CONSTRUCTION COST ESTIMATE. MANAGEMENT PLAN at VAUXHALL PARK, LAMBETH for LAMBETH PARKS MARCH 2006

Similar documents
Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

duncan heather & Associates GREYSTONE COLMORE LANE KINGWOOD OXON RG9 5NA

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

Poole Park Furniture Strategy February Design Stage C. Prepared by the Borough of Poole. First issue. Doc.no. PPL-SW-03

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

LIST OF COSTED PRIORITY PROPOSALS. January 2001

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Waterlily Playscape Committee Waterlily Playscape, Waterlily Park, Ocean Shores Draft Concept Plan. G Issue D 14/07/16

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Ohlone College Measure G Project Scope Revisions

Background Information

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

CHRIST & SAINT STEPHEN'S EPISCOPAL CHURCH 122 WEST 69TH STREET NEW YORK, NY 10023

Alexandra Road Park. 4.0 Park Zones. Document 3 - Stage D Design Report

Implementation plan. 3.1 Staging

GREENSPACES MANAGEMENT

MILL HOUSE, FLEET, LINCOLNSHIRE PE12 8LW

INTRODUCTION CURRENT APPLICATION

Burrus Old Mill Park

LAMBETH LANDSCAPES ANNUAL MANAGEMENT PLAN HILLSIDE GARDENS PARK

Derry City and Strabane District Council Planning Committee Report. Environmental Improvement Scheme. Derry City & Strabane District Council

Soft Landscaping. Soft Landscaping. Solutions

2 CASTLE COTTAGES CASTLE ROAD, SALTWOOD. 345,000 Freehold

Am I at risk of flooding?

Learning in the Landscape

Visualisations of reimagined Italian Garden & Rose Garden. Italian & Rose Gardens

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

POTTERSPURY PARISH COUNCIL Grass Mowing and Tree & Shrub Maintenance Tender 2017

LAMBETH LANDSCAPES ANNUAL MANAGEMENT PLAN HILLSIDE GARDENS PARK

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

Authority. any changes required as a result of the approved CHMP.

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

Gardners Crescent, Edinburgh Conservation Statement Page 0

Proposed Ice Skating Rink Impact Assessment & Mitigation Measures

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Master Plan Presentation August 12, 2015

Outstanding outdoor spaces for public parks

MetroParks Board Meeting 2018 Capital Improvement Projects

Rotary Park / Railroad Lake

Callendar Park Management Plan Consultation Phase 2

master plan hodge park

GROUNDS SERVICES COVERING EVERY ASPECT OF GROUNDS MAINTENANCE, LANDSCAPING AND DESIGN.

The term 'development' in the conditions below means the development permitted by this consent.

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

ADA Descriptions Website Posting 12/12/17

CHARMING COUNTRY HOUSE WITH A SEPARATE ONE BEDROOM COTTAGE. Hitherfield Farm, Brasted Lane, Knockholt, Kent TN14 7PJ

The planning and zoning board considered amending the zoning code to address plantings and alteration of the swale.

84 GREENFOOT LANE BARNSLEY S75 2TG

Forterra- Kimbolton Red Multi (sample ordered but awaited)

UPPER GORDON ROAD TO CHURCH HILL, CAMBERLEY CONSERVATION AREA

Welcome to our public exhibition

PLAYGROUND STANDARDS POLICY

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Note: This checklist is not intended as a research tool but as an aid to planning and evaluating playgrounds.

Ringsend & Irishtown Local Environmental Improvement Plan

BRITTINGHAM PARK DOG PARK IMPROVEMENTS PUBLIC INPUT MEETING #2. Sarah Lerner, Landscape Architect - City of Madison Parks Division

1) Providing education, access to healthy foods, and economic support for the local food system

12 Kiveton Lane Todwick, Sheffield. Park Estates

APPENDIX E: CITY OF HAMILTON* STANDARD REQUIREMENTS FOR PARK OR OPEN SPACE DEVELOPMENT

EnglEfiEld green SurrEy

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

DESIGN & ACCESS STATEMENT. REVISION A Residential Development, Neon Social Club, Nairn Street, Jarrow.

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

doyle + o troithigh landscape - architecture

GROUNDS SERVICES COVERING EVERY ASPECT OF GROUNDS MAINTENANCE, LANDSCAPING AND DESIGN.

