TECHNICAL BULLETIN ACCESSORY INFORMATION NU-984 FORMALIN/AMMONIA VAPORIZER

Similar documents
VENTLESS EXHAUST HOOD OPERATORS MANUAL AND PARTS LIST REV. MAY 2016

MODEL 925W FEATURES: ELECTRICAL DATA: DIMENSIONS: SHIPPING INFORMATION: FOOD WARMING/ MERCHANDISING CABINET

Ledco XL-44 Wide Format Pouch Laminator

Operation & Maintenance Manual MONSOON WET DOWNDRAFT TABLE. Visit our Website for more information on this product.

Blue Air. Commercial Refrigeration Inc. Installation & Operation Manual Ice Cream Freezers

Installation & Operation Manual Ice Cream Freezers

Owner s Manual Refrigerated Compressed Air Dryers Models F-200, 250, 300 & F350

Instruction Manual. 36 in. and 42 in. Popcorn Staging Cabinets

MODEL: 1407, , 1408, & INSTALLATION AND INSTRUCTION MANUAL

Series: MBC1-TC Mini Benchtop Temperature Controller

USE AND CARE GUIDE FOR MODEL MEK1, MEK15. Express Cordless Kettle

Owner s Manual Refrigerated Compressed Air Dryers Model F-100

RPI Industries, Inc.

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

COMMERCIAL REFRIGERATORS AND FREEZERS

ELECTRICAL DATA: FEATURES: SHIPPING INFORMATION: FOOD WARMING/ MERCHANDISING CABINET. 15 Width 7 Width

OWNER S MANUAL FOR AIR ADMIRAL VACUUM/PRESSURE STATION MODELS:

M Series Fan Filter Units

MaxLite LED High Bay Fixtures

USER S OPERATING AND INSTRUCTION MANUAL

Model 2016, 2025, 2025BN, 2025ST Staging Cabinets Instruction Manual

Professional Warming Drawer and Warming Drawer Cabinet

RPI Industries, Inc.

FOR EASY, FAST INSTALLATION AND FOR RESULTS

SANI-VAC MODEL #750 WARNING! FOR YOUR SAFETY PLEASE READ INSTRUCTIONS BEFORE OPERATING TOOL. & WEAR EYE PROTECTION

Instruction Manual for the Revolutionary Science RS-PB-100 Poly Pro Bath TABLE OF CONTENTS

Cincinnati, OH USA

RPI Industries, Inc.

WMWLB / WMWFM / WTWLB / WTWFM Series Hydronic Heating Unit

Instruction Manual. Nacho Cheese Dispenser and Warmer

Installation and Operating Guide Document No Vacuum Chambers Copyright 2017 Terra Universal Inc. All rights reserved.

Product Numbers & Ordering Information

TG-10 Wall Mount Installation and Operation Manual. High Output Ozone Generator

MACHO POP Instruction Manual Model 2554EX, 2554BCX

MODEL REO-1620SE ELECTRIC RETHERMALIZER OPERATING INSTRUCTIONS

Operator s Manual. 6 Gallon Model No. VQ607SFD FOR YOUR SAFETY. Read and understand this manual before use Keep this manual for future reference

Thank You & Congratulations On Your Purchase of: ARBE Model # SS-206 Table Top Dust Collector

MODEL 891 FEATURES: ELECTRICAL DATA: DIMENSIONS: SHIPPING INFORMATION: SHIPPING DIMENSIONS: - 19"W 19"D 28"H SHIPPING WEIGHT: - 46 LBS.

Quick-Start Operating Guide Document No Acrylic Vacuum Chambers Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

Cheese Display Case. Instruction Manual Model #5580BV2 and Model #5580BV3 Model #5582 and Model #5583. Cincinnati, OH USA.

