1 stream design, LLC 1535 grant st. ste 203 denver, co (p) Meeting Notes Project: Westwood Park Meeting Date: Feb. 28, 2012 Re: Public Meeting #2 Location: Cornerstone Baptist Church Date Issued: February 29, 2012 Compiled By: Paul Thomas Present: See attached sign-in list for meeting attendees. Denver Parks Staff: David Marquardt, Nicole Stahly LiveWell Westwood: Norma Brambilia, Jose Esparza Stream Design: Jess Clark, Paul Thomas Topics Discussed: 1. General: The meeting was held to further identify the public's preferences for types and characteristics of improvements such as water play, playgrounds, shade shelters, and court activities. In addition, three concept drawings showing different spatial arrangements of the activities and program elements around the site, and also showing different ways to deal with the significant slope across the site were presented. The meeting was held in English, with bi-lingual (English-Spanish) graphic presentation materials, and with simultaneous Spanish translation of the proceedings. The meeting was kicked off by Councilman Paul Lopez. He outlined the purpose of the meeting and asked participants to draw in their own ideas if the things that they wanted were not being shown as options. Nicole Stahly of Denver Parks and Recreation ("DPR") recapped the previous meeting, and her design workshop with a fifth grade class at Munroe Elementary School. 2. Paul Thomas of Stream Design explained the first "exercise" of the evening--using sticky dots to vote for the preferred type of park elements within the categories listed below. Attendees were given four colored dotes, and asked to vote for their favorite general type or character of improvements. Three options were presented for each of the four categories. The highest ranked group from each board is shown in bold. Activities and Games 1. Court sports and games 2. Climbing 3. Skateboarding Water Play 1. Natural style 2. Jets in pavement 3. Vertical pipes and elements Playgrounds 1. Nature play 2. Traditional structure and playground elements 3. Custom / alternative play
2 Shade Shelters 1. Traditional park structures 2. "Sails" (fabric elements supported on tall posts 3. Custom / art structures 3. Jesse Clark of Stream Design presented the 3 park concept diagrams developed for the meeting. The three alternatives can generally be described as follows (see attached Concept Plan graphics and descriptions): Concept A: A "single level" concept, with a large flat park area containing all of the park elements, organized around an oval walkway. This concept requires a tall wall along Alameda similar to what exists today. No pedestrian connections are made between the interior of the park and Alameda, (or the bus stop adjacent to the park on Alameda). Concept B: A "split level" concept that distributes all the park activities except the playing field along an upper level that wraps around the west, south, and east edges of the park. This alternative incorporates a significant slope between the upper and lower level that could be used for sledding. This plan provides connections to the bus stop on Alameda from the park. Concept C: Another "split level" concept that places most of the park activities on an upper level, with the playing field and group picnic area with shelter on the lower level. This alternative clusters most of the activities in the southwest corner of the site, creating a focused activity area. This alternative provides a connection to Alameda and the bus stop similar to Alternative B. The attendees were given three dots with numbers 1,2, and 3 written on them to vote for their favorite, second favorite, and least favorite concept alternative. General trends from the dot voting are as follows: Concept B garnered the largest number of first place votes, narrowly edging out Concept C. Concept C had the second highest number of first place votes, and the highest number of second place votes. Concept A had the least number of first and second place votes. Following the dot voting the group convened for a final discussion about why people voted the way they did. Each concept was discussed, and attendees were asked why they preferred or disliked each alternative. The following includes some of the comments received: Concept A Pros: Thought it was safer since it has bigger separation from Alameda Like the way it blocks Alameda Flatness allows more activities in the park Cons: Wall along Alameda attracts graffiti Some don't like flat park area Concept B Pros: Good visibility between park and Alameda Playground near Nevada is safe Some like basketball in this location Best for sledding Like plaza space Like access to bus stop Westwood Neighborhood Park Meeting Notes Stream Design, LLC 2