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

BROWNFIELD REGENERATION LONDON

Public Consultation. Land at Monks Farm, North Grove. Welcome

ACADEMY AREA CONCEPT PLAN

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Merry Place, 6 College Road, Bournemouth, Dorset, BH5 2DX PRICE: 775,000

DESIGN REVIEW COMMITTEE AGENDA ITEM

KEY MAP DEVELOPMENT PERMIT AREA MAP. Sunnymede North Sub-Area Plan

Birmingham University, Pritchatts Road, Adjacent to Gisbert Kapp Building, Edgbaston, Birmingham, B15

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Proposed Park Master Plan: The Master Plan has been revised to incorporate suggestions received in response to the Park Survey:

CHIPTON FARMHOUSE CHIPTON BARTON DITTISHAM NR DARTMOUTH DEVON

DIVISION 32 EXTERIOR IMPROVEMENTS

RENTAL AGREEMENT AND CODE OF CONDUCT FOR ALLOTMENT GARDENS

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

GREAT WESTERN SQUARE & ENVIRONS

Professional & Qualified Tree Surgeons, Landscapers & Forestry Contractors

Date: 23 January Grange and Riverside Ward. Deputy Chief Executive

Banks House Back Lane Chipping Preston PR3 2QA

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

547 Warwick Road, Solihull, West Midlands, B91 1AW

11 Lakesedge, Eccleshall Road, Cold Norton, Stone ST15 0BF

3 Adele Avenue, Digswell, Welwyn, AL6 0AU Guide price 975,000

THE OLD READING ROOM, GROVE LANE, REDLYNCH, SALISBURY, WILTSHIRE, SP5 2NR PRICE: 525,000

Fell Foot Moorside Lane Wiswell Clitheroe Lancashire BB7 9DB

Chapter 1. Introduction

Community Meeting #2. Cabrillo Playground Renovation A 2008 Clean and Safe Neighborhood Parks Bond Project

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

SIMPSONS FARMHOUSE BURGHFIELD, BERKSHIRE

Derry City and Strabane District Council Planning Committee Report

E. Natural areas include habitats such as wetlands, tidal marshes, waterways, natural drainage-ways, woodlands and grassland meadows.

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.

Transcription:

CONSTRUCTION COST ESTIMATE MANAGEMENT PLAN at VAUXHALL PARK, LAMBETH for LAMBETH PARKS MARCH 2006 Job Nr 47523 Prepared by CJU Checked by JP Reviewed by RE Authorised by SAMB (Partner/Associate) H:\qs\Jobs\47520\Vauxhall Park\Feb 06 Estimate\Notes.doc Davis Langdon LLP Clarence House, Minerva Business Park, Lynchwood Peterborough PE2 6FT Tel: 01733 362000 Fax: 01733 230875

Vauxhall Park, Lambeth Construction Cost Estimate Nr 1 March 2006 1.0 Introduction 1.1 Davis Langdon has been instructed by Barbara Moth Landscape Architects to prepare Stage B (feasibility) estimates for the construction works contained within the Vauxhall Park Management Plan for the Vauxhall Park, Lambeth. 2.0 Basis of Estimate 2.1 Barbara Moth Landscape Architects Vauxhall Park Work Plan received 20 February 2006, to which the numbering in brackets in this estimate refer. 2.2 Barbara Moth Landscape Architects site plans numbered P70/01, 11, 12, 13 and 17A received 15 February 2006. 2.3 Site visit and discussions with Barbara Moth on 15 February 2006. 2.4 The estimate assumes a traditional contract with tenders obtained in competition. 2.5 The estimate has been priced on the assumption that individual items of works will be procured and executed on a stand alone basis. It should be noted that the amalgamation or further division of items could have financial implications. 2.6 The estimate has been based on March 2006 prices for a fixed price contracts (see also item 4.1 below for inflation forecasts). Please note any measurement contained within this estimate should not be relied upon for any purpose other than the formulation of this estimate itself. 3.0 Estimate Summary 3.1 The estimate breakdown is included in Appendix A. The summary is as follows:- Year 1 Works 50,000 Year 2 Works 182,000 Year 3 Works 618,000 Year 4 Works 29,000 Year 5 Works 130,000 Total Estimated Present Value Construction Cost 1,009,000 Davis Langdon 08/03/2006 H:\qs\Jobs\47520\Vauxhall Park\Feb 06 Estimate\Notes.doc i

