GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Similar documents
WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

JOB CREATION PROJECTS

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Lilburn, Georgia A Pedestrian Master Plan Report

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

CHURCH STREET MAIN STREET CHURCH STREET

russell+mills studios

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

VEHICULAR AND PEDESTRIAN CIRCULATION

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

APPENDIX G: TOWN ORDINANCE REVIEW

MEMORANDUM & CITY COMMISSION BRIEFING Orlando Avenue Landscape Plans Consent Agenda Item

23 EA , , , , , , , LF , , ,596.

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

APPENDIX F: DETAIL DRAWINGS

Please call or me at if you cannot attend

Old Mill Community Association Bioretention Facility

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

Costs Design Construction Operation Maintenance

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Design Guidelines for Residential Subdivisions

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Costs Design Construction Operation Maintenance

3.13. Development Guidelines

John Portman Boulevard Corridor

FACT SHEET: Pervious Pavement with Infiltration

University Park Subdivision Street Assessment Report

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Governor Stone Parkway Shared Use Path Planning Study

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Kittson Parkway / Watershed Park Parking Lot

Rotary Park / Railroad Lake

Green Infrastructure and Low-Impact Development Technologies

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

Severn River Sub-Watershed: BMP 09-Retrofit

STANDARD DETAILS QUICK REFERENCE

Estimated Quantity. Description and Price. Estimated Cost. Item No General Conditions at the unit price of $ per LUMP SUM.

2016 WORKSHOP LVR Field Trip

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

COMPLETE GREEN STREET CHECKLIST

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

MER BLEUE URBAN EXPANSION AREA

Hidden Glen Mary Lane L2.01. Village of Salado, Texas. Not for Construction. Layout Plan. Landscape Schematic

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

DRAFT. 1. General Purpose. 2. Area of Application. 3. Uses CLIFTON PLACE AREA A DC2 (DRAFT)

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Federal Project No.: PM03369

County of El Dorado Standard Plans

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

Hidden Pointe Landscape Master Plan. June, archi terra

STREETSCAPE MANUAL DRAFT

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

Cottage Grove Road Reconstruction. City of Madison Engineering

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

UNAUTHORIZED CHANGES ACCURACY OF UTILITIES

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

City of Sheridan Landscape Plan Checklist

STORMWATER - GENERAL NOTES

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Appendix G. Detailed Design

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Learning in the Landscape


Rezoning Transportation Analysis Petition Number: General Location Identifier:

5-Year Street Reconstruction Plan ( )

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

8 th Ave NW LID Retrofit

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY

Austin, Texas GENERAL LEGEND SYMBOL ABBREVIATIONS DESCRIPTION DETAIL REFERENCE MATERIAL OR FINISH REFERENCE SYMBOL SECTION CUT REFERENCE

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Village Board Presentation May 8, 2018 Teska Associates Christopher Burke Engineering

Lambeth Main Street Streetscape Improvements

EROSION PREVENTION BMP SUGGESTED USES MATRIX

PLANNED UNIT DEVELOPMENT APPLICATION

Maplewood Avenue Downtown Complete Street Project

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

LANDSCAPE ORDINANCE PASADENA PLANNING DEPARTMENT (713) FAX (713)

Federal Project No.: OC-095-1(365), OC-095-1(367)

Transcription:

Sectional View of Concepts

PAVEMENT FEATURES PAVEMENTS INTERSECTION INTERSECTION TREATMENTS LANDSCAPE BUFFER LANDSCAPE DESIGN GPCID CD D: GWINNETT P LACE DRIVE & MALL B COMPLETE STREET DESIGN ELEMENTS OULEV VARD June 20, 2016 Copyright 2016 by Pond & Company. All rights reserved. No copying or duplication is allowed without the express written agreement of Pond & Company.

CANOPY TREES, TYP. ALLEY SIDEWALK AND TRAIL TRANSITION 10' WIDE MAIN TRAIL / PATH PLEASANT HILL ROAD Concept Plan View Mall Blvd. (Sheet A) ORNAMENTAL TREES, TYP. PLANTED BUFFER BETWEEN SIDEWALK AND ROADWAY ALLEY MALL BLVD. MATCHLINE. REFER TO SHEET B.

