NFPA 25 and the Influence of Liability

Similar documents
Slide 1. Slide 2 Instructor. Slide 3. NFPA 25 The Owner s Manual. Roles & Responsibilities DISCLAIMER

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

Antifreeze Solutions and Automatic Fire Sprinkler Systems. March 12, 2013

Understanding and Applying NFPA 25

Koffel Associates, Inc.

NFPA Edition. NFPA 13 (2016 Edition) Hot Topics and NFPA 13 FAQ s. Highlights of 2016 Changes. Storage Commodity Classification 4/29/2014

ANTIFREEZE AND AUTOMATIC FIRE SPRINKLERS UPDATE. Presented by: Jerry Schultz The FPI Consortium, Inc. July 28, 2017

Understanding, Applying and Enforcing NFPA 25. James D. Lake NFSA Director of Training

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

Inspection and Testing of Water-Based Systems

Annual Water-Based Fire Protection Systems Inspection

The Antifreeze Fire Sprinkler System Dilemma Eliminating One Issue has Opened the Door to Another. Jennifer Poynter, Esq. Charles B.

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Port of St Helens SIA Aircraft Hanger Scappoose, OR

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

Slide 2 NFPA 25: 2017

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Fixed Fire Protection Getting it right, Ensuring Performance and Value

AUTOMATIC FIRE SPRINKLER SYSTEMS

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

9/15/ Cantara Lane Vista, CA (760)

False Sense of Security???

Cold weather regions where temperatures can fall below freezing present a threat to any building housing water-filled systems.

September 30, Dear Fire Suppression System Contractor/Designer:

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

Freezing of Water-Based Fire Protection Systems

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

Fire Sprinkler System Design and Installation Requirements

Welcome to the Keys to a Successful Fire / Life Safety Inspection and Sustained Tenant & Building Safety

NFPA Edition Update

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

Fire Sprinkler Submittal Requirements and Acceptance Testing

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

9/10/12. NFPA Consumer Alert Antifreeze sprinkler systems. Dear Fire Sprinkler System Owner,

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

esfr pendent sprinkler vk510 (k25.2)

Why did we come up with this system?

Design & Construction Standards, Revised January

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

CITY OF DANIA BEACH Local Business Tax Receipt Division 100 W Dania Beach Blvd. Dania Beach, FL Phone: ext 3644 / Fax

Agency for Health Care Administration

Chapter 4: Fire Protection Systems

Changes in NFPA

Center for Life Safety Education

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

TECHNICAL DATA OBSOLETE

Manufacturing safety solutions

May 1, Dear Fire Suppression System Contractor/Designer:

The definitions provided in , C.R.S., apply to these rules and regulations. The following additional definitions also apply:

Home Fire Sprinkler. Display Guide USE THIS KIT TO CUSTOMIZE THE HOME FIRE SPRINKLER DISPLAY TO MATCH THE REQUIREMENTS IN YOUR JURISDICTION.

Agency for Health Care Administration

Advanced Fire Alarm Systems Training Program Outline (5 Day)

APPENDIX H (DESIGN SUBMISSION CRITERIA)

Fire Alarm Inspection, Testing, Maintenance. Assuring the System s Operational Reliability

proven to help in the control of residential fires and to improve the chance for occupants to escape or be evacuated. Dry Pipe System Application

proven to help in the control of residential fires and to improve the chance for occupants to escape or be evacuated. Dry Pipe System Application

RAPID RESPONSE Series LFII Residential Sprinklers 4.2 K-factor Horizontal Sidewall Wet Pipe and Dry Pipe Systems General Description

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

2016/2017 Fee Schedule

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

Renovation Program. Renovation Program GENERAL

American Society of Safety Engineers Professional Development Conference June 9-12, Fire Protection. Stephen J.

