FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT W. Ten Mile Road Novi, MI (248)

Similar documents
SEMSWA s Role in the Land Development Process

Existing Conditions and Environmental Consequences Floodplains

City of Fort Lupton Administrative Site Plan Process

ARTICLE 17 SITE PLAN REVIEW

City of Fort Lupton Site Plan Process

Please highlight flow chart where applicable and return with Form 2 and Form 3 (tab 1) to the City of St. Charles Engineering Department.

THE CITY OF MOBILE, ALABAMA

CHECKLIST FOR PHASE II DRAINAGE REPORT

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Driveway Regulations TOWN OF FREMONT ROCKINGHAM COUNTY NEW HAMPSHIRE

DRIVEWAY REGULATIONS

Washington County, Maryland Division of Public Works Policy Manual

SITE PLAN REVIEW APPLICATION AND CHECKLIST

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

KYTC and NFIP: Bridging Floodplain Management and Design KAMM CONFERENCE AUGUST 25, 2015

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

# 3 & 4 HOLDOVER ZON & ZON PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: June 4, 2009

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: April 6, 2017

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

SUBMITTAL REQUIREMENTS

TREE REMOVAL PERMIT PACKET

NAI Principles In Gwinnett County

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

CITY OF MOBILE MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. November 5, 2012

VIOLET TOWNSHIP ZONING & BUILDING DEPARTMENT Rustic Drive Pickerington, Ohio (614) Fax (614)

PLANNING APPROVAL & PLANNED UNIT DEVELOPMENT Date: November 2, 2017

Project phasing plan (if applicable) 12 copies of site plan

Appendix E Preliminary Location Hydraulic Study

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS.

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: April 4, 2013

NAPA COUNTY PUBLIC WORKS Standards & Specifications

IC Chapter Severe Weather Warning Sirens

Application for Certification for an Alarm System Contractor

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

Drexel, Barrell & Co.

PLANNING AND DEVELOPMENT DEPARTMENT SITE PLAN REVIEW SECTION / CURRENT PLANNING APPLICATION FOR PRELIMINARY SITE DEVELOPMENT PLAN APPROVAL

Camden County Development Regulations. Updated February 2017

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

When planning stormwater management facilities, the following principles shall be applied where possible.

Variance Staff Report St. Croix County Board of Adjustment Ben Hanke / Calda Donna LLC Hearing Date: January 20 & 21, 2016

City of Concord, NH Site Plan Regulations

Overall Drainage Report

RRW Stonebrook, LLC Tentative Map Findings

Zoning Ordinance Chapter 10

Drexel, Barrell & Co.

Huntington Stormwater Utility

CITY OF SCANDIA ORDINANCE NO. 174

Appendix I. Checklists

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Application for Site Plan Review

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

CIVIL ENGINEERING PERMIT APPLICATION

# 17 & 18 ZON & ZON PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 5, Mobile Carnival Association

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Sandwich Community Fire Protection District. Plan Review Submittal Guidelines and Requirements

TETON COUNTY FIRE PROTECTION RESOLUTION FOR NEW SUBDIVISIONS 2008 Edition. Chapter I General Provisions

WARSAW WAL-MART EXPANSION FLOODPLAIN EVALUATION STUDY

Stormwater Management Resource Type:

Neo-Traditional Overlay Application

LANDSCAPE AND IRRIGATION PLAN PREPARATION GUIDELINES

CITY OF ZEELAND PLANNING COMMISSION

ITEM # _ 41 _ DATE: COUNCIL ACTION FORM MAJOR FINAL PLAT FOR MENARDS SUBDIVISION BACKGROUND:

ARTICLE 22 CHESAPEAKE BAY PRESERVATION AREA (CBPA) OVERLAY DISTRICT. Statement of Intent

Procedures IV. V. Rural Road Design Option

Erosion & Sediment Control Plan Application Form & Checklist

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

Town of West Point Plan of Development

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

SOIL EROSION AND SEDIMENT CONTROL

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

Application for Certificate of Environmental Compatibility and Public Need

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

8.5 FLOODING. Environmental Setting

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements.