3 Cons: Some like more separation from Alameda Air quality and noise Activities too spread out Concept C Pros: Like the hill and raised corner focal point Good compromise between opening up to Alameda and protecting park from traffic and noise Good for bus stop users--can walk through park --adds activity and security to park Upper and lower levels with slope in between breaks up park and adds interest Like plaza space Cons: Sledding hill not big enough 4. The meeting was adjourned. Attendees were told to expect another meeting in approximately 2 months. Stream Design believes this report accurately reflects what transpired at the meeting. Please provide comment to the appropriate project manager if you have a different understanding of what occurred or would like to add specifics or additional information. Notification should be made within 5 working days of issuing this report, after which, it is assumed that all parties agree that this report is accurate. CC: File Westwood Neighborhood Park Meeting Notes Stream Design, LLC 3
4
5
6
7
8
9
10
Meeting Notes. Meeting Date: May 22, 2012
stream design, LLC 3330 larimer st. #1B denver, co 80205 (p)720.663.7352 www.streamlanddesign.com Meeting Notes Project: Westwood Park Meeting Date: May 22, 2012 Re: Public Meeting #3 Location: Cornerstone
More informationWashington Park Diagonal
Public Input Meeting August 3, 2011 Nicole Stahly RLA DPR Project Manager Jesse Clark RLA, LEED Stream Design Paul Thomas RLA Stream Design Kerry White RLA Urban Play Studio Tonight s Agenda 1st Meeting:
More informationLong Branch-Wayne Local Park Renovation Project
Montgomery Parks Long Branch-Wayne Local Park Renovation Project Community Meeting #2 September 20, 2016 Oak View Elementary School 7:00-9:00 PM Welcome / Team Introductions M-NCPPC (Montgomery Parks)
More informationThese meeting minutes summarize the community meeting held on February 22 nd, 2018 with the Greater Park Hill community.
FAIRFAX NEIGHBORHOOD PARK Community Meeting #1 Meeting Minutes Date: February 22 nd, 2018 Location: Stedman Elementary School These meeting minutes summarize the community meeting held on February 22 nd,
More informationCharles P. Johnson and Associates. Annapolis Landscape Architects
Charles P. Johnson and Associates Annapolis Landscape Architects AGENDA Introduction Project Limits and Scope Site Analysis Opportunities & Constraints Program Goals Image Boards Design Alternatives Pros
More informationMcConnell Park Renovation
McConnell Park Renovation New Assessment April 6, 2016 Property Owners approve new Assessment $133.42 Zone A & $136.08 Zone B New Assessment allows Maintenance of existing amenities Renovation of the browned
More informationWARM SPRINGS PARK MASTER PLAN
TABLE OF CONTENTS page 1.0 Introduction and Overview 1 2.0 Information Gathering 2 3.0 Conceptual Alternative Development 8 4.0 Master Plan Development 14 5.0 Construction Cost Estimates 19 LIST OF FIGURES
More informationSALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem
SALEM PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY For the City of Salem 6-13-17 This process undertaken by Weston & Sampson is to outline preliminary ideas only of what possibilities exist for
More informationBenedict Fountain Park Meeting Notes Wednesday, February 15, 2012
Benedict Fountain Park Meeting Notes Wednesday, February 15, 2012 ALTERNATIVE #1 Like the big open lawn space in alternative 1. Like cohesiveness of sidewalk walk and play areas shown on alternative 1
More informationMADISON MANOR PARK RENOVATIONS
MADISON MANOR PARK RENOVATIONS COMMUNITY KICK-OFF MEETING MINUTES To: Wilfredo Calderon, Steven Torgerson (AMT), Tom Mitchler, Kevin Stalica, Vincent Verweij, Greg Anselene, Chris Willett, Peter Alchin,
More informationBarrie Park Site Master Plan
Barrie Park Site Master Plan Community Meeting Number 4 May 13th, 2015 Barrie Park Site Master Plan: Process A Blue Print for the Future Already taken place: Site walkthrough, Focus Groups, 3 Community
More informationCover Planning. January I-70 East Final Environmental Impact Statement
Cover Planning January 2016 I-70 East Final Environmental Impact Statement This page intentionally left blank. I-70 COVER OVERALL PLANNING PROCESS CDOT, DENVER, AND DENVER PUBLIC SCHOOLS NOVEMBER 2013
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 21, 2018 SUPPLEMENTAL REPORT
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 21, 2018 SUPPLEMENTAL REPORT DATE: April 18, 2018 SUBJECT: Request to authorize advertisement of public hearings by the Planning Commission
More informationFebruary 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax
February 27, 2018 City Council Presentation The Crown Jewel Park in the City of Fairfax Master Planning Charge Van Dyck Park s first Master Plan will provide the City with a road map as to how best incorporate
More informationAPPENDIX C: PUBLIC INPUT SUMMARY
APPENDIX C: PUBLIC INPUT SUMMARY OVERVIEW The public process for the development of the GO! Green Oshtemo Plan was designed to follow both the legislative requirements for master plan adoption and the
More informationNorth Oakville East Parks Facilities Distribution Plan. November, 2009
North Oakville East November, 2009 POLICY CONTEXT 1) Purpose a) The purpose of this document is to be a guide for the location, configuration, design and development of the parks system for the North Oakville
More information2. Chris Yanez then gave an introduction to the formal presentation.
