Mapping and the 2013 Colorado Floods. Mapping before, during, and after

Similar documents
NAI Principles In Gwinnett County

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

Floodplain Technical Memorandum

Hazard Mitigation Planning. Association of New Jersey Environmental Commissions Workshop Edison, New Jersey October 20, 2012

VALUE OF URBAN DRAINAGE PLANNING AND FLOOD HAZARD REDUCTION PROJECTS IN THE 2013 FLOOD

MEMORANDUM. September 10, 2018

City of East Point Comprehensive Floodplain Management Program

Floodplain Management Strategies in Forsyth County Georgia Association of Floodplain Management 7 th Annual Technical Conference March 2012

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

ASFPM 2015 Conference June 3, 2015 Living with the River in Lyons, Colorado. Darrin Punchard, AICP, CFM Principal Risk & Resilience

No Adverse Impact. A Proposed National Standard. Association of State Floodplain Managers Annual Conference Kansas City, MO.

Conservation in South Jersey Being Creative with Restoration

Appendix E Preliminary Location Hydraulic Study

RIVER RECREATION AND CONSERVATION: LESSONS FROM COLORADO S 2013 FLOODS

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

Village of Forest Park. July 27, Sewer Separation Evaluation

Fisher Slough Tidal Marsh Restoration Project Scaling Down the Restoration Planning & Analysis Framework to Evaluate Project Alternatives

City of Waco Stormwater Management Regulations

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

STEERING COMMITTEE MEETING # 5 SEPTEMBER 18, 2018

CHECKLIST FOR PHASE II DRAINAGE REPORT

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

Floodplain Management Plan 2016 Progress Report

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

FLOOD ISSUE 62 INTRODUCTION

SPANISH TOWN, ST. CATHERINE JAMAICA

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis

Radnor Township. Factors affecting storm water issues.

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

Modeling Cumulative LID Features for Floodplain Impacts in an Urban Watershed in Houston, TX

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

Nevada Floodplain Management Program

1. Project Description

HYDROLOGICAL PERFORMANCE OF THE GREEN ROOF AT SYRACUSECOE

CRITICALFACILITIESASSESSMENT IN SOUTHEASTERN CONNECTICUT STRATEGIES FOR ALL HAZARDS RESILIENCE

KYTC and NFIP: Bridging Floodplain Management and Design KAMM CONFERENCE AUGUST 25, 2015

Existing Conditions and Environmental Consequences Floodplains

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

A G E N D A Council Update Training Room September 26, :45 p.m.

Roof Runoff Harvesting Benefits for Regional Conditions in Low Density and Medium Density Residential Areas. Leila Talebi 1 and Robert Pitt 2

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

When planning stormwater management facilities, the following principles shall be applied where possible.

ATTACHMENT 1 WILSON MINE LECROY AREA SEMIPERMANENT DEWATERING SYSTEM

The Benefits and Challenges Associated with Green Infrastructure Practices

- Phase. Project. areas using. project from. Project Type: Project is

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

8.5 FLOODING. Environmental Setting

FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT W. Ten Mile Road Novi, MI (248)

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

A TWENTY YEAR PLAN TO RESTORE NAPLES BAY. Natural Resources Manager

Problem Understanding

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

water resource specialists

DAM BREACH EMERGENCY PLAN SKI ISLAND LAKE, OKLAHOMA CITY

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Low Impact Development Calculations using the Source Loading and Management Model (WinSLAMM)

Green Infrastructure Planning for Sustainability and Resiliency

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena

Physical Approaches to Flood Mitigation

2014 HAZARD MITIGATION PLAN ANNUAL REVIEW. Consider receiving the 2014 Hazard Mitigation Plan annual review.

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

The Role of the Landscape Contractor to Conserve Water

Getting the Locals to Go Along. Keys to Tulsa s Successful Floodplain Management

TOWN OF BEDFORD CONSERVATION COMMISSION

4-H SOIL & WATER PROJECT UPDATE. Indiana 4-H. Youth Education

Blake C. Kronkosky, PE, Ph.D.

