FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Similar documents
FY 2005 TRANSPORTATION CAPITAL PROGRAM

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

4.1 Build Alternative 1 Construction Phasing

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

Fiscal Year 2003 Transition List

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Southern Windsor County RPC Transportation Project Priorities January 2015

Capital Projects in and near Odenton Town Center

Southern Windsor County RPC Transportation Project Priorities Methodology January 2016

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

2018 Primary Road Capital Improvement Plan (CIP) Projects Preservation / Structural Improvement, Non-motorized and Engineering Design Projects

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

CENTERTON ROAD BRIDGE REPLACEMENT

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM MPO Project Descriptions Suballocated STP Funding ($ millions)

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

AGENDA ACTION ITEMS INFORMATION ITEMS

Bexar County Public Works Department Flood Control Program

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Construction Engineering & Inspection

5-Year Street Reconstruction Plan ( )

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Fall 2017 Construction Update

Abbott Loop. Community Council Survey Capital Projects Needs Ranking Survey. Comm Council Priority Rank. Rank # ABBOTT LOOP COMMUNITY PARK

Moving The Metro. A special construction update for the metro Omaha area.

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

Berkshire Regional Planning Commission Clearinghouse Review Report

Page. I. Introduction 1. II. Project Purpose and Need 1. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) Property 3

TRANSPORTATION COMMITTEE

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Public Officials/Design Advisory Meeting #12. Bensalem Township Municipal building, 2400 Byberry Road Bensalem, PA

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

SR 483 Clyde Morris Boulevard FDOT District 5

Public Information Centre. Welcome

Project Purpose. Project Need

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Existing Transportation System 5-1

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

FY STUDY AND DEVELOPMENT PROGRAM

2 ALTERNATIVES AND OPTIONS

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

PROPOSED IMPROVEMENTS

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Olde Towne Vision Plan

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

List of Priority Projects

Access Management: An Overview

Regional and Local Perspectives

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

SECTION 4(f) DE MINIMIS DOCUMENTATION

DVRPC FY TIP for PA

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Victoria Bridge Municipal Class EA Civic Works Committee

1.0 Circulation Element

Mavis Road Class Environmental Assessment

Mississippi Skyway Preliminary Engineering Report

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

Planning Districts INTRODUCTION

Rutherford County Projects

Waukee. City of. The Key to Good Living

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

Capital Projects impacting Odenton Town Center

7.5 Impacts on the Section 4(f) Properties

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

SECTION II SECTION II STATEMENT OF GOALS, OBJECTIVES, PRINCIPLES, ASSUMPTIONS, POLICIES AND STANDARDS

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Welcome to the. Open House

Concord, BRF-X-5099 (021), Draft Alternative Analysis

The purpose of tonight s PIC is to:

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Southern Gateway Project and Public Green

City of Richmond. Engineering Design Specifications

Transcription:

ROUTE/ Project ID No. TIP No. Burlington County Computerized Signal Control, IV D9911 D9911 This ITS project will be a traffic responsive signal system, consisting of 24 intersections--9 on CR 607, 4 on CR 616, 6 on CR 674, 5 on CR 673. Design work is being funded through county funds. MUNICIPALITY: Various MILEPOSTS: N/A LEGISLATIVE DISTRICT: Various CATEGORY: SPONSOR: Burlington County Local Aid - Local Roadway Improvements $2,500,000 DVRPC CON STP-STU $2,500,000 Section III - Page 1

ROUTE/ Project ID No. TIP No. Burlington County Restriping Program D0302 D0302 This program will provide for the restriping of various roadways in Burlington County. MUNICIPALITY: Various MILEPOSTS: N/A LEGISLATIVE DISTRICT: 7 8 9 30 SPONSOR: Burlington County CATEGORY: Local Aid - Local Roadway Improvements $1,000,000 DVRPC CON STP-STU $500,000 DVRPC CON TBD $500,000 Section III - Page 2

ROUTE/ Project ID No. TIP No. Chesterfield-Sykesville Road Bridge L137 L137 The existing two-span, reinforced concrete bridge (Structure No. 03F2320) over Black's Creek will be replaced with a one-span bridge, using prestressed concrete superstructure and reinforced concrete substructure. Approximately 170 feet of approach roadway will be reconstructed. MUNICIPALITY: Chesterfield Twp. MILEPOSTS: N/A STRUCTURE NO.: 03F2320 LEGISLATIVE DISTRICT: 30 CATEGORY: Bridge Preservation - Local Bridges $1,762,000 DVRPC CON BRIDGE-OFF $1,762,000 Section III - Page 3