Vauxhall Park, Lambeth Construction Cost Estimate Nr 1 March 2006 4.0 Exclusions No allowance has been made for: 1. Inflation current forecasts indicate cumulative year on year increases over the next six years to be as follows:- 1. 4% 2. 9% 3. 16% 4. 23% 5. 30% 6. 38% 2. Any works beyond the curtilage of the site. 3. Any allowance for public road and/or footpath closures. 4. Surveying for and removal of asbestos in the existing 1 O Clock Club building and the existing Toilet Block. 5. Upgrading the existing service mains to serve the new 1 O Clock Club building. It is assumed that the existing mains are of sufficient size and capacity to cater for the scheme and that no upgrading of the infrastructure will be required. 6. Archaeological investigations and discoveries. 7. Soils investigation. 8. Any costs associated with the identification and remediation of land contamination. 9. VAT on any part of the construction cost or fees (Specialist advice can be given if required). Davis Langdon 08/03/2006 H:\qs\Jobs\47520\Vauxhall Park\Feb 06 Estimate\Notes.doc ii

Appendix A Estimate

Estimate Date: 08-Mar-2006 Description Rate Total Year 1 Works 50,000 Year 2 Works 182,000 Year 3 Works 618,000 Year 4 Works 29,000 Year 5 Works 130,000 Total 1,009,000 Davis Langdon Page 1

Estimate Date: 08-Mar-2006 Year 1 Works Description Total Revise fence alignment north of Nursery (1.3) 1,900 Replace Tennis Court fencing (1.4) 19,300 Relocate train within Children`s Area (1.5) 9,800 Dog free picnic area for general public use (1.6) 3,000 Rationalisation and replanting of beds in association with picnic area (1.7) 10,400 New gates to Fentiman Road entrance (1.8) 5,700 Total 50,100 Davis Langdon Page 2

Estimate Date: 08-Mar-2006 Year 2 Works Description Total Repair plinths and reinstate historic boundary railings to South Lambert Road boundary (2.1) Repair and upgrade uneven sections of paving at park entrances (SW entrance only included here - see elsewhere for works to other entrances) (2.2) 85,800 2,300 Replace entrance barriers - Area 1 (2.3) 4,500 Replace railings - Area 1 (2.4) 12,000 Phased refurbishment of planting areas (2.5) 5,200 Remove low railings near toilet block (2.6) 400 Improve security of Lawn Lane entrance (2.7) 5,000 Improvements to MUGA (2.8) 6,000 Provision of benches (2.9) 1,100 Remove redundant surfacing (2.10) 800 Provision of play equipment to meet current standards (2.11) 53,400 Signage for Children`s Area (2.12) 2,000 Replace refuse bins (2.13) 4,000 Total 182,500 Davis Langdon Page 3

Estimate Date: 08-Mar-2006 Year 3 Works Description Total Restore alignment of northern path (3.1) 25,700 Improve dog area (3.2) 4,100 Replace dog bins (3.3) 1,800 Repair and upgrade primary paths around central space - south east and west (3.4) 66,000 Replace benches to east west path (3.5) 5,500 Replace 1 O`Clock Club (3.6) 459,400 Provide drinking fountain (3.7) 8,500 Restore character of path from Fentiman Road (3.8) 27,000 Phased refurbishment of planting areas (3.9) 16,100 Replace refuse bins (3.10) 4,000 Total 618,100 Davis Langdon Page 4

Estimate Date: 08-Mar-2006 Year 4 Works Description Total Repair and upgrade paths around tennis courts (4.1) 7,300 Undertake tree management (4.2) 7,500 Fitness trail (4.3) 10,000 Replace refuse bins (4.4) 4,000 Total 28,800 Davis Langdon Page 5

Estimate Date: 08-Mar-2006 Year 5 Works Description Total Restore historic boundary railings to Lawn Lane Boundary (5.1) 67,500 Replace concrete panels and fence adjacent to Lawn Lane entrance (5.2) 6,000 Provide new gates to Lawn Lane entrance (5.3) 5,500 Interpretation (5.4) 7,600 Replace remaing internal railings to achieve consistency in design style (5.5) 30,100 Remove items from Children`s Area (5.6) 1,400 Replace refuse bins (5.7) 4,200 Demolish toilet block if not previously redeveloped by others (5.8) 7,500 Total 129,800 Davis Langdon Page 6

