The George Washington University Square Phase 1 Design Garage Base Building

Similar documents
SCIENCE AND ENGINEERING COMPLEX

SCIENCE AND ENGINEERING COMPLEX

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

CORCORAN HALL ADDITION

The George Washington University Museum Foggy Bottom Campus Plan Site 102B - Z.C. Case No F/06-12F April 5, 2012

THE GEORGE WASHINGTON UNIVERSITY School of Public Health and Health Services

LEED 2009 for New Construction and Major Renovation

TABLE OF CONTENTS: PROJECT TEAM:

Main Street Conversion Site

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

PARK PLAZA EXHIBIT A UNIVERSITY PARK, TX LAND USE STATEMENT TABLE OF CONTENTS CONCEPTUAL PD SUBMISSION OCTOBER 26, 2016

2007 Foggy Bottom Campus Plan

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

ARLINGTON COUNTY, VIRGINIA

ANC 2A Presentation. November 9, 2006

672 Flats. Arlington, VA. Contextual Aerial View. Hord Coplan Macht Inc. 2014

Athenahealth, Watertown, MA Mark Blair (athenahealth), Charles Rose (Charles Rose Architects Inc.), Bob Corning (Stantec), Frank Holmes (Stantec)

NEW ELEMENTARY SCHOOL AT THOMAS JEFFERSON MIDDLE SCHOOL

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Zoning:CS FLU: LI/CS 4, SF 10' HT 21,120 SF 24.5' HT Proposed Usable Open Space (120 SF) 4,774 SF 10' HT 4, SF 15.5' HT 4, SF 15.5'

LANGAN QUALIFICATIONS - INDIGO ASSET SERVICES

Planning Board Hearing October 20th, 2016

LANGAN LANDSCAPE ARCHITECTURE + PLANNING

Vision & Land Use. Discussion. Historic Preservation Plan. Foggy Bottom Campus Plan:

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

DITTMAR ROSSLYN ARLINGTON COUNTY, VIRGINIA

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

WASHINGTON DC METROPOLITAN AREA QUALIFICATIONS

Program Schedule, Budget and Scope

THE FOLGER SHAKESPEARE LIBRARY ANC 6B Meeting

tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only)

(DC1) Direct Development Control Provision DC1 Area 4

A/E REVIEW CHECKLIST SITE & LANDSCAPE

EXISTING CONDITIONS. Bellevue College Fountain Renovation

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

CRYSTAL. DRIVE NORTH DISTRICT RETAIL Crystal Drive Arlington, VA KEY PLAN LANDSCAPE CONSTRUCTION LEGEND MATCHLINE - SEE L1.

Rocky Mountain Public Media

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

A /19/2017 GAGAN RESIDENCE 1043 CENTINELA AVE. SANTA MONICA, CA CENTINELA AVE

FLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED)

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

PLAN REVIEW SUBMITTAL GUIDE

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

January 30, Design Rationale Statement RE: CITY OF KELOWNA REZONING / DP APPLICATION: FORTIS PARKING LOT

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Zoning Technical Review Presented by Camiros. November 10, 2015

City of Langford Green Development Checklist

JULIA M. CARSON TRANSIT CENTER

VIRGINIA KEY CONSENSUS MASTER PLAN

Project Overview. Washington s Most Exciting New Destination for Office and Retail PROPERTY GROUP PARTNERS

Architectural Review Board Report

Description of Preferred Alternative

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

The George Washington University

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

ARLINGTON COUNTY, VIRGINIA

Building & Site Design Standards Application

Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

PROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes).

THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC

Zoning OBJECTIVE: in the zoning. is to make. projects for. the Planning and. are attached ITTALS: Department

180 ZONING 180. ARTICLE XLII STREETSCAPE ENHANCEMENT OVERLAY ( SEO ) DISTRICT [Added Ord. No. 1086]

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

The principal elements of the NTC Strategic Vision plan are as follows.

IRVINGTON LOFTS 2017 AIA INDIANAPOLIS DESIGN AWARDS

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

EAST NAPLES SELF STORAGE

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

Incentives Bonus Height RequirementsProgram:: Proposed Mandatory and Elective Building Components

COUNTY COUNCIL OF PRINCE GEORGE S COUNTY, MARYLAND, SITTING AS THE DISTRICT COUNCIL ORDER OF APPROVAL

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

campus master plan VIRGINIA STATE UNIVERSITY

B. DESCRIPTION OF THE PROPOSED ACTION

REBUILD GUTTER AND ROLLED CURB TO MATCH EXISTING DETAIL. (TYPICAL) REPAIR EXISTING BENCH FINISH. RETURN TO EXISTING LOCATIONS.

