INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

Size: px
Start display at page:

Download "INSTALLATION MANUAL AND OPERATING INSTRUCTIONS"

Transcription

1 Z-4C / Z-6C ZE VLVE CLS SLL L D EG SCS G (echnical Support) 2201 Dwyer venue tica, Y (Corporate Sales) 85 iddle oad Dunkirk, Y n S Certified Company / , ev. [06/08]

2

3 installation manual and operating instructions BLE F CES Safety Symbols and Warnings...4 ntroduction...5 roduct Description...5 Z-4C Control Board...6 Z-6C Control Board...8 ounting nstructions...10 Electrical Specifications and Wiring...10 Z-C Wiring Schematics...11 Z-ZC Wiring...14 ndirect Water ank Wiring...16 Field Selectable ption Switches...17 Sequence f peration...19 Zone Staging...22 Z-C Control Expansion...22 eplacement arts and Controls...24 echnical Support...24 E HS L F FE EFEECE

4 SFEY SYBLS and warnings he following defined symbols are used throughout this manual to notify the reader of potential hazards of varying risk levels.! DGE! ndicates an imminently hazardous situation which, if not avoided, WLL result in death or serious injury.! WG! ndicates a potentially hazardous situation which, if not avoided, CLD result in death or serious injury.! C! ndicates a potential hazardous situation which, if not avoided, Y result in minor or moderate injury. t may also be used to alert against unsafe practices. : ead the following instructions CLEELY before installing!!! WG! ll installations should be done only by a qualified expert and in accordance with the appropriate rgo manual. nstalling an electric appliance with improper methods or materials may result in serious injury or death due to fire. 4

5 DC his manual is intended to familiarize the installer and user of the rgo Z-C Zone Valve Controls with their installation and operation so as to assure normal trouble-free operation. rgo controls are designed and manufactured with quality components for maximum life and durability and require minimum service. o insure a satisfactory installation, it is imperative that the instructions be followed carefully before operating the control. Failure to do so may result in breach of warranty. DC DESC he rgo Z-4C and Z-6C Zone Valve Controls are multi-zone (4 and 6 zone) controls for operating both low voltage (24Vac) zone valves for hydronic heating. he heating zones will be controlled by thermostats (low voltage, digital, or power-robbing) or any other type of low voltage control with SS switching action. riority for an indirect fired domestic hot water tank is provided by a field selectable switch on Zone 1. n option for a circulator on Zone 1 (by field selectable switch) is also provided. he following capacities can be achieved: Z-4C: 4 zone valves with a primary circulator or 3 zone valves with priority (indirect hot water) circulator and primary circulator. Z-6C: 6 zone valves with a primary circulator or 5 zone valves with priority (indirect hot water) circulator and primary circulator. 5

6 Z-4C Control Board

7 Z-4C Control Board 1. ransformer Spade erminals (120 Vac) (rimary) 2. ransformer Spade erminals (24 Vac) (Class 2) 3. solated End Switch X-X 4. Data ort erminal - used for communication with the rgo D-2 utdoor emperature Setback Control 5. LED rray Status LED - flashes during normal operation riority n - indicates priority mode is selected rimary ump - indicates primary pump is energized riority ump - indicates the priority zone pump is energized X-X Contact - indicates X-X contact is closed and calling for heat from the boiler Z n - indicates Z-ZC dip switch is in the position, priority zone is calling, and Z-ZC terminals are energized. 6. hermostat erminals (Class 2) 7. Green ndicator LED - indicates zone is calling for heat 8. Field Selectable ption Dip Switches (see Field Selectable ption Switches in this manual for explanation) 9. ed ndicator LED - indicates zone valve is fully open 10. Zone Valve erminals (Class 2) 11. ZC on Green ndicator LED 12. Z-ZC erminals (used for tankless coil applications) (rimary) 13. riority ump erminals (rimary) 14. rimary ump erminals (rimary) 15. Source ower erminals (rimary) 7

8 Z-6C Control Board E: he transformer found in the Z- 6C control contains a manual reset circuit breaker. Should the control not power up, check to see if the circuit breaker has tripped (a white indicator will be visible on the side of the breaker). he circuit breaker can be reset by pressing the black button found on top of the transformer

9 Z-6C Control Board 1. ransformer - 75V, 120V/24V 50 HZ 2. Circuit Breaker eset Switch 3. ransformer Spade erminals (120 Vac) (rimary) 4. ransformer Spade erminals (24 Vac) (Class 2) 5. solated End Switch X-X 6. Data ort erminal - used for communication with the rgo D-2 utdoor emperature Setback Control 7. LED rray (see Z-4C Control Board in this manual for specifications) 8. hermostat erminals (Class 2) 9. Green ndicator LED - indicates zone is calling for heat 10. Field Selectable ption Dip Switches (see Field Selectable ption Switches in this manual for explanation) 11. ed ndicator LED - indicates zone valve is fully open 12. Zone Valve erminals (Class 2) 13. ZC on Green ndicator LED 14. riority ump erminals (rimary) 15. Z-ZC erminals (used for tankless coil applications) (rimary) 16. Source ower erminals (rimary) 17. rimary ump erminals (rimary) 9

10 G SCS ount the Z-C Zone Valve Control vertically on a solid wall or partition. For your convenience it is recommended that the control be mounted as close as possible to the device to be controlled. he switching relay should never be mounted more than 75 feet away. Select a location that is easily accessible for installation and service. E: o reduce the possible transformer hum and relay noise that is sometimes amplified by mounting surfaces such as sheet metal, plasterboard, and similar materials, place rubber or felt washers between the case and the mounting surface. 1. osition the control and mark the mounting holes. 2. Start screws (not provided) for the keyhole type mounting holes in the upper corner(s). ighten the screws down to about ⅛ (3mm) from the surface. 3. Hang the control on the screw(s), position the case, and start the bottom screws. 4. ighten all screws. Electrical specifications and Wiring! WG! Electrical shock hazard! Disconnect power before installing or servicing. Can cause severe personal injury, death, or substantial property damage if ignored. General Wiring otice ll primary wiring must be 14 WG minimum. orque terminal screws 6 to 7 inch pounds..s.. - ational Electric Code and any other national, state, or local code requirements. Wiring must be.e.c. Class 1. CD - C.S.. C22.1 Canadian Electrical Code art 1 and any other national, provincial, or local code requirements. Wiring must be C.S.. C22.1 C.E.C. art 1. 10

11 odel umber Electrical specifications and Wiring Zones ELECCL SECFCS ransformer Voltage elay Switching ction otal mp Draw (120VC) Z-4C 4 120V/60Hz/40Va SS 7.2 Z-6C 6 120V/60Hz/75Va SS 7.2 az-c wiring Schematic az-4cp 11

12 az-c wiring Schematics az-6cp 12

13 z-c wiring Schematics he diagrams in this manual represent the rgo Z-4C Zone Valve Control. he Z-6C has similar electrical connections. Differences in operating features are noted in this manual. 120V Line Voltage L Line o ransformer L 24V From ransformer o Boiler o rimary Circulator o riority Zone Circulator o Z-ZC erminals n Boiler Control Y f priority switch is in position, Zones 2, 3, & 4 will not operate when priority zone is actuated. (See ote# 2) 3 Wire 1 Zone 2 Valve 3 Do ot se otor End Switch Black Black ed ed -stat -stat -stat ank Control ndirect Water Heater quastat or hermostat 4 Wire Zone Valve ES: 1. he switching relay terminals are approved for use with copper wires only. orque terminal block screws 6 to 7 inch pounds. 2. When using a priority zone circulator, a jumper is required between terminals 3 and 4 of riority Zone 1. his jumper is not required when using a zone valve. 13

14 Z-ZC Wiring! WG! When using ZC-Z careful attention must be paid to keeping the polarity of the wiring consistent between the rgo control and the boiler aquastat. Failure to do so could result in a secondary source of power activating the boiler under certain circumstances which could result in serious injury or death. lways disconnect power to both the rgo control and the boiler when installing or servicing this product. tankless coil boiler to az-cp control (priority pump, priority, and zr-zc options selected) ZE VLVE / Y Z-ZC D-2 SWCHES 24 VC 120 VC XF 120VC Y Y SS Y Y Y X-X CC Z F BLE ZE VLVE / Y Z-ZC D-2 SWCHES 14

15 Z-ZC Wiring tankless coil boiler with mh l8124 a or c to az-cp control (priority pump, priority, and zr-zc options selected) ZE VLVE / Y Z-ZC D-2 SWCHES 24 VC 120 VC XF 120VC Y Y SS Y Y Y X-X CC Z F BLE ZE VLVE / Y Z-ZC D-2 SWCHES 15

16 ndirect Water ank Wiring indirect water tank to az-cp control (indirect wiring with pump and priority options selected) ZE VLVE / Y Z-ZC D-2 SWCHES 24 VC 120 VC XF 120VC Y Y SS Y Y Y X-X CC Z F BLE ZE VLVE / Y Z-ZC D-2 SWCHES 16

17 field selectable option switches E: riority selection switches may be covered with protective film. emove before using selection switches. Zone Valve/ump Selection Switch Control must be in priority mode (priority switch ) to access this feature. With the zone valve/pump switch in the FF position, only the priority zone valve terminals are energized when Zone 1 calls for heat. With the zone valve/pump switch in the position, the priority pump terminals will be energized with 120Vac when Zone 1 calls for heat. : jumper wire (not included) must be installed between terminals 3 and 4 of Zone 1 when using the riority ump Feature. jumper is not required when using a zone valve. riority Selection Switch f priority switch is in the position: 1. Zone 1 becomes priority zone. 2. When Zone 1 calls for heat, the priority zone is activated and all other zones are deactivated. (Zone valves for Zones 2 and higher will not operate.) riority light turns on. 3. Built-in timer automatically shuts off priority feature (light off) temporarily if priority zone calls for heat longer than 30 minutes, allowing all zones to operate. epeats every 30 minutes until priority zone is satisfied. revents house freeze-up in event of indirect heater malfunction. Z-ZC Selection Switch he Z-ZC switch is used in tankless coil boiler applications. he Z- ZC terminals on the Z-C control are connected to the Z-ZC terminals on the boiler aquastat or low limit control. f the Z-ZC switch is in the position the Z-ZC terminals are energized when there is a call for heat on the priority zone and the priority zone end switch is closed. 17

18 D-2 Selection Switch he D-2 utdoor eset Control is designed to raise or lower the temperature of the boiler supply water based upon a proportionate drop or rise in temperature at the outside sensor. he D-2 plugs into a data port on the Z-C control with a ribbon cable. f the D-2 selection switch is in the position, the Z-C will be able to communicate with the D-2. (See the separate D-2 nstallation anual for more information.) E: Wiring application at right shows the D-2 utdoor eset with an Z-4C Control. field selectable option switches ZE VLVE / Y Z-ZC D-2 SWCHES 24 VC SS Y Y Y X-X CC Z ZE VLVE / Y Z-ZC D VC XF SWCHES 120VC Y Y F BLE 18

19 sequence of operation ormal peration (ll dip switches in the off position) he control will scan all terminals looking for a call for heat from any thermostat. When a call for heat is detected the green LED for that zone will illuminate. he corresponding zone terminals 1 & 2 will be energized with 24 volts. he control will then wait for the zone valve end switch to close, a red LED will illuminate, indicating an open valve. nce the zone valve opens the primary pump is energized with 120 volts and the X-X contact will close. riority Chosen he control will scan all terminals looking for a call for heat from any thermostat. When a call for heat is detected on the priority zone the green LED for the priority zone will illuminate. he priority zone (zone 1) terminals 1 & 2 will be energized with 24 volts. he control will then wait for the priority zone valve end switch to close, a red LED will illuminate indicating the valve has opened. nce the zone valve opens the primary pump is energized with 120 volts and the X-X contact will close. While the priority zone is calling for heat any call for heat on zones 2 and above will be ignored until the priority zone is satisfied or the priority timer has elapsed. (See riority imer in this manual for a more detailed explanation.) f call for heat is detected on terminals 2 or above when the priority zone is not calling the control will operate as outlined above. 19

20 sequence of operation riority ump Chosen n order to use the priority pump feature both the zone valve/pump and priority dip switch must be in the on position. he control will scan all terminals looking for a call for heat from any thermostat. When a call for heat is detected on the priority zone the green LED for the priority zone will illuminate. he jumper on terminals 3 & 4 of the priority zone will result in the end switch being automatically closed. he priority pump is energized with 120 volts and the X-X contact will close. While the priority zone is calling for heat any call for heat on zones 2 and above will be ignored until the priority zone is satisfied or the priority timer has elapsed. (See riority imer in this manual for a more detailed explanation.) f call for heat is detected on terminals 2 or above when the priority zone is not calling the control will operate as outlined above. Z-ZC he control will scan all terminals looking for a call for heat from any thermostat. When a call for heat is detected the green LED for that zone will illuminate. he corresponding zone terminals 1 & 2 will be energized with 24 volts. he control will then wait to for the zone valve end switch to close; a red LED will illuminate indicating an open valve. he X-X terminal will be closed. he control will wait for a signal back from the Z- ZC terminals on the boiler aquastat. nce the signal is received the ZC n light will illuminate. 20

21 sequence of operation he primary pump will be energized with 120 volts. D-2 Chosen he control will scan all terminals looking for a call for heat from any thermostat. When a call for heat is detected the green LED for that zone will illuminate. he corresponding zone terminals 1 & 2 will be energized with 24 volts. he control will then wait for the zone valve end switch to close; a red LED will illuminate indicating an open valve. fter the end switch has closed the Z-C control will wait to receive a signal from the D-2. lease see the separate D-2 manual for the D-2 sequence of operation. nce the D-2 sends a signal back to the Z- C control the primary pump is energized with 120 volts and the X-X contact will close. riority imer When the priority zone has called for heat for 30 minutes, the priority and non-priority zones are allowed to call for heat together for an additional 30 minutes. fter the second 30 minute period ends, the control will switch back to priority only mode. his pattern is repeated until the priority zone is satisfied. ump nactive imer (exercises pumps if off for more than 24 hours) f either the primary or priority pump is off for more than 24 hours, both pumps are turned on for 5 seconds and then turned off. f either pump is turned on, the timer is reset. : he Z-ZC and D-2 selection switches should not both be in the n position at the same time. 21

22 Zone StaGing Zone Staging is a feature that is unique to the Z-6C control. When the Z-6C senses a power demand that exceeds the capabilities of the 75V transformers, the control will energize one zone at a time until all calling zone valves are opened. lease note that riority/zone 1 is not affected by Zone Staging and is permitted to open at any time. Z-Cp control expansion Following the instructions below, up to two (2) Z-C controls can be wired together. sing two Z-6C controls, this allows a maximum of ten zones plus a priority zone to be installed in a system.! WG! Do not attempt to chain more than 2 controls together. nstallation f ultiple Controls 1. ount controls following directions in this instruction manual. 2. Wire controls together as shown on next page. ote that only the priority zone is shown wired. ther zones are installed as shown previously in this manual. 3. ove the priority selection switch to the position on both controls.! warning! When wiring the thermostat to both controls verify that there is no call for heat when the thermostat is not calling. f there is a continuous call on the priority zone regardless of the state of the thermostat, the transformers may be out of phase. f this occurs, reverse the C & ransformer leads on the secondary control. D CL F EXEDED ED F E WH SFES F HSE. 22

23 23 Z-Cp control expansion C V Y Y E L B F C 0 V 2 1 F X C 4 V 2 C X C - X Z Y Y Y S S S E H C W S C Z - Z 2 - D E / V L E V Z Y C 0 V 2 1 F X C V Y E L B F Y C 4 V 2 Z Y Y Y C X C - X S S S E H C W S E / V L E V Z Y 2 - D C Z - Z E E W E B E J 4 S 3 & L E ) D E L S ( When using the priority pump feature, a jumper (not supplied) will be required across terminals 3 and 4 of the priority zone terminal block. ote: Dip Switches must be in the same position on both controls.

24 ELCEE S D CLS replacement controls art Description Z-4C Control with riority Z-6C Control with riority D-2 utdoor eset Control art umber Z297 Z298 Z172 replacement S art Description art umber ransformer - 40V, 120V/24V 50 HZ (Z-4C) 79 ransformer - 75V, 120V/24V 50 HZ (Z-6C) echnical support For technical support on this and all rgo products, please contact EC nternational echnical Service at lease have the following information available when calling. nformation needed When calling model number nstallation Date nstaller

ARGO ZONE VALVE CONTROLS AZ-4CP / AZ-6CP

ARGO ZONE VALVE CONTROLS AZ-4CP / AZ-6CP G ZE VLVE LS Z-4 / Z-6 SLL, E & EE L nformation and specifications outlined in this manual in effect at the time of printing of this manual. E nternational, nc. reserves the right to discontinue, change

More information

AR861-2II AR822-II AR861-3II. ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501

AR861-2II AR822-II AR861-3II. ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 AR822-II AR861-2II AR861-3II (Corporate Sales) 85 Middle Road Dunkirk, NY 14048 www.argoindustries.com An ISO 9001-2000 Certified Company P/N

More information

ARM SERIES Switching Relays With Priority

ARM SERIES Switching Relays With Priority Models ARM-2P ARM-3P ARM-4P ARM-6P AD-1 AD-4 ARM SERIES Switching Relays With Priority INSTALLATION, OPERATION & MAINTENANCE MANUAL ARM-2P ARM-4P AD-1 ARM-3P ARM-6P AD-4 Information and specifications

More information

ARGO AR SERIES CONTROLS

ARGO AR SERIES CONTROLS ARGO AR SERIES CONROLS AR822-II, AR861-2II, AR861-3II INSALLAION, OPERAION & MAINENANCE MANUAL AR861-2II AR822-II AR861-3II Information and specifications outlined in this manual in effect at the time

More information

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road Dunkirk, NY ARH-1 ARH-2 ARH-3

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road Dunkirk, NY ARH-1 ARH-2 ARH-3 ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road Dunkirk, NY 14048 www.argoindustries.com ARH-1 ARH-2 ARH-3 An ISO 9001-2000 Certified Company P/N 240005131,

More information

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 INSTALLATION, OPERATION & MAINTENANCE MANUAL ARH-1 ARH-2 ARH-3 ARGO 2201 Dwyer Avenue Utica, NY 13501 www.argocontrols.com An ISO 9001-2000 Certified Company

More information

ARGO DPM-2 OUTDOOR TEMPERATURE SETBACK CONTROL

ARGO DPM-2 OUTDOOR TEMPERATURE SETBACK CONTROL ARGO OUTDOOR TEMPERATURE SETBACK CONTROL INSTALLATION, OPERATION & MAINTENANCE MANUAL Information and specifications outlined in this manual in effect at the time of printing of this manual. ECR International,

More information

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3

HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 HYDRO-AIR ZONING CONTROLS ARH-1, ARH-2, ARH-3 INSTALLATION, OPERATION & MAINTENANCE MANUAL ARH-1 ARH-2 Manufactured by: ECR International, Inc. 2201 Dwyer Avenue, Utica NY 13501 web site: www.ecrinternational.com

More information

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road

ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY (Corporate Sales) 85 Middle Road ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road An ISO 9001-2000 Certified Company Dunkirk, NY 14048 www.argoindustries.com P/N 240005498A, Rev. 1.5 [02/07]

More information

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS

INSTALLATION MANUAL AND OPERATING INSTRUCTIONS AMB4/AMB8 MULTIPLE BOILER SEQUENCERS INSTALLATION MANUAL AND OPERATING INSTRUCTIONS ARGO (Technical Support) 2201 Dwyer Avenue Utica, NY 13501 (Corporate Sales) 85 Middle Road An ISO 9001-2000 Certified

More information

Instruction manual. WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules

Instruction manual. WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules Instruction manual WMCR-2, WMCR-3, WMCR-4 and WMCR-6 Circulator Zone Controllers WMCR-1E and WMCR-4E Expansion Modules This manual must only be used by a qualified heating installer/service technician.

More information

Erie WA300. Application. Features. Two Zone Hydro-Air Relay General Instructions

Erie WA300. Application. Features. Two Zone Hydro-Air Relay General Instructions Building Systems - Americas Invensys Energy Solutions 354 lifford Avenue (Zip 6) P.O. Box 940 Loves Park, IL 63-940 United States of America www.ies.invensys.com Erie A300 wo Hydro-Air elay eneral Instructions

More information

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC

6 Zone 120/60/1vac 3A 24 VAC class 2 2 x 40 VA 2 x 5 amp fuses 1/6 hp, 120 VAC Viega Zone Control Applications The Viega Zone Control is a wiring and switching center for individual and / or multi- room control. The Zone Control simplifies wiring between Thermostats and Powerheads.

More information

TWZ/CT/ODV Series. Oil-Fired Hot Water Boilers (Less Tankless Heater) These instructions must be affixed on or adjacent to the boiler

TWZ/CT/ODV Series. Oil-Fired Hot Water Boilers (Less Tankless Heater) These instructions must be affixed on or adjacent to the boiler D E S I G N E D T O L E A D TWZ/CT/ODV Series Oil-Fired Hot Water Boilers (Less Tankless Heater) Installation Supplement for boilers equipped with honeywell L7248L 2012 Compliant boiler control These instructions

More information

R8845U Universal Switching Relay

R8845U Universal Switching Relay Universal Switching Relay PPLIION he Universal Switching Relay provides intermediate switching of line- and low-voltage devices from a line- or low-voltage controller. he may be used to replace several

More information

qualified heating installer/service technician

qualified heating installer/service technician Instruction manual This manual must only be used by a qualified heating installer/service technician. Failure to comply could result in severe personal injury, death or substantial property damage. Part

More information

Installation Guide. Contractor Hotline:

Installation Guide. Contractor Hotline: Need Additional Evergreen Help? Contractor Hotline: 1-866-503-8566 www.thedealeroolbox.com www.evergreenotor.com eminder: Please remember to leave this manual near the HVAC system and install the System

More information

WIRING GUIDE. Form rev.1. Certified to CSA C22-2 No.24 Conforms to UL Standard 873

WIRING GUIDE. Form rev.1. Certified to CSA C22-2 No.24 Conforms to UL Standard 873 WIRIG GUIDE The ZSR101 is a versatile single relay control with two outputs for operating a 120 VAC with boiler enable, or two 120 VAC devices without boiler enable. Features include rear knock outs for

More information

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS LCB-I-O Rev B MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS Models: KB 81-286, KBXL 400-801, WB 51-211, and WH 55-399 IMG00116 WARNING This manual must only be used by a qualified heating installer

More information

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS

MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS LCB-I-O Rev D MULTI-TEMPERATURE LOOP CONTROL BOARD INSTRUCTIONS Models: KB 81-286, KBXL 400-801, WB 51-211, FTX 400-850 and WH 55-399 WARNING This manual must only be used by a qualified heating installer

More information

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control.

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control. Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA 02717 The first totally integrated multiple boiler management control. USING THIS MANUAL USING THIS MANUAL A. INSTALLATION SEQUENCE Follow

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3200-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Input / 24 VAC Burner Circuit PATENT. 7,891,572 INSTALLATION INSTRUCTIONS and OPERATING MANUAL Saves Fuel Features

More information

qxd 3/27/03 10:51 AM Page 1 GAS

qxd 3/27/03 10:51 AM Page 1 GAS 110-1060.qxd 3/27/03 10:51 Page 1 7610 DIIL PL LCIC 7 Day Programmable 1 eat / 1 Cool User s anual Quick tart Installation and Programming 110-1060 2 N s an nergy tar partner, Climate s mericas has determined

More information

Materials Housing plastic: Front display lights: Transformer voltage: Electrical switch rating, ZR/ZC, DHW, XX:

Materials Housing plastic: Front display lights: Transformer voltage: Electrical switch rating, ZR/ZC, DHW, XX: A10333 Z-one Relay Multi-Zone Valve Control Copyright 2014 Caleffi ZVR10X series Function The ZVR series is a multi-zone zone valve and boiler operating control for multiple zone hydronic heating or cooling

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3250-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Operating Voltage PATENT. 8,931,708; 8,844,834; 7,891,572; others pending INSTALLATION INSTRUCTIONS and OPERATING

More information

Product Instructions. Viega Programmable Heat/Cool Thermostat. Technical data

Product Instructions. Viega Programmable Heat/Cool Thermostat. Technical data Programmable Heat/ool Thermostat The programmable heat/cool thermostat is easy to install, easy to wire, and easy to program. It can be used for single stage heating and cooling applications, making it

More information

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL USER'S INFORMATION MANUAL WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3200-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Input / 24 VAC Burner Circuit PATENT. 8,931,708; 8,844,834; 7,891,572; others pending INSTALLATION INSTRUCTIONS

More information

- Data Brochure Boiler Control 274

- Data Brochure Boiler Control 274 - Data Brochure Boiler Control 274 274_D 03/17 The Boiler Control 274 operates up to four on/off boilers to provide outdoor reset operation, domestic hot water and setpoint operation with priority. When

More information

- Data Brochure Addendum

- Data Brochure Addendum - Data Brochure ddendum Control 268 - ddition of Modes and Setpoint Modes D 268 10/03 The tekmar Control 268 has been modified to include the following features: demand for loads alarm New Setpoint operation

More information

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL USER'S INFORMATION MANUAL WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use

More information

be liable for any other loss or damage, whether direct, indirect, incidental or consequential.

be liable for any other loss or damage, whether direct, indirect, incidental or consequential. Integrated HydroStat 3200-Plus for Slant Fin Boilers Part No. 48-3200-03 and 48-3200-04 120 VAC Input / 24 VAC Burner Circuit PATENT S. 8.391,708; 7,891,572; 8,844,834; Others Pending INSTALLATION INSTRUCTIONS

More information

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL USER'S INFORMATION MANUAL WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use

More information

Installation Instructions Read and become familiar with these instructions before beginning installation.

Installation Instructions Read and become familiar with these instructions before beginning installation. KSAIC020230 (208-230V) 24V Interface Kit for Ductless Outdoor Single Zone matched with Air Handler Installation Instructions Read and become familiar with these instructions before beginning installation.

More information

Installation Instructions

Installation Instructions 50ZPB, C, 50ZHB, C, PA3Z ---A, PH3Z ---A, PA4Z, PH4Z, PAJ4,PHJ4,WJA4,WJH4 SMALL PACKAGED PRODUCTS (SPP) Accessory Electric Heaters 5---20 kw For 14 SEER, R---410A Manufactured Home Installation Instructions

More information

HPS Controls Ltd. Series 100 LTV / CTV Zone Control Stations. Heating and Radiant Floor Zone Control Stations. Installation Instructions

HPS Controls Ltd. Series 100 LTV / CTV Zone Control Stations. Heating and Radiant Floor Zone Control Stations. Installation Instructions Series 100 LTV / CTV Zone Control Stations Heating and Radiant Floor Zone Control Stations Installation Instructions Thank you for purchasing the finest in heating and radiant floor Control Stations. We

More information

W8703A Damper Interface Module

W8703A Damper Interface Module W870A Damper Interface Module INSALLAION INSUIONS APPLIAION he W870A Damper Interface Module (DIM) controls up to three conventional zone dampers when used with Microelectronic ommunicating Programmable

More information

INSTALLATION/OPERATING INSTRUCTIONS HEAT-TROL Elite Series. HWE-Motorized Valve

INSTALLATION/OPERATING INSTRUCTIONS HEAT-TROL Elite Series. HWE-Motorized Valve INSTALLATION/OPEATING INSTUCTIONS HEAT-TOL Elite Series HWE-Motorized Valve How Water eset Control with Setback and Boost For Motorized Valve Operation The HWE-Motorized Valve (HWE-MOV) establishes ambient

More information

Energy Manager INSTALLATION INSTRUCTIONS. Keep these instructions with the boiler at all times for future reference

Energy Manager INSTALLATION INSTRUCTIONS. Keep these instructions with the boiler at all times for future reference INSTALLATION INSTRUCTIONS Energy Manager Keep these instructions with the boiler at all times for future reference BOYERTOWN FURNACE CO. PO Box 100 BOYERTOWN, PA 19512 1-610-369-1450 www.boyertownfurnace.com

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3150 Combination Low Water Cut-Off & Universal Temperature Limit Control for Oil-Fired Boilers 120 VAC Operating Voltage PATENT S. 7,891,572; 8,931,708 INSTALLATION INSTRUCTIONS and OPERATING MANUAL

More information

Outdoor Reset IQ Option Card, p/n

Outdoor Reset IQ Option Card, p/n Outdoor Reset IQ Option Card, p/n 102723-01 Instruction Sheet CONTENTS Application... 1 General... 2 How it Works... 3 Installation.... 5 Wiring... 7 User Interface... 10 Using IQ Option Panel Display...

More information

M6063A Compact Rotary Mixing Valve Actuator

M6063A Compact Rotary Mixing Valve Actuator M6063A Compact Rotary Mixing Valve Actuator PRODUC DAA FEAURES: 24 Vac floating input for automatic control. Single screw attachment to V5442 valve body. Multi-poise mounting. Color-coded position indicator.

More information

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc.

INSTALLATION INSTRUCTIONS and OPERATING MANUAL. *Aquastat is a registered trademark of Honeywell International, Inc. MODEL 3200-Plus Temp Limit / LWCO Control with Thermal Targeting for Water Boilers 120 VAC Input / 24 VAC Burner Circuit PATENT. 8,931,708; 8,844,834; 7,891,572; others pending INSTALLATION INSTRUCTIONS

More information

FOSSILFUELKITAXWR02FFA1

FOSSILFUELKITAXWR02FFA1 FSSILFUELKITAXWR02FFA1 FR USE WITH Heat Pump utdoor Sections These instructions must be read and understood completely before attempting installation. SSTEM MATCH INFRMATIN The Fossil Fuel Kit may only

More information

TO BE OBSERVED BEFORE AND DURING SERVICING TO AVOID POSSIBLE EXPOSURE TO EXCESSIVE MICROWAVE ENERGY

TO BE OBSERVED BEFORE AND DURING SERVICING TO AVOID POSSIBLE EXPOSURE TO EXCESSIVE MICROWAVE ENERGY Tech Sheet Do not discard AI Electrical Shock Hazard Disconnect power before servicing. eplace all parts and panels before operating. Failure to do so can result in death or electrical shock. PECAUTIOS

More information

- Data Brochure Addendum

- Data Brochure Addendum - Data Brochure ddendum Control 264 - ddition of Modes and Setpoint Modes D 264 10/03 The tekmar Control 264 has been modified to include the following features: demand for loads alarm New Setpoint operation

More information

NeW. User's Manual Quick Start Installation. Application. Features Heat / 1 Cool

NeW. User's Manual Quick Start Installation. Application. Features Heat / 1 Cool DIGIL NN-PRGRMMBLE 8400 HERMS NeW G GS E H ELECRIC IL HE PUMP 1 Heat / 1 Cool User's Manual Quick Start Installation 110-1086 pplication he Robertshaw 8400 is a single-stage thermostat designed to control

More information

HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations

HPS Controls Ltd. Series 600 LFI / CFI Series 700 HFS Zone Control Stations. Heating and Radiant Floor Zone Control Stations Series 600 LFI / CFI Series 700 HFS Zone Control Stations Heating and Radiant Floor Zone Control Stations Installation Instructions Thank you for purchasing the finest in heating and radiant floor Control

More information

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL USER'S INFORMATION MANUAL WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use

More information

Owner's Manual TABLE OF CONTENTS

Owner's Manual TABLE OF CONTENTS 40MAQ High Wall Ductless System Sizes 09 to 36 Owner's Manual TABLE OF CONTENTS PAGE A NOTE ABOUT SAFETY... 2 GENERAL... 2 PART NAMES... 3 FUNCTION BUTTONS... 4 DISPLAY PANELS... 5 REMOTE CONTROL... 6

More information

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL USER'S INFORMATION MANUAL WARNING: If the information in this manual is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. Do not store or use

More information

Stainless Steel Condensing Boiler Connection Instructions To Additional Heating Devices

Stainless Steel Condensing Boiler Connection Instructions To Additional Heating Devices Stainless Steel Condensing Boiler Connection Instructions o Additional Heating Devices Kit #55002875 Kit installation shall be completed by qualified agency.! WARNING Fire, explosion, asphyxiation and

More information

Z-one Relay Multi-Zone Pump Control. ZSR10X series.

Z-one Relay Multi-Zone Pump Control. ZSR10X series. A10334 G2 Z-one Relay Multi-Zone Pump Control Copyright 2015 Caleffi www.caleffi.com ZSR10X series Function The ZSR series is a multi-zone and boiler operating control for multiple zone hydronic heating

More information

Intelligent cascading kit

Intelligent cascading kit Technical Service Instruction Intelligent cascading kit Kit components: Cascading cable (2X) 6720811759 / 238-51036-00A (2014/05) Table of contents Table of contents 1 Key to symbols and safety instructions............

More information

Boiler Demand Mix 1 Demand Mix 2 Demand DHW Demand Setpoint Demand

Boiler Demand Mix 1 Demand Mix 2 Demand DHW Demand Setpoint Demand Date Code - Data Brochure Universal Reset Control 374 D 374 10/03 The tekmar Universal Reset Control 374 is designed to maximize the comfort and effi ciency provided by a hydronic heating system. The control

More information

Outdoor Reset IQ Option Card, p/n

Outdoor Reset IQ Option Card, p/n Outdoor Reset IQ Option Card, p/n 102723-01 Instruction Sheet CONTENTS Application... 1 General... 2 How it Works... 3 Installation.... 5 Wiring... 7 User Interface... 10 Using IQ Option Panel Display...

More information

Installation Instructions

Installation Instructions 50ES--A, 50EZ--A, 50VG--A, B, 50VL--A, B, 50VR--A, 50VT--A, B 604D-- --A, 607C-- --A, B, 607E-- --A, 704D-- --A, 707C-- --A, B, 707E-- --A PA3G -- -- A, PH3G -- -- A, PA4G, PH4G PAD3, PHD3, PAD4, PHD4,

More information

DHW / Setpoint Demand WWSD Modulation Boiler Output (x10,000 BTU/hr) External Input Signal Offset / Priority Override

DHW / Setpoint Demand WWSD Modulation Boiler Output (x10,000 BTU/hr) External Input Signal Offset / Priority Override Date Code - Data rochure oiler Control 265 D 265 10/03 The tekmar oiler Control 265 can control the supply water temperature on up to three modulating boilers based on outdoor temperature or setpoint requirements.

More information

Comfort Indirect Fired Water Heater

Comfort Indirect Fired Water Heater Comfort Indirect Fired Water Heater WARNING echnical Specifications Installation and Maintenance Guide Before proceeding with installation and operation, read entire manual carefully. Failure to do so

More information

PLL. Pump-Lead-Lag. Provides Pump Rotation, Auxiliary Pump Activation, and Pump Failure Alarm Control. Installation and Operation Manual

PLL. Pump-Lead-Lag. Provides Pump Rotation, Auxiliary Pump Activation, and Pump Failure Alarm Control. Installation and Operation Manual Installation and Operation Manual Provides Pump Rotation, Auxiliary Pump Activation, and Pump Failure Alarm Control Pump-Lead-Lag Warning This Heat-Timer control is strictly an operating control; it should

More information

XIII Troubleshooting

XIII Troubleshooting XIII Troubleshooting The following pages contain troubleshooting charts for use in diagnosing control problems. To use these charts, go to the box marked Start at the top of the chart on page 34 or 36

More information

WARNING FOR SERVICE TECHNICIAN S USE ONLY

WARNING FOR SERVICE TECHNICIAN S USE ONLY ech Sheet Do not discard ANING Electrical Shock Hazard Disconnect power before servicing. eplace all parts and panels before operating. Failure to do so can result in death or electrical shock. Software

More information

ADDENDUM TO LIT91127U EVO CONFIGURED IN ODD WATER SYSTEM DESIGN

ADDENDUM TO LIT91127U EVO CONFIGURED IN ODD WATER SYSTEM DESIGN INNOVATIVE CONDENSIN TECHNOOY By Hamilton Engineering, Inc. ADDENDUM TO IT91127U EVO 79-599 CONFIURED IN ODD WATER SYSTEM DESIN WARNIN These appliances MUST be installed by a properly licensed individual

More information

G60UH(X) WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

G60UH(X) WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature Service Literature Corp. 0204 L2 Revised 11 2006 G60UH(X) G60UH(X) SERIES UNITS G60UH(X) series units are mid efficiency gas furnaces used for upflow or horizontal applications only, manufactured with

More information

Mini-Combo id. Model MCH. Installation and Operation Instructions. Induced Draft Residential Gas-Fired Space/Water Heater

Mini-Combo id. Model MCH. Installation and Operation Instructions. Induced Draft Residential Gas-Fired Space/Water Heater Installation and Operation Instructions Document 2101B Installation and Operation Instructions for Mini-Combo id Model MCH Induced Draft esidential Gas-Fired Space/Water Heater Note: This document is to

More information

Manifold Installation Controller MIC-180. Installation and Operation Instructions

Manifold Installation Controller MIC-180. Installation and Operation Instructions Manifold Installation Controller MIC-180 Installation and Operation Instructions For Use With Rheem-Ruud and Paloma Commercial Tankless Water Heaters Table of Contents Safety Information... 1-2 Manifold

More information

MR3CCUHV Temperature/Defrost Control

MR3CCUHV Temperature/Defrost Control Master Catalog 125 Temperature Controls Section A Product/Technical Bulletin Issue Date 0401 MR3CCUHV Temperature/Defrost Control The MR3CCUHV Temperature/Defrost Control is designed to control the temperature

More information

Owner's Manual TABLE OF CONTENTS

Owner's Manual TABLE OF CONTENTS 40MB*D Ducted Style Ductless System Sizes 09 to 48 Owner's Manual TABLE OF CONTENTS PAGE A NOTE ABOUT SAFETY... 2 GENERAL... 2 PARTS LIST... 3 DISPLAY PANELS... 4 FUNCTION BUTTONS... 5 REMOTE CONTROL...

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Keep these instructions with the boiler at all times. BOYERTOWN FURNACE CO. PO Box 100 BOYERTOWN, PA 19512 1-610-369-1450 www.boyertownfurnace.com 5-25-12 2 Danger Warning Caution

More information

Description / Applications

Description / Applications PARS & ACCESSORIES Description / Applications he Beckett AquaSmart is an advanced boiler control designed for use on residential and light commercial boiler systems. All models include the option of enabling

More information

S Voltage Regulators

S Voltage Regulators Voltage Regulators Tap-Changer Diagnostics Contents Product Information........................... 1 Safety Information............................ 2 Setup Procedure.............................. 3 Product

More information

mr.steam Lexington Collection Feel Good Inc. REFER TO INSTALLATION, MAINTENANCE MANUAL PROVIDED WITH PRODUCT FOR COMPLETE INSTRUCTIONS

mr.steam Lexington Collection Feel Good Inc. REFER TO INSTALLATION, MAINTENANCE MANUAL PROVIDED WITH PRODUCT FOR COMPLETE INSTRUCTIONS Model Serial No. Installation, Operation and Maintenance Manual Lexington Collection TO INSTALLATION, ELECTRIC C TOWEL TOPERATION WARMERS ARAND MAINTENANCE MANUAL PROVIDED WITH PRODUCT FOR COMPLETE INSTRUCTIONS

More information

Installation Instructions

Installation Instructions 40MBFQ Floor Console Ductless System Sizes 09 to 12 Installation Instructions TABLE OF CONTENTS PAGE SAFETY CONSIDERATIONS... 2 PARTS LIST... 3 SYSTEM REQUIREMENTS... 4 DIMENSIONS... 5 CLEARANCES... 5

More information

Installation Instructions

Installation Instructions Electric Heaters 5 --- 20 kw SMALL PACKAGED PRODUCTS (SPP) Accessory Electric Heaters For 13 SEER, R---410A Manufactured Home Installation Instructions NOTE: The Dual Point Kit can only be installed on

More information

NON-PROGRAMMABLE THERMOSTAT. The following Payne equipment is not compatible with the AC version (TSTATPPBAC01-B) of this

NON-PROGRAMMABLE THERMOSTAT. The following Payne equipment is not compatible with the AC version (TSTATPPBAC01-B) of this Installation Manual NN-PAMMABLE THEMSTAT TSTAT < < Fig. 1 Non-Programmable Thermostat NTE: ead the entire instruction manual before starting the installation. A98193 SAFET NSIDEATINS ead and follow manufacturer

More information

BB3000 Series. Application. Features. Injection Pump Control General Instructions

BB3000 Series. Application. Features. Injection Pump Control General Instructions BB3000 Series Injection Pump Control General Instructions Application The TAC Erie BB3000 Injection Pump Control with outdoor reset provides accurate control of the water temperature in the secondary (radiant)

More information

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10)

Use & Care Manual. Electric Tankless Water Heaters. With Installation Instructions for the Installer AP15447 (10/10) Use & Care Manual With Installation Instructions for the Installer Electric Tankless Water Heaters The purpose of this manual is twofold: one, to provide the installer with the basic directions and recommendations

More information

prestige Control Application Supplement WARNING

prestige Control Application Supplement WARNING prestige Control Application Supplement WARNING This document is intended to be used by a factory trained and qualified heating contractor or service technician only. Read all instructions within this

More information

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL Manufacturer's Warning To reduce the possibility of injury due to scalding,

More information

Installation Instructions

Installation Instructions 50ES---A, 50EZ---A, 50VL---A, 50VG---A, 50VR---A, 50VT---A, 604D--- ---A, 607C--- ---A, 607E,--- ---A, 704D--- ---A, 707C--- ---A, 707E--- ---A PA3G --- --- A, PH3G --- --- A SMALL PACKAGED PRODUCTS Electric

More information

MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL

MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL 5CIM2-0413 W30-AC0056 MODEL AC-SCC-5 INSTALLATION, OPERATION & MAINTENANCE MANUAL Multi-zone Hydronic Chiller Interface Module SECTION 1: INTRODUCTION Unit description... 5 Location... 5 Handling... 5

More information

Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER

Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER Models CHB/CCB APPLICATION GUIDE WALL MOUNTED GAS BOILER This manual has been prepared for use with the appropriate Installation, Operation and Maintenance Manual. For use with CCB/CHB Boilers ONLY. Manufactured

More information

Installation Instructions

Installation Instructions Electric Heaters 5 --- 20 kw SMALL PACKAGED PRODUCTS (SPP) Accessory Electric Heaters For 13 SEER, R---410A, Z Chassis Installation Instructions NOTE: Read the entire instruction manual before starting

More information

AQ475A Aquatrol Outdoor Temperature Compensator for Boilers

AQ475A Aquatrol Outdoor Temperature Compensator for Boilers A Aquatrol Temperature Compensator for s Features PRODUCT DATA Adjustable settings for boiler maximum temperature, boiler minimum temperature and outdoor low (design) temperature. Selectable Warm Weather

More information

T170 Thermostat. Installation and Maintenance Manual. 24 VAC/ VAC 3-Speed Fan Control (Continuous or Cycling) or Staged Fan Control

T170 Thermostat. Installation and Maintenance Manual. 24 VAC/ VAC 3-Speed Fan Control (Continuous or Cycling) or Staged Fan Control Installation and Maintenance Manual IM-846 Group: Fan Coil Part Number: IM 846 Date: July 2006 T170 Thermostat 24 VAC/120 277 VAC 3-Speed Fan Control (Continuous or Cycling) or Staged Fan Control US 2006

More information

AquaSaver DISPOSER CONTROL CENTER Installation Manual. Model AS-101K

AquaSaver DISPOSER CONTROL CENTER Installation Manual. Model AS-101K AquaSaver DISPOSER CONTROL CENTER Installation Manual Model AS-1K The Danger signal indicates an immediately hazardous situation which, if not avoided, will result in death or serious injury. The Warning

More information

Installation, Start-Up, and Operating Instructions

Installation, Start-Up, and Operating Instructions 33CS Commercial Programmable Thermostat Installation, Start-Up, and perating Instructions Part Number 33CS220-LA CNTENTS Page SAFETY CNSIDERATINS... 1 GENERAL... 1 INSTALLATIN... 1-6 Select Thermostat

More information

TJERNLUND PRODUCTS, INC.

TJERNLUND PRODUCTS, INC. TJERNLUND PRODUCTS, INC. 1601 Ninth Street White Bear Lake, MN 55110-6794 PHONE (800) 255-4208 (651) 426-2993 FAX (651) 426-9547 Visit our web site www.tjernlund.com PRESSURE SWITCH AND INSTALLATION WITH

More information

R8888A,B Hydronic Circulator Zone Panels with Priority Control

R8888A,B Hydronic Circulator Zone Panels with Priority Control A,B Hydronic Circulator Zone Panels with Priority Control EAURES PRODUC DAA APPLICAION he A,B Hydronic Circulator Zone Panels with Priority Control provide relay switching for multizone hot water control

More information

OWNER S MANUAL. R 410A Ductless Split System Air Conditioner and Heat Pump

OWNER S MANUAL. R 410A Ductless Split System Air Conditioner and Heat Pump R 410A Ductless Split System Air Conditioner and Heat Pump Models DLC4(A/H) Outdoor Unit, DLF4(A/H) Indoor Unit Sizes 9K, 12K, 18K, 24K, 30K and 36K Please read the operating instructions and safety precautions

More information

USERS INFORMATION MANUAL

USERS INFORMATION MANUAL MODULAR DX OR CHILLED WATER COOLING WITH ELECTRIC OR HOT WATER HEATING MODELS: US, UM SERIES USERS INFORMATION MANUAL For Installation In: 1. Modular Homes & Buildings 2. Residential Homes LIST OF SECTIONS

More information

RA889A Switching Relay

RA889A Switching Relay Switching Relay INSTALLATION INSTRUTIONS APPLIATION The Switching Relay provides intermediate switching of line- and low-voltage devices from a line- or low-voltage controller and is typically applied

More information

Safety & Installation Instructions

Safety & Installation Instructions Model 6203 & 6202 Zoned Comfort Control Safety & Installation Instructions READ AND SAVE THESE INSTRUCTIONS 61001213A 6202-6203 Zoned Comfort Control Install.indd 1 TABLE OF CONTENTS SAFETY INSTRUCTIONS..........................................

More information

Indirect Fired Water Heater

Indirect Fired Water Heater Indirect Fired Water Heater WARNING echnical Specifications Installation and Maintenance Guide Before proceeding with installation and operation, read entire manual carefully. Failure to do so can cause

More information

Installation, Start-Up, and Operating Instructions

Installation, Start-Up, and Operating Instructions Installation, Start-Up, and Operating Instructions CONTENTS Page SAFETY CONSIDERATIONS...1 GENERAL...1 INSTALLATION...1-5 Install Batteries...1 Select Transmitter Location (Optional)...1 Mount Transmitter

More information

ECO1ZN3P, ECO2ZN4P ECO

ECO1ZN3P, ECO2ZN4P ECO WARNING HOT This product may have hot fluid circulating through it. DO NOT TOUCH! SOME UNION NUTS MAY BECOME LOOSE AND CONSEQUENTLY LEAK THROUGH TRANSPORTATION VIBRATION AND HANDLING. DO NOT OVERTIGHTEN

More information

rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM

rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM 216279-000 rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM IDENTIFYING YOUR SYSTEM IOM216279-000 The HOTSTART heating system is designed to heat fluids for use in marine

More information

AE R1 October to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors

AE R1 October to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors October 2017 1.5 to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors Safety Safety Instructions... 2 Safety Icon Explanation... 2 Instructions Pertaining to Risk of Electrical Shock, Fire, or Injury

More information

AQ250 Series Hydronic Control Panels

AQ250 Series Hydronic Control Panels AQ50 Series Hydronic Control Panels PRODUCT DATA Need new photo of AQ50 PRODUCT DESCRIPTION The AQ50 easily converts a single-zone heating system into a room-by-room comfort control system, or upgrades

More information

District Heating Controller

District Heating Controller 2 510 District Heating Controller for 1 heating circuit and d.h.w. heating RVD120 RVD140 ultifunctional heating controller for use in district heating substations and district heating plants with odbus

More information