1 DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 5, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director Robert Garcia, Senior Planner DRC No City Parkway West Apartments (Orange Collection) SUMMARY The applicant proposes to construct 213 multiple family residential apartment units with an internal parking structure and a commercial office parking structure to replace existing surface parking. RECOMMENDED ACTION-RECOMMENDATION TO PC Staff recommends that the Design Review Committee (DRC) review and consider the project and the Mitigated Negative Declaration (MND) and recommend approval of the project to the Planning Commission (PC), subject to conditions of approval contained in the staff report and any conditions that the DRC determines appropriate to support the required findings. BACKGROUND INFORMATION Applicant/Owner: Property Location: General Plan Designation: Zoning Classification: Existing Development: Property Size: Associated Applications: Greenlaw Partners, LLC 500 & 600 City Parkway Urban Mixed Use du/ac FAR (UMIX) Urban Mixed Use (UMU) Existing 10-Story Office Building and 4-Story Office Building 8.94 Acres Tentative Parcel Map (TPM ), Conditional Use Permit No , Major Site Plan Review No , Administrative Adjustment No , and Addendum No Previous Project Review: March 2, 2016, April 20, 2016, and September 7, 2016 PUBLIC NOTICE No Public Notice was required for this project.

2 ENVIRONMENTAL REVIEW Design Review Committee Staff Report Page 2 of 10 The proposed project is subject to environmental review per the provisions of the California Environmental Quality Act (CEQA). Mitigated Negative Declaration (ENV No ) has been prepared for this project and is provided for the DRC s review and consideration. The role of the DRC is to provide a recommendation to the PC on this project and the DRC s comments may include any of the environmental impacts associated with the proposal. Comments provided by the DRC will be included in the PC staff report. The Notice of Intent (NOI) to adopt this environmental document was mailed to residents, property owners, and tenants within 300 of the subject property. Additionally it was advertised in the Orange City News on March 29, 2017 and posted at the site on March 29, The public review period began on March 29, 2017 and will end on April 17, Written comments must be received in the offices of the City of Orange Planning Division by 5:30 pm on April 17, PROJECT DESCRIP TION The applicant is proposing to replace existing surface parking spaces associated with an office development consisting of a 10-story office building and a 4-story office building with a new 4- level parking structure consisting of 590 parking spaces for the office uses. Then the applicant would construct a 5-story 213 unit apartment building with an internal 7-level parking structure for the residential units. Architecture The work of architect, Richard Neutra, inspired the architectural of the apartment building. Richard Neutra work can be found on the Christ Cathedral campus located to the west of the site across Lewis Street in the City of Garden Grove. The proposed architectural style of the apartment complex would be Contemporary, and design elements such as roof style, window fenestration, and wall material would be consistent with this architectural style. The design elements would include stucco walls, stone veneer, fiber-cement panels and sidings, metal railings, panels, columns, and awnings, vinyl windows, aluminum storefront, and entry stoop. Building pop-outs and offsets, variations in building heights and materials, and balconies would be added to offset the building s massing, provide human scale, and provide relief to and variation in the building form and style. The proposed architectural style of the parking structure would be Contemporary with an enhanced exterior treatment, including metal mesh screens, concrete, and vehicular entry signage. Metal mesh screens and landscaped green walls would be added to offset the structure s massing, provide human scale, and provide relief to and variation in the structures form and style. The green screens and street facing elevations of the structure are interesting yet understated in response to the established development surrounding the site. The parking structure would be designed to be open so that natural light can enter and to enhance visibility for security purposes.

3 Page 3 of 10 Landscaping A comprehensive landscape plan for the proposed apartment complex would include a variety of new trees, shrubs, and groundcover along the building perimeter, in the courtyards and common areas, and along the Lewis Street frontage. Proposed tree types would include but not be limited to carrot wood, crepe myrtle, southern live oak, and Brisbane box trees. Ground-level landscape planters would be placed in various locations along the building frontages. All setbacks and other common areas not occupied by buildings or hardscape improvements such as drive aisles, and pedestrian walkways would be landscaped. Vehicular entry/exit for the parking garage of the apartments, and the proposed fire lane, would include decorative pavers and an enhanced landscape scheme. Project development requires the removal of a number of trees and other landscape improvements associated with the existing parking lots where the proposed apartment complex and standalone parking structure would be developed. Although development of the overall project would include removal of most of the existing trees within the Project Site (approximately 138 trees), it would provide a greater number of trees (approximately 203 new trees) than currently exist. A comprehensive landscape plan would be provided for the proposed parking structure that includes a variety of new trees, shrubs, and groundcover along the parking structure perimeter. Proposed tree types would include but not be limited to carrot wood, crepe myrtle, southern live oak, and Brisbane box trees. Additionally, landscaped green walls would be provided along certain elevations of the parking structure. The proposed landscape elements for the parking structure would help to visually soften the parking structure when viewed from public areas. Lighting Lighting for the apartment complex would consist of building-mounted light fixtures; lighting for pedestrian walkways; ground-mounted decorative lighting for landscape, architectural features, and signage; interior lighting for the apartment complex and parking garage; lighting for the courtyards, including for the swimming pool area; and security lighting. Lighting for the parking structure would consist of building-mounted light fixtures; lighting for pedestrian walkways surrounding the structure; ground-mounted decorative lighting for landscape and architectural features; and interior parking area lighting. Amenities The proposed apartment complex would have access to a number of amenities, recreation, areas, and services, including a leasing area with offices, employee workroom, and breakroom; a fitness center with restrooms; a media room; a centralized mailroom; a clubhouse for resident entertainment and gatherings; three courtyards; and an area for game courts. Each apartment unit would include either a patio ground-level units only or balcony that would range from approximately 43 to 97 square feet. All units would also include a washer and dryer room. Three courtyards would be provided for use of the project residents. The enclosed courtyard on the north would feature a fire pit with lounge seating and landscaping. The semi-enclosed courtyard on the west would include communal dining tables and outdoor kitchen area, daybeds