ROUTE/ Project ID No. TIP No. Delaware River Heritage Trail, Burlington/Mercer 02390 02390 The purpose of this project is to construct the New Jersey portion of "The Delaware River Heritage Trail." This trail has been envisioned as a bi-state, multi-use, non-motorized recreational route along both sides of the Delaware River. The New Jersey portion of this trail extends from Trenton to Palmyra with both on and off-road sections envisioned. The trail will provide a link to many neighborhoods, parks, and trails in the region. Mercer MUNICIPALITY: Various MILEPOSTS: N/A LEGISLATIVE DISTRICT: 7 30 14 15 SPONSOR: Local Lead CATEGORY: Intermodal Programs - Bicycle/Pedestrian DVRPC ERC STP-STU $400,000 Section III - Page 4

ROUTE/ Project ID No. TIP No. CR 616 Hanover Street Bridge over Rancocas D9902 D9902 Creek Hanover Street bridge over the Rancocas Creek is 0.2 miles north of CR 530. The existing bridge is two narrow lanes, a sidewalk and no shoulders. The bridge will be replaced on the same alignment. The new structure will be two travel lanes, sidewalks and shoulders. This project will accommodate bicycles and pedestrians. MUNICIPALITY: Pemberton Boro MILEPOSTS: N/A STRUCTURE NO.: 03E4550 LEGISLATIVE DISTRICT: 8 CATEGORY: SPONSOR: Burlington County Bridge Preservation - Local Bridges $3,240,000 DVRPC DES BRIDGE-OFF $300,000 DVRPC ROW BRIDGE-OFF $100,000 DVRPC CON BRIDGE-OFF $3,240,000 Section III - Page 5

ROUTE/ Project ID No. TIP No. Region South Drainage Improvements (Rts. 40, 42, 206, 676) 02343 02343 The following drainage problems will be addressed through this project: Route 40, Buck Road (MP 21.80)--The improvement includes construction of a new drainage system and stormwater infiltration basin along Route 40. In addition, Route 40 will be regraded, paved and curbing replaced. Route 42, Maxine Avenue (MP 0.60)--The project will provide for reconstruction and upgrades to the existing drainage system, including new inlets and pipes as well as the replacement of existing culverts. The open channel will be regraded to provide stability to the roadway. Route 206, Tuckerton Road (MP 12.75)--The improvements include raising Route 206 as well as grading and repair of all existing ditches. Existing drainage pipes will be replaced with larger pipes and additional outlets. Route 676, Atlantic Avenue (MP 2.30)--This project will include reconstruction and upgrades to portions of the existing drainage systems. Also included will be construction of two stormwater management basins and addition of new inlets and pipes along Atlantic Avenue. COUNTY: Camden Gloucester Burlington Salem MUNICIPALITY: Various MILEPOSTS: See description LEGISLATIVE DISTRICT: 3 4 8 5 CATEGORY: Roadway Preservation - Drainage $4,454,000 DVRPC CON STATE $3,329,000 SJTPO CON STATE $1,125,000 Section III - Page 6

ROUTE/ Project ID No. TIP No. CR 684 Smithville Road Bridge over Rancocas D9903 D9903 Creek Smithville Road Bridge over the Rancocas Creek is 1 mile north of the intersection with CR 530. This two-lane bridge carries an AADT of about 3,200 vehicles. The road is classified as an Urban Collector. The current sufficiency rating for the bridge is 22.7. This bridge is in Local Scoping where a determination will be made as to whether the bridge needs to be replaced or rehabilitated. MUNICIPALITY: Eastampton Twp. MILEPOSTS: N/A STRUCTURE NO.: 03E4440 LEGISLATIVE DISTRICT: 8 CATEGORY: SPONSOR: Burlington County Bridge Preservation - Local Bridges $2,500,000 DVRPC DES BRIDGE-OFF $300,000 DVRPC ROW BRIDGE-OFF $50,000 DVRPC CON BRIDGE-OFF $2,500,000 Section III - Page 7

ROUTE/ Project ID No. TIP No. CR 530 South Pemberton Road D9912 D9912 This project will provide for the reconstruction of CR 530 from Route 206 to CR 644 to improve safety, reduce accidents, facilitate left-turn movements with a continuous center left-turn lane, and add shoulders. Alternatives being considered include possible intersection relocation. Construction will be multi-year funded. The total construction cost is anticipated to be $11,999,596. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under Section 1601, High Priority Projects Program. The Act allocated $6.0 M for this project. FY 2000 and FY2001 RABAs have increased the total authorization amount to $6,158,006. MUNICIPALITY: Southampton Twp. Pemberton Twp. Pemberton Boro MILEPOSTS: 0-2.68 LEGISLATIVE DISTRICT: 8 SPONSOR: Burlington County CATEGORY: Local Aid - Local Roadway Improvements $11,999,600 DVRPC DES DEMO $1,500,000 DVRPC ROW DEMO $2,000,000 DVRPC CON DEMO $1,450,596 DVRPC CON TBD $10,549,000 Section III - Page 8

