Introduction to project work group
|
|
- Nathaniel Matthew Smith
- 5 years ago
- Views:
Transcription
1 Introduction to project work group Environmental impacts Master in Environmental Engineering 5th Year, 1st Semester JOANA FERNANDES DIAS
2 CONTENT OVERVIEW Objective Size of groups Assessment criteria Development Deliverables The Project
3 OBJECTIVE Develop a semi-real EIA of the works going on the Central Axis of Lisbon (Marquês de Pombal - Entrecampos), including: Identification, Prediction, Assessment and mitigation of environmental impacts, and Monitoring programme for the proposed project, focusing on a selection of environmental factors per group, organized per environmental themes (one or more environmental factors per theme).
4 SIZE OF GROUPS Students must organize in groups of 4 to 5 each, mixing different nationalities Groups Students Group #1 Group #2 Group #3 Group #4 Group #5 Group #6
5 ASSESSMENT CRITERIA The group s project development (corresponding to 50% of the course final grade) will be assessed considering the structure, objectivity, deepness and originality of the work developed Component Percentage Technical report 60% First oral presentation 5% Second oral presentation 10% Final oral presentation 15% Elevator pitch and short video 5% Participation and group interaction 5%
6 DEVELOPMENT The group work is developed in four stages: 1. Problem Identification (What is the problem/project?); 2. Analysis (What information do we need and how will we use it?); 3. Solution (What can be the solutions?); 4. Conclusions and perspectives (Did we achieve it?). The group work will be divided in three phases that enable meeting the objectives in each stage: (i) scoping, (ii) analysis of environmental impacts and (iii) assessment, mitigation and monitoring programme.
7 DEVELOPMENT
8 DEVELOPMENT 1st phase Scoping: 1. What are the main features of the Project? 2. What are the legal requirements for EIA in this project? 3. What are the main expected impacts that will be determined by the project? 4. What are the main project actions that are responsible for significant environmental impacts? 5. What are the main environmental issues that must be studied/analyzed to enable assessing the significant environmental impacts? 6. Who are the main stakeholders?
9 DEVELOPMENT 2nd phase Analysis of environmental impacts (only for the environmental theme selected): 1. Simulate the development of baseline studies to enable the characterization of the affected environment, considering the environmental issues that have been selected in the EIA scoping and which are relevant to the selected theme in each group; 2. Stakeholder s analysis and engagement; 3. Definition of project alternatives and justification and further comparison of the alternatives; 4. Predict impacts considering the evolution of the existing situation with and without the project; 5. Analysis of project environmental impacts under the selected environmental theme, including cumulative impacts. The linkages to other environmental themes studied by other groups should be developed and demonstrated.
10 DEVELOPMENT 3rd phase Assessment, mitigation and monitoring programme (only for the environmental theme selected): 1. Assessment the environmental impacts of the project on the selected environmental theme, including cumulative impacts; 2. Identify mitigation and management measures that will reduce the magnitude of the environmental impacts; 3. Develop the monitoring programme; 4. Conclude on the assessment how would you advise decision-makers.
11 DELIVERABLES 1st oral presentation: October 13th Powerpoint or poster If PowerPoint, send by on October 12th to If Poster, deliver after the presentation 7 min for presentation Minimum content: What is the problem being addressed by the group, and why is it a problem; What is the project and why is it needed; What are the impacts (using Impacts identification matrix); What are the significant environmental factors that need to be studied; Who are the relevant stakeholders to be engaged.
12 DELIVERABLES 2nd oral presentation: November 10th Powerpoint or poster If PowerPoint, send by on November 9th to If Poster, deliver after the presentation 7 min for presentation Minimum content: Impact identification matrix, justified with the analysis based on the essential of the baseline information; Stakeholder s analysis; Impact prediction; Identification and comparison of alternatives; Cumulative impacts; Groups linkages.