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MAY 27, 2014

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

Proposed Major Institution Master Plan Street Vacation. March 19, 2009

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To: From:

PROJECT SPOTLIGHT TOUR: LANGAN LEADER JANUARY 2018

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507

1 N. Prospect Avenue Clarendon Hills, Illinois

KSURP OPEN SPACE

Urban Design Brief. 583, 585 and 589 OXFORD STREET EAST. Salt Clinic Canada Inc.

URBAN DESIGN PEER REVIEW PANEL MINUTES

CALDER PLAZA A PLAZA FULL OF OPTIONS GRAND RAPIDS HAS THE ICON... IT S TIME TO CREATE ICONIC EXPERIENCES!

The subject site plan amendment proposes the following revisions to the approved site plan:

601 Davis - Evanston PLAN COMMISSION 2017 SOLOMON CORDWELL BUENZ

CITY of RIDGEFIELD TYPE I DECISION SITE PLAN REVIEW (SPR 99-10) PDM MOLDING INC. PHASE II EXPANSION

C a m p u s I d e n t i t y

2010 Campus Master Plan Update - USF TAMPA Campus Master Plan Update USF TAMPA

Agenda Report Meeting Date 08/01/18

CONCEPT PLAN APPLICATION

ALTERNATIVE STATION AREA -

3 St Helens Drive Seaham Co. Durham SR7 7PU. Company: Castledene Sales & Lettings Inspected by: Stuart Hutchinson

HANOVER EXTON SQUARE

Transcription:

The George Washington University Square 103 - Phase 1 Design Garage Base Building DRAWING INDEX SHEET TITLE COVER SHEET AP1 AERIAL PHOTOGRAPH SECOND STAGE APPROVAL AUGUST 16, 2010 D1 D2 S1 S2 DEVELOPMENT DATA ZONE BOUNDARY SITE PLAN SITE PHOTOGRAPHS SITE PHOTOGRAPHS OWNER / DEVELOPER: ARCHITECT: LAND USE COUNSEL: CIVIL ENGINEER: LANDSCAPE ARCHITECT: THE GEORGE WASHINGTON UNIVERSITY PERKINS + WILL; SHALOM BARANES ASSOCIATES GOULSTON & STORRS WILES MENSCH CORPORATION-DC OCULUS S3 L1 L2 A1 A2 SITE CIRCULATION DIAGRAM LANDSCAPE PLAN LANDSCAPE MATERIALS/PLANTING PLAZA LEVEL PLAN LOWER LEVEL PLAN A3 P1 LEVEL PLAN A4 P2 LEVEL PLAN (TYPICAL) A5 P5 LEVEL PLAN A6 SITE ELEVATIONS A7 ENTRY PAVILION ELEVATIONS A8 BUILDING MATERIALS A9 BUILDING SECTION A-A A10 BUILDING SECTION B-B A11 BUILDING SECTIONS C-C & D-D A12 PERSPECTIVE RENDERINGS A13 PERSPECTIVE RENDERINGS A14 LEED SCORECARD C1 EXISTING CONDITIONS SURVEY C2 DEMOLITION PLAN C3 SEDIMENTATION AND EROSION CONTROL PLAN C4 SITE GRADING PLAN C5 UTILITY PLAN C6 SITE DETAILS C7 SEDIMENTATION AND EROSION CONTROL DETAILS C8 DC/WASA DETAILS

H STREET, NW G STREET, NW 22 ND STREET, NW 21 ST STREET, NW SITE SQUARE 103 20 TH STREET, NW 19 TH STREET, NW F STREET, NW E STREET, NW AERIAL PHOTOGRAPH AP1