EPSS Monitoring for Total Compliance

Standpipe Systems for Fire Protection

Narrative Reports As Regulated by 780 CMR, Section 903.0

Sheetz Inc. Fire Protection Service Guidelines

WRENCH FLATS 1/2" NPT. 7/16" (11,1 mm) NOMINAL MAKE-IN CENTERLINE OF WATERWAY ESCUTCHEON PLATE SEATING SURFACE

Risk Management Services

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

Contren Learning Series Apprenticeship Training Program for Fire Sprinkler Fitters

Sprinkler System Installer Consultation Discussion Guide

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

Series EC K-factor Extended Coverage (Light Hazard) Pendent and Recessed Pendent Sprinklers General Description

You are required to READ ALL PAGES. of this application

D. Reference Standards (Utilize latest editions available):

TECHNICAL DATA. The Viking Corporation s Web site at Frame Casting: Brass UNS-C84400

SECTION WET-PIPE SPRINKLER SYSTEMS

Protecting Your Property: Well Do You Know Your Fire Fire Systems Systems. Joe Szewczyk, Risk Control Consultant

System Test Report CLEAN AGENT

Model: 400E-5M. Bermad Hydraulically Controlled Anti-Columning Deluge Valve, with Easylock Manual Reset. Installation Operation Maintenance

ROSWELL INDEPENDENT SCHOOL DISTRICT P.O. Box 1437 Roswell, New Mexico General Bid Conditions

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

2010 FIRE CODE OF NEW YORK STATE

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Fire Protection Systems Operation and Maintenance 3 PDH / 3 CE Hours

Transcription:

NFPA 25 and the Influence of Liability NFPA 25 Summit Addison, IL Northern Illinois Fire Sprinkler Advisory Board/ Illinois Fire Inspectors Association Date: Speaker: July 28, 2017 Michael J Bosma

Meet the Presenter Michael J Bosma, EVP, Viking Group, Grand Rapids, MI 35 Years in the Fire Sprinkler Industry in Manufacturing, Marketing, R&D, and Sales. NFPA 25 Primary Seat Holder since 2001 Manufacturing Seat via Industry Associations Past Homebuilder Early 1980 s Not a Lawyer! So The opinions expressed in this presentation and on the following slides are solely those of the presenter and not necessarily those of Viking. Viking does not guarantee the accuracy or reliability of the information provided herein.

Sources of Liability Issues Why are you Inspecting? Compliance with an AHJ Permit to Occupy or do business Who is Inspecting? Outside Contractor Limited system installation knowledge Compliance with Insurance policies Maintain coverage Installing Contractor More thorough installation knowledge. Business Continuity assurance Good business practice Life Saftey Issue Compliance Nursing Home, Maintenance Staff Self Inspection Other Qualified Person or Company

Sources of Liability Issues Why are you Inspecting? Compliance with an AHJ Permit to Occupy or do business Who is Inspecting? Outside Contractor Limited system installation knowledge Compliance with Insurance policies Maintain coverage Installing Contractor More thorough installation knowledge. Business Continuity assurance Good business practice Life Saftey Issue Compliance Nursing Home, Maintenance Staff Self Inspection Other Qualified Person or Company

Sources of Liability Issues Why are you Inspecting? Compliance with an AHJ Permit to Occupy or do business Who is Inspecting? Outside Contractor Limited system installation knowledge Compliance with Insurance policies Maintain coverage Installing Contractor More thorough installation knowledge. Business Continuity assurance Good business practice Life Saftey Issue Compliance Nursing Home, Maintenance Staff Self Inspection Other Qualified Person or Company

Liability Concerns Building Owners Are you checking my system for problems to create work? The inspection company knows more than I do about these systems! Will the inspection cover me in the event of an issue in the future? Is the inspecting contractor just looking for additional work? Are the inspectors truly showing up or just Driving By Does a regular inspection increase my value and lower my risk? Chapter 4!!! Responsible for properly Maintaining a water based fire protection system Why can t the standard require the experts to give my system a complete clean bill of health?

Liability Concerns Authorities Having Jurisdiction How can I ensure every system is inspected, tested, and maintained? Are the inspection companies Qualified 3.3.34 Qualified. A competent and capable person who has met all the requirements and training for a given field acceptable to the AHJ. Trade offs were given in exchange for sprinkler systems require ongoing ITM work. System knowledge is often not as deep as contactor Balancing Economic needs with proactive safety requirements Future disaster would point blame on their department

Liability Concerns Contractors Scope of Work is operational only Expectations are often design based Properly noting deficiencies Implied expertise ie Spacing Hazard Classification Obstructions Design Criteria Who else has worked on the system? Accurate records Hydraulic data Considered the expert on site when Market conditions = Newer employee Why can t the standard make the owners responsible for everything?