13 DELIVERABLES Final presentation: December 15th Must include: - Elevator Pitch (50 words) - Short video (30 to 60 seconds) for public dissemination (e.g. through YouTube) - Oral presentation in 20 min max (in each group each student must present) - Technical Report, including a business plan (up to pages, plus annexes if adequate) PowerPoint must be sent by on December 14th to joanafmdias@tecnico.ulisboa.pt
14 DELIVERABLES Minimum content: What is the problem being addressed by the group, and why is it a problem; Project main objectives, brief description and justification; Impact identification matrix and relevant issues, including cumulative impacts; Impact assessment and mitigation measures; Stakeholder s analysis; Public participation programme; Monitoring programme (relevant indicators); Conclude on the assessment how would you advise decision-makers.
15 DELIVERABLES Technical report: Electronic copy must be sent by on December 14th to Paper copy must be delivered on December 15th before presentation Proposed content: Elevator pitch (max. 50 words) Introduction PART I Scoping PART II Analysis of environmental impacts PART III Assessment, mitigation and monitoring programme PART IV Main conclusions Bibliography Annexes (if adequate)
16 THE PROJECT Work at the Central Axis of Lisbon MARQUÊS DE POMBAL - ENTRECAMPOS Running theme: Urban development Challenge: Why and how project s environmental impacts are relevant to urban development? Works at the Central Axis of Lisbon, Marquês de Pombal - Entrecampos
17 THE PROJECT Work at the Central Axis of Lisbon MARQUÊS DE POMBAL - ENTRECAMPOS The axis Marquês de Pombal Entrecampos Total extension of approximately 2,5 km Integrates the section of Lisbon central axis that belongs to the 2ndlevel railway network of the Municipal Master Plan of Lisbon (MMPL) The city central axis Formed by Av. Fontes Pereira de Melo / Av. da República / Campo Grande, ending in 2ª Circular, and consequent connection with the areas of Lumiar and Telheiras through Calçada de Carriche, and Alta de Lisboa through a planned connection, until it connects at north with IP7 Eixo N/S
18 THE PROJECT Work at the Central Axis of Lisbon MARQUÊS DE POMBAL - ENTRECAMPOS Contributions obtained with public participation on the project of Av. Fontes Pereira de Melo, Picoas and Praça Duque de Saldanha allowed to identify the key problematics felt by the residents of this area the traffic in Av. Fontes Pereira de Melo and the need to increase and qualify public space All axis Marquês de Pombal Entrecampos, were also identified problems and insufficiencies regarding soft mobility infrastructures
19 THE PROJECT Work at the Central Axis of Lisbon MARQUÊS DE POMBAL - ENTRECAMPOS The intervention of the central axis includes the requalification of Av. da República, Praça do Saldanha, Praça de Picoas and Av. Fontes Pereira de Melo, and aims: Less noise More pedestrian area More comfortable sidewalks More bicycle paths More trees and green areas More safety in roads Parking for residents Loading and unloading areas
20 THE PROJECT Work at the Central Axis of Lisbon MARQUÊS DE POMBAL - ENTRECAMPOS The planning of these works predicts to reduce the disturbances resulted from its realization for business owners, residents, pedestrians and drivers. The work was scheduled to begin in the 2nd of May of 2016 and to take place in phases PREVIOUS EXPECTED PREVIOUS EXPECTED
volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08 glossary of terms Used in DMRB Volume 11, Sections 1 and 2 SUMMARY This
More informationSpatial / Land Use Planning System in Slovakia
SEA and spatial planning in Slovakia: Current practices and lessons for practical application of the EC Directive Szentendre, April 14-16, 2004 Spatial / Land Use Planning System in Slovakia Spatial planning
More informationURBAN PROJECT OF THE BENFICA STATION SURROUNDING AREA
URBAN PROJECT OF THE BENFICA STATION SURROUNDING AREA José Miguel Camilo de Matos Santos Pereira Extended Abstract INTRODUCTION The purpose of this report is to expose the strategies drawn to answer the
More informationPROJECT FOR THE NEW CONGRESS CENTER OF LISBON IN PARQUE EDUARDO VII
PROJECT FOR THE NEW CONGRESS CENTER OF LISBON IN PARQUE EDUARDO VII EXTENDED ABSTRACT Maria Catarina Ramos dos Santos Fuzeta da Ponte Student in Architecture, Instituto Superior Técnico, Lisbon, Portugal
More informationhow to improve walking as
Impacts SUMITS Conference Vienna 2013 Redistribution of Public Space Impacts SUMITS Conference Vienna 2013 how to improve walking as a mode of transport in a hilly city MAY 13 Fernando Nunes da Silva Carlos
More informationlow carbon strategies - energy efficiency
SUSTAINABLE MOBILITY low carbon strategies - energy efficiency Mediterranean area Sustainable mobility planning on university campuses in the Mediterranean region: Lessons learned from the CampSUMP project
More informationEvaluation Criteria. Detailed Evaluation Criteria
Evaluation Criteria Detailed Evaluation Criteria Community Well-being A safe and socially inclusive service that improves access to key community destinations and provides transportation choices for Calgarians.