SQUARE: 103 LOTS: 13, 14, 18, 809, 812-814, 819-820 ZONE: R-5-D PUD SITE AREA: 38,328 SF (Measured) Z O N I N G T A B U L A T I O N S DEVELOPMENT STANDARDS DCMR, TITLE 11 R-5-D DEVELOPMENT STANDARDS APPROVED UNDER CAMPUS PLAN PUD PROPOSED DEVELOPMENT (Note 2) FAR 3.5 4.85 0.194 TOTAL GROSS FLOOR AREA (NOTE 1) 133,504 SF (MAX) 185,983 SF (MAX) 7,430 SF TOTAL LOT OCCUPANCY 75.0% 90.0% 19.4% BUILDING HEIGHT 90'-0" 80'-0" 27'-9" (TRELLIS) PENTHOUSE HEIGHT 18'-6" -- NONE PROVIDED PENTHOUSE AREA 0.37 FAR -- NONE PROVIDED REAR YARD 4 IN/FT; 15'-0" MIN -- 12'-8" RELIEF REQUESTED SIDE YARD NONE REQUIRED -- NONE PROVIDED 3 IN/FT OF HT, 8 FT MIN IF PROVIDED COURTS NON-RESIDENTIAL WIDTH = 3 IN/FT OF HT; 10 FT MIN -- MULTIPLE (OPEN) WIDTH = 4 IN/FT OF HT; 15 FT MIN -- AREA = 2 X WIDTH SQUARED; 350 SF MIN (CLOSED) SCHOOL: PER CAMPUS PLAN 450 SPACES (NOTE 3) 2 PER EACH 3 TEACHERS; + 1 PER 10 CLASSROOM SEATS 1 PER 12 STADIUM SEATS OR 1 PER 10 AUDITORIUM SEATS (WHICHEVER IS GREATER) LOADING SCHOOL PER CAMPUS PLAN (OTHER USE LESS THAN 100,000 SF): 1 BERTH @ 30 FT DEEP 1 BERTH @ 30 FT DEEP 1 PLATFORM @ 100 SF 1 PLATFORM @ 100 SF 1 SERVICE @ 20 FT DEEP 8 SERVICE @ 20 FT DEEP AERIAL VIEW LOOKING SOUTH NOTES: 1. Gross Floor Area includes a deduction for mechanical shafts, but does not include areas for (1) bays projecting over the property line, (2) parking access ramps, and (3) spaces with structural clearance less than 6'-6". 2. PUD development standards per Campus Plan, Zoning Commission Order No. 06-11/06-12. 3. Includes 35 tandem spaces. Relief already granted per previously approved campus plan. DEVELOPMENT DATA D1

I STREET, NW PENNSYLVANIA AVENUE, NW C-3-C KEY SITE BOUNDARY CAMPUS BOUNDARY H STREET, NW ZONE BOUNDARY 23 RD STREET, NW 22 ND STREET, NW PUD 242 R-5-D 21 ST STREET, NW 19 TH STREET, NW C-4 18 TH STREET, NW G STREET, NW SITE SQUARE 103 20 TH STREET, NW C-3-C F STREET, NW R-5-E UNZONED SP-2 E STREET, NW ZONE BOUNDARY SITE PLAN D2

4 G STREET 6 3 2 21 ST STREET 20 TH STREET ALLEY 5 1 KEY PLAN 1. VIEW OF ALLEY LOOKING WEST FROM 20TH STREET 2. VIEW OF ADJACENT ROW STRUCTURES AT G AND 20TH STREETS LOOKING SW 3. VIEW OF ADJACENT ROW STRUCTURES FROM G STREET 4. VIEW OF ADJACENT STRUCTURES AT G AND 21ST STREETS LOOKING SE SITE PHOTOGRAPHS S1

5. VIEW OF SITE FROM ALLEY, MID-BLOCK, LOOKING NORTH 6. VIEW OF SITE FROM G STREET, MID-BLOCK, LOOKING SOUTH SITE PHOTOGRAPHS S2

KEY PEDESTRIAN PATH OF TRAVEL G STREET, NW 90 R.O.W. - ONE WAY 21 ST STREET, NW 90 R.O.W. - ONE WAY LOADING ZONE (20 WIDE PROPOSED) SURFACE EXISTING 16-0 PUBLIC ALLEY GARAGE ACCESS 20 TH STREET, NW 90 R.O.W. - ONE WAY F STREET, NW 100 R.O.W. - ONE WAY SITE CIRCULATION DIAGRAM S3

LANDSCAPE PLAN L1

SWEETGUM SAUCER MAGNOLIA RED BUD HICKS YEW SKYROCKET JUNIPER TIGER EYES SUMAC HYPERICUM CALYCINUM RUSSIAN SAGE HAMELN FOUNTAIN GRASS OVERDAM FEATHER REED GRASS NORTHWIND SWITCHGRASS LAWN WITH EARTHWORKS JOHN BURCH LIRIOPE VIRGINIA CREEPER DAFFODIL SEDUM GREEN ROOF BENCH BOLLARD LANDSCAPE MATERIALS/PLANTING L2