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT. Single Family Residential, Townhomes

ORDINANCE NO. 430 REGARDING WATER CONSERVATION

CONCURRENT SUBDIVISION/SITE PLAN REVIEW APPLICATION TOWN OF CONWAY, NH

Section General Tree Preservation Requirements for New Nonresidential and Residential Development

Stormwater. Management Manual

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

STREAM BUFFERS

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

Project Narrative Proposed Hillcrest Country Club Property Redevelopment Final Site Plan Application July 6, 2015 Revised: October 30, 2015

Physical Map Revision Flood Insurance Study

Emergency response lock box unit contents and maintenance.

County of Fairfax, Virginia

4. To assure that adequate screening and buffering will be provided between the planned project and contiguous properties;

Transcription:

FLOODPLAIN USE PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT 45175 W. Ten Mile Road Novi, MI 48375 (248) 347-0415 Office Use Only Permit Number: Date Issued: Processed By: Type of Permit: Date: Project Name: Residential: Non-Residential: Owner's Name: Owner's Address: City: State: Zip Code: Telephone Number: Fax: Property Location: Describe the proposed activity in the floodplain and/or floodway. Include the volume of fill if applicable. Flood Insurance Rate Map Information Community Name: City of Novi, Michigan Panel Number: Oakland County Map Revision Date: Is this project going through the Letter of Map Revision or Letter of Map Amendment process? Yes No Signature of Surveyor or Professional Engineer Date

Materials Included with Permit Application (check box if applicable) Fee MDEQ Permit 3 Sets of Final Engineering Plans or Subdivision Engineering Plans with Utility Sheet Grading Sheet showing Floodplain, Floodway, & Base Flood Elevations Copy of the applicable FIRM front panel and area including relevant benchmarks LOMA or CLOMR applications (if applicable) Building proposed finished grades and lowest finished floors elevations Hydrology & Hydraulic calculations and report if applicable Other Elevation Certificates Office Use Only

FLOOD PLAIN USE PERMIT CITY OF NOVI Community Development Department (248) 347-0415 PART I. WHEN IS A FLOODPLAIN USE PERMIT REQUIRED? A Floodplain Use Permit is required when proposed construction impacts to a property located in regulated floodplain or floodway meet the definitions given in the Floodplain Use Permit Categories as described below or within Chapter 12, Article IV Flood Damage Prevention of the Novi Code of Ordinances. Floodplain Use Permits are administered through the City of Novi Community Development Department. PART II. WHAT ARE THE FLOODPLAIN USE PERMIT CATEGORIES? There are three categories of Floodplain Use Permits: Major, Minor, and Individual Residential. For each of the categories, proposed impacts must be in compliance with the City of Novi Drainage and Flood Damage Prevention Ordinance Chapter 12, Article IV, copies of which are available at the office of the City Clerk and online at CityofNovi.org. A. MAJOR FLOODPLAIN USE PERMITS Any proposed construction impacts to a regulated floodplain or floodway that requires hydraulic and hydrologic analysis to be prepared by an engineer and reviewed by the City of Novi consulting engineer will qualify for a Major Floodplain Use Permit. This would include improvements with: Increases or decreases in the base flood elevation. Stream relocations where regulated floodplains or floodways are involved. Structures or fill within the floodway (other than street or driveway culvert crossings). Work in unnumbered zone A special flood hazard areas that require a base flood elevation to be established. Letters of Map Revision-Based on Fill (LOMR-BOF) from the Federal Emergency Management Agency (FEMA) for subdivisions with five or more lots proposed to be removed from the floodplain. Any other project that does not fall into the categories listed above may still require a Major Floodplain Use Permit when deemed necessary by the reviewing engineer.

