Mud Pump (Emsco Type) Diesel Engine

Similar documents
Better Oil Tools Africa General presentation

API Specification 6A. Abbreviated Terms

Table of Contents. 55 Foot Mast Trailer Tab 1. A Stops Tab 2. Bailers Tab 3. Bailer Bottoms See Tab 3. Baker Plugs See Tab 24. Broaching Tools Tab 4

Flowtools Middle East LLC

Purchasing Guide for Wellhead & Christmas Tree Equipment

HT4700 Heating Jacket Instruction Manual

FREEZE CASE HISTORY. 3-½ Tailpipe 7" packer 5-¾ open hole Lateral = 1500 ft

Offshore Drilling & Pipeline Equipment

INSTALLATION INSTRUCTIONS (please become familiar with these instructions before installing).

GS OILTOOLS PRESENTATION

f l e x i b l e s o l u t i o n s

OPERATOR S MANUAL. For BURLY ATTACHMENTS

Development of a High Pressure Gas Gun for H 2 S and CO 2 Service

Owner's Manual Paramount 65X GRAPHIC LAMINATION PRODUCTS

Industry Decanter Centrifuge

AIC Brazed Plate Heat Exchanger Operating and Instruction Manual

Oil and Gas Sector one stop solution provider

Products and Services

R A D I A N T O U T D O O R H E A T E R S OPERATION, INSTALLATION AND MAINTENANCE MANUAL. TT-MTM Wall Controller

P/N CC-100. Coolant Circulator. Operation manual

Heater Installation Kit

SUMMIT ENVIRO-CLEAN TOOLS

Installation of Downhole Heaters to Prevent Paraffin Blockages

OPERATOR S MANUAL SF-12 AND SF12A HI VOLUME WATER HEATER

Weatherford Completions Key-Techs Overview. Manuel Molina Technical Sales Manager

Del Rio Tile Top Fire Pit Table

CORPORATE OVERVIEW A LT E R N AT I V E T H I N K I N G

InTang DOWNHOLE EQUIPMENT RENTAL $ 3, HINTON 4800' 2 7/8" PH6 TUBING

Series TY-B & TY-FRB, 10 mm Orifice, ISO 7/1-R3/8 Upright, Pendent, and Recessed Pendent Sprinklers Standard and Quick Response General Description

Installation, Operation and Maintenance Manual for Model 8331 Condensate Accumulator

GRUNDFOS INSTRUCTIONS. Sololift2 C-3. Installation and operating instructions

INSTRUCTION MANUAL HS-229G

IMPORTANT INFORMATION - PLEASE READ CAREFULLY

Advanced Laundry Chemical Dosing System for Single and Multi-Washers

APPLIED VACUUM TECHNOLOGY VACUUM PUMPS & SYSTEMS

Auto Top-Off & Ultra-Precise Liquid Level Controller II

INSTALLATION INSTRUCTIONS: VERTICAL WALL BED HARDWARE KIT WITH FRAME

Professional Warming Drawer and Warming Drawer Cabinet

Figure 6- Capillary Installation

DESIGNED BY FIRE FIGHTERS FOR FIRE FIGHTERS.

installation, operation & Maintenance manual Floor-mounted Induction units acb 30/35

SOLARHOT. SuperVox. Description / Applications System Overview. Installation/ Owner s Manual

Corrosion Resistant Fluid and Air Handling Systems.