4 Page 4 of 10 on permeable synthetic turf, and landscaping. The semi-enclosed pool recreation courtyard on the south would feature a lap pool and spa, custom cabanas with chase lounges, daybeds on permeable synthetic turf, dining tables and barbecue counter, fire pit with lounge seating, outdoor game lawn, and landscaping. The apartment complex also includes a game court area at the terminus of the proposed fire lane, along the northern end of the project site. Furthermore, a multiuse plaza would front on the clubhouse/leasing area and would feature a tree allée, enhanced paving, and decomposed granite. Access and Circulation Vehicular access for the proposed apartment complex would be provided via an existing fullaccess driveway and a new full-access driveway off Lewis Street. A new northern full-access driveway would provide direct access into the resident parking garage and would feature decorative pavers. The southern driveway, which currently exists and would undergo minor modifications under the proposed project would connect to an internal drive aisle that would lead to a small asphalt parking area, a vehicular entry/exit to the stand-alone parking structure, and a proposed fire lane; decorative pavers would be provided along portions of the drive aisle. Once inside the residential parking garage, vehicles would circulate via internal drive aisles and vehicle ramps, wayfinding signs would be provided within the parking garage. The parking garage would be restricted to residents, guests, and employees of the apartment complex, with gated access entries. Vehicular access to the stand-alone parking structure would be provided via an entry/exit on the west, east, and south sides of the parking structure; access to the parking structure entry/exits would be provided from Lewis Street, City Boulevard West, and City Parkway West. Once inside the parking structure, vehicles would circulate via internal drive aisles and vehicle ramps, wayfinding signs would be provided within the parking garage. Access to the existing office buildings would be provided via the existing full access driveway off Lewis Street, as well as the existing access driveways off City Parkway West and City Boulevard West. Additionally, an east-west drive aisle would be flanked between the proposed stand-alone parking structure and the office buildings onsite. The drive aisle would provide direct access across the Project Site from Lewis Street to City Boulevard West. Decorative paving would be provided along a portion of the drive aisle to pronounce pedestrian crossing areas to oncoming motorists. Pedestrian access for residents, guests, and employees of the apartment complex would be provided via sidewalks that surround the building and tie into the existing sidewalks to the west and south. Along the south side of the apartment complex, pedestrian access would be through streets that are friendly to cars, bicycles, and pedestrians. A pedestrian corridor featuring a pergola, decorative paving and shade trees would be provided along a portion of the southern end of the apartment complex and northern end of the stand-alone parking structure; the corridor would provide a direct connection to The Outlets at Orange for future apartment residents. The proposed fire lane would also function as a pedestrian feature and would include decorative paving. Access to the individual apartment units would be provided via internal pedestrian corridors/walkways on each level of the apartment complex, as well as elevators and stairwells. As with the apartment complex parking structure, pedestrian access to the upper levels of the stand-alone parking structure would be provided via elevators and stairwells.

5 Page 5 of 10 Environmental Review The analysis contained in the MND determined that implementation of the project may result in significant environmental effects without mitigation. CEQA Guidelines requires that mitigation measures be identified for such impacts in an effort to reduce such impacts to a less than significant level and that mitigation be fully enforceable through permit conditions, agreements, or other legally binding instruments. The MND includes six mitigation measures, which will be folded into Conditions of Approval. Incorporation of the mitigation measures into the project results in a reduction of significant impact to a less than significant level. Staff requests that the DRC specifically review Aesthetics Section 3.1, and Cultural and Paleontological Resources Section 3.5 in the MND to determine if there are any impacts that may result from the implementation of the proposed project. EXISTING SITE The 8.94-acre site is currently developed with an existing 10-story office building consisting of 200,000 square feet and an existing 4-story office building consisting of 70,000 square foot with surface parking. EXISTING AREA CONTEXT The project site is located on the east side of Lewis Street, within the Uptown Orange area, which is zoned Urban Mixed Use (UMU). The properties to the west are residential single family and located in the City of Garden Grove. The properties to the north, east, and south are zoned UMU consisting of a mix of professional office uses, retail/restaurant uses, apartments, and the Christ Cathedral. EVALUATION CRITERIA Orange Municipal Code (OMC) Section establishes the general criteria the DRC should use when reviewing the project. This section states the following: The project shall have an internally consistent, integrated design theme, which is reflected in the following elements: 1. Architectural Features. a. The architectural features shall reflect a similar design style or period. b. Creative building elements and identifying features should be used to create a high quality project with visual interest and an architectural style. 2. Landscape. a. The type, size, and location of landscape materials shall support the project s overall design concept. b. Landscaping shall not obstruct visibility of required addressing, nor shall it obstruct the vision of motorists or pedestrians in proximity to the site. c. Landscape areas shall be provided in and around parking lots to break up the appearance of large expanses of hardscape.

6 Page 6 of Secondary Functional and Accessory Features. Trash receptacles, storage, and loading areas, transformers, and mechanical equipment shall be screened in a manner, which is architecturally compatible with the principal building(s). ANALYSIS/STATEMENT OF ISSUES The DRC reviewed the proposal for the apartment building and office parking structure at their March 2, 2016 and April 20, 2016 Committee meetings. At the September 7, 2016 meeting, the applicant requested Committee comments on the office parking structure only. Apartment Building Comments from March 2, 2016 Wanted to see the colors picked up from the Outlets at Orange instead of the current color palette. Liked the 4 and 5 story variation, which made the roofline more interesting. Liked how the design responded to the residents across the street but still concerned about the single story homes directly across the street. Wanted the applicant to explore the possibility of using color to pop on the corners, but wanted the colors to contrast more than pop. Noted the strong articulation of the canopies, balconies, and railings. Wanted an edge brought to it by taking one point and making it very strong. Suggested making it, a simple building but create shadow patterns. Suggested spots of colors on the awnings or trim. Wanted the elevation along Lewis Street to be more subdued and because of the residents across the street. Wanted the courtyard celebrated more. Apartment Building Comments from April 20, 2016 Noted the design was a big improvement by simplifying the colors, lightening up the recessed area, and emphasizing the base, middle, and top. Encouraged not making it diagonal where the balconies came together in the corners. Liked the lower portion of the elevation in the rendering. Suggested using one color stone and laying them horizontally. Liked the change in texture and materials. Noted the visual impact of the trees placed on the edge of the project and wanted a unified statement. Liked the plaza and the open space. Complimented the treatment of the paving on the fire lane. Office Parking Structure Comments from March 2, 2016 Parking structure was more interesting than the apartment building.