B. MINOR FLOODPLAIN USE PERMITS Any proposed construction impacts to a regulated floodplain or floodway that do not require hydraulic and hydrologic analysis to be prepared will likely require a Minor Floodplain Use Permit. Typical Minor Floodplain Use Permits would include: Letters of Map Amendment (LOMA) from FEMA. Minor stream crossings (streets or driveways) of a floodway or floodplain. Proposed impacts that do not fall into the categories listed in A. and B. above will need to be evaluated by the reviewing engineer to determine category of permit required. C. INDIVIDUAL RESIDENTIAL FLOODPLAIN USE PERMITS New residential construction or substantial improvements to existing structures as well as associated construction located within a floodplain area will require an Individual Residential Floodplain Permit. PART III. WHAT INFORMATION IS REQUIRED TO PROCESS A FLOODPLAIN USE PERMIT APPLICATION? A. Major and Minor Floodplain Use Permits As part of the review for the Major or Minor Floodplain Use Permits, a Michigan Department of Environmental Quality (MDEQ) permit for the proposed work within the floodplain or floodway must be issued, or a letter of no jurisdiction must be obtained. Major and Minor Floodplain Use Permit applications must include three sets of engineering plans with utility sheets and a grading plan showing the floodplain, floodway, and base flood elevation as established by the Flood Insurance Rate Maps (FIRM) for the City of Novi. Hydrology and hydraulic calculations must also be supplied upon submission of the Floodplain Use Permit application, where applicable. The application materials for a FEMA Conditional Letter of Map Revision, Letter of Map Revision, or Letter of Map Amendment should also be submitted to process the Floodplain Use Permit application (see Part IV. below). B. Individual Residential Floodplain Use Permits An Individual Residential Floodplain Use Permit will require a drawing of the lot or parcel of land, which shows location of improvements, structure elevations, the lowest adjacent grades, and the floodplain, floodway, and base flood elevation. When applicable, the materials for a Federal

Emergency Management Agency Conditional Letter of Map Revision, Letter of Map Revision, or Letter of Map Amendment should also be submitted to process the Floodplain Use Permit application (see Part IV. below). A FEMA Elevation Certificate for the structure will be required to be prepared and provided to the Novi Building Department for their records. NOTE: PART IV. All Floodplain Use Permit applications are required to be submitted through the City of Novi Building Department. PROCESSING MAP REVISIONS AND AMENDMENTS THROUGH THE FEDERAL EMERGENCY MANAGEMENT AGENCY Only the Federal Emergency Management Agency (FEMA) can issue revisions and amendments to existing Flood Insurance Rate Maps (FIRM) or individual parcels of land removing them from regulated floodplain and/or floodway. The following sections provide some detail on the process involved in applying for and securing revisions and amendments from FEMA. A. Conditional Letter of Map Revision (CLOMR) What is a Conditional Letter of Map Revision? A Conditional Letter of Map Revision (CLOMR) is the first of a two (2) step process whereby areas which have been mapped within the regulated floodplain are removed through FEMA by revision of a flood insurance rate map. Specific application forms and guidelines to prepare required submittal information are available through the City Engineers office for preparation of a CLOMR application. A CLOMR application, once approved and forwarded by the City of Novi is reviewed and must be issued by FEMA prior to any construction. It is recommended that CLOMR applications be prepared and submitted for the land in its undeveloped state. All applications for CLOMR s must be made through the City of Novi Building Department for review and forwarding to FEMA. When is a CLOMR required? All new residential development where structures are proposed to be constructed within the regulated floodplain or proposed to be elevated by fill will require a CLOMR prior to approval of the final site plan or subdivision engineering drawings allowing construction on the site. A CLOMR is not mandatory for non-residential developments however; it is strongly recommended that all non-