Liability Concerns Manufacturers 50+ Year life expectancy required of systems Life Safety and property liability exposure ITM activities are critical for ensured operation Liability effectively goes on forever Has the equipment been installed properly? Can Warranty protections be contingent upon ITM? Why can t the standard make the owners responsible for everything?

NFPA 25 Technical Committee Make Up Represents these concerns plus more! Building Owners = Inspect and correct systems AHJ s = Comply with Code Insurance Companies = Ensure Functional Operation - Property Protection Manufacture s = Protect Equipment Installers = Clear definition of Scope Fire Service = Ensure Operation for Life Safety Approval authorities = Protect Approval Standards

Hot Topics Topics that invoke Liability Discussions Inspecting for recalled Sprinklers Tagging systems(red, Yellow, Green) Extending Fire pump test cycles 3 rd Party Inspections Chapter 4 (Owners chapter) Manufactures leaning on NFPA 25 verbiage for warranties Responsibility to note deficiencies, obstructions, change in Hazard, slope, un sprinklered areas, etc Time frame for repairs Inspecting all sprinklers visually Insurability for the installers/inspectors Automated Testing

Hot Topics Anti Freeze in NFPA 13 and 13R facilities Systems installed after September 30, 2012 shall utilize Listed Antifreeze solutions* Systems installed before September 30, 2012 can utilize the following Maximum factory pre mixed solutions 30/70 Propylene Glycol (6F) 38/62 Glycerin (1F) Solution Mixtures can be raised(solution % s Not to be exceeded!) with a Deterministic Risk Assessment 40/60 Propylene Glycol (-6F) 50/50 Glycerin (-19) All solutions must be replaced with listed solutions by September 20, 2022!** All Antifreeze systems must be tagged and tested annually. *ESFR Systems specifically listed with Propylene Glycol are still allowed ** Expected to be addressed this cycle Extend the deadline?

Hot Topics Anti Freeze in NFPA 13D Not typically covered by NFPA 25 Systems installed after September 30, 2012 shall utilize Listed Antifreeze solutions** Systems installed before September 30, 2012 can be retained by tested specific gravity matching samples to be confirmed at: 40/60 Propylene Glycol (-6F) 50/50 Glycerin (-19F) Factory pre mixed solutions can be used to replace older systems not passing 40/60 Propylene Glycol (-6F) 50/50 Glycerin (-19) All Antifreeze systems must be tagged and tested annually.( Minimum Info: Date, % Concentration, Type of solution, Contactor performing the work, and noted if it was replaced or successfully tested) ** Expected to be addressed this cycle by 13D committee Extend the deadline?

Key things to Expect in an ITM project* Contractor OWNER(Chapt 4) Per 5.1.1.2(ITM Summary) Inspect (in the open and from floor) Test Valves, Gauges, Hangers, Heat trace, Signage, Pipe/Ftg, Sprinklers, Escutcheons, water flow alarm, and supervisory devices Anti Freeze, Control Valves, Main drain, Old(50 & 75 Yr) sprinklers, Dry Sprinklers(10 yr) QR Sprinklers(20 yr), High temp(5yr) & water flow alarm, and supervisory devices. Maintain Low Point Drains, Nozzles, Valves, and investigate for obstructions As applicable Standpipes, Private Mains, Pumps, Water tanks, Water Spray, Foam, Mist, Components, & Obstructions. Impairment Procedures and Notifications of Observations(Outside the Inspection report) Properly Maintain System Utilize Qualified Personnel Co-ordinate testing to minimize water damage Keep System components > 40F at all times Provide Ready Access and system documentation Provide Notification of a Shut Down Correct Deficiencies and Impairments Maintain Occupancy an Hazard classification of the facility(or Notify of changes!) Provide system signage Keep records of system information and ITM activities *Not a complete list

Who is Responsible? National Fire Sprinkler Association - 2011