MIT Kendall Square Initiative SoMa Project

Similar documents
MIT Kendall Square Initiative SoMa Project

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

Kendall Square Urban Renewal Area

SCIENCE AND ENGINEERING COMPLEX

brookline place presentation to the Brookline Board of Selectmen February 11, 2014

2007 Annual Town Gown Report

PROJECT SPOTLIGHT TOUR: LANGAN LEADER JANUARY 2018

SCIENCE AND ENGINEERING COMPLEX

The George Washington University Square Phase 1 Design Garage Base Building

volpe planning study Cambridge, Massachusetts volpe working group - may 10, 2017

JERSEY CITY. CONTACT HEADQUARTERS Parsippany New Jersey 300 Kimball Drive 4th Floor Parsippany NJ

Rethinking the MIT Campus Transportation System

SPRC PRESENTATION #3 JUNE 22, 2015

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

ENVIRONMENTAL DESIGN EVALUATION

SPRC PRESENTATION MAY 13, 2015

KENDALL SQUARE DESIGN GUIDELINES: SUMMARY OF URBAN DESIGN RECOMMENDATIONS

Town of Arlington Alewife Brook outfalls.

This image shows a conceptual green space connection(s) throughout the project area. Linear green space elements are shown along the entire length of

KSURP OPEN SPACE

The DCR Neponset River Trail Central Avenue to Mattapan Square

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

Implementation & Equity 201:

2007 Foggy Bottom Campus Plan

Planning Board Hearing October 20th, 2016

- INVITATION - COURTESY INFORMATIONAL MEETING

RESOURCE PACKET River Crossing

Executive Summary. Houston Museum of American Art New York, New York

CONCEPT PLAN APPLICATION

Ball Square Station Design Meeting BALL SQUARE STATION JUNE 3, 2013

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

Athenahealth, Watertown, MA Mark Blair (athenahealth), Charles Rose (Charles Rose Architects Inc.), Bob Corning (Stantec), Frank Holmes (Stantec)

Newark Riverfront Parks March 10, 2009 Community Meeting

Parcel 5. Level 1 Application March 12, Design Submittal POST ROAD RESIDENTIAL

5959 Yonge Street Rezoning Application - Preliminary Report

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

APPLICATION FOR AGENDA ITEM # URBAN DESIGN COMMISSION Project # REVIEW AND APPROVAL Legistar # PROJECT ADDRESS: ALDERMANIC DISTRICT:

CORRALES INTERNATIONAL SCHOOL TENANT IMPROVEMENT 5500 WILSHIRE AVE NE ALBUQUERQUE, NM 87113

LANDSCAPE ARCHITECTURE - NEW JERSEY

2011 Nature of the Fire (cause)

2012 Nature of the Fire (cause)

Diesel Fuel System Report

Winston-Salem State University Campus Master Plan 2016 Update

KENDALL SQUARE FINAL REPORT Cambridge Community Development Department 344 Broadway, Cambridge, MA

The George Washington University Museum Foggy Bottom Campus Plan Site 102B - Z.C. Case No F/06-12F April 5, 2012

ANC 2A Presentation. November 9, 2006

KENDALL SQ URBAN RENEWAL PLAN PUBLIC FORUM REPORT. March 12 th, 2015 Robert Healy Public Safety Building

Realizing Possibilities Inspiration Port Credit. November 1, 2012

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Existing Conditions. Planning and Design Principles

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278

3424 Chicago Drive Hudsonville, MI 49426

THE GEORGE WASHINGTON UNIVERSITY School of Public Health and Health Services

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

KING-SPADINA SECONDARY PLAN

PROCTOR TERRACE ELEMENTARY SCHOOL

JOHN ROSS 3601 SW RIVER PARKWAY PORTLAND OR

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

THE ARSENAL ON THE CHARLES - Athena Arsenal, LLC

Case 1:85-cv RGS Document 1769 Filed 06/15/12 Page 1 of 13. UNITED STATES DISTRICT COURT for the DISTRICT OF MASSACHUSETTS

Build on community input

Number of Credits: 6. Office Hours: Wednesday 10:00 AM to 12:00 PM in room 331, Design Building

