CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO CONFLUENCE BIKE/PED RAMPS-SOUTH PLATTE GREENWAY STATEMENT OF QUANTITIES

Similar documents
GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Estimated Quantity. Description and Price. Estimated Cost. Item No General Conditions at the unit price of $ per LUMP SUM.

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

Federal Project No.: OC-095-1(365), OC-095-1(367)

russell+mills studios

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

STANDARD DETAILS QUICK REFERENCE

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

FLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED)

VEHICULAR AND PEDESTRIAN CIRCULATION

Federal Project No.: PM03369

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Landscape and Streetscape Design 2.5

Illinois Urban Manual

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009

APPENDIX F: DETAIL DRAWINGS

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

Old Mill Community Association Bioretention Facility

DESIGN SCENE SUBJECT INDEX

A/E REVIEW CHECKLIST SITE & LANDSCAPE

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting

Severn River Sub-Watershed: BMP 09-Retrofit

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

JOB CREATION PROJECTS

BUSINESS DISTRICT DESIGN GUIDELINES

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

Main Street Conversion Site

Analyzing the Bioretention Construction Sequence

M-231 and Water Quality. Ottawa County Water Quality Forum November 21, 2016 James Fortney, MDOT

DERUlandscape architecture 812 Huron Road E, #411 Cleveland. OH

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

MER BLEUE URBAN EXPANSION AREA

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

STORMWATER MANAGEMENT FACILITIES/STORMWATER PONDS - What Are They?

Kittson Parkway / Watershed Park Parking Lot

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

County of El Dorado Standard Plans

Alternatives Analysis Summary Memorandum

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

Lockport Streetscape Plan Primary Streetscape Design 10th Street to 9th Street

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

MIAMI 21 PUBLIC HEARING-FIRST READING 2009

FREEWAY/TOURIST DISTRICT

4.0 Concept Plan Implementation

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

Use of Best Management Practices

Vegetated Filter Strips and Buffers

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

City of North Olmsted

DITTMAR ROSSLYN ARLINGTON COUNTY, VIRGINIA

SITE PLANNING. Raymond Design Guidelines Site Planning

Ames City Hall Campus: Stormwater Improvements

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Work Order Number. GENERAL SYSTEMS REQUIREMENTS Provide site improvements as required to make a useable facility that meets functional and

AS ADOPTED - JULY 2012

February 17, Sara Ullman Planner I. Sincerley,

Lansing s Moores River Drive Regional Network Trail project extended the Lansing River Trail system to Waverly Road, and also included bike lane

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager

The McCoppin Hub. Boor Bridges Architecture

City of Burlington Downtown Street Design & Construction Standards

5.0 Storm Water Landscape Guidance Introduction

Peninsula La PENINSULA LAKES COMMUNITY GUIDELINES

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Preferred Riverwalk Alternative Components August 17, 2017:

Construction Site Erosion Control

Case Study Bioretention Installation and Maintenance

STUMP STORAGE BUILDING F.F.E.=96.0± APRON CONC. Mag NailTEMP CHARGE STA STAFF PARKING ONLY STUMP EOP ELEC. VEHICLES ONLY CBN CBN SMH PARKING LOT

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

Structural Storm Water Best Management Practices (BMPs)

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

Monica Smith, PE President Robinson Engineering Company

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

PLANS FOR THE CONSTRUCTION OF A NEW COMMERCIAL BUILDING FOR: & MONTGOMERY ROAD, SYCAMORE TOWNSHIP, HAMILTON COUNTY, OHIO ZONED "E"

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

a. Service roads. b. Paths / trails. c. Garden areas (crushed rock or limestone, consult FMGR).

GENERAL SYSTEMS REQUIREMENTS Provide site improvements as required to make a useable facility that meets functional and

Lilburn, Georgia A Pedestrian Master Plan Report

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

MEADOWVIEW HOMEOWNERS ASSOCIATION

Guidance on Preparation of Construction and Maintenance Costs

Project purpose. advise. The purpose of the Beaumaris Lake Open Space Rehabilitation project is to: + Develop a Functional Program Concept

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

23 EA , , , , , , , LF , , ,596.

Transcription:

01050-1 Construction Surveying 1 LS 01500-1 Temporary Fences & Barricades 1,500 LF 02600-1 Shoring, Cofferdam, Temp. Sheeting, & Dewatering 1 LS 01565-1 Storm Drainage & Erosion Sediment Control 1 LS 01565-2 Silt Fence 215 LF 01565-3 Storm Inlet Protection 4 EA 01565-4 Vehicle Tracking Control 1 EA 01565-5 Concrete Washout 1 EA 01565-6 Sediment Traps 8 EA 01565-7 Rock Socks 450 LF 01565-8 Erosion Control Blanket-at West Bank 317 SY 01570-1 Traffic Control Supervisor 520 HR 01570-2 Traffic Control Flagger 1,040 HR 01570-3 Traffic Control Devices 1 LS 02050-1 Remove Concrete Paving (Haul/Dispose Off-Site) 90 CY 02050-2 Remove Concrete Retaining Walls- at Plaza 25 CY 02050-3 Remove Concrete Retaining Wall- Cut at Promenade 100 CY 02050-4 Remove Concrete/Sheetpile Walls- Cut at River 7 CY 02050-5 Remove Ramps (including caissons) 140 CY 02050-6 Remove Guardrail 800 LF 02050-7 Remove & Dispose Brick Pavers 40 CY 02050-8 Remove & Dispose Permeable Pavers 90 CY 02050-9 Remove Structural Conc. Slab 210 CY 02050-10 Remove H Piles (cut off & dispose) 8 CY 02050-11 Remove Concrete Stairs 130 CY 02050-12 Remove Concrete Curbs 6 CY 02050-13 Remove Concrete Bollards 23 EA 02050-14 Demolition of Existing Gabions 115 CY 02050-15 Salvage & Store materials -steel, furnishings 1 LS 02050-16 Remove Wood Bridge 1 LS 02050-17 Remove Existing Trees +3" Caliper 21 EA

02110-1 Clearing and Grubbing 5,138 SF 02150-1 Tree Protection Fencing 840 LF 02200-1 Earthwork -Move Earth on site 3,500 CY 02220-2 River/Bank Excavation- Move Earth on site 460 CY 02220-3 River/Bank Excavation- haul off 500 CY 02220-4 River Bed Restoration 1,100 CY 02371-1 Soil Riprap-Type M Rip Rap with bedding 220 CY 02371-2 Buried Riprap (at Planting Areas& lawn) 380 CY 02502-1 Adjust Manhole Rim to Finish Grade 2 EA 02620-1 12" Outfall modifications (at terrace/wall) 1 LS 02620-2 24" Outfall modifications (at 15th St bridge) 1 LS 02520-1 Concrete Pavement: regional trail, 6" colored, lt. Broom 4,806 SF 02520-2 Concrete Pavement: 6"gray, light broom finish 1,539 SF 02520-3 Concrete Pavement: 6", color, "sand" finish 1,245 SF 02520-4 Concrete Mow Band 150 LF 02521-1 Concrete Unit Pavers (concrete set) 2,492 SF 02521-2 Permeable Pavers 7,220 SF 02521-3 Brick Paving (concrete set) 1,860 SF 02810-1 Irrigation System 1 LS 02870-1 Bench - 6' Standard 2 EA 02870-2 Bench - 4' Standard 3 EA 02870-3 Trash/Recycling Receptacles 2 EA 02870-4 Bike Racks 10 EA 02870-5 Signage (Wayfinding and Directional) 1 LS 02870-6 Bicycle Storage Cover 1 LS 02870-7 Relocated Plaque Monument 1 LS 02925-1 Topsoil 560 CY 02933-1 Native Seed 1,200 SF 02935-1 Sodding 2075 SF 02950-1 Erosion Control Blanket at Landscape Areas 425 SY 02950-2 Shademaster Honeylocust 2 EA 02950-3 Turkish Filbert 2 EA

02950-4 English Oak 3 EA 02950-5 Texas Red Oak 2 EA 02950-6 Serviceberry 8 EA 02950-7 Groundcover- 1 Gallon Container 1,392 EA 02950-8 Perennials- 1 Gallon Container 223 EA 02950-9 Grasses, 1 Gallon Container 869 EA 03300-1 Landscape Wall - Curb Wall at Promenade 60 CY 03300-2 Landscape Wall - Ramp Wall 15 CY 03300-3 10" and 4" Curbs (colored concrete) 5 CY 03300-4 New H Pile Caps (Conc., incl bar) 53 EA 03300-5 Sheet Pile Rein. Concrete Cap 96 LF 03300-6 Concrete Seating Terraces - Upper Plaza 224 CY 03300-7 Stem Wall 12 CY 03350-1 Structural Slab (new) 690 CY 03350-2 Structural Concrete- Extended Wall (plain finish) 2 CY 03350-3 Structural Concrete- River Wall (board formed) 25 CY 03350-4 Structural Concrete- Curved Wall (board formed) 75 CY 03350-5 Structural Concrete- 15th St. Wall (board formed) 13 CY 03350-6 Structural Concrete-Trail Wall (board formed) 140 CY 03350-7 Structural Beams (new, 2'x2' reinforced conc.) 1,250 LF 04400-1 Boulder Wall 95 LF 05120-1 Guardrail- Promenade 80 LF 05120-2 Guardrail w/ Handrail - Promenade 27.5 LF 05120-3 Guardrail- w/rub Rail 236 LF 05900-1 Sheet Piling - PZ-22 4,660 SF 05900-2 River Wall- Sheetpile- PZ-22 1,885 SF 05900-3 Curved Wall - H Piles 2 EA 05900-4 Curved Wall - Sheet Pile-PZ-35 725 SF 05900-5 H-Piles (new, 12x74 @30') 53 EA 16110-1 1/2" Electrical Conduit (PVC) 680 LF 16110-2 1-1/4" Electrical Conduit (PVC) 750 LF 16110-3 4" Electrical Conduit (PVC) 680 LF