Model 2016, 2025, 2025BN, 2025ST Staging Cabinets Instruction Manual

SOUP COOKER/WARMER 120V, 240V MODEL 6423 INSTRUCTIONS. Installation Operation Maintenance

DH07, DH07A /DH08, DH08A CONVECTED AIR DISH HEATERS

A2Z Ozone, Inc. PRODUCT MANUAL

MANUAL 8/12/05. Model BKP TM 100 INSTALLATION, OPERATION & MAINTENANCE. Commercial High Efficiency Heat Pipe Dehumidifier

Owner s Manual Refrigerated Compressed Air Dryer Model F-50

Warmer Cabinet Instruction Manual Model # 5581, 5581EX. Part No

Countertop Clear Ice Maker

92831 TEL: (714) FAX:

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Owner s Manual Refrigerated Compressed Air Dryers Models F-3528, F-3529, F-3530, F-3531 & F-3532

DESCRIPTIVE AND INSTALLATION INSTRUCTION MANUAL FOR MODEL AH1000, BH1000, AND EH1000 SERIES ANNUNCIATORS

DESCRIPTIVE AND INSTALLATION INSTRUCTION MANUAL FOR MODEL G1000 AND H1000 SERIES ANNUNCIATORS

POLAR TEMP FARM MORTALITY UNIT OPERATION MANUAL

HC12W COOL MIST ULTRASONIC HUMIDIFIER OWNER S MANUAL. Read and save these instructions.

Citation Models #2001, 2001ST, 2001BN Instruction Manual

Refrigerator Freezer Installation and Operation Manual

Sunleaves Air Conditioner

DR Series. Installation & Operations Manual. Model: DR-10 HIGH OUTPUT SHOCK TREATMENT OZONE GENERATOR

COMMERCIAL REFRIGERATOR INSTRUCTION MANUAL

Milk Coolers Installation and Operation Manual Please read this manual completely before attempting to install or operate this equipment!

ADVANTAGE SERIES KXRP28 AIR-TO-AIR HEAT EXCHANGER

INSTRUCTION MANUAL BEFORE USE, PLEASE READ AND FOLLOW ALL SAFETY RULES AND OPERATING INSTRUCTIONS.

IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

OPERATING INSTRUCTIONS

OWNERS MANUAL For IN ROOM BREWING SYSTEM MODEL REFILLABLE CAPSULES K901. Includes: Installation Use & Care Servicing Instructions

Low Profile. Baseboard Heater

T-Series Air Conditioner T15 Model

5.0 Installation Instructions

Operator s Manual. Histology Bath

T-Series Air Conditioner T53 Model

MODEL (Single Door) MODEL (2 Door pass through)

Operator s Manual. Model G32-S Model G32-E Disinfection Soak Stations

3800 North Mill Road Vineland, NJ USA Tel: Fax: Web: Rev. A

Installation and Operations Manual

HOT DOG STEAMER Instruction Manual Models: 8007 & 8012

T-Series Air Conditioner T20 Model

OWNERS MANUAL MODEL EXTERMINATOR VS900 C/R BLACK VAPOR CLEANING SYSTEM SAFETY INSTRUCTIONS OPERATIONS CARE AND MAINTENANCE TROUBLESHOOTING WARRANTY

Operation & Maintenance Manual MONSOON WET DOWNDRAFT TABLE

AH-400 Oil Filled Personal Heater

INSTALLATION MANUAL. Double Electric Wall Oven

AH-600 Baseboard Heater

INSTALLATION AND OPERATION MANUAL

INSTRUCTION MANUAL 4HP WET / DRY VACUUM VC V 60 Hz 7A. Gal

Quality Refrigeration OWNER S MANUAL. Instructions for the installation, operation and maintenance of Traulsen: Heated Banquet & Transport Carts

Part No Revised Nov Lil Max. Instruction Manual Model #2389, 2389EX

INSTRUCTIONS FOR OPERATION AND CARE OF

Ion Genesis II Pump Controller Digital Level Control with Pump Alternation and High Water Alarm

Operation and Maintenance Manual

RecoverX Oil-Filled Hermetic Refrigerant Recovery System. Operation and Maintenance Manual

Cavitator Ultrasonic Cleaner Instruction Manual

Next Generation Corona Discharge Auto Voltage Sensing Installation Manual

Remote Relay Module (RRM)

HotPoly Tote Tank / IBC Heaters (TTH Series)