stream design, LLC 1245 east colfax ave. #300 denver, co 80218 (p)720.663.7352 www.streamla.com Meeting Notes Project: La Alma Playground Meeting Date: August 11, 2015 Re: Public Meeting #2 Location: Lincoln
More informationAvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation
AvalonBay Communities + BRIDGE Housing Mission Housing Habitat for Humanity Pacific Union Development Corporation Tonight s Agenda Recap of discussion from last CAC meeting Updates on meetings with Stakeholders
More informationDowdy Park. Concept Plans TOWN OF NAGS HEAD NORTH CAROLINA. Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc.
TOWN OF NAGS HEAD NORTH CAROLINA Concept Plans Developed by: Albemarle & Associates, Ltd VHB/ Vanasse Hangen Brustlin, Inc. Site Looking Southeast Dowdy Park Existing Conditions Nags Head Woods Sound Future
More informationUV120 January 30th, Charrette Findings
UV120 January 30th, 2014 Charrette Findings UV120 Purpose and Summary of the January 30 th Meeting The purpose of the January 30 th public meeting and design charrette was to gather feedback from El Paso
More informationSouth th E ast Communit ity Centre (SECC)
South East Community Centre (SECC) 1 New Park Design & Community Centre Update Thursday, February 8, 2018 Public Open House Thank you for attending this Open House! The town and the Consulting Team will
More informationAmenity Guidelines For Medium and High Density Residences
Amenity Guidelines For Medium and High Density Residences Corporation of the Municipality of Clarington Planning Services Department Approved by Council on January 25, 1993 I:\Administration\Publications\GUIDELINES
More informationCommunity Visioning Workshop Prep
Community Visioning Workshop Prep Visioning Workshop 73 Visioning Workshop: Public Events 1 2 3 4 74 Visioning Workshop: draft Schedule 75 Visioning Workshop: draft Schedule working to schedule stakeholder
More informationI-70 Highway Cover Study MARCH 4, 2015 COMMUNITY WORKSHOP SUMMARY
I-70 Highway Cover Study MARCH 4, 2015 COMMUNITY WORKSHOP SUMMARY MARCH 2015 COMMUNITY WORKSHOP CDOT and the City and County of Denver joined together to engage the community and gather ideas to explore
More informationEast Area Plan. Steering Committee Meeting May 24, Art Gym Denver
East Area Plan Steering Committee Meeting May 24, 2018 Art Gym Denver East Area Plan Steering Committee Meeting May 24, 2018 ArtGym Denver, 1460 Leyden Street AGENDA 1 6:00-6:05 Approval of April Meeting
More informationJames Madison Park Master Plan and Shelter Design
James Madison Park Master Plan and Shelter Design Public Meeting #2 - PARKitecture Workshop Notes 1:00 4:00 PM, February 10, 2018 The BUBBLER at Madison Central Library, 201 W. Mifflin Street Total participants:
More informationNew Park / Entry Court & Plaza Concept Design
New Park / Entry Court & Plaza Concept Design The SECC Public realm is proposed to have a focus on health, wellness, and community and that site users will include patrons of the neighbourhood. The block
More informationCARMODY PARK MASTER PLAN
the site Smith Reservoir Cottonwood Lake Kendrick Lake Carmody Rec Center Carmody Middle School Pool Court Play Carmody Pond Sanderson Ditch Sports Fields Foothills Ice Arena Open Field why a master plan?