7 Page 7 of 10 Thought the design of the structure was too forced and suggested something more free form. Liked the treatment of the green screen and the fin treatment on the south side, it was a nice balance between the different elements. The up and down was a good first try but the design needed to be developed further. Wanted to make sure that the soil area at the base was big enough to sustain the landscape element indicated on the plans. Wanted something done on the roof. Office Parking Structure Comments from April 20, 2016 Noted the random live green wall heights and questioned if the randomness of the width had been considered. Liked the corners with the stair elements and the entries. Office Parking Structure Comments from September 7, 2016 Suggested having something that signaled entry like a canopy. Corner of the Lewis Street elevation may not reflect the two trees that were there. Suggested addressing a ground plane on the south elevation at the entry. Verified there would be rolled curbs on the plaza. Discussed the Heritage tree in the plaza. Suggested using three different vines on the three parking structures. The applicant has made multiple revisions to the proposed architectural style of the apartment complex and office parking structure in an effort to address the concerns and previous discussions with the Committee during the preliminary review stages. REQUIRED FINDINGS The courts define a Finding as a conclusion, which describes the method of analysis decision makers utilize to make the final decision. A decision making body makes a Finding, or draws a conclusion, through identifying evidence in the record (i.e., testimony, reports, environmental documents, etc.) and should not contain unsupported statements. The statements, which support the Findings, bridge the gap between the raw data and the ultimate decision, thereby showing the rational decision making process that took place. The Findings are, in essence, the ultimate conclusions which must be reached in order to approve (or recommend approval of) a project. The same holds true if denying a project; the decision making body must detail why it cannot make the Findings. The Findings are applied as appropriate to each project. Below are the four findings that, as applicable, are used to determine whether a project meets the intent of the code related to design review and historic preservation guidelines:

8 Page 8 of In the Old Towne Historic District, the proposed work conforms to the prescriptive standards and design criteria referenced and/or recommended by the DRC or other reviewing body for the project (OMC G.1). The project is not located in the Old Towne Historic District; therefore, this Finding does not apply to the application at hand. 2. In any National Register Historic District, the proposed work complies with the Secretary of the Interior s standards and guidelines (OMC G.2). The project is not located in the Old Towne Historic District; therefore, this Finding does not apply to the application at hand. 3. The project design upholds community aesthetics through the use of an internally consistent, integrated design theme and is consistent with all adopted specific plans, applicable design standards, and their required findings (OMC G.3). The built environment is characterized by a variety of architectural styles, ages of buildings, types of development, and sizes. The project would be designed in a modern architectural style for both the wrap around apartment complex and the office parking structure that would incorporate architectural features that complement the surrounding styles, while creating a balance design internally. The landscaping introduces pedestrian oriented elements that enhance the streetscape and establish linkage between the project and surrounding office and retail uses. These elements contribute to the City s long-term goal of a vibrant mixed-use district. There is no specific plan for the site. 4. For infill residential development, as specified in the City of Orange Infill Residential Design Guidelines, the new structure(s) or addition are compatible with the scale, massing, orientation, and articulation of the surrounding development and will preserve or enhance existing neighborhood character (OMC G.4). The proposal is a large-scale multi-family residential development that falls outside of the applicability of the City s Infill Residential Design Guidelines; therefore, this Finding does not apply. ADVISORY BOARD RECOMMENDATION City staff completed its review of the submitted plans on March 1, 2017, and has recommended approval of the applications requested subject to standard conditions. CONDITIONS Staff is recommending that the DRC recommend approval of the project design and the environmental determination to the PC subject to standard conditions of approval, and additional conditions as deemed appropriate by the Committee to support the required findings and ensure the preservation of community aesthetics. 1. The project shall conform in substance and be maintained in general conformance with plans and exhibits date labeled including any modifications required by conditions of approval, and as recommended for approval by the Design Review Committee. Any future expansion in area or in the nature and operation of the use approved by Tentative Parcel Map (TPM ), Conditional Use Permit No.

9 Page 9 of , Major Site Plan Review No , Design Review Committee No , Administrative Adjustment No , and Addendum No , shall require an application for a new or amended Site Plan Review. 2. Except as otherwise provided herein, this project is approved as a precise plan. After any application has been approved, if changes are proposed regarding the location or alteration of any use or structure, a changed plan may be submitted to the Community Development Director for approval. If the Community Development Director determines that the proposed change complies with the provisions and the spirit and intent of the approval action, and that the action would have been the same for the changed plan as for the approved plan, the Community Development Director may approve the changed plan without requiring a new public hearing. 3. Subsequent modifications to the approved architecture and color scheme shall be submitted for review and approval to the Community Development Director or designee. Should the modifications be considered substantial, the modifications shall be reviewed and approved by the Design Review Committee. 4. Any modifications to the plans including, but not limited to, the landscaping and parking as a result of other Department requirements such as Building Codes, Water Quality, Fire, or Police shall be submitted for review and approval to the Community Development Director or designee. Should the modifications be considered substantial, the modifications shall be reviewed and approved by the appropriate determining body. 5. Prior to Certificate of Occupancy, all landscaping located within public areas shall include the installation of root barriers acceptable to the Public Works Department on the sidewalk side of the tree, or where conditions warrant, the installation of a Deep Root box as directed by the Public Works Director. 6. Prior to building permit issuance, the applicant shall demonstrate to the satisfaction of the Community Development Director that new mechanical equipment screening shall be installed that architecturally matches the building. 7. Prior to building permit issuance, City required irrigation and landscape inspection notes shall be placed on the final landscape plan, to the satisfaction of the Community Services Director. 8. The project is considered a Priority project and will need to prepare and submit a Final Water Quality Management Plan (WQMP) with treatment BMPs and site design features such as more permeable pavements, landscaping infiltration, directing roof runoff into planters and other BMPs that will serve as buffers for runoff from the site. The WQMP shall be approved prior to issuance of building permits. 9. Prior to building permit issuance, construction plans shall show that all structures shall comply with the requirements of Municipal Code (Chapter Building Security Standards), which relates to the use of specific hardware, doors, windows, lighting, etc. (Ord. No. 7-79). Architect drawings shall include sections of the Ordinance that apply under Security Notes. An Approved Products List 1/08 of hardware, windows, etc. is available upon request. 10. Prior to building permit issuance, security and design measures that employ Defensible Space concepts shall be utilized in development and construction plans. These measures