MALL BLVD. MATCHLINE. REFER TO SHEET A. ENHANCED PAVEMENT DRIVEWAY, TYP. SEATWALL 10' WIDE MAIN TRAIL / PATH MARKET STREET ORNAMENTAL TREES, TYP. SCULPTURE AREA CANOPY TREES, TYP. PLANTED BUFFER BETWEEN SIDEWALK AND ROADWAY Concept Plan View Mall Blvd. (Sheet B) MARKET STREET RECONFIGURED SIGNALIZED INTERSECTION MALL BLVD. MATCHLINE. REFER TO SHEET C.

ENHANCED PAVEMENT DRIVEWAY, TYP. SIDE PATH WITH SEATING STORMWATER COLLECTION GARDEN 10' WIDE MAIN TRAIL / PATH MALL BLVD. MATCHLINE REFER TO SHEET B Concept Plan View Mall Blvd. (Sheet C) ORNAMENTAL TREES, TYP. CANOPY TREES, TYP. PLANTED 2' SOD STRIP BETWEEN SIDEWALK AND ROADWAY MALL BLVD. MALL BLVD. MATCHLINE. MATCHLINE REFER C TO SHEET D.

ENHANCED PAVEMENT DRIVEWAY, TYP. 10' WIDE MAIN TRAIL / PATH MOUND LINEAR PARK GATEWAY RING ROAD MALL BLVD. MATCHLINE. REFER TO SHEET C. ORNAMENTAL TREES, TYP. CANOPY TREES, TYP. PLANTED 2' SOD STRIP BETWEEN SIDEWALK AND ROADWAY Concept Plan View Mall Blvd. (Sheet D)

Concept Plan View Gwinnett Place Dr. (Sheet E) PLEASANT HILL ROAD (INTERSECTION CONFIGURATION SHOWN IS OF PROPOSED IMPROVEMENTS PROJECT, NOT EXISTING CONDITION) PLANTED 2' SOD STRIP BETWEEN SIDEWALK AND ROADWAY ORNAMENTAL TREES, TYP. ALLEY GWINNETT PLACE DR MATCHLINE. REFER TO SHEET F

GWINNETT PLACE DR MATCHLINE. REFER TO SHEET E SIDEWALK AND TRAIL TRANSITION SHRUBS AND GROUNDCOVER MARKET STREET CANOPY TREES, TYP. ORNAMENTAL TREES, TYP. Concept Plan View Gwinnett Place Dr. (Sheet F) RECONFIGURED SIGNALIZED INTERSECTION MARKET STREET GWINNETT PLACE DR MATCHLINE. REFER TO SHEET G

GWINNETT PLACE DR MATCHLINE. REFER TO SHEET F ENHANCED PAVEMENT DRIVEWAY, TYP. SIDE PATHS 10' WIDE MAIN TRAIL / PATH X PLANTED 2' SOD STRIP BETWEEN SIDEWALK AND ROADWAY Concept Plan View Gwinnett Place Dr. (Sheet G) ORNAMENTAL TREES, TYP. CANOPY TREES, TYP. GWINNETT PLACE DR MATCHLINE. REFER TO SHEET H

GWINNETT PLACE DR MATCHLINE. REFER TO SHEET G CANOPY TREES, TYP. MOUND SEATWALLS SIDE PATH ORNAMENTAL TREES, TYP. MOUND X X X X X 10' WIDE MAIN TRAIL / PATH Concept Plan View Gwinnett Place Dr. (Sheet H) PLANTED 2' SOD STRIP BETWEEN SIDEWALK AND ROADWAY GWINNETT GWINNETT PLACE DR PLACE DR. MATCHLINE. MATCHLINE REFER TO D SHEET I

GWINNETT PLACE DR MATCHLINE. REFER TO SHEET H RING ROAD LINEAR PARK GATEWAY Concept Plan View Gwinnett Place Dr. (Sheet I) PLANTED 2' SOD STRIP BETWEEN SIDEWALK AND ROADWAY