More informationRosslyn Highlands Park + Coordinated Open Spaces Plan (Plan Adoption) County Board Meeting September 24, 2016
Rosslyn Highlands Park + Coordinated Open Spaces Plan (Plan Adoption) County Board Meeting September 24, 2016 BACKGROUND The County Board shall consider adoption of the proposed Rosslyn Highlands Park
More informationSOUTH COMMUNITY PARK MASTER PLAN
CORTEZ SOUTH COMMUNITY PARK MASTER PLAN PROCESS SUMMARY During the summer and fall of 2018, the City of Cortez, together with landscape architecture studio Connect One Design, developed a master plan for
More informationTown of Jamestown. Parks and Recreation Master Plan for Jamestown Park
Town of Jamestown Parks and Recreation Master Plan for Jamestown Park Adopted December 16, 2014 Acknowledgements Town Council Keith Volz, Mayor Brock Thomas Lynn Montgomery Georgia Nixon-Roney William
More informationDesign Alternatives Workshop. Hilfiker Park Master Plan Workshop #2
Design Alternatives Workshop Hilfiker Park Master Plan Workshop #2 Agenda for Tonight Staff Presentation (40 min) Introduction Master Plan Process Planning Context What We ve Heard So Far Design Alternatives
More informationSt. Kevin s Area Planning Collaborative
Table of Contents page 2 EXECUTIVE SUMMARY 3 MISSION STATEMENT 4 NEIGHBORHOOD CONTEXT 6 STREET CHARACTER 7 SITE PARAMETERS 9 COMMUNITY CHARRETTE - VISIONING GROUP TABLE 1 11 GROUP TABLE 2 12 GROUP TABLE
More informationComment NATURAL ELEMENTS & PLANTINGS
Park at Gables N. Rolfe Public Meeting, 4/09/14 Public Comments by Topic Location of Comment Comment NATURAL ELEMENTS & PLANTINGS #1 [Like] The preservation of nature [Like] The large amount of green [Like]
More information1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails
Appendix A: Park Classifications The intent of parks and recreation classifications is to aid in making acquisition and design decisions for park sites, facilities and the organization of recreation space
More informationPALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES. DATE: 21 September Palo Alto HS Update
PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES DATE: 21 September 2010 SUBJECT: Landscape Subcommittee Meeting Palo Alto HS Update The purpose of the meeting was to update the Landscape
More informationIntroduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1
Chapter 1 Introduction Lakewood 2025: Moving Forward Together Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1 Purpose of the Comprehensive Plan The Comprehensive
More informationA.9. Cannon River. Campostella Park. Adjacent Industrial & City Facility Uses
Campostella Park Classification: Nature Area 14 acres Character: This park is an undeveloped, heavily wooded natural open space park located along the Cannon River, just to the southwest of Babcock Park
More informationPARK MASTER PLAN. for MANITOWOC ROAD PARK. HARRISON, WI August Ayres Associates, Inc. Manitowoc Road Park Master Plan 1
PARK MASTER PLAN for MANITOWOC ROAD PARK HARRISON, WI August 2017 Ayres Associates, Inc. Manitowoc Road Park Master Plan 1 Ayres Associates, Inc. Manitowoc Road Park Master Plan i Table of Contents 1 Introduction
More informationMontana Rail Link Park
Montana Rail Link Park Neighborhood Open House A Missoula Community Partnership WITH LEADERSHIP FROM THE FRANKLIN TO THE FORT & SOUTHGATE TRIANGLE NEIGHBORHOODS Sovereign Hope Church, (1919 North Ave.)