Year 1 Works Revise fence alignment north of Nursery (1.3) Remove existing gate and posts (approx overall size 3m x 1.5m high); setting aside for re-use; making good Re-fixing existing gates and posts including concrete bases etc 1.5m high bow top fencing top match existing 1 Item 115.00 100 1 Item 300.00 300 6 m 250.00 1,500 Total 1,900 Davis Langdon Page 7

Year 1 Works Replace Tennis Court fencing (1.4) Take down and remove from site existing fencing 126 m 7.00 900 Fencing 2.75 m high top existing courts 126 m 120.00 15,100 Extra for gate 1 nr 250.00 300 Mowing strip to edge of courts (50 x 200 precast concrete edging laid flat on and including concrete foundation etc) Backfill with topsoil around edge of courts; grade surface, cultivate and seed 126 m 20.00 2,500 126 m 4.00 500 Total 19,300 Davis Langdon Page 8

Year 1 Works Relocate train within Children`s Area (1.5) Take up and remove from site 2 nr benches and 1 nr litter bin Demolish and remove from site dwarf brick wall 1 Item 115.00 100 1 Item 335.00 300 Break up and remove from site base 1 Item 210.00 200 Topsoil filling to make up levels; cultivating and turfing Carefully dismantle existing toy train and grass reinforcement surfacing surround Extra for topsoil filling to make up levels; cultivating and turfing Re-assemble existing toy train in new location; making good Compliant Grow Through Tile Grass reinforcement surfacing surround Supply and install bench seat type David Ogilvie Engineering KC180 on and including grass reinforcement surround 10 m2 9.00 100 1 Item 445.00 400 54 m2 9.00 500 1 Item 510.00 500 54 m2 30.00 1,600 5 nr 1,000.00 5,000 Signage 1 Item 1,000.00 1,000 Total 9,700 Davis Langdon Page 9

Year 1 Works Dog free picnic area for general public use (1.6) Supply and install timber picnic table with attached benches (to match existing) on and including grass reinforcement surfacing 4 nr 750.00 3,000 Total 3,000 Davis Langdon Page 10

Year 1 Works Rationalisation and replanting of beds in association with picnic area (1.7) Remove hedge to west of Lavender Garden 37 m 5.00 200 Planting of ornamental grasses to west side of Lavender Garden Rationalisation of planting beds 8.2 to 8.8 and 8.10 Grub up and remove from site remnants of old fencing and hedging to south boundary of Lavender Garden; reinstate soil etc 1 Item 3,000.00 3,000 1 Item 3,125.00 3,100 60 m 10.00 600 New holly hedge 60 m 25.00 1,500 Allowance for works to trees 1 Item 2,000.00 2,000 Total 10,400 Davis Langdon Page 11

Year 1 Works New gates to Fentiman Road entrance (1.8) Take down and remove from site existing gates; supply and fix pair of gates of approved design; hanging from existing brick piers Remove top 6 courses of brickwork to existing piers and prepare to receive cappings; supply and fix reconstructed stone cappings to approved design 1 Item 3,500.00 3,500 2 nr 1,100.00 2,200 Total 5,700 Davis Langdon Page 12

Year 2 Works Repair plinths and reinstate historic boundary railings to South Lambert Road boundary (2.1) Carefully take off and set aside for re-use existing copings Extra over for disposal of unsalvageable units (50% allowed) 130 m 15.00 2,000 65 m 5.00 300 Rebed existing copings on wall 130 m 20.00 2,600 Extra over for provision of new coping to match existing Carefully dismantle existing brick wall; clean bricks and set aside for re-use 65 m 100.00 6,500 59 m2 100.00 5,900 Rebuild wall 59 m2 125.00 7,400 Extra over for replacement brick (50% allowed) Take down and remove from site existing concrete post and wire mesh fencing Grub up and remove from site existing hedge 3500 nr 1.00 3,500 130 m 20.00 2,600 130 m 5.00 700 Period railings (to match Fentiman Road) 130 m 350.00 45,500 Hedging 130 m 30.00 3,900 Allowance for additional works where wall is adjacent to plane trees 1 Item 5,000.00 5,000 Total 85,900 Davis Langdon Page 13