1 Parkcenter Drive NWC Howe Ave and Parkcenter Dr Sacramento, CA

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

ARLINGTON COUNTY, VIRGINIA

Design and Access Statement Volume III Part 1 of 9 Plot A1. May 2018 Allies and Morrison

1 Parkcenter Drive NWC Howe Ave and University Ave Sacramento, CA

MAY 2012 CITY OF ST. LOUIS PARK, MINNESOTA SAINT LOUIS PARK BELTLINE AREA FRAMEWORK & DESIGN GUIDELINES

16. KING-SPADINA SECONDARY PLAN

Legal & General Launches Walbrook Square

City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM

DEVELOPMENT PLAN FOR PLANNED DEVELOPMENT AREA NO BOYLSTON STREET PROJECT BOSTON, MASSACHUSETTS TABLE OF CONTENTS

Middlebury RS 0174(8)

Developing a Master Plan. By LH-PA, City of Sunnyvale, & Anderson Brulé Architects

*BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.* Project Name

A. INTRODUCTION B. EXISTING CONDITIONS

John Callaway, for Rees 514 LLC & Brent Brunswick LLC Name of Project

City of Surrey PLANNING & DEVELOPMENT REPORT. OCP Amendment of a portion from Suburban to Urban

Grand Rounds History

Considering the Arch Competition Finalists

CALL FOR ENTRIES FOR PROFESSIONAL LANDSCAPE ANALYSIS AND PLANNING

GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

YUN GAO SCHOOL WORK. T E A 150 huntington ave. apt. sg9 boston ma, Program Illustration

City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

TABLE OF CONTENTS PAGE

of ZONING OVERHAUL

CITY COUNCIL STUDY SESSION MEMORANDUM

AD ELA. LOCATION: Lunar Dr. REAL ESTATE NUMBER: ;

D E S I G N R E V I E W B OA R D

Hill Center Greenwood. January 10, 2017

UO North Campus Conditional Use Permit Project

Columbia University Baker Athletics Complex STEVEN HOLL ARCHITECTS

EAST BAY BIKE PATH PROVIDENCE, RHODE ISLAND SAFETY MADE STYLISH

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER

BRADENTON RIVERWALK EXPANSION MASTER PLAN

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Transcription:

MI Kendall Square Initiative SoMa Project Volume III: Graphic Materials Final Development Plan Submission Cambridge Planning Board #303 November 5, 2015 Submitted by: Massachusetts Institute of echnology (MI)

ABLE OF CONENS VOLUME III: SoMa Project Graphic Materials SECION A: Existing Conditions and Project Overview Figures A1 - A8 SECION B: Site Planning and Open Space Figures B1 - B48 SECION C: Ground Floor Activation and Programming Figures C1 - C17 SECION D: Building Concept Design Figures D1 - D80 SECION E: Building Plans, Elevation and Sections Figures E1 - E95 SECION F: echnical Graphics Figures F1 - F19 SECION G: PUD-5 Conceptual Plan Figures G1 - G3

OWNER/ PROJEC PROPONEN Massachusetts Institute of echnology (MI) LEGAL COUNSEL Goulston & Storrs Gallucio & Watson, LLP PROJEC MANAGEMEN Redgate Northstar (Building 6) BUILDING DESIGN ARCHIECS Elkus Manfredi Architects (Building 2) Perkins + Will Architects (Building 3) NADAAA (Building 4) Weiss/Manfredi Architects (Building 5) narchiecs (Building 6) LANDSCAPE ARCHIECS Hargreaves Associates REAIL AND PLACEMAKING Graffito SP CIVIL ENGINEERING Nitsch Engineering RANSPORAION ENGINEERING VHB

PARKING CONSULAN Desman Design Management M/E/P ENGINEERING AHA Consulting Engineers Bard Rao + Athanas Consulting Engineers WSP ARUP SRUCURAL ENGINEERING MacNamara Salvia Robert Silman Associates Odeh Engineers GEOECHNICAL/GEOENVIRONMENAL McPhail Associates, LLC ACOUSICAL ENGINEERING Acentech SUSAINABILIY CONSULAN Atelier en he Green Engineer DISRIC ENERGY CONSULAN JB&B WIND CONSULAN RWDI Consulting Engineers