More informationCity Council Update October 24, 2017
City Council Update October 24, 2017 Master Planning Project Team City of Fairfax Cathy Salgado, Director of Parks and Recreation Brianne Baglini, Facilities Operation Manager Joanna Ormesher, Cultural
More informationRESEDA - WEST VAN NUYS COMMUNITY PLAN
RESEDA - WEST VAN NUYS COMMUNITY PLAN Executive Summary As part of the initial outreach effort, the Department of City Planning hosted two workshops for the Reseda-West Van Nuys Community Plan Area during
More informationLOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY
LOMA VISTA ROUND 1 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY Reagan Elementary School, Clovis, CA May 14, 2014 6:30pm-8:30pm SUMMARY On Wednesday, May 14, 2014, staff from the City of Clovis and PlaceWorks
More informationSOUTHEAST SPORTS COMPLEX MASTER PLAN
REPORT TO SOUTHGATE NEIGHBORHOOD COUNCIL APRIL 13, 2016 Visioning Process April 30: Stakeholder Meeting with Sports Groups May 5: Stakeholder Meeting with Southgate Land Use Committee May 13: SNC Meeting
More informationMEETING MINUTES East Carolina University Comprehensive Master Plan Page 1 of 1
Page 1 of 1 26472.J00 04.06.2009 04.24.2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Health Sciences Building Open House-West Campus Location MEETING LOCATION MEETING PURPOSE Ryan Podvin ISSUED BY SIGNATURE
More informationPor favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation
FEDERAL BOULEVARD CORRIDOR WIDE STUDY PUBLIC MEETING #1 APRIL 27, 2016 Por favor, levanten la mano si necesita traduccion en espanol Please raise your hand if you need Spanish translation HDR DESIGN WORKSHOP
More informationNagle Place Extension Workshop August 3, 2010
Nagle Place Extension Workshop August 3, 2010 Overview On Tuesday, August 3, 2010, Sound Transit, the Capitol Hill Community Council, the Capitol Hill Chamber of Commerce and the City of Seattle teamed
More informationCommunity Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project
Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project Community Meeting #2 September 22, 2010 District Supervisor Eric Mar Paulina Araica, Project Manager Andy Maloney, Architect
More informationTA B L E O F C ON T EN T S
TA B L E O F C ON T EN T S Introduction 1 Site Analysis 2 EXISTING TREE ANALYSIS 3 Community Outreach 5 PUBLIC WORK SHOP #1 GENERAL PUBLIC 6 PUBLIC WORKSHOP #2 4 TH OF JULY CELEBRATION 9 PUBLIC WORKSHOP
More informationNeighborhood Districts
NEIGHBORHOOD DISTRICTS SEVEN MAIN DISTRICTS Neighborhood Districts While the Development Plan provides a broad-scale overview of the neighborhood, this section focuses on uses and relationships at the
More informationExhibit Planning and Design Workshop February 3-6, Commissioned by the Maryland-National Capital Park and Planning Commission (M-NCPPC)
Exhibit Planning and Design Workshop February 3-6, 2014 Commissioned by the Maryland-National Capital Park and Planning Commission (M-NCPPC) Planning and Design Workshop The Montgomery County Planning
More informationPark Types and Attributes
02 APPENDIX B APPENDIX B s and s 194 APPENDIX B 04 Size Level of Service Any privately owned park, of any size, is a neighborhood park Primary Service Area - 1/2 mile or within 15 minutes walking distance
More informationPARDI MARKET PLAZA PMSCDC WORKSHOP
PARDI MARKET PLAZA PMSCDC WORKSHOP CITY OF DIXON FEBRUARY 23, 2017 Presented by: CITY STAFF INTRODUCTION Deborah Barr Associate Civil Engineer, Project Manager Joe Leach City Engineer/Public Works Director
More informationThe urban parks in Charlottesville include Jackson Park, Lee Park, and McGuffey Park.
Park Classifications Charlottesville s parks can be grouped into 4 different classifications: urban parks, neighborhood parks, community parks, and regional parks. Figure 1 on page 5 inventories the facilities
More informationCourthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014
Courthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014 1 Study Area Courthouse Square DRAFT Design Concepts A B C 3 Public Feedback July 23 Workshop & Online Survey
More informationNEIGHBOURHOOD DECISION MAKING NORTHWEST LONDON
NEIGHBOURHOOD DECISION MAKING NORTHWEST LONDON Thank you for voting! Please use the paper provided to mark down the numbers of the idea you would like to vote for, and bring it to the voting station. VOTE
More informationYesler Terrace Explorations of Ideas 11 March 2009
Yesler Terrace Explorations of Ideas 11 March 2009 Exploration of Ideas for Yesler Terrace Where are we in the process? Testing the Yesler Terrace Planning Program 1) How does the new Yesler Terrace feel?