D B G STREET, NW C TRELLIS ABOVE 21ST STREET, NW A QUIGLEY S LAWN SECURED BICYCLE RACKS PEDESTRIAN PLAZA ENTRY PAVILION SKYLIGHT ABOVE SURFACE ATTENDANT BOOTH MECH MECHANICAL EQUIPMENT WELL 2004 G ST 2002 G ST 2000 G ST A 20TH STREET, NW MECH LOADING ZONE 10x20 SERVICE DELIVERY 12x30 LOADING BERTH LOADING PLATFORM EMERGENCY GENERATOR COVERED RAMP TO PROPERTY LINE EXISTING 16-0 PUBLIC ALLEY (20 WIDTH PROPOSED) 4-0 OVERHEAD TRUCK BARRIER 12-8 REAR YARD PROPERTY LINE D B SERVICE YARD C NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. PLAZA LEVEL PLAN A1

PL PL MECH IT ENTRANCE RAMP LAW LEARNING CENTER ELEC GARAGE EXHAUST STORMWATER MANAGEMENT MECH P L P L FUEL OIL STORAGE INTAKE SHAFT LINE OF FUTURE BUILDING ABOVE NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. LOWER LEVEL PLAN A2

PL PL FIRE PUMP STORAGE OFFICES STORAGE RAMP TO P2 P L P L INTAKE SHAFT MECH STORMWATER MANAGEMENT EXHAUST SHAFT NOTE: INTERIOR DESIGN AND LAYOUT ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. P1 LEVEL PLAN A3

PL PL RAMP TO P3 P L P L INTAKE SHAFT EXHAUST SHAFT NOTE: INTERIOR DESIGN AND LAYOUT ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. P2 LEVEL PLAN (TYPICAL) A4

PL PL RAMP TO P4 P L P L INTAKE SHAFT P A R K I N G S U M M A R Y LEVEL HANDICAP ( HC ) COMPACT ( C ) STANDARD ( S ) FUEL EFFICIENT TANDEM ( T ) 10' X 20' TOTAL 8'X16' 9'X19' VEHICLES (FE) GROUND LEVEL 23 35 58 P1 LEVEL 3 15 35 4 6 63 (Includes 2 HC Van Spaces) P2 LEVEL 2 38 58 98 P3 LEVEL 2 36 68 106 P4 LEVEL 2 36 68 106 P5 LEVEL 13 6 19 TOTAL 9 138 258 4 35 6 450 Parking relief for use of tandem/valet spaces already granted per previously approved campus plan. In accordance with this approval, the University may modify the parking garage operation further to add or remove tandem/valet spaces to accommodate parking demand needs. NOTE: INTERIOR DESIGN AND LAYOUT ARE SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. P5 LEVEL PLAN A5

PATTERNED SPLIT-FACED CMU PAINTED METAL PANELS PAINTED ALUMINUM TRELLIS PAINTED METAL SCREEN PAINTED METAL PANELS PATTERNED SPLIT-FACED CMU OVERHEAD DOOR PAINTED METAL PANELS OVERHEAD TRUCK BARRIER, 8-0 CLEAR (PAINTED METAL) 14-1 11-7 19-10 MP (T.C.) 65.39 ELEVATION 1.0 SOUTH SITE AT ALLEY PAINTED METAL PANELS PATTERNED SPLIT-FACED CMU PAINTED METAL PANELS RAIN CISTERN PAINTED ALUMINUM TRELLIS WOOD SCREEN WALL 24-2 27-9 MP (T.C.) 65.39 ELEVATION 2.0 NORTH SITE AT G STREET 2.0 G STREET 21 ST STREET 20 TH STREET 1.0 NOTE: BUILDING HEIGHTS ARE TAKEN FROM MEASURING POINT: 65.39 (T.C. AT G STREET). KEY PLAN SITE ELEVATIONS A6