16120-1 Wiring 1 LS 0 50A Event Receptacle with Cover 1 EA 16470-1 Lighting Control Center 1 EA 16520-1 Type A - Light Standard and Luminaire (LED) 12 EA 16520-2 Type A - Light Standard Foundation 12 EA 16520-3 Type B - Lawn Pole with LED Luminaries 4 EA 16520-4 Type B - Lawn Pole Foundation 4 EA 16520-5 Type C - LED Steplight 36 EA 16520-6 Type E - LED Marker 37 EA F/A 02 On the Job Training 750 HRS ADD ALT 1: North Stairs 02810-1 Drip Irrigation-DEDUCT -465 SF 02925-1 Topsoil-DEDUCT -5 CY 02950-1 Shrubs & Groundcover-DEDUCT -200 EA 03300-1 Concrete Seating Terraces & Stairs 25 CY 05120-1 Handrail 70 LF 16120-1 Wiring 1 EA 16520-1 Type A - Light Standard and Luminaire (LED) 1 EA 16520-2 Type A - Light Standard Foundation 1 EA ADD ALT 2: South Stairs 02810-1 Drip Irrigation- DEDUCT -275 SF 02925-1 Topsoil-DEDUCT -4 CY 02950-1 Shrubs & Groundcover-DEDUCT -98 EA 03300-1 Concrete Seating Terraces & Stairs 11 CY 05120-1 Guardrail- Promenade 50 LF 05120-1 Handrail 29.5 LF 16110-1 1/2" Electrical Conduit (PVC) 90 LF 16120-1 Wiring 1 LS

16520-1 Type C - LED Steplight 10 EA ADD ALT 3: Overlook Wall 02521-1 Permeable Pavers 595 SF 02810-1 Drip Irrigation -DEDUCT -655 SF 02870-1 Specialty Benches/Seating 6 EA 02925-1 Topsoil -DEDUCT -8 CY 02950-1 Shrubs & Groundcover -DEDUCT -300 EA 03300-1 Overlook Wall- Concrete wall (board formed) 575 CY 03300-2 Promenade Wall -DEDUCT -12 CY 03350-1 Overlook Wall- H Piles & Reinforcing 10 EA 05120-1 Guardrail- Promenade 78 LF ADD ALT 4: Ipe Deck at Pearl 02520-1 Concrete (sand finish)- DEDUCT -350 SF 05900-1 Steel-band 47 SF 05900-1 Steel-bracings 30 EA 06160-1 Ipe Decking 350 SF ADD ALT 5: Lighting at Pearl 16120-1 Wiring 1 LS 16520-1 1/2" Electrical Conduit (PVC) 345 LF 16520-2 TYPE D - LED Ribbon Light (4-meter Section) 6 EA 16470-1 24VDC POWER SUPPLY (25W) 1 EA 16470-2 24VDC POWER SUPPLY (187W) 2 EA 16470-3 24VDC DRIVER (DIMMABLE) 2 EA 16470-4 PLASTIC WIREWAY (LINE VOLTAGE) 1 LS 16470-5 PLASTIC WIREWAY (LOW VOLTAGE) 1 LS 16470-6 DIMMER CONTROL (DMX) 1 EA 16130-1 JUNCTION BOX (FD TYPE) 3 EA ADD ALT 6: Electrical Maintenance Inventory 16520-1 Type A - Light Standard and Luminaire (LED) 1 EA

16520-2 Type B - Lawn Pole with LED Luminaries 1 EA 16520-3 Type C - LED Steplight 2 EA 16520-4 Type E - LED Marker 12 LF