More informationSUMMARY MEETING. The following is a compilation of voting results from all five visioning sessions.
SUMMARY MEETING The following is a compilation of voting results from all five visioning sessions. WHO ARE YOU? The next 10 graphs show compiled demographic information about the participants at all 5
More informationWelcome to the Neighborhood! COPPERLEAF NEIGHBORHOOD GUIDE
Welcome to the Neighborhood! COPPERLEAF NEIGHBORHOOD GUIDE 2017 At Copperleaf, feeling at home just comes naturally. Not surprising when you take a look around at the abundance of resources we offer to
More informationPART TWO: PROJECT SPECIFIC DESIGN GUIDELINES
PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES 2.1.0 GENERAL REQUIREMENTS: 1. Approved warm season turf varieties shall be used for LMD/CFD, commercial, industrial, and public landscape areas. The use of
More informationLas Colonias Park Master Plan
2013 Las Colonias Park Master Plan City of Grand Junction June 2013 Introduction Las Colonias Park, a 101 acre parcel on the edge of the Colorado River south of downtown, was deeded to the City of Grand
More informationLasley Park Design Concepts Feedback from meeting on March 3, 2016
Lasley Park Design Concepts Feedback from meeting on March 3, 2016 1. Which design concept do you prefer for the play experience? 2 1 4 1 2 3 C and E - I like the boulders C and E Lots of different play
More informationSURVEY BACKGROUND. In addition to the upgrade of the play space, the courts and oval lighting will be upgraded.
SURVEY BACKGROUND The Edwardstown Soldiers Memorial Recreation Ground play space has been identified in Council s Play Space Strategy for upgrade in the 2014/15 financial year. In addition to the upgrade
More informationMASTERPLAN AND PARK IMPROVEMENTS
ST.JAMES PARK MASTERPLAN AND PARK IMPROVEMENTS Stakeholder Meeting 3 April 26, 2016 Team: PMA Landscape Architects Ltd. Lead Landscape Architects MASS LBP Public Facilitation Consultant RAW Design Architectural
More informationNokomis Hiawatha Regional Park Master Plan and Park Improvements
Nokomis Hiawatha Regional Park Master Plan and Park Improvements Community Advisory Committee (CAC) Workshop #1 Project Initiation and Needs Assessment MEETING SUMMARY HELD Thursday, May 15, 2014 6:30
More informationJuly 23, 2014 Wilson School. Working Group Meeting #3 Preliminary Site Analysis School Siting Considerations Guiding Principles
July 23, 2014 Wilson School Working Group Meeting #3 Preliminary Site Analysis School Siting Considerations Guiding Principles Agenda Follow-Up from Meeting #2: WG & community feedback Presentations /
More informationPublic Workshop #2 Summary
Public Workshop #2 Summary Project Number: Project Title: 2320.01 (R&M) MOA Parks and Recreation Muldoon Town Square Park Master Plan Subject: Muldoon Town Square Park Master Plan Public Workshop #2 Author:
More informationPublic Workshop Summary
Public Workshop Summary October 23, 2017 at the Bryan Glazer Family JCC Approximately 100 people were in attendance, including residents, business owners, employees/employers, and government representatives
More informationMILLS PARK & PANTHER CREEK GREENWAY
, North Carolina August 19th, 2014 Introduction, North Carolina Why are we here? Planning Investment to Date - Park, North Carolina 2012 Parks, Recreation, and Cultural Resources Master Plan Planning Investment
More informationCaroline Freeland Park Facility Plan Project
Montgomery Parks Caroline Freeland Park Facility Plan Project Community Meeting #1 November 6, 2013 Bethesda Library 7:00-9:00 PM Welcome / Team Introductions Parker Rodriguez, Incorporated (Landscape
More informationdoyle + o troithigh landscape - architecture
doyle + o troithigh landscape - architecture REPORT: PROJECT: LANDSCAPE DESIGN REPORT. STUDENT HOUSING DEVELOPMENT AT WESTWOOD HOTEL SITE. DATE: MAY 2018. www.doyle-otroithigh.com Landscape design report,
More informationPublic Meeting #3. July 10, 2017