Year 2 Works Repair and upgrade uneven sections of paving at park entrances (SW entrance only included here - see elsewhere for works to other entrances) (2.2) Plane off existing surfacing to footpaths and resurface Extra over for complete reconstruction of footpath (25 % of area allowed for) Break up and remove from site existing paving (to edge adjacent tree) 72 m2 20.00 1,400 18 m2 25.00 500 9 m2 10.00 100 Precast concrete edging to match existing 18 m 15.00 300 Topsoil backfilling; cultivation and seeding 9 m2 9.00 100 Total 2,400 Davis Langdon Page 14

Year 2 Works Replace entrance barriers - Area 1 (2.3) Take down and remove from site set of existing pedestrian barriers Set of 2 nr bespoke design barriers; curved; each 5 m x 1 m high 2 nr 150.00 300 2 nr 2,100.00 4,200 Total 4,500 Davis Langdon Page 15

Year 2 Works Replace railings - Area 1 (2.4) Take down and remove from site existing 450 high bow top railings Make good areas of turf where railings removed 181 m 15.00 2,700 194 m 4.50 900 450 high interlaced railings 112 m 75.00 8,400 Total 12,000 Davis Langdon Page 16

Year 2 Works Phased refurbishment of planting areas (2.5) Take down and remove from site existing bow top railings 1 m high around bed 2.1 13 m 15.00 200 Removal of existing rose bed 2.1 28 m2 5.00 100 Design and creation of new planting bed in location of bed 2.1 81 m2 30.00 2,400 Redesign and replant beds 1.1 and 1.2 80 m2 30.00 2,400 Total 5,100 Davis Langdon Page 17

Year 2 Works Remove low railings near toilet block (2.6) Take down and remove from site existing 450 high bow top railings 27 m 15.00 400 Total 400 Davis Langdon Page 18

Year 2 Works Improve security of Lawn Lane entrance (2.7) Provisional allowance pending the establishment of detailed requirements 1 Item 5,000.00 5,000 Total 5,000 Davis Langdon Page 19

Year 2 Works Improvements to MUGA (2.8) Replace existing entrance gate 1 nr 1,000.00 1,000 Modifications to baffle to suppress noise 1 Item 5,000.00 5,000 Total 6,000 Davis Langdon Page 20

Year 2 Works Provision of benches (2.9) Remove from site existing bench and make good paving Supply and install bench seat type David Ogilvie Engineering KC180 on and including grass reinforcement surround 1 nr 100.00 100 1 nr 1,000.00 1,000 Total 1,100 Davis Langdon Page 21

Year 2 Works Remove redundant surfacing (2.10) Take up and remove from site existing redundant rubberised play surfacing in Children's Area 56 m2 5.00 300 Topsoil, cultivation and turfing 56 m2 9.00 500 Total 800 Davis Langdon Page 22

Year 2 Works Provision of play equipment to meet current standards (2.11) Dismantle and remove from site existing items of play equipment (climbing igloo and apparatus) Provide and fix in position new items of play equipment Extend existing ruberised play surface to accomodate new swings 2 nr 250.00 500 2 nr 10,000.00 20,000 272 m2 110.00 29,900 Provide and fix in position four swing set 1 nr 3,000.00 3,000 Total 53,400 Davis Langdon Page 23

Year 2 Works Signage for Children`s Area (2.12) Supply and install signs 1 Item 2,000.00 2,000 Total 2,000 Davis Langdon Page 24

Year 2 Works Replace refuse bins (2.13) Take up and remove from site existing refuse bins; make good surfacing Supply and install circular cast iron style litter bin 5 nr 50.00 300 5 nr 750.00 3,800 Total 4,100 Davis Langdon Page 25

Year 3 Works Restore alignment of northern path (3.1) Break up and remove from site existing footpath and base beneath Topsoil reinstatement, cultivating and seeding (allow average 200 thick) 340 m2 10.00 3,400 340 m2 9.00 3,100 Tarmacadam footpath including edgings 385 m2 50.00 19,300 Total 25,800 Davis Langdon Page 26

Year 3 Works Improve dog area (3.2) Take up and realign length of existing chespale fencing Supply and fix chespale fencing to match existing 20 m 10.00 200 50 m 20.00 1,000 Extra over for single gate 1 nr 350.00 400 Extra over for double gates 1 nr 500.00 500 Supply and fix dog drink water trough including new water connection 1 Item 1,500.00 1,500 Signage 1 Item 500.00 500 Total 4,100 Davis Langdon Page 27

Year 3 Works Replace dog bins (3.3) Take down and remove from site existing dog bins 6 nr 50.00 300 Supply and fix dog bin to approved style 6 nr 250.00 1,500 Total 1,800 Davis Langdon Page 28

Year 3 Works Repair and upgrade primary paths around central space - south east and west (3.4) Plane off surface to existing footpaths and resurface (note: measured as complete areas NOT patching) Allowance for the replacement of existing path edgings (PROVISIONAL) Allowance for resetting existing drainage gullies Allowance for repair works to sub base (10 % of area allowed for) 2655 m2 20.00 53,100 50 m 25.00 1,300 1 Item 5,000.00 5,000 266 m2 25.00 6,700 Total 66,100 Davis Langdon Page 29

Year 3 Works Replace benches to east west path (3.5) Take up and remove from site existing bench seats Provide and install bench seats type David Ogilvie Engineering KC180 5 nr 100.00 500 5 nr 1,000.00 5,000 Total 5,500 Davis Langdon Page 30

Year 3 Works Replace 1 O`Clock Club (3.6) Demolish existing 1 O`Clock Club building 1 Item 7,000.00 7,000 New 1 O`Clock Club building comprising:- multi-use space to accommodate 20 seated persons; small kitchen; toilets; store; mess room and store for 4/5 people with external access; 1 nr public unisex/disabled toilet; high quality construction including `green` roof (gross internal floor area 180 m2) 1 Item 370,000. 00 370,000 Take down and remove from site existing cast iron pergolas size approx 7.5 x 3.5 x 2.5 m high Take down and remove from site existing 1 m high interlaced fencing Take down and remove from site existing 1.5 m high bow top fencing New 1m high interlaced fencing to match existing 2 nr 550.00 1,100 92 m 15.00 1,400 67 m 17.50 1,200 95 m 200.00 19,000 Extra for double gate 1 nr 250.00 300 Extra for single gate 2 nr 375.00 800 New 1.5 m high bow top fencing to match existing Break up and remove from site existing paved surfaces Break up and remove from site existing rubberised play surface 15 m 250.00 3,800 56 m2 10.00 600 86 m2 10.00 900 New tarmacadam footpaths 310 m2 50.00 15,500 New rubberised play surface 86 m2 110.00 9,500 Reinstatement of grass area to east of building 384 m2 9.00 3,500 Planting beds - flowers 279 m2 15.00 4,200 Carry Forward 438,800 Davis Langdon Page 31

Year 3 Works Replace 1 O`Clock Club (3.6) Description Brought Forward Quantity Units Rate Total 438,800 Planting beds - shrubs 319 m2 20.00 6,400 Yew hedging 71 m 50.00 3,600 Remove from site existing bench seat 10 nr 100.00 1,000 Provide and install bench seats type David Ogilvie Engineering KC180 10 nr 1,000.00 10,000 Total 459,800 Davis Langdon Page 32

Year 3 Works Provide drinking fountain (3.7) Dismantle and set aside for possible re-use existing drinking fountain including capping off existing water service Allow a PC Sum for either refurbishment of the existing fountain, or if not feasible, the provision of a new fountain; set in position; water main connection 1 Item 1,000.00 1,000 1 Item 7,500.00 7,500 Total 8,500 Davis Langdon Page 33

Year 3 Works Restore character of path from Fentiman Road (3.8) Carefully dismantle and set aside for re-use existing 1 m high bow top fencing Reset existing fencing to lines of new footpath (to gentle curves) including any adaptation and making good Break up and remove from site existing tarmacadam footpath and edgings New tarmacadam footpath with edgings to match existing 150 m 25.00 3,800 150 m 50.00 7,500 262 m2 10.00 2,600 262 m2 50.00 13,100 Total 27,000 Davis Langdon Page 34