10 Page 10 of 10 incorporate the concepts of Crime Prevention through Environmental Design (CPTED), which involves consideration such as placement and orientation of structures, access, and visibility of common areas, placement of doors, windows, addressing, and landscaping. 11. Prior to building permit issuance, the final landscape plan shall be reviewed and approved by the Orange Fire Department. 12. Prior to building permit issuance, final landscaping plans for the project shall be designed to comply with the City s Water Efficient Landscape Guidelines as described in Section IX et al of the City of Orange Landscape Standards and Specifications. 13. Prior to issuance of Certificate of Occupancy, the applicant shall schedule a light reading inspection with the Crime Prevention Bureau. The lighting shall be tested and confirmed to determine if the lighting meets or exceeds the exterior boundary standards. The applicant shall use shielding so as to ensure that the light standards meet the requirements of OMC Section for the areas beyond the property s exterior boundaries; light spillage or pollution to surrounding residential areas shall not exceed a maintained minimum of 0.5 foot-candle. 14. The applicant agrees to indemnify, hold harmless, and defend the City, its officers, agents and employees from any and all liability or claims that may be brought against the City arising out of its approval of this permits, save and except that caused by the City s active negligence. The City shall promptly notify the applicant of any such claim, action, or proceedings and shall cooperate fully in the defense. 15. The applicant shall comply with all federal, state, and local laws, including all City regulations. Violation of any of those laws in connection with the use will be cause for revocation of this permit. 16. Building permits shall be obtained for all construction work, as required by the City of Orange, Community Development Department s Building Division. Failure to obtain the required building permits may be cause for revocation of this entitlement. ATTACHMENTS 1. Vicinity Map 2. Design Review Committee Minutes from the March 2, 2016, April 20, 2016, and September 7, 2016 Meetings 3. Proposed Plans cc: Donald Lamm Tarek Shaer Diamond Star Associates, Inc. Urbanestgroup 4100 MacArthur Boulevard, Suite N. Sepulveda Boulevard, #231 Newport Beach, CA Manhattan Beach, CA 90267

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 5, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: DECEMBER 16, 2015 TO: THRU: FROM: SUBJECT: Chair McCormick and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Kelly Christensen

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 3, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: AUGUST 2, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: OCTOBER 17, 2012 TO: Chair Woollett and Members of the Design Review Committee THRU: FROM: SUBJECT: Leslie Aranda Roseberry, Planning Manager Daniel Ryan,

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 1, 2015 TO: THRU: FROM: SUBJECT: Chair McCormack and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Jeff Borchardt,

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: NOVEMBER 5, 2014 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Leslie Roseberry, Planning Manager Lucy Yeager, Contract

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: MAY 17, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Director of Community Development

More information

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Planner Kristine Gay Applicant/Owner Ocean Rental Properties, LLC Public Hearing April 13, 2016 City Council Election District Beach Agenda Item 1 Request Alternative Compliance to the prescribed criteria of the Oceanfront

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: APRIL 19, 2017 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Anna Pehoushek, Assistant Community Development Director

More information

WINDSOR GLEN DESIGN GUIDELINES

WINDSOR GLEN DESIGN GUIDELINES WINDSOR GLEN DESIGN GUIDELINES Adopted by Council, 2006 WINDSOR GLEN REDEVELOPMENT DESIGN GUIDELINES August 2006 1.0 Master Plan Organization For this area of the Coquitlam Town Centre, a mix of high,

More information

Community Mixed Use Zone Districts (CMU)

Community Mixed Use Zone Districts (CMU) 18.28.500 Community Mixed Use Zone Districts (CMU) The Community Mixed Use Zone Districts (CMU) are intended to help implement the land use goals and strategies found in the Golden Vision 2030 values,

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: FEBRUARY 19, 2014 TO: THRU: FROM: SUBJECT: Chair Imboden and Members of the Design Review Committee Leslie Roseberry, Planning Manager Lucy Yeager, Contract

More information

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for all guidelines applicable

More information

D1 September 11, 2013 Public Hearing APPLICANT:

D1 September 11, 2013 Public Hearing APPLICANT: D1 September 11, 2013 Public Hearing APPLICANT: BEACH MUNICIPAL FEDERAL CREDIT UNION PROPERTY OWNER: SISTERS II, LLC STAFF PLANNER: Karen Prochilo REQUEST: Conditional Change of Zoning (AG-2 Agriculture

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report Architectural Review Board Meeting: February 3, 2014 Agenda Item: 7.9 To: From: Subject: Architectural Review Board Steve Traeger, Principal Urban Designer Scott Albright,

More information

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity. 6-22 Community Design Street Walls and Street-front Setbacks The siting of buildings will play a critical role in establishing the character and sense of place for the District. Siting buildings at the

More information

Resolution : Exhibit A. Downtown District Design Guidelines March 2003

Resolution : Exhibit A. Downtown District Design Guidelines March 2003 Resolution 03-011: Exhibit A Downtown District Design Guidelines March 2003 DOWNTOWN DISTRICT DESIGN GUIDELINES CITY OF SOUTHLAKE, TEXAS Adopted March 2003 1 DOWNTOWN DISTRICT DESIGN GUIDELINES Adopted

More information

Design Guidelines for Multi-Family Residential Development

Design Guidelines for Multi-Family Residential Development Design Guidelines for Multi-Family Residential Development Development Services 972-466-3225 cityofcarrollton.com September 2012 Table of Contents Purpose... 1 Design Objectives... 2 Building Design Guidelines...

More information

Prepared by: Casey Kempenaar, Senior Planner

Prepared by: Casey Kempenaar, Senior Planner CITY OF CITRUS HEIGHTS PLANNING DIVISION STAFF REPORT PLANNING COMMISSION MEETING September 13, 2017 Prepared by: Casey Kempenaar, Senior Planner REQUEST The applicant requests a Design Review Permit Modification

More information

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC)

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC) PC RESOLUTION NO. 16-07-26- ARCHITECTURAL CONTROL (AC) 15-035 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO, CALIFORNIA APPROVING ARCHITECTURAL CONTROL (AC) 15-035, INN AT

More information

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued.

MIDTOWN MIXED-USE VILLAGE. TECHNICAL DATA SHEET COMPONENT C-1 FOR PUBLIC HEARING - PETITION NUMBER Project No RZ1.1. Issued. N MIDTOWN MIXED-USE VILLAGE TECHNICAL DATA SHEET COMPONENT C- FOR PUBLIC HEARING - PETITION NUMBER 04-00 Project No. 496 Issued Revised SCALE: " = 0' N 0 0 0 40 RZ. c GENERAL PROVISIONS: a. SITE LOCATION.

More information

Planning Commission Staff Report June 5, 2008

Planning Commission Staff Report June 5, 2008 Owner/Applicant Taylor Village Sacramento Investments Partners, LP c/o Kim Whitney 1792 Tribute Road #270 Sacramento, CA 95815 Staff Recommendation Planning Commission Staff Report Project: File: Request:

More information

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist Applicant s Name: Project Address: Phone: Email: Applicant shall fill out the design guidelines checklist for

More information

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012 PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012 TO: FROM: Members of the Planning Commission Michael Klein, Associate Planner FILE NO.: 120000890 PROPOSAL: APPLICANT: Request for an Administrative

More information

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects.

D. Landscape Design. 1. Coverage Intent: To provide adequate landscaping materials that enhance the appearance of development projects. D. Landscape Design The standards and guidelines in this section give design guidance for the landscaping components of industrial and office projects. City regulations require that all landscaping be

More information

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN The Village SPECIFIC PLAN Chapter 3 3.1 INTRODUCTION 3.1.1 Purpose This Chapter describes the development regulations applicable to the Mixed-Use and Transit Center Planning Areas. These form-based regulations

More information

Architectural Review Board Report

Architectural Review Board Report Architectural Review Board Report To: From: CC: Subject: Architectural Review Board Architectural Review Board Meeting: May 21, 2018 Agenda Item: 8-A Grace Page, Senior Planner Stephanie Reich, AIA, LEED

More information

Planning Commission Agenda Item

Planning Commission Agenda Item Planning Commission Agenda Item TO: FROM: Chair Glasgow and Members of the Planning Commission Anna Pehoushek, Assistant Community Development Director SUBJECT PUBLIC HEARING: MITIGATED NEGATIVE DECLARATION

More information

Request Change in Nonconformity. Staff Recommendation Approval. Staff Planner Jonathan Sanders

Request Change in Nonconformity. Staff Recommendation Approval. Staff Planner Jonathan Sanders Applicant & Owner Public Hearing April 11, 2018 City Council Election District Beach Agenda Item 5 Request Change in Nonconformity Staff Recommendation Approval Staff Planner Jonathan Sanders Location

More information

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use TABLE OF CONTENTS CHAPTER 1 SITE DESIGN Purpose 1 CHAPTER 2 SITE DESIGN Streetscape

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

- INVITATION - COURTESY INFORMATIONAL MEETING

- INVITATION - COURTESY INFORMATIONAL MEETING - INVITATION - COURTESY INFORMATIONAL MEETING Hosted by the Property Owner and Project Developer CAMELLIA COURT DEVELOPMENT WEDNESDAY, JANUARY 25, 2017, 7:00 9:00 P.M. BLOY CENTER 1441 S. BENITO AVE, ALHAMBRA,

More information

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT Agenda Item: 2 March 9, 2011 Project: Description: Applicant: DSR11-004 The applicant is requesting approval to replace the existing exterior wood framed

More information

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO) TO: FROM: Honorable Mayor and City Council Planning & Community Development Department SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 260-400 E. COLORADO BOULEVARD (PASEO COLORADO) RECOMMENDATION:

More information

City of Lafayette Staff Report Design Review Commission

City of Lafayette Staff Report Design Review Commission City of Lafayette Staff Report Design Review Commission Meeting Date: February 13, 2017 Staff: Subject: Niroop K. Srivatsa DR13-14DDII Lennar Homes (Applicant), C-Zoning: Request for: (1) Review of Phase

More information

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development Adopted June 18, 2009 This section of the Design and focuses on site planning and design guidance for new multi-family

More information

B. Blocks, Buildings and Street Networks

B. Blocks, Buildings and Street Networks B. Blocks, Buildings and Street Networks Figure IV.4 A rational block pattern with connected streets Introduction The single most important element in the physical and functional integration of mixed use

More information

Planning Board Hearing October 20th, 2016

Planning Board Hearing October 20th, 2016 Planning Board Hearing October 0th, 06 Developer: Real Estate Management & Leasing: Architect: Transportation Engineers: Landscape Architect: Civil Engineer: THE ARSENAL PROJECT Planning Board AGENDA Introduction

More information

Policies and Code Intent Sections Related to Town Center

Policies and Code Intent Sections Related to Town Center Policies and Code Intent Sections Related to Town Center The Town Center Vision is scattered throughout the Comprehensive Plan, development code and the 1994 Town Center Plan. What follows are sections

More information

6 November 13, 2013 Public Hearing APPLICANT: CAH HOLDINGS, LLC

6 November 13, 2013 Public Hearing APPLICANT: CAH HOLDINGS, LLC 6 November 13, 2013 Public Hearing APPLICANT:, LLC PROPERTY OWNER: LC REALTY, LLC STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Automated Car Wash) ADDRESS / DESCRIPTION: 3565 Holland Road

More information

Residential Design Guidelines

Residential Design Guidelines Residential Design Guidelines Single-Family Residential Design Guidelines Introduction These guidelines seek to provide property owners, designers and developers with a clear understanding of the City

More information

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET PRE-APPLICATION CONFERENCE Prior to the actual filing of a Master Plan application, it is strongly recommended that the applicant contact Planning

More information

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion Future Five Design/ Development Guidelines January 2008 Amended June 08 per City Council motion 5-Points Design Guidelines Table of Contents I. Introduction 3 II. Area boundaries 4 III. Review Process

More information

PLANNING BOARD REPORT PORTLAND, MAINE

PLANNING BOARD REPORT PORTLAND, MAINE PLANNING BOARD REPORT PORTLAND, MAINE Zero Canal Plaza Development 0 Canal Plaza 2016-162 Cow Plaza 1, LLC Submitted to: Portland Planning Board Date: August 4, 2016 Public Hearing Date: August 9, 2016

More information

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021 ITEM NO FDP #130021 MEETING DATE July 23, 2013 STAFF Pete Wray ADMINISTRATIVE TYPE I HEARING STAFF REPORT PROJECT: APPLICANT: OWNER: Harmony Technology Park Third Filing, Second Replat Custom Blending,

More information

DESIGN REVIEW COMMITTEE AGENDA ITEM

DESIGN REVIEW COMMITTEE AGENDA ITEM DESIGN REVIEW COMMITTEE AGENDA ITEM AGENDA DATE: FEBRUARY 6, 2013 TO: THRU: FROM: SUBJECT: Chair Woollett and Members of the Design Review Committee Leslie Aranda Roseberry, Planning Manager Anna Pehoushek,

More information

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval Applicant Property Owner Steven H. Murden Public Hearing June 14, 2017 City Council Election District Beach Agenda Item 8 Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort

More information

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards Division VI 18.40.800 Community Mixed Use (CMU) Architectural Guidelines and Standards 18.40.810 Guidelines The goals of the Comprehensive Plan include a focus on pedestrian safety, amenities and aesthetics

More information

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation SMALL LOT DESIGN STANDARDS An Illustrated Working Draft for Test Implementation SMALL LOT DESIGN STANDARDS ILLUSTRATED WORKING FOR TEST IMPLEMENTATION OVERVIEW SMALL LOT CODE AMENDMENT & POLICY UPDATE

More information

CENTERS AND CORRIDORS

CENTERS AND CORRIDORS INITIAL DESIGN STANDARDS AND GUIDELINES for CENTERS AND CORRIDORS City of Spokane Planning Services Third Floor, City Hall 808 W. Spokane Falls Blvd. Spokane, WA 99201-3329 (509) 625-6300 www.spokaneplanning.org

More information

Highland Village Green Design Guidelines

Highland Village Green Design Guidelines Highland Village Green Design Guidelines Publishing Information Title Highland Village Green Design Guidelins Author The City of Calgary Status DRAFT - Proposed document subject to changes Additional Copies

More information

BACKGROUND / DETAILS OF PROPOSAL

BACKGROUND / DETAILS OF PROPOSAL 8 APPLICANT AND OWNER: MISSION ENTERPRISES, L.L.C STAFF PLANNER: Kristine Gay REQUEST: Conditional Use Permit ( Eating and Drinking Establishment within 100 of Protected District ) ADDRESS / DESCRIPTION:

More information

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5 VISION STATEMENT 3 UTILIZATION OF THE GUIDELINES 3 IMPLEMENTATION 3 PROCEDURES FOR DESIGN REVIEW 3 LAND USE AND ZONING 4 LAND USE 4 ELEMENTS:... 4 ZONING 4 ELEMENTS:... 4 BUILDING SCALE AND SETBACKS 5

More information

COMMERCIAL & INDUSTRIAL DESIGN GUIDELINES CITY OF RANCHO CUCAMONGA PLANNING DIVISION

COMMERCIAL & INDUSTRIAL DESIGN GUIDELINES CITY OF RANCHO CUCAMONGA PLANNING DIVISION COMMERCIAL & INDUSTRIAL DESIGN GUIDELINES CITY OF RANCHO CUCAMONGA PLANNING DIVISION INTRODUCTION These guidelines were prepared in response to the needs of many users: developers, property owners, architects,

More information

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Recommendation Approval

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form-Based Code. Staff Recommendation Approval Applicant & Property Owner Public Hearing February 8, 2017 City Council Election District Beach Agenda Item D1 Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District

More information

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project DEVELOPER: SIGNATURE PROPERTIES ARCHITECT: HKIT ARCHITECTS April 23, 2010 TABLE OF CONTENTS 3 Vision 4 Description of Site 5 Guiding Concepts 6

More information

Chapter 4: Jordan Road Character District

Chapter 4: Jordan Road Character District 4: Jordan Road Character District 4.1 Introduction The Jordan Road character district encompasses much of the former Jordan orchard and farmstead, which was a significant part of Sedona s history. The

More information

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara Applicant Franklin Johnston Group Management & Development, LLC Property Owner Virginia Wesleyan College Public Hearing July 12, 2017 City Council Election District Bayside Agenda Item 3 Request Conditional

More information

DRAFT DESIGN GUIDELINES

DRAFT DESIGN GUIDELINES IHZ Booklet #7 May 6, 2010 DRAFT DESIGN GUIDELINES CANTERBURY 7 Overview During the recent planning process for the Plan of Conservation and Development community character was identified as an important

More information

VEHICULAR AND PEDESTRIAN CIRCULATION

VEHICULAR AND PEDESTRIAN CIRCULATION This perspective sketch communicates the intended character and quality of a proposed streetscape design. Locate benches near a major intersection where people tend to gather. Seating and lighting provide

More information

PUBLIC HEARING May 18, 2010 SUMMARY AND RECOMMENDATION

PUBLIC HEARING May 18, 2010 SUMMARY AND RECOMMENDATION PUBLIC HEARING May 18, 2010 SUMMARY AND RECOMMENDATION 7. REZONING: 5912-5970 Oak Street Summary: To rezone from RS-1 (single-family) to Comprehensive Development (CD-1) District to permit a 27-unit townhouse

More information

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES MIXED-USE ZONING DISTRICT DESIGN GUIDELINES In addition to the development regulations contained in the Mixed-Use Zoning District, design guidelines are presented here to provide an added level of definition

More information

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT Chapter 11-17 PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT Sections: 11-17-01 GENERAL PURPOSE 11-17-02 PERMITTED BUILDING TYPES 11-17-03 USES PERMITTED WITH DESIGN REVIEW 11-17-04 USES PERMITTED BY CONDITIONAL

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 23, 2004 DATE: October 6, 2004 SUBJECT: SP #106-3 Site Plan Amendment for changes to façade, plaza deck, landscaping, number of units,

More information

Commercial Development Permit Area

Commercial Development Permit Area City of Kamloops KAMPLAN Commercial Development Permit Area PURPOSE The purpose of this Development Permit Area (DPA) is to establish objectives and provide guidelines for the form and character of commercial

More information

Planning Commission Staff Report February 19, 2009

Planning Commission Staff Report February 19, 2009 Planning Commission Staff Report February 19, 2009 Project: Warda Warehouse File: EG-08-051 Request: Design Review Location: 9260 Bendel Place APNs: 134-0660-004 Planner: Gerald Park Property Owner/Applicant

More information

U.S. Highway 377 North Overlay District. 1. General Purpose and Description

U.S. Highway 377 North Overlay District. 1. General Purpose and Description U.S. Highway 377 North Overlay District 1. General Purpose and Description The purpose of the U.S. Highway 377 North Overlay District is to implement the recommendations within the U.S. Highway 377 North

More information

Building & Site Design Standards Application

Building & Site Design Standards Application FOR OFFICE USE ONLY Design standards plan review fee Building & Site Design Standards Application Phone: 208-468-5406 Fax: 208-468-5439 411 3rd Street South Nampa, Idaho 83651 5,000

More information

D3 January 14, 2015 Public Hearing

D3 January 14, 2015 Public Hearing D3 January 14, 2015 Public Hearing APPLICANT: DONALD J. BOUCHER, JR. PROPERTY OWNER: D.J.B. SERVICE CENTER, LLC STAFF PLANNER: Kristine Gay REQUEST: A. Conditional Change of Zoning (I-1 to B-2) B. Conditional

More information

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon 4.0 Design Guidelines For The Village Centre 4.0 Design Guidelines for the Village Centre The Village Centre is the focal point of the entire South Fields Community and is designed as a traditional commercial

More information

City of San Juan Capistrano Agenda Report

City of San Juan Capistrano Agenda Report ITEM F1 City of San Juan Capistrano Agenda Report TO: FROM: DATE: SUBJECT: Planning Commission Development Services Department Submitted and Reviewed by Sergio Klotz, Al~ rector~ Prepared by Mathew Evans,

More information

Infill Residential Design Guidelines

Infill Residential Design Guidelines Infill Residential Design Guidelines Adopted March 23, 2004 Amended September 10, 2013 City of Orange Community Development Department Planning Division Phone: (714) 744-7220 Fax: (714) 744-7222 www.cityoforange.org

More information

13. New Construction. Context & Character

13. New Construction. Context & Character 13. New Construction Context & Character While historic districts convey a sense of time and place which is retained through the preservation of historic buildings and relationships, these areas continue

More information

Design Review Commission Report

Design Review Commission Report City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Design Review Commission Report Meeting Date: Thursday, March 2, 2017 Subject:

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 23, 2019 DATE: April 12, 2019 SUBJECT: SP #413 SITE PLAN AMENDMENT to permit a fixed bar in a private outdoor café space with associated

More information

Incentive Zoning Regulations Florida Municipal City of Orlando

Incentive Zoning Regulations Florida Municipal City of Orlando Topic: Resource Type: State: Jurisdiction Type: Municipality: Year (adopted, written, etc.): 2002 Community Type applicable to: Title: Incentive Zoning Regulations Florida Municipal City of Orlando Document

More information

Staff Report to the North Ogden City Planning Commission

Staff Report to the North Ogden City Planning Commission Staff Report to the North Ogden City Planning Commission SYNOPSIS / APPLICATION INFORMATION Application Request: Concept review on a legislative application to rezone land located at approximately 1750

More information

2 January 14, 2015 Public Hearing

2 January 14, 2015 Public Hearing 2 January 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PEMBROKE SQUARE ASSOCIATES, LLC STAFF PLANNER: Kevin Kemp REQUEST: Conditional Use Permit (Indoor Commercial Recreation Facility) ADDRESS /

More information

Chapter 11. Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE 11.3 SITE PLANNING GUIDELINES 11.2 GENERAL DESIGN OBJECTIVES

Chapter 11. Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE 11.3 SITE PLANNING GUIDELINES 11.2 GENERAL DESIGN OBJECTIVES Chapter 11 Industrial Design Guidelines 11.1 INTRODUCTION AND PURPOSE The following industrial/design guidelines seek to assure high quality development in Santa Ana s industrial districts by: The design

More information

AIRPORT BUSINESS PARK

AIRPORT BUSINESS PARK PIER MAC PETROLEUM INSTALLATION LTD. AIRPORT BUSINESS PARK DEVELOPMENT APPLICATIONS March 2003 4.1 Airport Business Park Development Permit Area 4.1.1 Justification/Design Concept The design concept envisioned

More information

WATERFRONT DISTRICT DESIGN STANDARDS

WATERFRONT DISTRICT DESIGN STANDARDS WATERFRONT DISTRICT DESIGN STANDARDS 20.25.080 WATERFRONT DISTRICT A. Purpose. This section is intended to implement The Waterfront District Subarea Plan by: 1. Creating a safe, vibrant mixed-use urban

More information

The subject site plan amendment proposes the following revisions to the approved site plan:

The subject site plan amendment proposes the following revisions to the approved site plan: PROPOSED AMENDMENT The subject site plan amendment proposes the following revisions to the approved site plan: 1. The building footprint was modified to accommodate the revised architectural design. 2.

More information

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts) BUILDING CODE ANALYSIS REFERENCE CODES 0 CALIFORNIA BUILDING CODE 0 INTERNATIONAL BUILDING CODE OCCUPANCY USE AND CLASSIFICATION SECTION 0 & THE PROPOSED BUILDING CONSISTS OF STORIES OF OVER STORY OF VALET

More information

4 January 11, 2012 Public Hearing APPLICANT:

4 January 11, 2012 Public Hearing APPLICANT: . 4 January 11, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

Joint Design Review Body Report

Joint Design Review Body Report Joint Design Review Body Report To: From: Cc: Subject: Joint Design Review Body Joint Design Review Body Meeting: October 12, 2017 Agenda Item: 6-A and 6-B Stephanie Reich, AIA. LEED AP, Design & Historic

More information

PLANNING AND DESIGN GUIDELINES FOR BLOCK C OF THE MT. DIABLO REDEVELOPMENT PROJECT AREA Adopted by Design Review Commission February 4, 2004

PLANNING AND DESIGN GUIDELINES FOR BLOCK C OF THE MT. DIABLO REDEVELOPMENT PROJECT AREA Adopted by Design Review Commission February 4, 2004 PLANNING AND DESIGN GUIDELINES FOR BLOCK C OF THE MT. DIABLO REDEVELOPMENT PROJECT AREA Adopted by Design Review Commission February 4, 2004 The Walnut Creek Redevelopment Agency has an adopted plan for

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

Landscape and Streetscape Design 2.5

Landscape and Streetscape Design 2.5 Landscape and Streetscape Design 2.5 2.5.1 Goals 2.5.2 Planting 2.5.3 Sidewalks and Pavement 2.5.4 Furnishings 2.5.5 Walls 2.5.6 Lighting 2.5.7 Stormwater 2.5.8 Street Cross Sections 2.5 LANDSCAPE AND

More information

7 November 12, 2014 Public Hearing

7 November 12, 2014 Public Hearing 7 November 12, 2014 Public Hearing APPLICANTS & PROPERTY OWNERS: DAVID C. & JUDITH L. MARTIN STAFF PLANNER: Graham Owen REQUEST: Change of Zoning from AG-2 Agricultural to Conditional B-2 Community Business

More information

4.9 Mendocino Avenue Corridor Plan Design Guidelines

4.9 Mendocino Avenue Corridor Plan Design Guidelines 4.9 Mendocino Avenue Corridor Plan Design Guidelines The Mendocino Avenue Corridor Plan addresses the area between College Avenue and Steele Lane. Mendocino Avenue is a busy arterial that runs parallel

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No.: Date: 5-03-18 Pike and Rose, Phase I: Site Plan Amendment No. 82012002D Rhoda Hersson-Ringskog,

More information

8 October 14, 2015 Public Hearing

8 October 14, 2015 Public Hearing 8 October 14, 2015 Public Hearing APPLICANT & PROPERTY OWNER: PRICE S HOLDINGS, LLC STAFF PLANNER: Karen Lasley REQUEST: A. Conditional Use Permit (Automobile Repair Garage) B. Change in Nonconforming

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2018- RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF BELMONT APPROVING A SINGLE-FAMILY DESIGN REVIEW AND TREE REMOVAL PERMIT FOR A VACANT LOT ON LOWER LOCK AVENUE (APN: 043-042-750,

More information

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS 20.25 DESIGN REVIEW. 20.25.080 WATERFRONT DISTRICT A. Purpose. This section is intended to implement The Waterfront District Subarea Plan by: 1. Creating a

More information

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 DESIGN REVIEW COMMITTEE PERMIT PROCESS 1. Discuss project with Planning staff to determine zoning regulations, any unusual characteristics

More information

Agenda Report Meeting Date 11/02/16. Architectural Review (Wildwood Estates Townhomes)

Agenda Report Meeting Date 11/02/16. Architectural Review (Wildwood Estates Townhomes) Architectural Review and Historic Preservation Board Agenda Report Meeting Date 11/02/16 REPORT DATE: October 24, 2016 File: AR 16-19 TO: FROM: RE: Architectural Review and Historic Preservation Board

More information

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and

ORDINANCE WHEREAS, this Ordinance is consistent with the City of Winter Garden Comprehensive Plan; and ORDINANCE 17-06 AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF WINTER GARDEN, FLORIDA, CREATING ARTICLE XIV OF CHAPTER 118 OF THE CITY OF WINTER GARDEN CODE OF ORDINANCES PROVIDING FOR THE EAST PLANT

More information

M E M O R A N D U M CITY PLANNING DIVISION PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA

M E M O R A N D U M CITY PLANNING DIVISION PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA M E M O R A N D U M CITY PLANNING DIVISION PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA DATE: March 13, 2017 TO: FROM: The Honorable Landmarks Commission Planning Staff SUBJECT: Certificate

More information

Chapter 5: Mixed Use Neighborhood Character District

Chapter 5: Mixed Use Neighborhood Character District 5: Mixed Use Neighborhood Character District 5.1 Introduction The Mixed Use Neighborhood character district acts as a transition or bridge between the State Route 89A District s commercial area to the

More information