorandum of Understanding

Main Street Conversion Site

Jordan Harrison, Planner III, San Francisco Recreation and Park Department

Butler Junior High School

THE ASHLAND OVERVIEW. FXCollaborative SPAN Architecture WSP USA ICOR Associates Site/Civil Geotechnical Environmental Surveying/Geospatial

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

MEETING MINUTES. MAIN STREET 500 Block Rehabilitation PIN Stakeholders Design Meeting

Staff Report City of Manhattan Beach

Village of Fair Haven Goals & Objectives

Corporate Report. Further, that Legal Services be directed to prepare the necessary amendments to the City s Delegation By-law.

PROJECTS UNDER CONSTRUCTION

Brains and Archibald park concept plan

Parks & Recreation report cards

Open Space Considerations

Arsalun Tafazoli CH Projects. Paul Basile BASILE Studio

Guidelines for Community Gardening In Saskatoon

PLANNING COMMISSION STAFF REPORT

Architectural Review Board Report

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

Terrace View Park. Master Plan

Meeting Notes. Meeting Date: Feb. 28, Re: Public Meeting #2 Cornerstone Baptist Church Date Issued: February 29, 2012 Compiled By: Paul Thomas

Stafford Township Adopt a Park Program

Juri Commons Design Review

The following principles guide the development of goals and strategies to protect and promote these amenities:

Grand River Ravines Georgetown Township

DESIGN REVIEW COMMITTEE AGENDA ITEM

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

Coffey Neighborhood Park Master Plan/Design/Rebuild Workshop. August 4, :00pm 4:00pm

Transcription:

Municipality of Anchorage, Alaska Parks & Recreation Department 632 W. 6 th Avenue, Suite 630 P.O. Box 196650 Anchorage, AK 99519 Tel 907-343-4355 URL www.muni.org/departments/parks MEMORANDUM Date: February 5, 2014 To: Cc: From: Project: Parks & Recreation Commission Holly Spoth-Torres, Parks Superintendent Maeve Nevins, Park Planner PRC 2014-09: Roosevelt Park Challenge Grant Park Improvement INTRODUCTION & BACKGROUND Roosevelt Park is.51 acres and is located at 2200 Jefferson Ave. This park is one of the oldest parks in the Spenard area dating back to the 1950s. The park includes play equipment for 5-12 year olds and 2-5 toddlers; it has a picnic table and benches. In 2003, during a renovation, the old swing set was removed. In March 2013 a park neighbor and parent, Kelly Peterson, received a $15K APF Challenge Grant to reinstall a swing set in the park. P&R staff worked with Ms. Peterson to select both an appropriate swing set and site within the playground to install the equipment. The new swing set will be located adjacent to the existing play structures for shared access of the concrete ADA access pathway. PLANNING AND PUBLIC INVOLVEMENT In 2013 Kelly Petersen and P&R began planning efforts for the new swing set. Both the Spenard Community Council and the Spenard Chamber of Commerce support this project and they agreed to assist Kelly in meeting the APF Challenge Grant match requirement. The proposed improvements for the new swing at Roosevelt Park were supported by Spenard Community Council vote of 9-0 in favor at the February 6, 2014 meeting. 2014 IMPROVEMENTS The Improved Playground will include the following contractor installations: Swing Set with four-bay single-post frame swing set including: o 2 belt seat swings for 5-12 year olds o 2 full bucket infant swing seats for children 9 to 30 months who can sit up unaided Excavation and installation of a concrete edge perimeter barrier, grading preparation for the volunteer installation of fall surface material The Improved Playground will include the following Volunteer installations: Wood fiber fall surface material set on weed barrier fabric inside footprint Clean up of existing flowerbeds, weed and re-plant with new hardy perennials STAFF RECOMMENDATION The proposed improvements for the new swing set at Roosevelt Park are supported by Spenard Community Council. The Department recommends that the Parks & Recreation Commission pass the proposed resolution to support the new playground as presented. ATTACHMENTS INCLUDE: Challenge Grant Application and Update Roosevelt Swing Concept Boards Spenard Community Council Resolution of Support

ANCHORAGE PARKS AND RECREATION & THE ANCHORAGE PARK FOUNDATION PRESENT... C HALLENGE GRANT PARK IMPROVEMENT Roosevelt Park 2200 JEFFERSON AVE. PROJECT PLANNER: MAEVE NEVINS, MUNICIPALITY OF ANCHORAGE PARKS & RECREATION DEPT. CONTACT: E-MAIL: MEVINSMVJ@MUNI.ORG/PHONE: 907.343.4135 FEB. 5, 2014

EXISTING CONDITIONS ROOSEVELT PARK 2200 JEFFERSON AVENUE FEBRUARY 5, 2014 PLACEHOLDER FOR SMALL ANALYSIS PHOTO Historically, the park amenities included a swing set and a playground. In 2003, the swing set was removed, but not replaced. However, the playground equipment was updated. This project proposes to replace the swing set with a new 4-bay one. PLACEHOLDER FOR 1 LARGE PHOTO/DIAGRAM [TO INSERT AND LINK PHOTOS: GO TO FILE, PLACE, USE FITTING SETTING TO FILL FRAME AS DESIRED. TO UNLOCK THE FRAMES FOR EDIT, DOUBLE-CLICK THE LOCK SYMBOL. PLACEHOLDER FOR SMALL ANALYSIS PHOTO The previous location of the swing set footprint was reseeded. This site would remain open and will not be reused for play equipment. A new swing set site was chosen. PLACEHOLDER FOR SMALL ANALYSIS PHOTO The selected location for the new swing set would allow for a new concrete path connected to the existing playground. The footprint of the new swing set will meet all fall-safety standards.

PLAYGROUND IMPROVEMENTS ROOSEVELT PARK 2200 JEFFERSON AVENUE FEBRUARY 5, 2014 PLACEHOLDER FOR 1 LARGE PHOTO/DIAGRAM [TO INSERT AND LINK PHOTOS: GO TO FILE, PLACE, USE FITTING SETTING TO FILL FRAME AS DESIRED. TO UNLOCK THE FRAMES FOR EDIT, DOUBLE-CLICK THE LOCK SYMBOL.

PLAYGROUND IMPROVEMENTS ROOSEVELT PARK 2200 JEFFERSON AVENUE FEBRUARY 5, 2014 Provide 4-bay single-post frame swing set to fit within existing site per fall-safety area requirements of by manufacturer. Provide two durable slash-proof belt swing seats, made of weather- resistant EPDM rubber, safety approved for children ages 5 to 12. Provide two Full Bucket Infant Swing Seats, safety approved for children ages 9 to 30 months who can sit up unaided. Provide wood fiber fall surface material, to be installed by Volunteers lead by Challenge Grant Recipient, Kelly Petersen.