Public Meeting #3 July 10, 2017 City Staff: Market Analysis Consultant: City Alders: Rebecca Cnare Michael Stumpf David Ahrens Urvashi Martin Place Dynamics, LLC Denise Demarb Jeff Greger Amanda Hall Mike
More informationTOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE
TOWN OF BETHLEHEM LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE MEETING SUMMARY Purpose: LWRP Update Public Workshop #3 Date and Time: October 24, 2017, 6:00 pm - 8:00 pm Location: Town Hall, 445 Delaware
More informationEXCHANGE PARKWAY RECREATION CENTER FEASIBILITY STUDY PUBLIC MEETING ONE APRIL O4, 2019
EXCHANGE PARKWAY RECREATION CENTER FEASIBILITY STUDY ONE APRIL O4, 2019 COMMUNITY ENGAGEMENT & INPUT AGENDA INTRODUCTIONS PROJECT HISTORY & GOALS SITE ANALYSIS AND INFLUENCES TRENDS IN RECREATION PROGRAMMING
More informationELLENBERGER PARK FAMILY CENTER
COMMUNITY MEETING: NOVEMBER 16, 2011 Healthy Lifestyles Exercise, Wellness, Social Interaction Family and Inter-generational Use Accessibility, Transparency, Flexibility, Safety Sustainability Revenue
More informationDavid Ache, representing Councilmember Hucker s office was present during the first portion of the meeting.
Long Branch Wayne LP Renovation Project Community Meeting #1 March 8, 2016 Park Staff Present at Community Meeting #1 Lucas Bonney, Project Manager, Park Development Michael Ma, Park Development Tricia
More informationDecember 1, 2014 (revised) Preliminary Report -- Thomas Jefferson Site Evaluation
December 1, 2014 (revised) TO: FROM: RE Arlington County Board Thomas Jefferson Site Evaluation Working Group by Carrie Johnson, Chair Preliminary Report -- Thomas Jefferson Site Evaluation The Thomas
More informationThe Corporation of Delta. COUNC~L REPORT Regular Meeting. Burnsview Secondary School/Chalmers Park Memorandum of Understanding
The Corporation of Delta COUNC~L REPORT Regular Meeting Fa 13 To: Mayor and Council File No.: 14035-20/ChaP From: Parks, Recreation & Culture Department Date: June 19, 2015 Burnsview Secondary School/Chalmers
More informationCommunity Input Survey
Balcones Park Community Input Survey Friday, January 13, 2017 448 Total Responses Complete Responses: 372 Date Created: Thursday, August 18, 2016 Balcones Park Community Input Survey Friday, January 13,
More informationSite Design. Planning Check List. Looking at the whole site First things first Preparing the plan
Site Design Site Design Looking at the whole site First things first Preparing the plan Sample Site Plans Adding information to the plan Adding comments from the surveys Adding ideas to the plan A plan
More informationNOTES FILED WITH TOWN CLERK
Page 1 of 6 Town of Farmington Parks Master Plan Advisory Committee FILED WITH TOWN CLERK August 18, 2015 TOWN OF FARMINGTON PARKS MASTER PLAN ADVISORY COMMITTEE NOTES FROM THE BEAVER CREEK PARK SITE WALK,
More informationBlood Alley Square/Trounce Alley Redesign
June 216 Kick-Off Events Questionnaire and Engagement Summary Background The City of Vancouver is redesigning Blood Alley Square and Trounce Alley, important public spaces in the heart of Gastown, which
More informationPARDI MARKET PLAZA MASTER PLANS
PARDI MARKET PLAZA MASTER PLANS CITY OF DIXON APRIL 25, 2017 Presented by: 1 CITY STAFF INTRODUCTION Deborah Barr Associate Civil Engineer, Project Manager Joe Leach City Engineer/Public Works Director
More informationAppendix A. Park Land Definitions
Appendix A Park Land Definitions Mini Park May serve specific function for any and all ages, depending on need of the user area. Size range 1-5 acres with optimum size being 3 acres. Service area is sub-neighborhood
More informationPARDI MARKET PLAZA MASTER PLAN
PARDI MARKET PLAZA MASTER PLAN CITY OF DIXON PLANNING COMMISSION MAY 16, 2017 Presented by: 1 CITY STAFF INTRODUCTION Deborah Barr Associate Civil Engineer, Project Manager Joe Leach City Engineer/Public
More informationPUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN
Connecting the heart of Eagle to the soul of the river - Kathy Chandler-Henry, Commissioner Eagle County CHAPTER 1 PUBLIC ENGAGEMENT & SIX THEMES OF THE PLAN town of eagle - river corridor plan 1 PUBLIC
More informationWORKSHOP PURPOSE PERRY COMPREHENSIVE PLAN COMMUNITY WORKSHOP APRIL 4 TH, 2013 WHAT IS A COMPREHENSIVE PLAN? AGENDA
WORKSHOP PURPOSE PERRY COMPREHENSIVE PLAN COMMUNITY WORKSHOP APRIL 4 TH, 2013 Provide background information on the Perry Comprehensive Plan Tap the expertise of the local experts (YOU!) Understand what
More informationEASTSIDE REGIONAL PARK MASTER PLAN
EASTSIDE REGIONAL PARK MASTER PLAN Goal 3: Promote the visual image of El Paso Goal 4: Enhance El Paso s Quality of Life through Recreational, Cultural and Educational Environments Goal 4.1: Deliver bond
More informationSITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016
SITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016 OWNER & DESIGN TEAM GENERAL BACKGROUND INFORMATION PGCPS received a Carnegie Corporation Opportunity by Design grant to
More informationMore than 30 adults and 19 children were involved in these community workshops.
Linwood Workshops held at Household of Faith Deliverance Church 3.29.08 and 4.05.08 What is a Design Workshop? We use the term workshop (often called charrette among design professionals) to describe a
More informationPARKS & RECREATION SUBCOMMITTEE. Oct. 1, 2015
PARKS & RECREATION SUBCOMMITTEE Oct. 1, 2015 1999 Bond - $22,000,000 Land Acquisition Allen Station Phase II Neighborhood Parks PREVIOUS BOND ELECTIONS 1999 & 2007 2002 Bond - $4,000,000 Allen Senior Recreation
More informationCity of Los Angeles Department of Public Works
City of Los Angeles Department of Public Works Environmental Scoping Meeting for the Proposed Sixth Street Park, Arts, River & Connectivity Improvements (PARC) Project May 3, 2017 1 Agenda Introductions
More informationCCI Concerned Citizens Group, Inc. Report on Community Survey Regarding Future Use of CCI Property after Cleanup July 1, 2005
CCI Concerned Citizens Group, Inc. Report on Community Survey Regarding Future Use of CCI Property after Cleanup July 1, 2005 Introduction CCI is a 1.5 acre Superfund site at 320 South Blake Street, Olathe,
More informationOpen Space Considerations
Open Space Considerations Department of Parks & Recreation WESTERN ROSSLYN AREA PLANNING STUDY WORKING GROUP MEETING OCTOBER 9, 2014 1 Purpose of the Presentation Provide context of the Rosslyn park and
More informationThe Plan for Port Whitby
The Plan for Port Whitby December 5, 2012 Community Meeting Summary Report Prepared by GLPi January 17, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement Plan
More informationPRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9
#230 177 Victoria Street P rince George, BC V2L 5R8 Tel. (250) 564-7285 F ax. (250) 564-7286 1100 Patricia Boulevard Prince George, BC V2L 3V9 PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT CITY OF PRINCE GEORGE
More informationThroughout. square. (Crystal City Vision Plan 2050)
1: Terms related to the PSMP document 1 public space (see also public realm, civic space) An open space designated on the regulating plan, accessible to all, including Plazas, Mini Parks, and Neighborhoods
More informationGlenbrooke North. New Westminster s Neighbourhoods Identifying Historical Contexts. Historical Neighbourhood Context Statements 2008
Historical Neighbourhood Context Statements 2008 Glenbrooke North Fifth Street: wide boulevard, with garden median at south end 1950s subdivision character along much of Eighth Avenue and east of Fourth
More informationARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 16, 2018 DATE: June 7, 2018 SUBJECT: Z-2604-18-1 Rezoning from R-6 and R-5 Single Family Residential Districts to S-3A Special District
More informationUrban Planning and Land Use
Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning