Equipment ATA 12 April 2016

Similar documents
UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Sivu 2/8 Rate data Description Suomi Shut off times total 0.0 h/day Weekends with shut off times yes Daytime rate of heat pump Time for daytime rate 5

CURTISS-WRIGHT CONTROLS INTEGRATED SENSING (CAGE CODE: 03972).

LEASEHOLD YEARLY PROPERTY SCHEDULE

COMPONENT MAINTENANCE MANUAL INDEX. Aug 2013

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Free cooling on RTAF Chiller. Integrated option

WLAC Facilities Committee Meeting. September 18, 2017

CROWN YEARLY PROPERTY SCHEDULE

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014

Make gelato and more delicious things right in front of your customers Let the show begin!

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

Remodeling Market. Kermit Baker. Remodeling Futures Conference November 9, Harvard University JOINT CENTER FOR HOUSING STUDIES

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

SOUTHEND CARELINE ANNUAL REPORT

WLAC Facilities Committee Meeting. May 15, 2017

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

McQuay. Aircon Air Cooled Condenser. AMB, APB AMD, APD Vintage A. Last Manufacture: 1978

SOLAR HOT WATER AND HEAT PUMP BOOSTER ENERGY CALCULATION METHODOLOGY

2 Safety valve. 3 Pressure gauge. 4 Thermometer. 8 Ball valves

Practical and Effective Approaches to Residential Ventilation for Production Builders

KELLYVILLE LIONS CALENDAR 2016 to 2017

PTC Creo 2.0 Hardware Support Hewlett Packard

Index. Premises Information 2 About This Log Book 3 Service and Maintenance Requirements 4 8. Fire Risk Assessments 9

Lauzon Life Safety Consulting

2010 Fire Log Fire Log. Annual Fire Safety Report

Hot Water Generation for Commercial and Industrial Applications. Paul Marsden Specification Sales Manager

Welcome to the. Open House

Time-Based Scheduling of Residential Ventilation

Special Topics on Residential HVAC

The RPII s radon road shows. Hugh Synnott Scientific Officer Radon Advice Section

Daikin Altherma Selection Report

Dehumidification: Energy Efficiency Comparisons

Performance of Berries in Field and High Tunnel Production System

Mobile home became 50 Non-Work

Auburn University Basketball Arena:

DISTRICT HEATING SCHEME FEASIBILITY STUDY FRANKTON FLATS QUEENSTOWN

COST REDUCTION BY REPLACING STEAM WITH COKE OVEN GAS FOR HOT AIR DRYER UNIT IN THE ELECTROLYTE CLEANING LINE

announcements 4/10/08

Kimberly Rollins, Professor, Department of Economics, University of Nevada, Reno

SF REC & PARK MOSCONE RECREATION CENTER: EAST SITE. Supervisor Mark Farrell District 2. Project Manager Dan Mauer Recreation and Parks Department

Appendix A. Reference Evapotranspiration (ETo) Table.

INSTRUCTIONS MANUAL FOR MED75HD - UPRIGHT GLASS DOOR FRIDGE

In partnership with: Harbor Corridor Plan Bali Hi Mobile Home Park July 24, 2013

Better Buildings By Design 2013 Building the Renewable Energy Ready Home Solar Thermal Lessons Learned and Results

The Ed Roberts Campus Berkeley, CA

DUMONT AIRCRAFT CHARTER LLC 2000 BRETT ROAD NEW CASTLE DE (FAX) (EFAX-CARDS)

EL PALOMAR 19 UNITS + HOUSE

MEASURED PERFORMANCE DATA FOR

Millburn, NJ, Residential Area Stormwater Analyses

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

INEEL (1500) [45] 5.6 C 217 mm 60. Precipitation (mm) Temperature (oc) Month

How increased prices in bananas show people will move store for produce January Kantar Worldpanel

Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects

Don t Flood The Rodeo! Preparing for Fort Worth s New Arena

Solar Heating Solutions

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT

Standardization Programme ( ) Building & Construction Standards Committee

Village of Glenview Appearance Commission

OHS WORKPLACE INSPECTION (1) SCHEDULE AND RATINGS

Residential Structure Match or Lighter Ignited Fires

Division of Fire Safety. State of New Jersey Department of Community Affairs FIRE IN NEW JERSEY

Water Heater Innovations Marathon Water Heater Limited Warranty Policies & Procedures

Differential seed dormancy and germination requirements of two upland prairie sedges Carex inops ssp. inops and Carex tumulicola

CHART PERUVIAN TECHNICAL STANDARDS

Food Control Plans or National Programmes Cold Hold Records 2019

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

LAKE JOHANNA FIRE DEPARTMENT

Transfer Station Recycling Update SWANA Technical Session-Waste Diversion 4 2/24/2017 2/28/2017

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Kingfisher AGM. 17 June 2010

Designing and Operating an Energy Efficient Foodservice Facility March 12, 2014 Winnipeg, MB

URBAN DESIGN LONDON TRAINING PROGRAMME UDL are pleased to present our programme for April 2013 to March 2014.

Village of Glenview Appearance Commission

A novel technique for addressing ecological restoration constraints on ex-arable land

FUEL TYPE relating to UK deaths from unintentional carbon monoxide poisoning from to

AIRCRAFT TECHNICAL SPECIFICATIONS Dornier / MSN 3079

A New Plan For The Calgary Region June calgary.ca call 3-1-1

Heat Pumps and Public Swimming Pools, a Perfect Match

Living the (Solar) Dream Powering your lifestyle with the sun Ron Kube. Photo: Great Canadian Solar

Copyright 2003 IBACOS, Inc. All rights reserved.

As one of high polymers, polyethyleneimine products with different molecular weights or

Asparagus Response to Water and Nitrogen

UNDERCOUNTERS, WORKTOPS AND FOOD PREP TABLES REFRIGERATORS AND FREEZERS PARTS BREAKDOWNS

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-IH-01 Internal Fire Safety Case Substantiation.

MassDOT Highway ACEC State Markets Conference April 4, Jonathan Gulliver, Highway Administrator

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church

Access. Chapel Parking & Entry Loop Snowbridge Square Skier/Visitor Parking. Dumpster Access. 3 Entry Monument Future Chapel Park

McQuay. Incremental. PSEA, PSEC, PSEH, PSEI, PSES, PSHA, PSHC, PSHI, PSHS Suite II, 1 Motor 007, 009, 012, 015 Design A (1)

In addition to daily/ weekly Clean baseboards Clean/vacuum between. furniture. In addition to daily/ weekly Dust inside any cabinets

On Balance: Heat Rejection Control a Packaged Solution

Heritage Park Irrigation System Inspection Review of Water Use Estimated Water Budget Potential for Savings

Energy efficient climate control in museum stores. Poul Klenz Larsen

SED ENGINEERING TECHNICAL LETTER AD-A I I 1111 li 11 I1'1 FIRE PROTECTION ENGINEERING CRITERIA EMERGENCY LIGHTING AND MARKING OF EXITS

Site Evaluation. for. Oregon School for the Deaf. 999 Locust Street Northeast Salem, OR BE15178

Monthly Report for October 2015

McQuay. Roofpak Roof Mounted Air Handler Draw- Through. RDS Size: 900 Vintage: B. Last Manufactured: 1998

Transcription:

05-00-01 Time limits and Maintenance Frequencies Various JUN 14 1 25-00-01 Charging Head Mk 2 & Accessories WKA26592 WKA26592A 25-60-15 Submersion Actuator K38215 58178-001 AUG 92 JAN 15 Initial Issue 25-60-33 Cylinders and D Valve Assemblies K38364 WKA34113 WKA34113-1 WKA34113-2 25-60-39 Air Cylinder and Type 3B Valve Assemblies WKA33584-2 WKA33584-3 WKA34442-1 WKA37211-1 25-60-41 Operating Head Type 3 K38396 WKA29496-2 WKA29496-3 25-60-46 Operating Head Type 11 Mk C and Mk D WKA34112-1 WKA34112-2 WKA34112-3 WKA37228 WKA37228-1 WKA37453 WKA37453-1 25-60-62 Mk 12 Operating Head WKA37158-01 WKA37158-4 K37158-12 WKA37158-21 WKA37158-24 25-60-63 Mk 12 Dinghy Valve Assembly WKA37169A WKA37169A-1 WKA37169B WKA37169B-1 25-60-65 9 Litre Cylinder and Mk 12 Dinghy Valve Assembly WKA37611 WKA37611-1 OCT 15 18 NOV 09 6 JAN 15 11 JAN 15 14 OCT 15 9 OCT 15 8 JAN 15 7 Page 1 of 9

25-60-67 Marine Valve and Cylinder K15165 K15167 K15170 K15217 K15371 K37777 K38169 K38170 K38274 K38817 K38818 K38819 K38861 K38868 K39024 K39025 K39162 K39163 WKA28993 WKA32395 WKA37207 WKA37322 57192-001 NOV 11 9 25-60-71 Heliraft Operating Head Assy Type A1-E K38556 OCT 15 10 25-60-72 Operating Head Type A1 K15985 K15985A OCT 15 13 25-60-75 Drop Raft Operating Head with Mk 9 Cylinder, Type Q Operating Head with Mk 9 Cylinder K10605 K16644 NOV 15 8 25-60-82 Mk 9 Cylinder and A1 Valve Assembly K38593 FEB 15 5 25-60-83 A1 Valve Assembly 47545-101 47545-102 K15981 K15981-1 K15981B 25-60-85 Type L Head and Cylinder K11488 K11489 K11999 K13210 K9466 WKA25874 WKA27657 WKA27897 25-62-01 Inflation Cylinder Assemblies 58185-201-02 58185-201-03 58185-201-04 NOV 15 10 FEB 98 1 NOV 14 7 25-66-01 Flotation Valve and Cylinder Assembly 58185-203-01 58185-204-02 AUG 14 Initial Issue Page 2 of 9

26-00-01 Test Kit T1814 (High Speed Resetting Switches Series 3, 4 and 5) MAY 01 26-05-01 Piston Inertia Switches Types 8C, 10C, 18C and 29C 53433-001 53433-002 53433-003 53433-004 JUN 15 17 26-06-01 HSRS Fire Detector Series 3 53181 SERIES MAR 15 26-06-03 HSRS Fire Detector Series 5 151D 155D 158D MAR 15 26-06-04 HSRS Fire Detector Series 5 150D NOV 12 26-10-01 Sensor Assemblies K38006 K38007 K38039 K38040 WKA35310 WKA35311 WKA35835 WKA36614 WKA36615 WK37545 WK37546 WK37547 AUG 13 8 26-10-02 Two and Six Channel Smoke Detector Kits K39080 K39081 FEB 16 26-10-03 Firewire Triple FD Overheat and Fire Detection System Control Unit and Mounting Base Assy Type 166D 162D(1) JUN 15 26-11-01 RB211 Rail Mounted Element Assys 51291-013 51291-014 51291-015 51291-016 51291-017 51291-018 51291-025 51291-026 51291-027 51291-028 51291-029 51291-030 MAY 15 4 Page 3 of 9

26-11-02 Rail Mounted Element Assemblies & Cable Termination Fittings 51291-001 51291-013 51291-014 51291-015 51291-016 51291-017 51291-018 51291-040 51291-051 51291-052 51291-069 51291-070 51291-118 51291-119 51291-120 51291-126 51291-169 51291-170 51291-173 51291-175 51291-176 51291-179 51444-123 51444-124 51444-129 51444-130 51444-137 51444-138 OCT 11 13 26-11-03 Control Unit Type 193D 193D(1) 193D-03 JUN 15 26-11-08 Fire Detector Control Unit 51653-122 JUN 15 26-11-23 Control Unit Type 335D 335D 335D-2 MAY 15 9 Page 4 of 9

26-11-60 A310 Fire Detection System 51291-059 51291-060 51291-062 51291-063 51291-071 51291-072 51291-073 51315-108 51315-109 59241-022 59241-022-1 59241-023 51444-132 51444-133 51226-077 JUN 15 5 26-11-62 Fire Detection Control Unit (A310 Aircraft) 51653-111 JAN 13 10 26-11-63 Overheat Detection Control Unit 51653-118 JUN 14 26-11-64 Graviner Firewire Fire Detection Control Unit 51653-120 APR 15 26-11-65 Graviner Firewire Fire Detection Control Unit 51653-142 JUL 15 5 26-11-66 Fire Detection System (ATR42 Aircraft) (See 26-11-83) 51216-086 51216-088 51216-090 51216-095 51291-073 51291-074 51315-110 51315-114 51315-115 51315-116 51315-117 51315-118 JUL 15 26-11-67 Control Unit Type 218D 218D JUL 15 26-11-68 Graviner Firewire Fire Detection Control Unit 51653-152 JUL 14 9 26-11-69 Fire Detection Control Unit 51653-027 JUN 13 8 26-11-70 Overheat Detection Control Unit 51653-145 JUL 15 26-11-71 Fire Detection Control Unit 51653-154 MAR 15 8 26-11-72 Rail Mounted Element Assembly (Gulfstream Aircraft) 51216-093 51216-094 51291-105 51444-144 51444-145 AUG 15 5 Page 5 of 9