Stoneridge Fire Pit High Dining Table Assembly Instruction

Goulds 3600 Between-Bearing, Axially-Split, Multi-Stage Pumps. Goulds Pumps

Reliable, Compact Systems with Complete Flexibility in Customization and Design

Hydraulic V-Top & Flat-Top Surgery Tables

DEMA PROPORTIONER MODEL 167 & 167T INSTALLATION INSTRUCTIONS

Installation and Maintenance Instructions

92831 TEL: (714) FAX:

TrueClean ToteCleaner

UPP7500E2 AUTOMATIC PRESSURE POT CLEANER

Flat Line Spray Systems Kits

INSTALLATION INSTRUCTIONS WARRANTY

Goulds 3600 Between-Bearing, Axially-Split, Multistage Pumps


Instruction Manual GP110 GelPump

IMPORTANT INFORMATION - PLEASE READ CAREFULLY

55-Gallon Dispenser Package

Oil and Water Retort Instruction Manual

installation, operation & Maintenance manual acb ceiling-mounted cassette models

CAUTION UM120W (RIGHT TANK) FOR WATER BORNE PAINTS ONLY UM120W (RIGHT TANK) SECTION IS NOT DESIGNED FOR USE WITH SOLVENT BASED PAINT

M Series Fan Filter Units

Corrosion Resistant Alloy Running Procedures with Eckel Tongs and Non-Marking Grit Faced Dies

Roots TM Blowers, Compressors & Controls

Drain Tempering Reservoir READ & SAVE THESE INSTRUCTIONS. Installation, Operation, & Maintenance. TRION

OPERATING INSTRUCTIONS

40/40 Duct Mount P/N Installation Guide. Document Ref: TM777670, Rev. (3) June 2017

Thermometers Installation, Operation and Maintenance WINTERS INSTRUMENTS. MANUFACTURER OF INDUSTRIAL INSTRUMENTATION

"SWVP - SWHP" COMMERCIAL WATER SOURCE HEAT PUMPS & AIR CONDITIONERS

specifications the many advantages of bondstrand gre pipe systems

Propane Fume Detection System With Solenoid Valve Control

CSD-1 CRN Electra Steam, Inc. Instruction Manual for JR06 Steam Generator, JG- and JJ- Models

55-Gallon Dispenser Package

CIRRUS PRO. User Manual and Responsibilities ASPIRATING FIRE DETECTOR

THERMOMETER INSTALLATION, OPERATION AND MAINTENANCE

INSTALLATION AND OPERATING INSTRUCTIONS FOR Built-in units Blt-in-38, Blt-in-58, Blt-in-36 & Blt-in-62

V-Top & Flat-Top Surgery Tables. Table of Contents

SERVICE MANUAL (v1) UL / ULC. WET CHEMICAL HAND PORTABLE RESTAURANT KITCHEN FIRE EXTINGUISHERS Model: SF-6LK / WBDL-6LK

installation, operation & Maintenance manual Floor-mounted Induction units

Torq N Seal. Operating and Maintenance Instructions. Mechanical Tube Plugs

Dry Bulk Truck Blowers

Installation Instructions Built-In Dishwasher

Troubleshooting the MPH 24FP Series Pedestal Hydrant

OPERATION, INSTALLATION AND MAINTENANCE MANUAL. THX Flush Mount Enclosure. Take heating to the Max!

BLACKSTAR ELECTROMAGNETIC MEASUREMENT WHILE DRILLING (MWD) TOOLS

BATHBAY COLLECTION INSTALLATION AND OPERATION INSTRUCTIONS

LEWA Plunger pumps. For high hydraulic power.

Desiccant / Pump Dehumidification System. Model Operating Manual

Retro-DWS Internal Heating Cable System for Non-Pressurized Sewer and Waste Drain Pipes

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

Portable Roller Oven (115 Volt) (230 Volt) Instruction Manual. Updated 8/11/2015 Ver. 3.0

OPERATING MANUAL UG2000D SERIES SPRAY GUN CLEANERS UG2000D, UG2000DM UNI-RAM CORPORATION ONTARIO CANADA UG2000DM UG2000D REVISION

LITTLE BLASTER SET-UP INSTRUCTIONS FOR SHOT PEEN MACHINES WITH CARTRIDGE TYPE DUST COLLECTORS *** READ BEFORE OPERATING EQUIPMENT***

Owner s Manual Refrigerated Compressed Air Dryers Models F-200, 250, 300 & F350

UM120W OPERATING MANUAL MANUAL WATERBORNE GUN CLEANER CAUTION FOR WATERBORNE PAINTS ONLY UNI-RAM CORPORATION ONTARIO CANADA

INSTRUCTION MANUAL. Keep this manual in a safe place for future reference FREE FLOAT TYPE STEAM TRAPS SS3/SS5 SERIES. Manufacturer

OPERATION MANUAL Model 8011 & mA

BX Series. Installation, Operation, Maintenance Instructions & Spare Parts

OWNER S MANUAL FINLEY FIREPLACE. Product code: UPC code: Date of purchase: / /

Transcription:

Houston: +1 713-893 - 5018 Beijing: +86 10 82898786 E-mail: info@cppipe.com Website: www.cppipe.com www.cppipe.cn CP Pipe & Equipment Corporation (CP) is a major US supplier of tubular products, petroleum equipment and rigs with headquarters in Houston and office in Beijing and Geneva. CP partners with the highest quality American and Chinese manufacturers to meet our customer s needs with reliable quality and accountable delivery at competitive price. CP specializes: Tubular Products Drill Pipe Drill Collar Heavy Weight Drill Pipe Kelly Casing Tubing Wellhead Equipment Casing Head Tubing Head Christmas Tree Polymer Pump Three Phase Separator Reducing Flange Wellhead Tools Well Control Equipment Ram BOP Annular BOP Control System Choke Manifold Kill Manifold Diverter Drilling Spool (Mud Cross) Valves & Unions Mud Pump System Mud Pump (Gardner Denver Type) Mud Pump (Emsco Type) Diesel Engine Pulsation Dampener Packers Production Packer Testing Packer Service Packer Rigs Truck Mounted Drilling Rig Truck Mounted Work-over Rig Drilling Rig CP has more than 10 years of experience servicing our customers in, Mexico, Columbia, Angola, Spain, Netherlands, and Great Central Asia. All of our factories are API and ISO certificated and guaranteed by our international standard quality assurance and warranty. In addition to our tubular products, petroleum equipment and rigs, we also provide rigs and accessories for water well drilling. Houston Headquarters Phone: +1 713 893 5018 Beijing Office Geneva Office Phone: +41 22 575 38 18

www.cppipe.com www.cppipe.cn info@cppipe.com Houston +1 713-893-5018 Beijing +86 10 82898786 Wellhead Equipment Christmas Tree Casing Head Tubing Head Polymer pump Three Phase Separator Wellhead Tools Houston Headquarters, Phone: +1 713 893 5018 Beijing Office Beijing 100085, China Geneva Office,

Wellhead Equipment -- Christmas Tree www.cppipe.com www.cppipe.cn info@cppipe.com Houston +1 713-893-5018 Beijing +86 10 82898786 Christmas Tree (Shanghai SK, Doyles, Downing) According to API 6A specification Meet NACE MR-0175 standard Compact structure and reliable operation Metal seal from tubing hanger to Christmas Tree All connections are flange Outlet valve changeable under pressure Specifications Main Bore: 2 1/16-4 1/16 Work Pressure: 3,000-20,000 Psi Temperature Class: K L P R S T U Material Class: AA BB CC DD EE FF HH Performance Class: PR1, PR2 Production Class: PSL1, PSL2, PSL3, PSL3G Christmas Tree with ESP Dual Tubing Christmas Tree Wellhead Equipment For Gas Production Well Test Equipment

Wellhead Equipment -- Casing Head www.cppipe.com www.cppipe.cn info@cppipe.com Houston +1 713-893-5018 Beijing +86 10 82898786 Casing Head (Shanghai SK, Doyles, Downing) According to API 6A specification Automatically set and support any casing string Automatically seal the annulus Corrosion resistance Weld Type Casing Head Housing Two welding joints at the bottom for welding casing Pressure test ports for water pressure testing of weld joints Ground Casing: 13 3 / 8-20 Thread Type Casing Head Housing API bottom connection: long-round, short-round and buttress thread Ground Casing: 7-20 Slip Type Casing Head Housing Easy to install at the fields The direction can be adjusted Double seals to connect the casing Pressure testing ports. Casing Hanger W Type WE Type WD Type Mandrel Type

Wellhead Equipment -- Tubing Head www.cppipe.com www.cppipe.cn info@cppipe.com Houston +1 713-893-5018 Beijing +86 10 82898786 Tubing Head (Shanghai SK, Doyles, Downing) According to API 6A specification Seal: Rubber, Rubber-Metal, Metal-Metal Reliable second seal Max working pressure: Up to 20,000 Psi Tubing Head with Cable Penetration Excellent insulation and seal for cable penetration Under-well control line entry Working Pressure: 3,000-15,000 Psi Tubing Head with Dual Tube Tubing Hanger Seal: Rubber, Metal - Metal Top & Bottom Thread: API thread or other special gas seal thread, with under well control line entry. Work Pressure: 3,000-10,000 Psi Tubing Hanger Rubber-sealed Wrapped Cable Penetration Metal-Sealed Reducing Flange According to API 6A specification Type: S, MH, T Bottom Flange: 7 1 / 16 (2,000-10,000 Psi) Top Flange: 2 1 / 16-3 1 / 8 (2,000-10,000 Psi) Studded Outlet (Optional): 2-3.150 mm

Wellhead Equipment -- Polymer pump & Three Phase Separator www.cppipe.com www.cppipe.cn info@cppipe.com Houston +1 713-893-5018 Beijing +86 10 82898786 Polymer pump According to API 6A specification Stainless steel pump fluid end Long service life, easy maintenance and splash lubricated for power end Specifications Input pressure: 3-145 Psi (0.02-1 MPa) Output pressure: 1,160-4,650 Psi (8-32 MPa) Displacement: 2-200 gal/min (8-800 L/min) Three Phase Separator The separator and the heating furnace are horizontal skid-mounted. The separator is made of high quality steel plate by welding process. Pressure, fluid level and oil-water interface are controlled by pneumatic instruments. The heating furnace has water-bath type structure, and the combustor can fire oil or gas. Specifications Working Pressure: 1,420 Psi (9.8 MPa) Chamber Diameter: 31.5 (800 mm), 39.4 (1,000 mm) Liquid processing capacity: 106,000 gal/d (400 m 3 /d), 212,000 gal/d (800 m 3 /d) Gas processing capacity: 132,000,000 gal/d (500 Km 3 /d), 264,000,000 gal/d (1,000 Km 3 /d)

Warranty Terms CP PIPE & EQUIPMENT, LLC Houston, Texas 77450 Email: info@cppipe.com Tel: 1-713-893-5018 Fax: 1-866-792-3588 The following terms and conditions shall apply to all the products sold or furnished by CP Pipe & Equipment LLC (CP): 1. Warranty: CP offers limited twelve (12) months warranty for all its products. The warranty period will be effective from the date of delivery to the destination port. During this period, CP warrants its products being defects-free in materials, parts and workmanship. 2. Limitations: During the warranty period, CP s total liability for any defects shall be limited to repair or replacement of the product. CP has sole and unfettered discretion to determine whether a particular product will be replaced or repaired. And CP assumes no liability as a consequence of following circumstances, under which will be automatically excluded for warranty: - The products are found to be defective after expiry of the warranty period. - The product has been subjected to misuse, abuse, or unauthorized repair, whether by accident or other cause. - Product is damaged beyond repairs due to uncontrollable factors such as shipping and nature disasters. 3. Inspection before shipment: The Buyer shall have the right to inspect the products at the plant before dispatch to the port. Under the premise, CP shall notify the buyer to send inspector(s) to come to the manufacturing facility to perform the inspection at least a week prior the shipment. Upon the buyer s arrival for inspection, the seller should have all the original inspection records and material certificates ready. The inspector(s) shall arrive and perform the inspection before scheduled shipping date. The buyer should bear the costs of the inspectors. Houston Headquarters, Phone: +1 713 893 5018 Beijing Office Beijing 100085, China Geneva Office,