SURVEYOR Feldman PRECONSRUCION SERVICES urner Construction Elaine Construction COMMUNICAIONS Solomon McCown & Company

SECION A: Existing Conditions and Project Overview

FELDMAN FIGURE A1

FELDMAN FIGURE A2

WELLINGON-HARRINGON AREA IV CAMBRIDGEPOR E19 E18 E17 E15 E14 E25 E2 E1 E23 E38 E39 E34 E33 100 Memorial Dr. PUD 5 E48 E40 E51 E55 E70 E53 E52 E62 E60 November 5, 2015 FIGURE A3 0 500 scale: 1 = 500 1000 SIE CONEX MAP EXISING CONDIIONS MI KENDALL SQUARE SoMa PROJEC

Galileo Galilei Way Ames St Broadway hird St BROAD CANAL Main St Vassar St Dock St Deacon St Hayward St Wadsworth St Main St Carleton St Amherst St PUD 5 Memorial Dr CHARLES RIVER November 5, 2015 FIGURE A4 0 200 scale: 1 = 200 400 AERIAL EXISING CONDIIONS MI KENDALL SQUARE SoMa PROJEC

Galileo Galilei Way Main St Ames St E28 4,027 sf office Cambridge rust 2,777 sf retail Broadway hird St One Broadway 297,069 sf office/retail BROAD CANAL Vassar St E17/E18/E19 328,532 sf E15 114,236 sf Dock St E14 162,665 sf Deacon St E35/E23 241,490 sf E1 17,709 sf PUD 5 E38 63,124 sf / retail Carleton St E2 61,437 sf E34 25,966 sf E33 7,581 sf RIMAC 12,943 sf commercial Amherst St E39 40,660 sf office/ retail Hayward St 100 Memorial Drive 282,816 sf residential Memorial Dr E48 77,900 sf office/ retail E40 101,253 sf Wadsworth St E51 102,333 sf E55 163,733 sf graduate student housing E53 89,589 sf E52 136,753 sf E62 209,000 sf E60 27,246 sf CHARLES RIVER Main St November 5, 2015 FIGURE A5 0 200 scale: 1 = 200 400 Base Plan - Existing Conditions (Gross ( Floor Square Area Area) ) MI KENDALL SQUARE SoMa PROJEC

E19 PHOO A E38 E39 E48 PHOO D E55 PHOO C E18 E25 E34 E62 E17 E23 E33 PHOO F PHOO B E40 E53 E52 E15 E51 PHOO E 64 E14 100 Memorial Dr. November 5, 2015 0 100 scale: 1 = 100 FIGURE A6 200 SoMa OPEN SPACE MI KENDALL SQUARE EXISING CONDIIONS SoMa PROJEC

A D E B F C November 5, 2015 SoMa OPEN SPACE EXISING CONDIIONS FIGURE A7 MI KENDALL SQUARE SoMa PROJEC

Galileo Galilei Way connect to WELLINGON HARRINGON / AREA 4 Ames St Broadway hird St connect to EAS CAMBRIDGE E70 BROAD CANAL connect to CENRAL SQ Main St Kendall / MI Main St connect to BOSON Vassar St MI North Court E19 E18 E17 Dock St Deacon St E25 E23 Carleton St E38 E39 E48 Hayward St E34 E33 E40 Wadsworth St E55 E53 E62 E60 E52 E15 Amherst St E51 connect to MI MAIN CAMPUS McDermott Court E14 E2 E1 PUD 5 100 Memorial Drive Memorial Dr connect to CHARLES RIVER Paul Dudley White Bike Path Memorial Drive Riverfront Greenway CHARLES RIVER EXISING CONNECION CAMPUS CONNECION Killian Court November 5, 2015 connect to HARVARD BRIDGE RANSI CONNECION PUD 5 RIVERFRON BIKE PAH FIGURE A8 0 200 scale: 1 = 200 400 EXISING OPEN SPACE CONNECIONS MI KENDALL SQUARE SoMa PROJEC