26-11-74 Fire Detector Rail Mounted Element Assemblies 51291-111 51291-112 51291-113 51291-114 SEP 14 5 26-11-75 Fire Detector Rail Mounted Element Assembly (Boeing 747 Aicraft APU) 51291-001 51291-004 OCT 14 5 26-11-76 Fire Detection Control Unit Assembly 51653-176-02 51653-177 26-11-77 Rail Mounted Element Assemblies 51291-002 51291-003 51291-005 51291-006 51291-048 51291-049 51291-067 51291-110 26-11-78 Rail Mounted Element Assemblies 51291-007 51291-008 51291-009 51291-010 51291-011 51291-012 51291-019 51291-046 51291-047 FEB 16 7 NOV 14 8 OCT 14 6 26-11-79 Rail Mounted Element Assemblies Element Assemblies Firewire Detector Coiled Unit Cable Termination Fittings 51216-095 51216-096 51218-701 51218-702 51271-107 51291-115 51291-177 51444-137 51444-138 51444-139 51444-143 OCT 14 8 26-11-80 Rail Mounted Element Assemblies 51291-124 51291-124-01 51291-125 51291-125-01 OCT 14 5 Page 6 of 9

26-11-81 Rail Mounted Element Assemblies 51291-065 51291-066 51216-001 51216-002 51216-082 51216-083 51236-001 51236-003 OCT 12 3 26-11-83 ATR72 Fire Detection System (Elements and Cable Harness Assemblies) 51216-052 51216-086 51226-050 51226-051 51315-119 51315-121 51315-122 51315-124 51315-125 OCT 14 26-11-85 Terminal Lug Firewire Element Assemblies 51291-187 59241-038 26-11-86 Dry Bay Fire Protection Unit 53523-301 53523-302 26-11-87 Directional flow valves 58111-007 58111-008 58111-011 A1168 (1) A1330 A1524 A520 MAR 15 FEB 16 APR 15 26-11-88 Rail Mounted Element Assemblies 51291-188 51291-189 51291-203 51291-204 51291-209 51291-210 51291-211 51291-212 51291-213 JUL 11 10 26-11-89 Fire Detection Control Unit 51653-151 51653-151-02 51653-151-03 51653-153 26-11-90 Firewire Accessories 51411, 51414, 51417, 51421, 51441 and 51447 SERIES NOV 14 NOV 14 26-11-91 Fire Detection Control Unit 51653-274 NOV 14 1 Page 7 of 9

26-11-92 Fire Detector Rail Mounted Assemblies 51291-229 51291-230 51291-231 51291-232 51291-233 NOV 14 1 26-11-93 Firewire Rail Assembly 51291-234 NOV 14 3 26-11-94 Firewire Control Unit 51653-182 DEC 14 1 26-12-70 High Speed Reseting Switch (HSRS) Detectors (Series 5) 156D01-xxx 156D02-xxx 156D03-xxx 156D04-xxx 156D05-xxx 156D06-xxx 156D07-xxx 156D08-xxx 53183-109 53183-110 53183-111 53183-112 53183-113 53183-114 53183-116 53183-117 APR 10 26-16-10 Terminal Lug Firewire and Accessories 35221-202 36111-238 36311-xxx 51218-xxx 51228-xxx 51238-xxx 26-16-11 Firewire Sensing Elements 51211-xxx 51221-xxx 51231-xxx D1384N D17530 D2370 D3691 D3894 D4176N D5280N D5281N D5282N D889N D890N D891N AUG 15 AUG 15 26-21-40 Automatic Extinguisher with Copper Containers (For Part Numbers refer to CMM) SEP 15 21 Page 8 of 9

26-21-52 Automatic Fire Extinguishers with Steel Containers 1247A 1249A 197A 220A 229A 238A 242A 244A 247A 249A 260A 57133 Series 57135 Series 57143 Series 57145 Series 57183 Series 26-24-01 Hand Operated Fire Extinguishers 34H(1) 35H(1) 38H(1) 26-24-02 Hand Operated Fire Extinguishers 27H 28H AUG 15 18 SEP 15 6 SEP 15 2 32-71-01 Flotation Valve and Cylinder Assembly K38300 JUL 13 16 32-71-02 Flotation Valve and Cylinder Assembly K38212 K38212-1 K38212-2 K38212-3 MAY 15 16 Page 9 of 9