Year 3 Works Phased refurbishment of planting areas (3.9) Redesign and replant bed 3.1 adjacent SW Entrance Replanting to eastern edge of Area 8 adjacent realigned footpath from Fentiman Road Clear Area 9 of all vegetation and prepare as community garden plots Yew hedging to eastern boundary of garden plots 90 m2 20.00 1,800 1 Item 4,500.00 4,500 1180 m2 5.00 5,900 78 m 50.00 3,900 Total 16,100 Davis Langdon Page 35

Year 3 Works Replace refuse bins (3.10) Remove old bins and dispose of off site 5 nr 50.00 300 Supply and install circular cast iron style litter bin 5 nr 750.00 3,800 Total 4,100 Davis Langdon Page 36

Year 4 Works Repair and upgrade paths around tennis courts (4.1) Plane off tarmacadam surface to existing footpaths and re-surface; as repairs in isolated areas Allowance for repairs/replacement of edgings to tarmacadam paving Take up and relay existing crazy paving; as repairs in isolated areas Allowance for repairs/replacement of edgings to crazy paving 160 m2 20.00 3,200 20 m 25.00 500 50 m2 55.00 2,800 32 m 25.00 800 Total 7,300 Davis Langdon Page 37

Year 4 Works Undertake tree management (4.2) Arboricultural works 1 Item 3,000.00 3,000 Tree planting - extra heavy standards 15 nr 300.00 4,500 Total 7,500 Davis Langdon Page 38

Year 4 Works Fitness trail (4.3) Trim trail comprising 5 to 8 pieces of equipment with required safety surfacing surround 1 Item 10,000.00 10,000 Total 10,000 Davis Langdon Page 39

Year 4 Works Replace refuse bins (4.4) Remove old bins and dispose of off site 5 nr 50.00 300 Supply and install circular cast iron style litter bin 5 nr 750.00 3,800 Total 4,100 Davis Langdon Page 40

Year 5 Works Restore historic boundary railings to Lawn Lane Boundary (5.1) Take down and remove from site existing 1.8 m high railings along Lawn Lane boundary 180 m 25.00 4,500 Period railings (to match Fentiman Road) 180 m 350.00 63,000 Total 67,500 Davis Langdon Page 41

Year 5 Works Replace concrete panels and fence adjacent to Lawn Lane entrance (5.2) Take down and remove from site existing concrete post and wire mesh/chespale fencing Demolish and remove from site existing concrete "retaining" structure New retaining structure (one brick wall approx 600 high allowed) Making good to planting etc adjacent to structure 17 m 15.00 300 21 m 25.00 500 21 m 200.00 4,200 1 Item 500.00 500 Making good footpath up to structure 21 m 10.00 200 New chespale fencing 17 m 20.00 300 Total 6,000 Davis Langdon Page 42

Year 5 Works Provide new gates to Lawn Lane entrance (5.3) Take down and remove from site existing gates and side panels Supply and install new gates and side panels to approved design 1 Item 500.00 500 1 Item 5,000.00 5,000 Total 5,500 Davis Langdon Page 43

Year 5 Works Interpretation (5.4) Provide and install interpretation plaques 2 nr 3,800.00 7,600 Total 7,600 Davis Langdon Page 44

Year 5 Works Replace remaing internal railings to achieve consistency in design style (5.5) Take down and remove from site existing 1 m high bow top railings 140 m 15.00 2,100 Interlaced fencing to match existing 140 m 200.00 28,000 Total 30,100 Davis Langdon Page 45

Year 5 Works Remove items from Children`s Area (5.6) Take down and remove from site existing timber animal including making good to grass area Take down and remove from site existing cast iron pergolas size approx 7.5 x 3.5 x 2.5 m high 3 nr 100.00 300 2 nr 550.00 1,100 Total 1,400 Davis Langdon Page 46

Year 5 Works Replace refuse bins (5.7) Take up and remove from site existing refuse bins not replaced previously; make good surfacing (Note: 15 nr replaced in years 2-4) Supply and install circular cast iron style litter bin 8 nr 50.00 400 5 nr 750.00 3,800 Total 4,200 Davis Langdon Page 47

Year 5 Works Demolish toilet block if not previously redeveloped by others (5.8) Demolition of existing toilet block 1 Item 4,500.00 4,500 Soft landscaping including shrub planting to area remaining after demolition of toliets 150 m2 20.00 3,000 Total 7,500 Davis Langdon Page 48