Installation and Operating Instructions ELECTRIC HOT WATER STEAM BOILERS

Size: px
Start display at page:

Download "Installation and Operating Instructions ELECTRIC HOT WATER STEAM BOILERS"

Transcription

1 Installation and Operating Instructions ELECTRIC HOT WATER & STEAM BOILERS 1

2 FOR YOUR SAFETY This manual supplies information on the application, installation and operation of Precision Electric Hot Water & Steam Boilers. Review all application and installation procedures completely before proceeding with the installation. Consult the Precision Boilers Factory or local Factory Representative with any problems or questions regarding this equipment. Experience has shown that improper installation causes most operation problems. WARNING Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Read this manual thoroughly and follow the instructions herein. The PRECISION Boilers shall be installed according to the procedures detailed in this manual, or the Precision Boilers Limited Warranty may be voided. The installation must conform to the requirements of the local jurisdiction having authority, and to the latest edition of the National Fuel Gas Code, ANSI Z Any modifications to the boiler or its gas / oil controls may void the warranty. If field installation requires modifications, consult either the local Precision Boilers Representative or the Factory. RETAIN THESE INSTRUCTIONS NEAR THE EQUIPMENT FOR READY REFERENCE 2

3 TABLE OF CONTENTS 1.0 GENERAL INFORMATION 1.1 Introduction Local Regulations Recommendations Preventative Maintenance STORAGE and HANDLING 2.1 Receiving Storage Uncrating Placement 5 Figure 1 Minimum Clearance INSTALLATION 3.1 Piping connections Electrical Connections Power Feed Wiring Grounding Conductors Control Wiring Filling System PRE-STARTUP INSPECTION 4.1 Minimum Equipment for Startup Mechanical System Checks Plumbing Connections Feedpump/ Circ Pumps System Flush Valves Electrical System Checks Heating Elements Inspection Power/Voltage STARTUP INSTRUCTIONS 5.1 Control Settings Controller High Limit Low Water Cutoffs Low Limit Sensors Operating Instructions Electric Door Interlocks Volt Power Source Alarm and Reset Circuits Sequencing of Elements SEQUENCE OF OPERATION 6.1 Activation of Heating Element Circuits Contactors Fuses Sequencing Controls Staged Control Circuit Proportional Step Controls Step Control Sequence Progressive Controls Sequence Step Linear Step Controls Recycle feature Manual Toggle Switches Preheat Switch OPERATIONAL TESTING 7.1 Standard Controls ohm Type Controllers Outdoor Reset Controls ohm Reset Controller 15 TABLE 1 Setting the Temperature Controller Solid State Dual Input Reset Controls PREVENTATIVE MAINTENANCE 8.1 General Water Treatment Electrical System Maintenance Boiler Mechanical System Maintenance Element Replacement Procedure 18 TABLE 2- Feedwater / Boiler Water Properties Typical Preventative Maintenance List 19 3

4 1.0 GENERAL INFORMATION 1.1 Introduction PRECISION has made a commitment to product improvement and follows a continuing quest for the highest standards of product performance. In pursuing this policy of continuous development of products, the manufacturer reserves the right to vary any details in this manual without notice. This Electric Hot Water / Steam Boiler and Water Heater Operations and Maintenance manual presents information that will properly operate and care for the equipment. Study the contents carefully. The unit will provide good service and continued operation if proper operating and operation if proper operating and maintenance instructions are followed. The standard Limited Warranty is not applicable with equipment not installed or operated in accordance with these procedures. The boilers are designed and engineered to provide excellent service and to give long life on the job. Although the unit and its components afford a high degree of protection and safety, operation of the equipment is not be considered free from hazards inherent in the handling of electricity and pressurized hot water or steam. Pay close attention to WARNINGS and CAUTIONS as these present situations of potential hazard, and remember no amount of written instruction can replace intelligent thinking and reasoning. 1.2 Local Regulations Consult local building and safety codes before proceeding with work. The operation of this equipment by the owner and his operating personnel must comply with all requirements or regulations of the authorities having jurisdiction. In the absence of such authorities, the installation must conform to the safety codes set forth by both the American Society of Mechanical Engineers (ASME) and the National Electric Code (NEC). 1.3 Recommendations Preventative Maintenance A preventative Maintenance Schedule is provided as a recommendation for periodic equipment inspections. Recording of daily, weekly, monthly, and yearly maintenance activities, as well as the recording of any unusual operation, will serve as a valuable guide to any necessary investigation. The standard Limited Warranty does not cover any damage caused by lack of required maintenance Water Treatment for Boilers Feedwater and Boiler Water Properties should be maintained in accordance with the table provided in this manual (Section 8.0). It is customary to engage the services of a qualified water treatment consultant to recommend the proper water treatment program. Damage from scaling, corrosion or erosion attributed to improper treatment of boiler water is not covered by the standard Limited Warranty. 4

5 2.0 STORAGE & HANDLING 2.1 Receiving Each boiler/water heater is completely inspected at the factory and carefully packaged for shipment. Upon receipt of the shipment, immediately inspect the packing for signs of exterior damage. Verify receipt of all packages listed on the packing slip. Advise the carrier of any shortage or damage. Any such claims should be filed with the carrier. The carrier, not the shipper, is responsible for shortages and damage to the shipment. 2.2 Storage Electrical equipment can be damaged if exposed to adverse weather. The boiler should be stored inside. The electrical panel and controls should be covered with plastic throughout construction to avoid accumulation of dust and moisture on the controls and load components. The contactors can be damaged by dust/dirt in the mechanism. 2.3 Uncrating Care must be taken not to damage controls or deform the boiler sheet metal during removal of the crate If using pry bars or fork lifts, be certain of support the boiler weight by the skids or channel base. 2.4 Placement CAUTION: If the equipment is placed in a room with little or no ventilation, a supply of ducted filtered air may have to be brought to the lower portion of the control cabinet to limit the control cabi Provide a firm, level foundation for the equipment. NOTE: Standard electric boilers/water heaters are not suitable for placement on combustible flooring Leave a permanent space for element removal opposite element access panels as shown on the Dimensional Drawing (DD), and 36 inches opposite electrical panels. NOTE: Electrical panels require 42 opposite any opposing conductive surface Be sure to keep electrical panels and controls covered at all times while construction work is in process. CAUTION: Do not use the equipment housing top for scaffolding. 5

6 Figure 1 Minimum Clearance Recommendations and General Dimensional Data for Boiler Placement PRECISION Electric Hot Water (HW) PRECISION Electric Steam Boiler (ST) NOTE: Consult Local codes for specific requirements and refer to the Dimensional Drawing and Wiring Diagram provided with unit. NOTE: Removal clearance required on both ends for HW_D and ST_D models. 6

7 3.0 INSTALLATION 3.1 Piping Connections NOTE: Some of the following piping may have been completed at the Factory Boiler piping connections and values MUST comply with state and local codes, in addition to compliance with ANSI piping requirements. CAUTION: The pipe extensions outside the unit are usually the extensions of pipes which are permanently welded into the unit s vessel. Normally the only removable (threaded) connection is the drain pipe. DO NOT ATTEMPT TO REMOVE ANY OTHER PIPING! Install the safety relief valve(s) on the pipes provided. Plumb the relief valve outlet connections full size to the floor drain. Check local codes for proper safety valve discharge for steam boilers above 15 psi, which normally are required to be piped to overhead discharge outside safely away from personnel Hot water boilers may be equipped with an air vent pipe on the top of the boiler. Plumb this connection to the expansion tank or install an automatic air vent on this pipe The direction of flow through hot water boilers and water heaters must be from the inlet to the outlet (IE: bottom to top). Do not reverse these connections. NOTE: Do not oversize feedwater piping and values on steam boilers, as this may result in severe pressure fluctuations during feedwater cycles if the fill rate is too rapid. 3.2 Electrical Connections Power Feed Wiring The recommended wire size is listed on both the unit s Bill of Material (BOM) and the Wiring Diagram (WD). Also, the full load amperage and maximum voltage are stamped on the unit s nameplate. The feeder must be sized for 125% of the full load amperage in accordance with Article of the NEC. The wiring must have insulation rated 75 C or greater. Copper wiring is recommended for all power connections. The recommended size is noted in the Notes on the wiring diagram. CAUTION: Do not exceed the maximum voltage as listed on the nameplate. For resistance loads, amperage increases proportionally with voltage Equipment Grounding Conductors The unit is equipped with grounding lug(s) inside the power panel(s). The grounding conductors must be installed and sized in accordance with NEC Article The recommended size is noted in the Notes on the diagram Control Wiring Alteration of, or additions to, control wiring may void both the Underwriters Laboratories listing and the Manufacturer s Limited Warranty. Field-installed controls, control connections, and modifications must be approved in writing by the Factory. 7

8 NOTE: All power connections are 3-Phase, 3-wire. (Exception: If unit is single phase.) There is no provision for a neutral connection ;( IE: the unit should not be wired wye or star ). 3.3 Filling the System The system and the boiler / water heater must be thoroughly flushed before the final fill. Steam boilers should be boiled out before operation Water Treatment Consult a local water treatment firm for recommendations on proper water treatment and boilout procedure to prevent damage to the boiler vessel, components and heating elements. The internal materials of boilers are Steel, Incoloy and cast Iron, which all are compatible with standard boilout compounds. In lieu of a commercial boilout compound, the following mix of chemicals can be used for every 1000 gallons of water: 30lbs. TSP (tri-sodium phosphate; NA₃Po₄), commonly found in many building supply centers. 5lbs. caustic soda (50% pure sodium hydroxide; NaOH) 2lbs. ordinary powdered laundry detergent (Example: Tide) These chemicals should be dissolved in warm water prior to their addition to the boiler. The boiler should be heated for at least 3 hours, then drained and flushed. NOTE: Standard hot water boilers are suitable for ethylene glycol mixtures up to 50/50 mix. 4.0 PRE-STARTUP INSPECTION 4.1 Minimum Equipment Required For Startup And Troubleshooting Volt OHN Meter Clamp-On Ammeter Megohm Meter Torque Wrench-inch lbs Toque Wrench-foot lbs 4.2 Mechanical System Checks Plumbing Connections Completed Inlet/makeup Water? Discharge/Outlet? Drain/Blowdown Relief/Safety Valve Discharge? Feedpumps/Circulating Pumps Pumps wired, connected and checked for proper rotation? Is the boiler filled to the proper level with water? 8

9 4.2.3 System Flush Has the System been flushed? Has the unit been cleaned of all construction debris? Valves Are all valves in the proper open or closed positions? 4.3 Electrical System Checks WARNING: ALL POWER supplying boiler should be off and locked out! With the unit(s) main power switch (es) OFF and locked out. Inspect all components, external and internal, to assure that there has been no damage during shipment or installation. Remove one of the unit s control circuit transformer primary fuses. Then check the resistance phase-to-phase for all three phases. Make sure that there are no short circuits phase-to-phase ground. With a megger (500VDC minimum) check contactor load side terminals to ground. If a reading of < 1 megohm is obtained, consult the Factory. Remove element access panel(s) and open doors to the electrical control panel(s). Run an inspection the tightness of all electrical connections (IE: at fuse lugs, power entrance lugs, contactors, heating elements). All branch circuit connections should be tightened to inch lbs. (actual value listed on components).torque to avoid component damage from heat build-up. This tightness inspection is vital, because the vibration during shipment can often loosen electrical connections. If this is not done, damage may occur to component parts when power is switched on, and those damaged parts will not be covered under the manufacturer s Limited warranty. NOTE: See Maintenance Section on rechecking the torque on these components after an initial break-in period, then typically one to two weeks after start-up and then at least annually. With an ohm meter, check the resistance between the phases on the load side of the contactors. Each should read the same and approximately what is shown on the wiring diagram. Check the electrical panels for loose material, dust and/or moisture. Thoroughly vacuum the panels if dust or foreign materials have accumulated there. 9

10 If there has been severe exposure to dust, the contactors should be disassembled and cleaned. Dust in the contactors will cause contractor chattering and eventual destruction of the contacts. All components should be clean and free of dust, moisture and foreign matter. Verify that field-installed control and load connections have been properly completed. Check the tightness of all control circuit connections. CAUTON: Moisture in the elements may result in damage to the elements. NOTE: There is a possibility that during shipment prior to operation, the elements may accumulate moisture. The moisture will turn to steam when the elements are turned on and may rupture the element casing. 4.4 Heating Elements How to check Elements for Moisture Take a reading with a megger between the contactor terminals (load side) to ground for each contactor. Moisture is present if the reading is less than1 megohm for standard 3 phase connection Removal of Moisture in Element (Method#1) Remove the fuses going to that contactor. The fuses should be removed so that, during the first day of operation, the affected element will not be energized allowing the hot water to drive the moisture out at a controlled rate Removal of Moisture in Element (Method #2) An alternate heating method is to direct a heat After completion of either of the above methods for moisture removal, re-check the element with a megger. When the reading indicates an acceptable level, the element may be put in operation by replacing the fuses Replace all Element Access Panel(s) and close electrical / control panel doors. 4.5 Inspection Power/ Voltage Verify the boiler ON / OFF control switch is in the OFF position. Close the boiler main power switch, turn the control switch to ON and then: Check the phase-to-phase voltage at the main terminals in the boiler electrical panel. The phase-to-phase voltage between any two of the phases must not exceed the boiler nameplate voltage Check the voltage at the boiler control circuit fuse. It should be between 105 volts and 125 volts Open the boiler main power switch If all of the above prove satisfactory, proceed with Startup Instructions (Section 5.0). Replace all covers and close all doors. 10

11 5.0 STARTUP INSTRUCTIONS 5.1 Control Settings Controller (See parts List for Part No. and Type) The controller is the pressure or temperature sensing device which controls the operation of the contactors directly or indirectly via the step control Set the Controller for the desired Outlet Water Temperature (or Steam Pressure). NOTE: (For Water Heaters) the Maximum water temperature for lined vessels is NOTE: (For Hot Water Boiler) Outdoor reset (dual bulb) (this outdoor reference temperature is adjustable on most solid state controls; fixed on Honeywell T991B controllers). The reset ration (fixed on Honeywell T775J) is the number of degrees the boiler control temperature will increase for a 1 degree decrease in outdoor temperature Throttling Range The throttling range is the number of degrees (or psi) the outlet water temperature (or steam pressure) must change to drive the step controller from full-off to full-on. (1/2 of throttling range above setpoint). The more stable the load on the unit (from system demands), the smaller the throttling range may be set High limit (Temperature or Pressure) F (or 5 psi), or twice the throttling range, whichever is greater, above the setting of the controller. Manual reset limits should be set slightly higher than the automatic reset limits. For steam boilers, the manual reset high limit should be set at least to 10% below safety valve set pressure Low water Cutoffs These cutoffs are always factory-set. If additional cutoffs are field-installed, the cut-offs should be at least three inches above the highest heating element. Manual reset cutoffs should be set below automatic reset cutoffs Low Limit Sensors (Temperature or Pressure) Low limits should be set below the controller setting by at least the same margin as specified for high limits to be above the controller setting. 11

12 5.2 Operating Instructions With the unit(s) control power ON/OFF or ON/OFF/PREHEAT switch to OFF, close the main power switch (es). NOTE: Units with shunt trip disconnects and rmoet120-volt control power may require turning the control power switch ON and activating the 120-volt control power, before closing the main power switch (es) Electric Door Interlocks For units equipped with electric door interlocks, do not attempt to open electrical panel doors after the main switch is closed. The lock tabs are mechanically restrained by the electric interlocks Switch all the enable/disable pilot switches the OFF position (toggle down) Volt Power Source If a separate 120-volt power source is provided, close it s disconnect switch Turn the control power ON/OFF or ON/OFF/PREHEAT switch to ON Alarm and Reset Circuits If the alarm sounds when the control switch is turned ON, depress the alarm silence button. Check the unit to make certain that no limit condition exists by noting if the alarm pilot is illuminated Units with Manual Rest Button(s) may require resetting of the manual reset switch upon initial application of power, and after the interruption of power or the tripout of a limit control Sequencing of Elements Circuits On units with step controls, the unit will always start with no steps energized As the steps begin cycling on, the LED s on the step control (circuit board inside cabinet) will light up one at a time, indicating that step control is operating properly. NOTE: The enable pilot lights or contractors will not be activated at this time since the enable/disable switches are in the off position) With the step control board full on, individually enable each step. The respective pilot light should light and the contractor(s) applying power to the respective elements For units with ON/OFF/Preheat switches, only part (approximately 25% may be activated when the switch is down in the PREHEAT position. This PREHEAT option is now rarely used If PREHEAT switch is used when the outlet water temperature (or steam pressure) is at or near setpoint, turn the ON/OFF/PREHEAT switch OFF, then to ON again. The controls will recycle to the no-load condition. The steps should then begin to cycle on as needed, and all of the steps may come on if necessary. 12

13 6.0 SEQUENCE OF OPERATION 6.1 Activation of Heating Element Circuits Contactors The heating elements are energized by pilot operation. That is, the power to an element circuit is supplied through the contacts of a contactor. The contactor is activated (on a call for heat) by the closure of a temperature (or pressure) switch or by a contact in the step control circuit Fuses All power leads to the elements are fused. The fusing is on the line side of the contactors. 6.2 Sequencing Controls Staged Control Circuit In this type circuit, the contractor coils are energized directly by the contracts of immersion thermostats (or pressuretrols). There is usually on thermostat (or pressuretrols) for each stage; or a multi-stage thermostat (or pressuretrols) may be provided in some cases The safety limit devices (high temperature, low water, etc.) interrupt the power to the contactor coil circuits Proportional Step Controls Step Control Sequence The controller senses the unit s water temperature (either via 135-ohm device or thermistor) or steam pressure (either via 135-ohm device or 4-20 ma transducer). The output signal or the controller causes the step control to sequence the steps on, or off, depending on whether the unit s output is below or above setpoint. When one of the switches closed on the step control, a contractor coil (or coils) is energized in a step-wise fashion. This type of step control will mid-position (bring on half of the steps) when the unit s water temperature (or steam pressure) is at setpoint. For example: an 8 step steam boiler with the pressure controller set at 12 PSIG, will have 4 steps on when the boiler steam pressure is at 12PSIG Progressive Controls Sequence Step These controls are provided as standard and include Selectronix SLC series and Viconics model R851B. They provide first-on, first-off staging of the element circuits. As the unit s temperature (or pressure) drops below setpoint, the control brings on more steps. As the temperature (or pressure) increases and approaches setpoint, the step control drops out stages. The first step to drop off is the one that has been on the longest. This provides even usage of the system s components Linear Sequence Step Controls This type of step control is limited to the some Selectronix models and Viconics model R851B. In this sequence progression, the control applies power by progressing from Step 1 to the maximum number required to satisfy the load, and then decreases power by retracing this sequence down toward the first step. 13

14 NOTE: Refer to the applicable vendor literature provided on the step control installed in your unit Recycle Feature All step controls now incorporate the recycle feature which returns the step control to the no-load condition upon loss of control power Manual Step ENABLE / DISABLE Toggle Switches All units with >1 step now include manual ENABLE / DISABLE toggle switches to provide a positive OFF override of each step. These are used to disable a faulty step, limit total output or allow for a slow preheat Preheat Switch (Boilers Only) The preheat switch is a manual limit switch. In order to preheat the boiler, the ON/OFF/PREHEAT switch must be in the down position. When the ON/OFF/PREHEAT switch is in it s down or PREHEAT position, the boiler output is limited to approximately 25% of full load power. This allows the operator to limit the boiler output during startup cycles (particularly if the boiler is shut off at night and turned on again in the morning), which could lessen electrical demand charges. When the boiler has been brought up to the setpoint temperature (or pressure), the ON/OFF/PREHEAT switch is moved slowly from it s down or PREHEAT position to it s up or ON position passing through the OFF position to cause the step control to recycle to the NO LOAD position. Thereafter, the boiler can operate up to full load if necessary. NOTE: The PREHEAT switch is included as an option on boilers of 9 or more steps. It is intended to be used to prevent setting demand peaks on cold starts. It does not have to be used if so desired. 7.0 OPERATIONAL TESTING 7.1 Standard Controls ohm Controllers (T991, T915, L91,etc.) With the water temperature (or steam pressure) at setpoint, the step controller should bring on nominally one half of the steps. An adjustable proportional band is provided on the controller (sensor) to enable tuning the unit to system demand Solid State Controls With the water temperature (or pressure) at setpoint, the step controller should bring on nominally on half of the steps. Adjustable time delays between steps and adjustable proportional bands are normally provided on the step control to enable tuning the unit to system demand. Most solid state controls also include band width adjustment at the control itself, and normally include PID control action. IMPORTANT: The timing between stages adjustable (with step control). Steam boilers normally have delay of between seconds while stepping up and 3-5 seconds while 14

15 stepping down. Water boilers can normally respond slower so seconds up and 5 10 seconds down is usually appropriate. The slower the step sequencing, the less wear on both the contractors and heating elements (yet still able to control the process as needed) the less heat is generated in the cabinet which results in longer component life. 7.2 Outdoor Reset Controls ohm Type Outdoor Reset Controller (Hot Water Boilers Only) (Honeywell T991B type) These controllers have a fixed reset ratio: either 1-to-1, 1-to-1.5 or 1.5-to-1. The outdoor reference temperature is 70 F (IE: the boiler outlet water control point temperature is equal to the setting on the controller when the outdoor temperature, at the outdoor bulb, is 70 F). In order to test the operation of this controller, either: Check the outdoor temperature at the outdoor air sensing bulb; then determine the number of degrees this temperature is above, or below 70 F Check the boiler outlet water temperature; if the outdoor temperature is below 70, multiply the difference between 70 F and the actual outdoor temperature by the reset ratio (1.0,.67 or 1.5); and subtract this from the temperature of the boiler outlet water Then set the controller at this resultant temperature; the step controller should maintain nominally half of the steps on. Setting the OUTDOOR RESET CONTROLLERS basic information is shown in Table 1 below. Table 1 SETTING THE TEMPERATURE CONTROLLER Reset Ratio: 1:1-1/2 (IE: 2/3:1) Outdoor Temperature: 40 F Boiler Water Temperature: 130 F Step A Difference between outdoor temp and 70 F = 30 Step B Multiply 30 F times the Reset Ratio 2/3 (and then) 30 x 2/3 = 20 F Subtract 20 F from the Boiler Water Temp 130 F = 110 F Step C Set the Controller at 110 F Note: If the Outdoor Temperature is above 70 F, add the difference in Step A, multiplied by the Reset Ratio, to the Boiler Water Temperature. See Honeywell manual for specific details Solid State Dual Input Reset Controls (Honeywell T775J controls) These are dual sensor reset controllers with adjustable reset ration and outdoor reference temperature. The reset ratio is the ratio of the change in the temperature at the secondary sensor to the opposing change in the control point. If the reset ratio is 2:1, every 2 F change at the outdoor sensor will cause an automatic inverse change of 1 F at the control point. 15

16 EXAMPLE: Assume a reset ratio of 2:1, a primary set point of 100 F, and a secondary setpoint at 70 F. The first number of the reset ratio indicates change in outdoor temperature; the second, the change in the control point. If the outdoor temperature drops from 70 F to 20 F, a change of 50 F, the control point will increase from 100 F to 125 F, a change of 25 F. NOTE: Refer to the applicable vendor literature provided on both the setpoint controls and step controls installed in your boiler. 8.0 PREVENTATIVE MAINTENANCE 8.1 General Electrical immersion heating element boilers and water heaters are automatic, quiet and safe. Consequently, they are all too often neglected. Like any piece of electrical / mechanical equipment, they require care and maintenance to keep them in top working condition. If electrical connections are allowed to become loose or dirty, there is danger of an electrical fault. If the elements are not inspected periodically for leaks, the water from leaking elements can leak onto adjacent elements, causing external element damage and resulting in blowing of load fuses in the boiler electrical panels. If the boiler water is not properly treated, element failure could occur due to the formation of scale. Treat the boiler with respect. CAUTION: Always work on the boiler with all electrical power sources disconnected. 8.2 Water Treatment (Boilers Only) Boiler water should be periodically checked through a sampling procedure. Properties should be maintained in accordance with Table 2 at the end of this section. For consultation relative to water treatment, please contact a reputable water treatment firm. 8.3 Electrical System Maintenance Clean the control cabinets periodically (as often as needed) to keep both the interior and the exterior free of dust, moisture and foreign matter. The interior cleaning of the electrical panels must be done with the POWER OFF! NOTE: For units supplied with control cabinet cooling fans, the condition of the fan filter must be periodically checked and the filters cleaned or replaced as necessary. 16

17 8.3.2 With the POWER OFF, periodically check the tightness of electrical connections; particularly at power entrance lugs, fuses (line side) and contractors (load side). This should be done at time of commissioning, at 7 14 days thereafter and at least annually. Replace any components that show signs of heat damage (IE: discoloration, charring, melted insulation, etc.) Inspect the condition of the contactors. Look for burned or corroded contacts or overheated coils and wires. If the contactors chatter or hum during operation, they should be either disassembled and cleaned to remove dust or other foreign material in the mechanism or replaced Inspect the heating elements. Make sure that the terminal contacts are tight, clean, and corrosion-free Check all the wiring throughout the unit for frayed or brittle insulation. Replace any wiring showing insulation degradation. 8.4 Boiler Mechanical System Maintenance With the POWER OFF, remove the element access covers. Inspect all internal vessel connections, particularly at the heating elements. Spot check torque on element flange bolts. The acceptable torque range is ft. lbs. CAUTION: Do not over tighten elements! Remove and replace any leaking elements or element gaskets. Inspect handhole and manhole gaskets. If these gaskets are brittle, they should be replaced. WARNING: Over-torquing of the elements nuts will damage the element gasket Repair any leak at any place on the unit or adjacent piping. Re-torque flange bolts on system piping For all boilers, the interior of the pressure vessel must be inspected at least once a year. If there is any presence of scale, refer to Preventative Maintenance Water Treatment above a consult a local water treatment firm immediately. Scale formation on the elements will cause heating element failures. Scale formation elsewhere in the boiler can cause erratic control operation / failure, particularly on water level controls When the boiler is inspected, rod out the pipes to the water column(s) and inspect the operation of the float(s) in the level controller(s) Remove and clean the low water cutoff probe Steam Boiler Special Maintenance All PRECISION steam boilers are supplied with a surface blow-off connection. If surface blowoff valves are not Factory-installed, they should be installed in the field. The surface blow-off should be used as often as necessary to remove organics which accumulate at the water surface, and to limit TDS. (Boiler water TDS should not exceed 3500 ppm). 17

18 Both the boiler and water column should be blown down periodically to remove bottom sludge The water column should be blown down daily to assure proper operation of the level control / LWCO assembly Water Treatment Water treatment is required for satisfactory operation of steam boilers to prevent both deposition of scale and corrosion from acids, oxygen and other harmful elements that may be in the water supply. A qualified water treatment specialist should be consulted to establish a proper water treatment program. 8.5 Element Replacement Procedure (4-Bolt Style Element) CAUTION: Before element replacement, make certain main power to the unit is turned off, that there is no pressure in the unit, and that the unit is drained below the element opening. NOTE: To prevent hazardous conditions of leaking water / steam at the element terminal ends, defective elements or element gaskets should be replaced immediately upon leak detection Adequately tag wire and then remove wires from defective elements Remove element by removing the four (4) attachment nuts Install replacement element with the new gasket and torque nuts to ft. lbs. WARNING: Do not exceed 15 ft. lbs Connect phase wires to new element When the unit is filled and pressurized, check for leaks. Table 2 Recommended Feedwater and Boiler Water Properties Type of Boiler Hardness (ppm) FEEDWATER ph Oxygen (cc/l) TDS (ppm) Total Dissolved Solids Hot Water Steam

19 BOILER WATER Type of Boiler Hardness (ppm) ph Oxygen (cc/l) TDS (ppm) Total Dissolved Solids Hot Water # Steam # # - The limit of 9.5 pertains to copper elements; a ph of 10.5 is allowable for incoloy elements. 8.6 Typical Preventative Maintenance List NOTE: This list may not be all inclusive! Read and understand entire Operation and Maintenance Manual and take into consideration any modifications and / or optional equipment for this unit: WARNING: MAIN POWER MUST BE TURNED OFF TO DO ELECTRICAL CHECKS! Bottom Blow-down to keep sludge from building up and help with water TDS Daily Surface Blow-off to remove floating solids and maintain proper TDS Ensure valves, connections, piping, gaskets, etc. are not leaking Weekly 7 14 days After STARTUP (Fax form) Monthly to Verify that boiler water properties are within desired parameters Blow-down water column and (sight-glass) to prevent sludge from building up in piping. Re-torque screws on distribution, fuse blocks and contactors to their specified torque (typically in lbs.) Re-torque any bolts on copper distribution from disconnects or circuit breakers to typical torque valves for the size of bolt used. Check for any heating element gasket or manway gasket leaks Clean filters on cooling fans to maintain proper air flow 19

20 every Six Months Annually Check fuses and heating elements with an ohm meter for proper values. Look for signs of overheating on fuses, fuse blocks, contractors and wires. Any discolored, charred or melted components should be replaced. Ensure all screws are torqued to their proper values for any replaced components. Inspect interior of tank for sludge or scale. Clean tank and modify water treatment chemistry as necessary. Replace brittle element gaskets, valve gaskets and manway gaskets as necessary. Re-torque ALL distribution, fuse block and contactor screws to the proper value. Re-torque any bolts on copper distribution from disconnects or circuit breakers to typical torque values for the size of bolt used. 20

Instruction Manual STR MODEL RESISTO-FLO ELECTRIC BOILER

Instruction Manual STR MODEL RESISTO-FLO ELECTRIC BOILER Page 1 of 18 Instruction Manual STR MODEL RESISTO-FLO ELECTRIC BOILER Page 2 of 18 FOREWORD The STR Resisto-Flo Electric Steam Boiler is designed to provide a compact packaged unit requiring a minimum

More information

INSTALLATION & MAINTENANCE MANUAL PVI ELECTRIC HOT WATER SUPPLY BOILER

INSTALLATION & MAINTENANCE MANUAL PVI ELECTRIC HOT WATER SUPPLY BOILER INSTALLATION & MAINTENANCE MANUAL PVI ELECTRIC HOT WATER SUPPLY BOILER Installation and service must be performed by a qualified service installer or service agency. IMPORTANT: THIS MANUAL CONTAINS INFORMATION

More information

Instruction Manual HWR MODEL RESISTO-FLO ELECTRIC BOILER

Instruction Manual HWR MODEL RESISTO-FLO ELECTRIC BOILER Page 1 of 16 Instruction Manual HWR MODEL RESISTO-FLO ELECTRIC BOILER Page 2 of 16 FOREWORD The HWR Resisto-Flo Electric Hot Water Boiler is designed to provide a compact packaged unit requiring a minimum

More information

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER 1 Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER FOR YOUR SAFETY This manual supplies information on the application,

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS INDEECO Circulation Heaters are designed to provide years of trouble free operation if properly installed and maintained. Please read and follow these instructions for installing and maintaining the heater.

More information

INSTALLATION AND SERVICE MANUAL

INSTALLATION AND SERVICE MANUAL INSTALLATION AND SERVICE MANUAL Electric Power Water Heater 12kW 162kW NOTE: retain this manual for future reference Installation and service must be performed by Qualified Service Personnel Only. WARRANTY:

More information

EHB Series. STONESTEEL Commercial Electric Water Heaters Individually Mounted Elements Vertical or Horizontal CEMLINE CORPORATION

EHB Series. STONESTEEL Commercial Electric Water Heaters Individually Mounted Elements Vertical or Horizontal CEMLINE CORPORATION EHB Series STONESTEEL Commercial Electric Water Heaters Individually Mounted Elements Vertical or Horizontal STONESTEEL is a registered trademark of Cemline Corporation CEMLINE CORPORATION P.O. BOX 55

More information

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model BWXP OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)

More information

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-8-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!! Sample Written Program For Your Company For BOILER SAFETY Provided By: P.O. Box 2136 Slidell, LA 70458 Phone: 985-781-1444 Fax: 985-781-1446 Email: info@se-safety.com Purpose Boiler Safety Program The

More information

Installation and Operating Instructions. Precision Flextube Boilers. FTS Series STEAM BOILERS

Installation and Operating Instructions. Precision Flextube Boilers. FTS Series STEAM BOILERS Installation and Operating Instructions Precision Flextube Boilers FTS Series STEAM BOILERS 1 Installation and Operating Instructions Precision Flextube Boilers FTS Series HOT WATER BOILERS FOR YOUR SAFETY

More information

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16 INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16 CROWN FOOD SERVICE EQUIPMENT LTD. 70 OAKDALE ROAD, DOWNSVIEW, (TORONTO), ONTARIO, CANADA, M3N 1V9 TELEPHONE: (416) 746-2358,

More information

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-2-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to elements

More information

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00 I&M NUMBER: 316-42-5-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Watlow heaters are built to comply with UL and CSA dielectric requirements, it may be

More information

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

! The Caution Symbol (exclamation point) alerts you to a CAUTION, a safety or I&M NUMBER: 316-42-10-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Condensing Unit Installation and Operating Instructions

Condensing Unit Installation and Operating Instructions Bulletin WCU_O&I 01 June 2003 Condensing Unit Installation and Operating Instructions WCU Air Cooled Condensing Unit Table of Contents Section 1. Section 2. Section 3. Section 4. Section 5. Section 6.

More information

INSTALLATION and OPERATION MANUAL DIRECT STEAM KETTLES MOUNTED ON ELECTRIC BOILER BASE CABINET MODELS: EMT-6 EMT-10 EMT-12 EMT-6-6 EMT-10-6 EMT-10-10

INSTALLATION and OPERATION MANUAL DIRECT STEAM KETTLES MOUNTED ON ELECTRIC BOILER BASE CABINET MODELS: EMT-6 EMT-10 EMT-12 EMT-6-6 EMT-10-6 EMT-10-10 INSTALLATION and OPERATION MANUAL DIRECT STEAM KETTLES MOUNTED ON ELECTRIC BOILER BASE CABINET MODELS: EMT-6 EMT-10 EMT-12 EMT-6-6 EMT-10-6 EMT-10-10 CROWN FOOD SERVICE EQUIPMENT LTD. 70 OAKDALE ROAD,

More information

WATLOW ELECTRIC MFG CO. FIREBAR Screw Plug Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.

WATLOW ELECTRIC MFG CO. FIREBAR Screw Plug Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4. I&M NUMBER: 316-42-3-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to elements

More information

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2 I&M NUMBER: 316-42-15-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE:

More information

SERVICE MANUAL. Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models

SERVICE MANUAL. Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models SERVICE MANUAL Troubleshooting Guide and Instructions for Service (To be performed ONLY

More information

Niles Steel Tank Hot Water Generator Installation and Operation Manual

Niles Steel Tank Hot Water Generator Installation and Operation Manual Niles Steel Tank Hot Water Generator Installation and Operation Manual Contents: Contents 1 Hazard definitions 1 1. General Information.... 2 Availability... 3 Optional Control Packages... 5 2. Installation....

More information

American Dish Service

American Dish Service American Dish Service INSTALLATION INSTRUCTIONS Model JDS12 (T) or (R) Muffler Booster (T) 12kW, 240v, 3-ph, (R) 12kW, 208v, 3-ph Manufactured by Hubbell Electric Heater Company for use on American Dish

More information

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL ALDRICH COMPANY 341 EAST WILLIAMS ST WYOMING, IL 61491 PH: 309-695-2311 FAX: 309-695-5779 1 General Information:

More information

! WARNING. Replacement Head Mechanism INSTRUCTION MANUAL MM-413F

! WARNING. Replacement Head Mechanism INSTRUCTION MANUAL MM-413F INSTRUCTION MANUAL MM-413F Replacement Head Mechanism With Switch Assembly: 93-HD, 94-HD 93-M-HD, 94-M-HD 93-7B-HD, 94-7B-HD 93-7B-M-HD, 94-7B-M-HD Without Switch Assembly: 93-HDLS 94-HDLS Replacement

More information

INSTALLATION & MAINTENANCE MANUAL RHWE ELECTRIC WATER BOILER

INSTALLATION & MAINTENANCE MANUAL RHWE ELECTRIC WATER BOILER INSTALLATION & MAINTENANCE MANUAL RHWE ELECTRIC WATER BOILER Installation and service must be performed by a qualified service installer, service agency or the gas supplier. IMPORTANT: THIS MANUAL CONTAINS

More information

CONTENTS Warranty Start-Up Procedure Installation Requirements Maintenance Trouble Shooting Electrical Service Components and Controls

CONTENTS Warranty Start-Up Procedure Installation Requirements Maintenance Trouble Shooting Electrical Service Components and Controls Warranty..........................1 Safety Warnings................1 Checking the Equipment..........1 Codes........................4 Installation Requirements Location......................4 Drain Pan

More information

INSTALLATION, OPERATION AND MAINTENANCE

INSTALLATION, OPERATION AND MAINTENANCE INLINE HEATER INSTALLATION, OPERATION AND MAINTENANCE MODELS: ILS SERIES 1.5kW 120V SINGLE PHASE BEFORE YOU BEGIN CHECK ALL ELECTRICAL CONNECTIONS TO ALL COMPONENTS WITHIN THE HEATER FOR TIGHTNESS. CONNECTIONS

More information

ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS

ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS M24E M36E Telephone: (802) 658-6600 Fax: (802)864-0183 www.marketforge.com PN 14-0309 Rev G (11/17) 2017 - Market Forge

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler

ClearFire. Startup Guide. Model CFH. Horizontal Steam Boiler ClearFire Model CFH Horizontal Steam Boiler Startup Guide 750-293 www.cleaverbrooks.com Improper installation, adjustment, service, or maintenance can cause equipment damage, personal injury, or death.

More information

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL T Edition 0 HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 88 STRATFORD, CT 0665

More information

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 870 SERIES INDUSTRIAL CONTROL PANELS GENERAL INDEECO Industrial Control Panels are designed to provide years of trouble free operation if properly

More information

Control and power circuit fusing to meet N.E.C.

Control and power circuit fusing to meet N.E.C. LARGE VOLUME ELECTRIC WATER HEATERS SEV & SEH MODELS Commercial Electric ADVANCED State s new propriety electronic water heater control, provides precise + or - 1ºF temperature control, that is ideal for

More information

Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC. Installation and Operating Service Manual BOILER FEED SYSTEM

Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC. Installation and Operating Service Manual BOILER FEED SYSTEM 0 Form 2143 Date: 4/3/03 Repl: 2/1/99 BRYAN STEAM LLC Installation and Operating Service Manual BOILER FEED SYSTEM INSTALLATION AND OPERATION SERVICE MANUAL BOILER FEED SYSTEM Bryan Steam LLC 783 North

More information

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS

THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS Page 1 of 10 THERMAPHASE INSTALLATION AND OPERATING INSTRUCTIONS Purpose of Manual The purpose of this manual is to provide operating, servicing and repair instructions for the Summit standard models ThermaPhase

More information

PDF Created with deskpdf PDF Writer - Trial ::

PDF Created with deskpdf PDF Writer - Trial :: Instruction Manual Index Introduction Uncrating and Checking for Damage Locating Your Unit Installation Fill Tank Process Connections Pre Startup Startup Sequence Trouble Shooting Chart Operating Lights

More information

Revitalize Building Mechanical Systems (4619)

Revitalize Building Mechanical Systems (4619) SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SuperStor Glass Lined Storage Tank

SuperStor Glass Lined Storage Tank SuperStor Glass Lined Storage Tank INSTALLATION MAINTENANCE TROUBLESHOOTING PARTS Storage Tank Models GL-50 / GL-80* GL-119* / GL-175* For Residential and Commercial Use *Available in Metal Jacketed ASME

More information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-214(C) Series 61 Low Water Cut-Off OPERATION

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-214(C) Series 61 Low Water Cut-Off OPERATION Series 61 Low Water Cut-Off Typical Applications: - Primary or secondary low water cut-off for hot water and steam boilers. - Low water cut-off - High water cut-off - Alarm actuator OPERATION Maximum Boiler

More information

EB-M*-** Midsize Electro-Boiler BL509. EB-S-**/EB-WX-**-2 TS Standard Electro-Boiler BL506. EB-CX-** TS Commercial Electro-Boiler BL508

EB-M*-** Midsize Electro-Boiler BL509. EB-S-**/EB-WX-**-2 TS Standard Electro-Boiler BL506. EB-CX-** TS Commercial Electro-Boiler BL508 Electro-HELPS IX Boiler, Submittal Data Sheets These provide the mechanical technical details often required for architects/design engineers, shop drawings, etc. They are also useful in providing additional

More information

ELECTRIC SPA-PAK HEATER INSTALLATION & OPERATING INSTRUCTIONS

ELECTRIC SPA-PAK HEATER INSTALLATION & OPERATING INSTRUCTIONS ELECTRIC SPA-PAK HEATER INSTALLATION & OPERATING INSTRUCTIONS CATALOG NO.: 6100.53O Effective: 03-15-05 Replaces: 02-01-05 INTRODUCTION The SPA-PAK Spa Heaters have been designed to provide efficient,

More information

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual

UHIR Series. Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater. Owner s Manual UHIR Series Horizontal or Vertical Mounting Industrial / Commercial Electric Unit Heater Owner s Manual This manual covers installation, maintenance and repair parts. Read carefully before attempting to

More information

SuperStor Ultra Stainless Steel Storage Tank

SuperStor Ultra Stainless Steel Storage Tank SuperStor Ultra Stainless Steel Storage Tank INSTALLATION START-UP MAINTENANCE PARTS Storage Tank Models SSU-30CB / SSU-45CB SSU-60CB / SSU-80CB / SSU-119CB For Residential and Commercial Use This manual

More information

Unfired Steam Generators (Series RB) Installation, Operation and Maintenance

Unfired Steam Generators (Series RB) Installation, Operation and Maintenance Unfired Steam Generators (Series RB) Installation, Operation and Maintenance Horizontal USG Vertical USG 534-EN Please read and save these instructions Disclaimers This Installation, Operation, and Maintenance

More information

Installation and Operating Service Manual

Installation and Operating Service Manual Installation and Operating Service Manual SPRAY-TYPE DEAERATOR Bryan Steam LLC, 783 N. Chili Avenue, Peru, IN 46970, Phone 765.473.6651, Fax 765.473.3074 www.bryanboilers.com Form 2141 Revision Date 5/1/2015

More information

Commercial Electric Energy Saver Water Heater IMMERSION AND SURFACE MOUNTED THERMOSTAT MODELS

Commercial Electric Energy Saver Water Heater IMMERSION AND SURFACE MOUNTED THERMOSTAT MODELS Energy Saver Commercial Electric Energy Saver Water Heater IMMERSION AND SURFACE MOUNTED THERMOSTAT MODELS SERVICE MANUAL Troubleshooting Guide and Instructions for Service (To be performed ONLY by qualified

More information

SPA HEATER INSTALLATION, OPERATION AND MAINTENANCE

SPA HEATER INSTALLATION, OPERATION AND MAINTENANCE SPA INSTALLATION, OPERATION AND MAINTENANCE MODELS: ST SERIES 5.5 & 11kW 240V SINGLE PHASE BEFORE YOU BEGIN CHECK ALL ELECTRICAL CONNECTIONS TO ALL COMPONENTS WITHIN THE FOR TIGHTNESS. CONNECTIONS CAN

More information

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS **WARNING TO INSTALLER, SERVICE PERSONNEL AND OWNER** Altering the product or replacing parts with non authorized factory parts voids all warranty

More information

INSTALLATION & MAINTENANCE MANUAL PVI DURAWATT ELECTRIC WATER HEATERS

INSTALLATION & MAINTENANCE MANUAL PVI DURAWATT ELECTRIC WATER HEATERS INSTALLATION & MAINTENANCE MANUAL PVI DURAWATT ELECTRIC WATER HEATERS Installation and service must be performed by a qualified service installer, service agency or qualified electrical contractor. IMPORTANT:

More information

INSTALLATION, OPERATION AND MAINTENANCE

INSTALLATION, OPERATION AND MAINTENANCE POOL HEATER INSTALLATION, OPERATION AND MAINTENANCE MODELS: PHS-CN SERIES, 5, 8, 4, 0, 6, 45, 54 & 57kW 08V, 40V, 480, 600V SINGLE & THREE PHASE BEFORE YOU BEGIN CHECK ALL ELECTRICAL CONNECTIONS TO ALL

More information

Installation, Operation and Maintenance

Installation, Operation and Maintenance Bulletin No. 534 Installation, Operation and Maintenance Unfired Steam Generators (Series RB) Horizontal USG Vertical USG Disclaimers This Installation, Operation, and Maintenance Manual is intended to

More information

WATLOW ELECTRIC MFG CO. WATROD Duct Heater (module only) I& M Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.00

WATLOW ELECTRIC MFG CO. WATROD Duct Heater (module only) I& M Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.00 I&M NUMBER: 316-42-16-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to

More information

Installation and Maintenance "L" and "LS" Series

Installation and Maintenance L and LS Series Installation and Maintenance "L" and "LS" Series IB-43-E This bulletin should be used by experienced personnel as a guide to the installation and maintenance of "L" and "LS" Series ultra capacity float

More information

WIRING MODEL 20 Low Water Cut-Off and Pump Control MAXIMUM PRESSURE: 20 PSI INTERNAL WIRING BLUE WHITE UPPER PROBE (FEED OFF) FEED PROBE (FEED ON) ALL

WIRING MODEL 20 Low Water Cut-Off and Pump Control MAXIMUM PRESSURE: 20 PSI INTERNAL WIRING BLUE WHITE UPPER PROBE (FEED OFF) FEED PROBE (FEED ON) ALL No moving parts to stick, wear or hang-up. 20 Series Pump Control Low Water Cut-Off Combination 120 VAC Operating Voltage Max. Pressure 20 psi LISTED No replacement or rebuilding of floats or mechanical

More information

User s Information Manual Models: 45, ,000 Btu/hr

User s Information Manual Models: 45, ,000 Btu/hr SBR-USER_100161678_2000017137_Rev C User s Information Manual Models: 45,000-260,000 Btu/hr If the information in this manual is not followed exactly, a fire or explosion may result causing property damage,

More information

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME: Supersedes: 201.28-CL2 (817) Form 201.28-CL2 (1017) MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: PHONE: JOB NAME: CUSTOMER ORDER NO: JCI CONTRACT NO: CHILLER MODEL

More information

Industrial Flanged Immersion Heaters

Industrial Flanged Immersion Heaters Industrial Flanged Immersion Heaters Installation, Operation, and Maintenance Instructions 1.0 Handling 1.1 Unpack and handle with care to avoid damage to heater and components. Elements may come in contact

More information

Ace Heaters LLC INSTALLATION and MAINTENANCE INSTRUCTIONS for ACE STORAGE TANKS INSTALLATION AND HOOKUP

Ace Heaters LLC INSTALLATION and MAINTENANCE INSTRUCTIONS for ACE STORAGE TANKS INSTALLATION AND HOOKUP Ace Heaters LLC INSTALLATION and MAINTENANCE INSTRUCTIONS for ACE STORAGE TANKS A. INSTALLATION AND HOOKUP 1 Inspect tank and lining for shipping damage. 2 Place tank in desired location and carefully

More information

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners 1 1. General Installation Information (to be completed by technician) Date installed: Location (city & state): Cleaner s name: National Board number (boiler): Installed by (company): Installed by (technician):

More information

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL VS SERIES NH3 STEAM VAPORIZERS Revised March 1997 OPERATION MANUAL CONTENTS PAGE 1. GENERAL................................... 1 Figure 1-1 - VS Series Vaporizer......................... B How to Select

More information

POOL HEATER INSTALLATION, OPERATION AND MAINTENANCE

POOL HEATER INSTALLATION, OPERATION AND MAINTENANCE POOL HEATER INSTALLATION, OPERATION AND MAINTENANCE MODELS: TR SERIES, 5 & 8kW 08V, 40V, 480V, 600V BEFORE YOU BEGIN CHECK ALL ELECTRICAL CONNECTIONS TO ALL COMPONENTS WITHIN THE HEATER FOR TIGHTNESS.

More information

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw SEMI-INSTANTANEOUS ENERGY: STEAM TO WATER U-TUBE SINGLE-WALL & DOUBLE-WALL HEAT EXCHANGERS FLOOR DRAIN Typical Construction Figure 34-1 FLOOR DRAIN 1. U-tube

More information

INSTALLATION & MAINTENANCE MANUAL EZ PLATE INSTANTANEOUS WATER HEATER

INSTALLATION & MAINTENANCE MANUAL EZ PLATE INSTANTANEOUS WATER HEATER INSTALLATION & MAINTENANCE MANUAL EZ PLATE INSTANTANEOUS WATER HEATER Installation and service must be performed by a qualified service installer, service agency or qualified plumbing contractor. IMPORTANT:

More information

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS VIHS OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS Technical Control Systems Limited MODELS "VIHS" Technical Control Systems Ltd Treefield Industrial Estate Gildersome, Leeds

More information

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO: Supersedes: (316) Form QTC4-CL2 (617) MODEL QTC4 EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: ADDRESS: PHONE: JOB NAME: LOCATION: CUSTOMER ORDER NO: TEL NO: ORDER NO: CONTRACT NO: CHILLER MODEL

More information

Series 300 VTB. Installation Instructions

Series 300 VTB. Installation Instructions Series 300 VTB Installation Instructions Sizes 7 12 16 20 30 HP #2 Fuel Oil Gas (500 to 2500 BTU) Gas Light Oil Combination High Pressure Steam Sizes 7 thru 16 HP (125 PSI) Sizes 20 and 30 HP (150 PSI)

More information

INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER S USE. Condensate Return Systems General Installation, Operation, & Service Instructions !

INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER S USE. Condensate Return Systems General Installation, Operation, & Service Instructions ! Condensate Return Systems General Installation, Operation, & Service Instructions INSTALLER: PLEASE LEAVE THIS MANUAL FOR THE OWNER S USE. SAFETY INSTRUCTIONS This safety alert symbol will be used in this

More information

WD7664 / WD7663 Maxon Burner Ellis Whisper Dryer Installation & Start UP

WD7664 / WD7663 Maxon Burner Ellis Whisper Dryer Installation & Start UP WD7664 / WD7663 Maxon Burner Ellis Whisper Dryer Installation & Start UP Receiving Do a quick visual inspection on the truck for any major damage prior to signing the paperwork. Damage should be noted

More information

MBA Electric Steam Generator. Installation, Operation and Maintenance Manual. Products Covered by this Manual

MBA Electric Steam Generator. Installation, Operation and Maintenance Manual. Products Covered by this Manual Installation, Operation and Maintenance Manual MBA Electric Steam Generator Model No. Generator Serial No. Power Circuit Voltage Control Circuit Voltage National Board No. Amps Phase Cy IMPORTANT: This

More information

MODELS R & RH 10 THRU 20 RB SERIES ELECTRIC STEAM BOILERS

MODELS R & RH 10 THRU 20 RB SERIES ELECTRIC STEAM BOILERS REIMERS ELECTRA STEAM, INC. 4407 MARTINSBURG PIKE CLEAR BROOK, VA 22624-0037 PHONE:540-662-3811 FAX:540-665-8101 April 01, 2001 MODELS R & RH 10 THRU 20 RB SERIES ELECTRIC STEAM BOILERS INSTALLATION, OPERATING,

More information

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual ITC 2000 HEATING CONTROL CABINET Installation & Operation Manual VTI, Incorporated 24 McMillan Way Newark, DE 19713 Phone (302) 738 0500 FAX (302) 738 6594 Revision Level 0.03 Manual No. 90003314 June,

More information

Installation, operating and servicing instructions

Installation, operating and servicing instructions English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1 ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes

More information

J120 STEAM BOOSTER INSTALLATION, OPERATION, AND SERVICE MANUAL J120 STEAM BOOSTER. J120 Steam Booster Manual D

J120 STEAM BOOSTER INSTALLATION, OPERATION, AND SERVICE MANUAL J120 STEAM BOOSTER. J120 Steam Booster Manual D INSTALLATION, OPERATION, AND SERVICE MANUAL J120 STEAM BOOSTER J120 STEAM BOOSTER J120 Steam Booster Manual REVISION HISTORY Revision Letter Revision Date Made by Applicable ECNs Details A 10-27-04 CBW

More information

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

4 route 147, C.P.33 Coaticook, Qc J1A 2S8 4 route 147, C.P.33 Coaticook, Qc J1A 2S8 TABLE OF CONTENTS INSTALLATION Nozzles p.3 Clearance for dismantling p.4 Foundations p.4 Foundation bolts p.5 Leveling p.5 Bolted joints p.5 Recommended bolt tightening

More information

T-SERIES Air Conditioner. T29 Model INSTRUCTION MANUAL nvent Rev. I P/N

T-SERIES Air Conditioner. T29 Model INSTRUCTION MANUAL nvent Rev. I P/N T-SERIES Air Conditioner T29 Model INSTRUCTION MANUAL Rev. I P/N 89104464 TABLE OF CONTENTS Warranty and Return Policy...2 IMPORTANT NOTICE...2 RECEIVING THE AIR CONDITIONER...3 HANDLING AND TESTING THE

More information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C)

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-315(C) Models 51, 51-S and 53 Boiler Water Feeders Models 51-2, 51-S-2 and 53-2 Feeder Cut-Off Combinations McDonnell & Miller Installation & Maintenance Instructions MM-315(C) OPERATION Maximum Water Supply

More information

Ace Heating Solutions, LLC INSTALLATION and MAINTENANCE INSTRUCTIONS for ACE STORAGE TANKS INSTALLATION AND HOOKUP

Ace Heating Solutions, LLC INSTALLATION and MAINTENANCE INSTRUCTIONS for ACE STORAGE TANKS INSTALLATION AND HOOKUP Ace Heating Solutions, LLC INSTALLATION MAINTENANCE INSTRUCTIONS for ACE STORAGE TANKS A. INSTALLATION AND HOOKUP 1 Inspect tank lining for shipping damage. 2 Place tank in desired location carefully level

More information

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS SECTION 22 34 00 (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS System shall provide a complete hot water return throughout the entire system with balancing (flow control) valves not less than 10 feet from

More information

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS:

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS: INSTALLATION AND OPERATION MANUAL GAS BOILERS MODELS: CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) southbend A MIDDLEBY COMPANY 1100 Old Honeycutt Road Fuquay-Varina, NC 27526 (919) 552-9161

More information

UNDERCOUNTER LABORATORY REFRIGERATORS and FREEZERS Installation, Operation and Maintenance Instructions

UNDERCOUNTER LABORATORY REFRIGERATORS and FREEZERS Installation, Operation and Maintenance Instructions UNDERCOUNTER LABORATORY REFRIGERATORS and FREEZERS Installation, Operation and Maintenance Instructions INSPECTION When the equipment is received, all items should be carefully checked against the bill

More information

ELECTRIC WATER HEATER INSTALLATION & OPERATING INSTRUCTION MANUAL

ELECTRIC WATER HEATER INSTALLATION & OPERATING INSTRUCTION MANUAL ELECTRIC WATER HEATER INSTALLATION & OPERATING INSTRUCTION MANUAL THE MANUFACTURER OF THIS HEATER WILL NOT BE LIABLE FOR ANY DAMAGE RESULTING FROM FAILURE TO COMPLY WITH THESE INSTRUCTIONS. READ THESE

More information

Instruction Manual - Anti-Siphon Ejector Chlorine & Sulfur Dioxide 500 PPD (10 kg/h) Maximum Capacity

Instruction Manual - Anti-Siphon Ejector Chlorine & Sulfur Dioxide 500 PPD (10 kg/h) Maximum Capacity - Anti-Siphon Ejector Chlorine & Sulfur Dioxide 500 PPD (10 kg/h) Maximum Capacity 100 PPD (2 kg/h) Chlorine or Sulfur Dioxide 250 & 500 PPD (5 & 10 kg/h) Chlorine or Sulfur Dioxide Anti-Siphon Ejector

More information

Condensing Unit Installation and Operating Instructions

Condensing Unit Installation and Operating Instructions Bulletin ACU_O&I 02 August 2016 Condensing Unit Installation and Operating Instructions ACU Air Cooled Condensers Table of Contents Section 1. General Information... 2 Section 2. Refrigeration Piping...

More information

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier OM004 Installation, Operation and Maintenance Instructions for Electric Storage Calorifier The operating and maintenance instructions contained within this package are for standard electric storage calorifiers

More information

238 Series. Industrial/Commercial Electric Unit Heater. Owner s Manual

238 Series. Industrial/Commercial Electric Unit Heater. Owner s Manual 238 Series Industrial/Commercial Electric Unit Heater Owner s Manual This manual covers installation, operation and maintenance. Read carefully before attempting to install, operate or service the 238

More information

Quartzone. Infrared Quartz Tube & Metal Sheathed Electric Heaters. Owner s Manual. File E COMFORT HEATERS for INDOOR* and OUTDOOR** USE

Quartzone. Infrared Quartz Tube & Metal Sheathed Electric Heaters. Owner s Manual. File E COMFORT HEATERS for INDOOR* and OUTDOOR** USE Quartzone Infrared Quartz Tube & Metal Sheathed Electric Heaters Owner s Manual File E97759 COMFORT S for INDOOR* and OUTDOOR** USE *Excluding Residences ** With Quartz Elements and when mounted Underneath

More information

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer 5/16 Rev. A 57-02509 2 Contents INTRODUCTION... 4 WARNING LABELS AND SAFETY INSTRUCTIONS... 5 PS SERIES PARALLEL

More information

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY Bousquet Technologies Inc. 2121, Nobel, Ste Julie, Quebec, Canada, J3E1Z9 SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL Oil-Fired air heater for industrial and commercial use. FOR YOUR SAFETY Do not

More information

L A signature series TA T N E RE O, A L L A T S IN

L A signature series TA T N E RE O, A L L A T S IN signature series COMMERCIAL STEAM GENERATORS INSTALLATION, OPERATION AND MAINTENANCE MANUAL INSTALLATION MANUAL COMMERCIAL STEAM GENERATOR SIGNATURE SERIES (SS) INTRODUCTION Steam Sauna manufactures steam

More information

LHE OIL LINE HEATER ELECTRIC TYPE

LHE OIL LINE HEATER ELECTRIC TYPE INSTRUCTIONS LHE OIL LINE HEATER ELECTRIC TYPE WARNING These instructions are intended for use only by experienced, qualified combustion start-up personnel. Adjustment of this equipment and its components

More information

Rev. E 2013 Pentair Technical Products P/N Distributed by: McLean Parts

Rev. E 2013 Pentair Technical Products P/N Distributed by: McLean Parts PROAIR Water-Cooled Air Conditioner CR43WC Model INSTRUCTION MANUAL Rev. E 2013 Pentair Technical Products P/N 10-1008-167 TABLE OF CONTENTS HANDLING & TESTING THE AIR CONDITIONER...3 INSTALLATION INSTRUCTIONS...4

More information

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,

More information

SECTION DOMESTIC WATER HEATERS

SECTION DOMESTIC WATER HEATERS SECTION 223500 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

Hot Water Dispensers HWD2, HWD3, HWD5. Table of Contents

Hot Water Dispensers HWD2, HWD3, HWD5. Table of Contents Hot Water Dispensers HWD2, HWD3, HWD5 Operator Manual Activate your warranty now at http://gmcw.com/warranty-registration Model HWD2 Safety Information...2 Rough-In Drawing...3 Specifications...4 Installation...4

More information

USERS INFORMATION MANUAL FOR GAS FIRED BOILERS

USERS INFORMATION MANUAL FOR GAS FIRED BOILERS USERS INFORMATION MANUAL FOR GAS FIRED BOILERS CATALOG NO.: 2000.52G Effective: 06-01-00 Replaces: 07-01-94 WARNING: If the information in this manual is not followed exactly, a fire or explosion may result

More information

Water Boilers ME10EN, ME15EN. Table of Contents

Water Boilers ME10EN, ME15EN. Table of Contents Water Boilers ME10EN, ME15EN Operator Manual Model ME15EN Model ME10EN Safety Information...2 Rough-In Drawing...3 Installation...4 Priming...5 Cleaning...5 Table of Contents Adjustments...6 Maintenance...7

More information

Instructions Manual. RHP120 RHP300 High Pressure Steam Boiler Models MODEL: Electra Steam, Inc. SERIAL #:

Instructions Manual. RHP120 RHP300 High Pressure Steam Boiler Models MODEL: Electra Steam, Inc. SERIAL #: 4407 Martinsburg Pike Clear Brook, VA 22624 USA Electra Steam, Inc. Phone: 540-662-3811 Fax: 540-665-8101 email: Sales@reimersinc.com web: www.reimersinc.com MODEL: SERIAL #: RHP120 RHP300 High Pressure

More information

Silhouette. Feedwater Heater. Boiler Feedwater

Silhouette. Feedwater Heater. Boiler Feedwater Roth Roth Low Low Silhouette Silhouette TRAY DEAERATORS Boiler Boiler Feedwater Feedwater Heater Heater Capacities Capacities to to 50,000 50,000 lb/hr lb/hr Model RDTV-150-5-1-2 vertical tray type deaerator

More information

Construction Electrical

Construction Electrical INDEECO offers a broad range of electrical components for temperature, safety, and power control. For most applications, the Control Option system, described in the previous section, makes it easy to specify

More information