Desiccant / Pump Dehumidification System. Model Operating Manual

PROAIR Air Conditioner. CR23 Model INSTRUCTION MANUAL nvent Rev. D P/N

TACH-IT MODEL #3568 SEMI-AUTOMATIC TWIST TIE MACHINE OPERATION MANUAL AND PARTS LIST

Rev. E 2013 Pentair Technical Products P/N Distributed by: McLean Parts

Installation, Operation & Service Manual

Field Top Mounted Condensing Unit

Transcription:

TECHNICAL BULLETIN ACCESSORY INFORMATION NU-984 FORMALIN/AMMONIA VAPORIZER 2100 Fernbrook Lane Plymouth, MN 55447-4722 U.S.A. Phone: 763.553.1270 Fax: 763.553.0459 Toll Free: 1.800.328.3352 Specifications Power: 230 VAC, 50/60 Hz, 1 Amp (Per Vaporizer) NU-984-01 (UK (type G) Power Cord) NU-984-02 (Shuko (type F) Power Cord) General Information The Nu-984 Formalin/Ammonia Vaporizer has been used to decontaminate Biological Safety Cabinets (BSC s) using many of the principles and practices of many international standards. Generally the steam concentration of formalin will be more than 100 Part per Million (PPM) after the BSC decontamination. That is why ammonia is used to neutralize the formalin to a safe level of permissible exposure (typically less than 2 PPM). During the actual vaporization, the concentration will be much higher to assure an effective decontamination will occur. The amount of formalin and ammonia used depends upon the size of BSC to be decontaminated. After the formalin and ammonia has been evaporated, the internal auto breaker will cut off the heating power automatically to stop heating for safety. The vaporizer construction features a stainless steel heater tank, steam nozzle and cap. Indicator lamps are provided for power and heating notification. Power is provided through a fused IEC connector and appropriate cord as required. NOTE, The capacity of the Formalin and Ammonia Vaporizers are 120 m/ each. ATB0165 PG 1-5 1

Steam Nozzle Nozzle Cap Side View Stainless Steel Cap and Fill Port Indication lamp only lights when vaporizer is heating Indication lamp lights up when power is on. IEC connector with fuses inside 230V/50Hz Front View ATB0165 PG 1-5 2

Decontamination Process Hazardous Gases Personal Protection Equipment Required. A disinfection using formaldehyde must be performed in accordance with the specifications of NSF 49/1992, Annex G or EN 12469, Annex J. This procedure presents considerable risks and must be performed only by specially trained and authorized service personnel in accordance with applicable national safety regulations (e.g. Germany: TRGS 522) The formaldehyde is vaporized within the tightly sealed sample chamber. The quantity of the applied formaldehyde depends on the volume of the sample chamber in the safety cabinet that is to be disinfected. The formaldehyde evaporates immediately after reaching its boiling point; the minimum reaction time is 6 hours. Therefore, the formaldehyde should be neutralized after the specified reaction time by vaporizing ammonia. Flammable Hazard Formalin is flammable. The auto-ignition temperature of formalin is 430 C (820 F). With a volume percentage of 7.75% in dry air, formaldehyde vapor may explode. For vaporization, do not use heating devices reaching temperatures above 250 C (477 F). Chemical Hazard Formalin in reaction with hydrogen chloride will form BCME which is a hazardous chemical. When using formalin, all residues of hydrogen chloride in the work chamber of the cabinet must be removed. The NU-984 Formalin/Ammonia Vaporizer can be used in conjunction with BSC s auto decon cycle (i.e. NU-480) or manually through the use of externally timed On/Off functions. Each of the liquids, Formalin and Ammonia will be placed into their respective vaporizers and placed onto the cabinet worksurface. NOTE: To verify proper vaporizer function, it is suggested to place a small amount of single distilled water into each of the vaporizers chambers and power on until steam is generated. Once verified, remove power, let cool, remove distilled water and prepare to fill each chamber with the suggested amounts of Formalin and Ammonia. ATB0165 PG 1-5 3

NOTE Warning Label A warning label should be attached to the safety cabinet during the vaporization process. Formalin (37% Solution Added with Water, 1:1 Ratio) On the basis of the calculated safety cabinet volume, use an industry standard acceptable formaldehyde quantity that ensures an adequate formaldehyde concentration within the cabinet. As stated above, the required formalin quantity depends on the cabinet volume that equals the industry standard (1) of.30g/cu.ft. or 10.6g/cu.m of paraformaldehyde. In addition to the cabinet volume, to keep the cabinet at a negative pressure during the decontamination process, a low volume of air is being exhausted either into the vapor collection cartridge or if allowed, into the facility exhaust system. To assure the correct concentration of formalin is maintained, an additional amount of formalin is added for the discharged volume of cabinet air. Applying these amounts to readily available 37% formalin solution added with an equal amount of water will result in the following requirements. (1) NSF/ANSI 49, Annex G NU-480E Model Size Cabinet Volume Discharged Volume Total Volume Water/Formalin Solution (37%) (1:1 ratio = total (ml)) 300E 32.8 (.93) 5 (.14) 37.8 (1.07) 31:31 = 62 400E 44.2 (1.25) 5 (.14) 49.2 (1.39) 40:40 = 80 500E 55.7 (1.58) 5 (.14) 60.7 (1.72) 49:49 = 98 600E 67.1 (1.90) 5 (.14) 72.1 (2.04) 58:58 = 116 Ammonia (50%) The neutralization of formaldehyde gas is accomplished by vaporizing ammonia. Again, using the industry standard (1) of 10% greater in mass ratio than paraformaldehyde/formalin and also accounting for the additional discharge volume will result in the following requirements. NU-480E Model Size Liquid ml 300E 35 400E 44 500E 54 600E 64 Auto Decon Run Cycle An auto decon run cycle is already pre-programmed into the BSCC system based on an 8 hour dwell time (hold time). Other parameters such as formalin burn-off formalin dwell (holdtime) ammonia burn-off, ammonia dwell (hold time) and cabinet blower run time are also defaulted as shown below. 580 * Indicates when cabinet blower will run for default time of 30 minutes. ATB0165 PG 1-5 4

Warranty NuAire, Inc. warrants that it will repair F.O.B. its factory or furnish without charge F.O.B its factory, a similar part to replace any material in its equipment within 12 months after the date of sale if proved to the satisfaction of the company to have been defective at the time it was sold provided that all parts claimed defective shall be returned, properly identified to the company at its factory, charges prepaid. Factory installed equipment or accessories are warranted only to the extent guaranteed by the original manufacturer and this warranty shall not apply to any portion of the equipment modified by the user. Claims under this warranty should be directed to NuAire, Inc. setting forth in detail the nature of the defect, the date of the initial installation and the serial and model number of the equipment. This warranty shall not apply to any NuAire product or part thereof which has been subject to misuse, abuse, accident, shipping damage, improper installation or service or damage by fire, flood or acts of God. If the serial number of the product is altered, removed or defaced as to be illegible, the warranty shall be null and void in its entirety. The warranty is for the sole benefit of the original purchaser and is not assignable or transferable. Shipments NuAire takes every reasonable precaution to insure that the NuAire product arrives without damage. Motor carriers are carefully selected and shipping cartons have been specially designed to insure your purchase. However, damage can occur in any shipment and the following outlines the steps you should take on receipt of the NuAire product to be sure that if damage has occurred, the proper claims and actions are taken immediately. Damaged Shipments Terms are factory, unless stated otherwise. Therefore it is important to check each shipment before acceptance. If there is visible damage, the material can be accepted after the driver makes a notation on the consignee s copy of the freight bill. Then an inspection must be made to verify the claim against the carrier. This inspection is the basis of your filing the claim against the carrier. If concealed damage is found, it is absolutely necessary to NOTIFY THE FREIGHT AGENT AT ONCE, and request an inspection. Without this inspection, the transportation company may not accept a claim for loss or damage. If the carrier will not perform the inspection, an affidavit must be prepared stating that he was contacted on a certain date and that he failed to comply with the request. This, along with other papers in the customer s possession, will support the claim. ATB0165 PG 1-5 5