GPCID Road Diets Magnitude of Probable Cost 9/1/2016 ITEM QUANTITY UM COST/UNIT TOTAL ROUNDED TOTALS Demolition & Earthwork Traffic control 1 LS $20,000.00 $20,000.00 $20,000.00 Clearing and grubbing 1 LS $10,000.00 $10,000.00 $10,000.00 Grading complete 1 LS $45,000.00 $45,000.00 $45,000.00 Mill asph concrete pvmt, 2" depth 5198 SY $2.25 $11,695.50 $11,700.00 Roadway Demo 34700 SY $7.12 $247,064.00 $247,070.00 Disposal 17350 CY $8.63 $149,730.50 $149,740.00 Fill 11600 CY $2.93 $33,988.00 $33,990.00 Subtotal $517,500.00 Erosion Control Construction entrance & washdown 2 EA $1,500.00 $3,000.00 $3,000.00 Temporary silt fence, Type C w maint. 7760 LF $4.45 $34,532.00 $34,540.00 Tree save fence 2000 LF $2.50 $5,000.00 $5,000.00 Temporary Grassing 1 AC $500.00 $500.00 $500.00 Subtotal $43,040.00 Pavement & Roadway Tack coat 300 GL $2.47 $741.00 $750.00 2" Asphalt Paving 572 TON $85.00 $48,620.00 $48,620.00 Stone pavers (ped/bike) 4847 SF $25.00 $121,175.00 $121,180.00 Brick pavers (Apron) 14107 SF $15.00 $211,605.00 $211,610.00 Concrete sidewalk, 4" 4850 SY $56.85 $275,722.50 $275,730.00 Conc. Curb & gutter, 6" x 24" typ 7 10200 LF $14.22 $145,044.00 $145,050.00 Thermoplastic pvmt marking, arrow tp 1 10 EA $80.00 $800.00 $800.00 Solid traf stripe, 6", white 3533 LF $0.21 $741.93 $750.00 Solid traf stripe, 6", yellow 2567 LF $0.15 $385.05 $390.00 Detectable Warning Surface 588 SF $33.83 $19,892.04 $19,900.00 Reset Highway Sign 25 EA $141.15 $3,528.75 $3,530.00 Subtotal $828,310.00 Site Structures Seat wall 500 LF $100.00 $50,000.00 $50,000.00 Subtotal $50,000.00 Lighting 20' Ht. Street Lighting 6 EA $5,000.00 $30,000.00 $30,000.00 12' Ht. Pedestrian Light 32 EA $4,500.00 $144,000.00 $144,000.00 Subtotal $174,000.00 Stormwater & Sanitary Sewer Conveyance Catch Basin, GP 1 10 EA $2,717.05 $27,170.50 $27,180.00 Remove Catch Basin 16 EA $800.00 $12,800.00 $12,800.00 $39,980.00 Landscape Bulk Materials Landscape mulch 1595 SY $4.28 $6,826.60 $6,830.00 Sod 1077 SY $8.00 $8,616.00 $8,620.00 Plant Soil 11600 CY $33.00 $382,800.00 $382,800.00 Bioretention areas 150 SY $49.68 $7,452.00 $7,460.00 Perennials 1 gal perennial 2425 EA $10.50 $25,462.50 $25,470.00 Shrubs & Ornamental Grasses 36" 48" Shrub 600 EA $42.00 $25,200.00 $25,200.00 Trees 2" Flowering tree 50 EA $200.00 $10,000.00 $10,000.00 3" Cal. 80 EA $325.00 $26,000.00 $26,000.00 Site Furniture 1

GPCID Road Diets Magnitude of Probable Cost 9/1/2016 ITEM QUANTITY UM COST/UNIT TOTAL ROUNDED TOTALS Bench 15 EA $1,500.00 $22,500.00 $22,500.00 Waste receptacle unit 10 EA $500.00 $5,000.00 $5,000.00 Subtotal $519,880.00 Project Subtotal $2,172,710.00 Location Adjustment (.90) $1,955,439.00 Proj Mgmt/Mobilization/Bonding & Insurance/O&P $488,860.00 15 % Contingency $293,316.00 SITE TOTAL $2,954,886.00 2