PAINTED ALUMINUM TRELLIS SKYLIGHT PAINTED ALUMINUM TRELLIS PAINTED METAL PANELS GLAZED WALL SYSTEM W/ CLEAR GLASS PAINTED METAL PANELS CLEAR GLASS ELEVATION 3.0 ENTRY PAVILION - WEST ELEVATION ELEVATION 4.0 ENTRY PAVILION - NORTH ELEVATION PAINTED ALUMINUM TRELLIS PAINTED METAL PANELS GLAZED WALL SYSTEM W/ CLEAR GLASS GLAZED WALL SYSTEM W/ FRIT COATED GLASS 4.0 G STREET 21 ST STREET 3.0 5.0 20 TH STREET ELEVATION 5.0 ENTRY PAVILION - EAST ELEVATION KEY PLAN ENTRY PAVILION ELEVATIONS A7

TEXTURED CONCRETE MASONRY GLAZED WALL SYSTEM PAINTED METAL PANELS WOOD SCREEN GLAZED WALL SYSTEM ALUMINUM TRELLIS BUILDING MATERIALS A8

LISNER HALL BEYOND BELL HALL BEYOND STUART HALL BEYOND WOODHULL HOUSE BEYOND ENTRY PAVILION 21st ST., NW GARDEN SURFACE 20th ST., NW LAW LEARNING CENTER MECHANICAL STORAGE STORAGE PL SITE PL SECTION A-A: EAST-WEST SECTION LOOKING NORTH G STREET 21 ST STREET A A 20 TH STREET NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. KEY PLAN BUILDING SECTION A-A A9

PROPOSED 20-0 WIDE ALLEY EXISTING 16-0 WIDE PUBLIC ALLEY QUIGLEY S PHARMACY BEYOND ENTRY PAVILION LOADING AREA ALLEY G STREET, NW LAW LEARNING CENTER LP SITE LP SECTION B-B: NORTH-SOUTH SECTION LOOKING WEST B G STREET 21 ST STREET 20 TH STREET NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. B KEY PLAN BUILDING SECTION B-B A10

PROPOSED 20-0 WIDE ALLEY PROPOSED 20-0 WIDE ALLEY TOWNHOUSES BEYOND EXISTING 16-0 WIDE PUBLIC ALLEY EXISTING 16-0 WIDE PUBLIC ALLEY QUIGLEY S PHARMACY BEYOND COVERED BICYCLE GARAGE ENTRY STRUCTURE BEYOND REAR YARD 12-8 LOADING AREA GARDEN G STREET, NW SURFACE ALLEY ALLEY G STREET, NW LAW LEARNING CENTER LAW LEARNING CENTER LP SITE SECTION C-C: NORTH-SOUTH SECTION LOOKING EAST LP LP SITE LP SECTION D-D: NORTH-SOUTH SECTION LOOKING WEST D G STREET C 21 ST STREET 20 TH STREET NOTE: INTERIOR DESIGN IS SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. THE FINAL DESIGN MAY VARY. D C KEY PLAN BUILDING SECTIONS C-C & D-D A11

VIEW A GARDEN AND ENTRY PAVILION FROM G STREET - LOOKING SOUTH VIEW B ENTRY PAVILION FROM G STREET - LOOKING WEST A B G STREET 21 ST STREET 20 TH STREET KEY PLAN PERSPECTIVE RENDERINGS A12

VIEW C GARDEN AND ENTRY PAVILION FROM G STREET - LOOKING SOUTH VIEW D ENTRY PAVILION FROM GARDEN - LOOKING EAST C G STREET 21 ST STREET D 20 TH STREET KEY PLAN PERSPECTIVE RENDERINGS A13

NOTE: THE 2007 FOGGY BOTTOM CAMPUS PLAN COMMITS GWU TO ACHIEVING THE EQUIVALENT OF 16 POINTS, USING USGBC S LEED V2.2 SCORECARD AS AN EVALUATOR OF THE SUSTAINABLE QUOTIENT OF A PROJECT. THIS SCORECARD REFLECTS GWU S ANTICIPATED GOAL OF SUBMITTING TO GBCI THIS PROJECT UNDER THE LEED V.3 (OR 2009) CERTIFICATION PROGRAM, AND ACHIEVING SILVER LEVEL CERTIFICATION. LEED SCORECARD A14

EXISTING CONDITIONS SURVEY C1

DEMOLITION PLAN C2

SEDIMENTATION AND EROSION CONTROL PLAN C3

SITE GRADING PLAN C4

UTILITY PLAN C5

SITE DETAILS C6

SEDIMENTATION AND EROSION CONTROL DETAILS C7

DC/WASA DETAILS C8