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

A Functional Annex Alert and Warning

Planning for Historic/Cultural Resources Coastal Resiliency in Connecticut. Presented to CAFM s 3 rd Annual Conference

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Physical Map Revision Flood Insurance Study

Weston s Wetlands, Stormwater, & Open Space

Adapting Floodplain Ordinances to New Mapping in Historically Modified Floodplains for Urban Areas

Outflow to Saw Mill Run

Kimberly Rollins, Professor, Department of Economics, University of Nevada, Reno

Stormwater Management at The University of New Orleans

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Deer Creek Watershed Stakeholders Committee

The Rocky Mountain Arsenal and the Northeast Greenway Corridor Project:

CITY OF HOLLY SPRINGS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Highlands Region Stormwater Management Program Guidance

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

Green Inspirations for Landscapes

City of Manassas Park Proposed Stormwater Management Funding

City of Elyria. Frequently Asked Questions

Rainfall, Streamflow, and Water-Quality Data During Stormwater Monitoring, Halawa Stream Drainage Basin, Oahu, Hawaii, July 1, 2000 to June 30, 2001

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

Priorities. Public Communication & Transparency Website, CM Public Updates, Magic City Newsletter

ICON engineering, inc.

Tracking spatiotemporal patterns of building vulnerabilities and evacuations during flood hazards

Transcription:

Mapping and the 2013 Colorado Floods Mapping before, during, and after

Presented by

Outline 2013 Floods Floodplain Mapping Before During After

20 counties 21,000 households 6000 sq. mi. 2,132 NFIP claims total $64M 10 Fatalities 17 rain in 6 days, 12 average annual 1,882 structures destroyed 16,000 structures damaged Reservoirs filled, spillways activated

2013 Colorado Floods 10.7 inches

Gilbert White Boulder Creek Floodplain Notebook How do Colorado floodplain managers compose our own Flood Notebooks?

Floodplain Mapping Before During After

@CORIVERDUDE

Floodplain Mapping Before Federal FHBMs FIRMs MapMod DFIRMs RiskMAP State Criteria Manual Stream Restoration Floodplain Mapping Local CRS UDFCD - Flash Flood Prediction Program F2P2 Alert Network

Colorado State Flood Rules Started in 2009 to carry out statutory mission to reduce flood damages Benefit Cost Analysis required

Assumed elevations, assessor building information Detailed DFIRM floodplain analysis

Community Storm Water Masterplans Using existing terrain and DFIRM data, review existing and proposed land uses for flood-safe elevations.

Flood Smart Elevations Lowest Lot Elevation DFIRM Data Terrain Data Output Parcel Data Flood Depth Flood Smart Finished Floor Elevation Included in outreach materials Highest Flood Elevation

Floodplain Mapping Before Federal Better Maps State Better Rules Local Better Data

Floodplain Mapping During Federal Emergency Response MOTF State EOC CASFM Conference Local Alert Gages Forecasts

UDFCD ALERT SYSTEM Started following the 1976 Big Thompson Flood 219 gaging stations 195 rain gages 103 stream gages 26 full weather stations

Marston Lake Full Weather Station

Rainfall rate alarms, informed forecasters, who updated precipitation models, for Emergency Ops and Public Information

Emergency Operation Center National Incident Management Standards GIS links across state

Civil Air Patrol Aerial Photos High Water Marks Inundation Mapping

Attempts to capture multitude of photo documentation in one place, georeferenced

During the Flood During Federal Resources Situational Awareness State Operations Local Emergency Information

Floodplain Mapping After Federal NFIP Outreach Assistance MOTF State Outreach Assistance Mapping Local BCA Planning

LiDAR Led thru USGS FEMA State of Colorado Denver Regional Council of Governments Disaster Relief Fund Federal Operational Support

Scope of Work: Project Area Total Project Area: 5,636 sq. Miles plus minimum 100 meter buffer. FEMA AOI s: Mountain Reaches (205 sqm) Eastern Plains (3,150 sqm) High Relief Mountain (1,261 sqm) Priority 1 & 2 Areas DRCOG AOI: Total 3,600 sq miles 2,580 sq mile overlap with FEMA AOI 1,020 sq miles of new area

Post-Flood Timeline Sept Oct Nov Dec Jan Flood LiDAR flights Priority Delivery Emergency Repairs Master Planning Recovery Mapping Feb Mar Apr May June Advisory FPs & Ordinances Spring runoff designs Spring runoff repairs Terrain delivery BCAs

New lidar amazing to come through as quick and during disaster with recovery money Other basins within Colorado were scoped ahead of USGS flood collection and still are not delivered

Add cut-fill comparison photo - Sterling

Flood Recovery Mapping Advisory BFEs Local Floodplain Ordinance Updates

Floodplain Mapping After Federal LiDAR terrain data to support recovery State Recovery flood mapping Assistance Support Local Advisory Mapping Ordinances Master Planning

Conclusion What does your flood notebook look like? Does it have a map? Does it have elevations?

Premise Location Spatial relationship of the data we use as floodplain managers And once we have x,y added to our data, what happens when you add elevation x,y,z is a powerful basis for floodplain management before, during, and after a flood event.