ROUTE/ Project ID No. TIP No. 70 Bisphams Mill Creek Bridge 98359 98359 The objective of this project is to replace the structure and improve the safety of the highway. The improvements will include vertical alignment modifications, shoulder widening, guiderail upgrades, and replacement of the structure. The non-functioning dam adjacent to Route 70 will be removed. MUNICIPALITY: Pemberton Twp. Woodland Twp. MILEPOSTS: 27.85-27.905 STRUCTURE NO.: 0311150 LEGISLATIVE DISTRICT: 8 CATEGORY: Bridge Preservation - Bridge Rehab and Replacement $2,435,000 DVRPC CON STATE $2,435,000 Section III - Page 9

ROUTE/ Project ID No. TIP No. 73 Fox Meadow Road/Fellowship Road 94068 94068 Route 73 is two lanes in each direction with shoulder/acceleration-deceleration lanes. The improvements will provide four northbound lanes and three southbound lanes along Route 73 at the intersection of Fox Meadow Drive. Auxiliary/acceleration/deceleration lanes will be constructed at Fox Meadow Drive exits and at the Main Street Bridge ramps. Fellowship Road will be realigned at the traffic signal at Fox Meadow Drive. Main Street Bridge will be replaced to provide proper vertical clearance over Route 73. This will require Main Street reconstruction and replacement of the Main Street Bridge over Pennsauken Creek. The project will also include drainage improvements at the railroad bridge. MUNICIPALITY: Maple Shade Twp. MILEPOSTS: 28.80-29.98 STRUCTURE NO.: 0314151 03D4290 LEGISLATIVE DISTRICT: 7 CATEGORY: Bridge and Roadway Preservation - Bridge and Roadway Rehabilitation $26,450,000 DVRPC ROW MIN GAR $4,400,000 DVRPC UTI MIN GAR $6,371,000 DVRPC CON MIN GAR $20,079,000 Section III - Page 10

ROUTE/ Project ID No. TIP No. 73 70 Marlton Circle Elimination (5) 567 567 The Marlton Circle, at the intersection of Route 70 and Route 73, will be eliminated; a grade-separated interchange (Route 73 over Route 70) will be constructed. The primary objective is to improve traffic flow and thereby reduce congestion on Route 73 and 70 through the intersection. MUNICIPALITY: Evesham Twp. MILEPOSTS: 23.90-24.50 LEGISLATIVE DISTRICT: 8 CATEGORY: Congestion Management - Hwy Operational Improvements $36,500,000 DVRPC DES NHS $1,100,000 DVRPC ROW NHS $5,500,000 DVRPC UTI NHS $3,500,000 DVRPC CON TBD $33,000,000 Section III - Page 11

ROUTE/ Project ID No. TIP No. 73 Median Closures, Fairview Avenue to 94035 94035 Greentree Road The project is to enhance safety along Route 73 by closing nine selected median openings and the construction of left-turn lanes at another eight openings. The construction of a right-turn lane at West Franklin Avenue is also included. Camden MUNICIPALITY: Berlin Twp. Voorhees Twp. Evesham Twp. MILEPOSTS: 17.84-25.32 LEGISLATIVE DISTRICT: 5 8 6 CATEGORY: Safety - Safety Improvements $2,569,000 DVRPC CON STP-SY $2,569,000 Section III - Page 12

ROUTE/ Project ID No. TIP No. 130 Corridor No. 3B, Airport Circle to Wood 95078B 95078B Street, Burlington City Various roadway improvements are being studied in support of the Burlington County Route 130/Delaware River Corridor Strategic Plan from Route 73 to Wood Street, Burlington City. It may include comprehensive corridor rehabilitation and operational improvements including, where appropriate, pavement rehabilitation, intersection improvements, drainage improvements, development of an access management plan, pedestrian improvements, signing and lighting improvements, and roadside rehabilitation. The study includes a county-led visual corridor planning effort under the same contract which is being administered by DVRPC, with a general project manager role. The federal Transportation Equity Act for the 21st Century (TEA-21) provided funding for this project under Section 1601, High Priority Projects Program. The Act allocated $3.0 M for this project. FY 2000 and FY2001 RABAs have increased the total authorization amount to $3,079,004. Camden MUNICIPALITY: Various MILEPOSTS: 30.50-46.20 LEGISLATIVE DISTRICT: 7 5 CATEGORY: Capital Program Delivery - Corridor Studies DVRPC CD DEMO $500,000 Section III - Page 13