residential developments with structures proposed for construction within the floodplain obtain a CLOMR. B. Letter of Map Revision (LOMR) and Floodway Revisions What is a Letter of Map Revision? A Letter of Map Revision is the final step after issuance of a CLOMR to have areas, which have been mapped within the regulated floodplain removed through FEMA by revision of a Flood Insurance Rate Map. Once construction of the proposed activity is completed in accordance with the issued CLOMR, as-built documentation is prepared and submitted to the City of Novi for review and approval who will then forward it to FEMA for consideration of issuance of a LOMR. A LOMR must be issued by FEMA prior to the issuance of individual building permits on the site. Specific application forms and guidelines to prepare required submittal information are available through the City Engineers office and contained in the FEMA Map Revision Guidelines for preparation of a LOMR application. When is a Letter of Map Revision or Floodway Revision required? All residential development where structures or fill are proposed within the regulated floodplain or floodway will require the issuance of a LOMR or Floodway Revision from FEMA before issuance of a building permit from the City of Novi for impacted lots. A LOMR is not mandatory for non-residential developments however; it is strongly recommended that all non-residential developments with structures proposed for construction within the floodplain obtain a LOMR. A LOMR or Floodway Revision will be required for all proposed encroachment into a regulatory floodway that would cause any rise in the base flood elevation. All LOMR and Floodway Revisions are required to be submitted, reviewed, and approved by the City of Novi Building Department. It should be noted that notwithstanding the above, a FEMA Elevation Certificate for the structure would be required to be prepared and provided to the Novi Building Department for their records. C. Letter of Map Amendment (LOMA) What is a Letter of Map Amendment (LOMA)? A LOMA is the process whereby land, which has been erroneously mapped within the regulated floodplain, is removed through FEMA by revision of a Flood Insurance Rate Map. Specific application forms and guidelines to prepare required submittal information are

available through the City Engineers office and contained in the FEMA Map Amendment Guidelines for preparation of a LOMA application. When is a Letter of Map Amendment required? A LOMA is required prior to approval of development construction plans in all residential areas with proposed impacts to regulated floodplains, which have been erroneously mapped. A LOMA is not mandatory for non-residential developments however; it is strongly recommended that all non-residential developments that have been erroneously mapped obtain a LOMA. A LOMA cannot be used for sites where fill has been placed to elevate a structure or lot above the base flood elevation. It should be noted that notwithstanding the above, a FEMA Elevation Certificate for the structure will be required to be prepared and provided to the Novi Building Department for their records. PART V. STEP 1. STEP 2. STEP 3. WHAT ARE THE STEPS INVOLVED IN THE FLOODPLAIN USE PERMIT APPLICATION REVIEW PROCESS (Other than individual single family residential)? Proposed floodplain uses are reviewed with the applicant and their engineer at the required pre-application meeting with the City of Novi. Site planning information requirements related to floodplain use are detailed at this meeting as well as the local permit application and/or FEMA map amendment/revision process. The City of Novi engineering consultant reviews preliminary site plans and/or preliminary subdivision/condominium plats for details of proposed floodplain use and the requirements necessary to apply for and obtain a City of Novi Floodplain Use Permit. This information is specified in the preliminary site plan or tentative preliminary plat review letter. Applicant submits floodplain use permit application and review fee as specified in the engineering consultants Preliminary Site Plan or Tentative Preliminary Plat review letter along with application information requirements to the City of Novi Building Department. NOTE: Floodplain Use Permit Application will be required to be submitted for review no later than the first completed engineering review of the Final Site Plan or Subdivision Construction Plan. Comments regarding the second engineering review will not be released until the Floodplain Use Permit Application is received and reviewed. It is strongly

recommended that applications for LOMA s, CLOMR s, or LOMR s be submitted as early as possible due to the often lengthy time required for review by FEMA. STEP 4. STEP 5. PART VI. Upon review and recommendation for approval of the Floodplain Use Permit Application, a Floodplain Use Permit can be issued by the Building Department. Secure required FEMA amendment and/or revision letters either prior to or during construction process as required. In the case of platted subdivisions all required FEMA amendment and/or revision letters are to be secured prior to the approval of the Final Plat. REVIEW FEE, PERMIT AND BONDING REQUIREMENTS. The following Review and Permitting Fee Schedule applies: Major Floodplain Use Permit $2,500.00 Minor Floodplain Use Permit $300.00 Individual Residential Floodplain Use Permit $300.00 To each of these fees a 15% City of Novi Administrative Fee must be added. The following Bonding Requirements apply: Major Floodplain Use Permit $10,000 Minor Floodplain Use Permit $2,500 Individual Residential Floodplain Use Permit $1,000 All bonds must be posted at the time of issuance of the Floodplain Use Permit.