ROUTE/ Project ID No. TIP No. 130 DVRPC Deck Replacements ( B), 01313A 01313A Mercer/Burlington County This program will provide for the rehabilitation of the following deck replacement projects in the DVRPC area: Route 130 southbound over Assiscunk Creek and Route 130 over Rocky Creek. COUNTY: Mercer Burlington MUNICIPALITY: East Windsor Twp. MILEPOSTS: 46.65; 68.92 STRUCTURE NO.: 1123152 0317152 LEGISLATIVE DISTRICT: 7 12 CATEGORY: Burlington City Bridge Preservation - Deck Rehab and Replacement $2,000,000 DVRPC CON BRIDGE $2,000,000 Section III - Page 14

ROUTE/ Project ID No. TIP No. 130 Kinkora Branch Bridges, removal 98346 98346 The northbound and southbound structures over the abandoned railroad will be removed. The typical section would, therefore, be constructed on fill. Field evidence and contacts with local officials have indicated the existing conveyance under the structures is utilized by wildlife; therefore, in order to maintain a safe and adequately sized opening for wildlife, a 15-foot by 15-foot arch culvert will be constructed under the roadway improvements. The roadway typical section will consist of two 12-foot lanes, a 10-foot outside shoulder, and 3-foot inside shoulder in each direction of travel. In addition, a 16-foot grass median will be consistent throughout the limits of the project. Furthermore, the substandard vertical curve in the immediate vicinity of the structures will be lowered to conform with NJDOT standards. The horizontal alignment is to be modified in order to remove the reversing curves existing within the project limits. MUNICIPALITY: Mansfield Twp. MILEPOSTS: 52.00-52.40 STRUCTURE NO.: 0317156 0317157 LEGISLATIVE DISTRICT: 8 CATEGORY: Bridge Preservation - Bridge Rehab and Replacement $5,889,000 DVRPC CON STATE $5,889,000 Section III - Page 15

ROUTE/ Project ID No. TIP No. 206 Jack's Run, Drainage Improvements 96002 96002 An inadequate drainage system, sedimentation and backwater cause flooding impacts. The project will replace and upgrade the existing storm drainage system. The section of the ditch between Route 206 and CR 641 will be contained in a drainage easement, allowing NJDOT to maintain the ditch. Grading will reestablish the umbrella roadway section and adjacent roadway ditches. The project will also include repaving of a portion of Route 206 to raise it above the 25-year water surface elevation of Beaver Dam Creek, provide superelevation of a horizontal curve and improve a crest vertical curve. The project will mitigate flooding in the 25-year and smaller storm events. MUNICIPALITY: Southampton Twp. MILEPOSTS: 18.40 LEGISLATIVE DISTRICT: 8 CATEGORY: Roadway Preservation - Drainage $1,331,000 DVRPC DES NHS $300,000 DVRPC ROW NHS $25,000 DVRPC CON NHS $1,331,000 Section III - Page 16

ROUTE/ Project ID No. TIP No. 206 Old York Road/Rising Sun Road (39) 9208 9208 This project will provide construction of a new connector road between Rising Sun Road and Route 206 as well as pavement rehabilitation on Old York Road and Rising Sun Road to accommodate heavy traffic between I-295 and Interchange 7 of the New Jersey Turnpike. This is a multi-year funded project under the provisions of Section 13 of P. L. 1995, c.108. Total construction funding is anticipated to be $26,059,000. MUNICIPALITY: Bordentown Twp. MILEPOSTS: 34.00-34.10 LEGISLATIVE DISTRICT: 30 8 CATEGORY: Mansfield Twp. Congestion Management - Hwy Operational Improvements $21,357,000 DVRPC CON NHS $8,408,000 $12,949,000 Section III - Page 17

ROUTE/ Project ID No. TIP No. 295 38 Missing Moves, Mount Laurel 191A 191A The existing I-295 and Route 38 interchange does not provide all the direct traffic movements between the two roadways. A study is underway to determine whether it is appropriate to complete the interchange. The adjacent signalized intersections of Marter Avenue and Briggs Road along Route 38 will be included in the study. The Federal FY 2003 Interstate Maintenance Discretionary program provided funding in the amount of $250,000. The Federal FY 2004 Interstate Maintenance Discretionary program provided funding in the amount of $750,000. MUNICIPALITY: Mount Laurel Twp. MILEPOSTS: 295: 40.0-41.0; 38: 9.1-10.3 STRUCTURE NO.: 0327160 LEGISLATIVE DISTRICT: 8 CATEGORY: Congestion Management - Hwy Operational Improvements DVRPC PD DEMO $3,500,000 Section III - Page 18