More informationTHE ENVIRONMENTAL PROTECTION IN THE URBANISTICPLANNING AND LAND DEVELOPMENT IN EUROPEAN UNION LAW
THE ENVIRONMENTAL PROTECTION IN THE URBANISTICPLANNING AND LAND DEVELOPMENT IN EUROPEAN UNION LAW The answes must be sent, imperatively in English or in French, before the 15th August 2011 to Ms. Anna
More informationFigure 1- Site Plan Concept
Figure 1- Site Plan Concept Parking will be provided underground on three levels at rate of 1.0 space/ unit; this rate includes all visitors parking. MMM Group has prepared a parking assessment (April,
More informationWinston-Salem State University Campus Master Plan 2016 Update
Winston-Salem State University Campus Master Plan 2016 Update Request for Qualifications Page 1 of 6 Overview Winston-Salem State University (WSSU) is requesting qualifications from planning firms specializing
More informationURBAN REQUALIFICATION OF CARNIDE The urban continuity in a contrasting territory
URBAN REQUALIFICATION OF CARNIDE The urban continuity in a contrasting territory Catarina Albuquerque Durão Barroso EXTENDED ABSTRACT OCTOBER 2012 0 INTRODUCTION This document intends to summarize the
More informationCOMMISSION IMPLEMENTING REGULATION (EU) /... of XXX. on the European Rail Traffic Management System European deployment plan
EUROPEAN COMMISSION Brussels, XXX [ ](2016) XXX draft COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX on the European Rail Traffic Management System European deployment plan EN EN COMMISSION IMPLEMENTING
More informationURBAN PROJECT CARNIDE AV. LUSÍADA BENFICA
URBAN PROJECT CARNIDE AV. LUSÍADA BENFICA Infrastructure, Public Space, Urban Continuity José Rafael Garcia dos Santos Rosa Capelão Extended Abstract ARQUITECTURE October 2012 01 INTRODUCTION 01.01 Aims
More informationSpatial planning instruments in Portugal: plans as regeneration tools
Spatial planning instruments in Portugal: plans as regeneration tools Portuguese Local Spatial Planning Tools Local Development Plan (municipality) Urban(isation) Plan (territory within the urban perimeter)
More informationPART 1. Background to the Study. Avenue Study. The Danforth
The Danforth 1.1/ Study Purpose & Key Municipal Goals 1.2/ The Local Advisory Committee 1.3/ The Project Team 1.4/ Study Process/Summary of Method 1.5/ Summary of Consultation 1.1 Study Purpose and Key
More informationAssessing the impact of smallscale wind energy proposals on the natural heritage
Scottish Natural Heritage Assessing the impact of smallscale wind energy proposals on the natural heritage Guidance March 2016 Version 3 1 Contents 1. Introduction. 3 2. Encouraging a spatial approach
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the removal of Municipal Railway bus zones at various
More informationFor Registration or any Inquiries. Date: November 2017 (3-Day) Time: 8:00 am - 4:00 pm Venue: Manama, Kingdom of Bahrain
Date: 07-09 November 2017 (3-Day) Time: 8:00 am - 4:00 pm Venue: Manama, Kingdom of Bahrain QQA Seal of Recognition For Registration or any Inquiries Tel: +973 17-727100 / 17-810 725 Fax: +973 17-827475
More informationLower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary
TABLE OF CONTENTS Page Executive Summary 1.0 INTRODUCTION...1-1 1.1 Purpose of the Undertaking...1-1 1.2 Study Area Description...1-1 1.3 Description of the Undertaking...1-1 1.4 Rationale for the Undertaking...1-2
More informationCalifornia Environmental Quality Act (CEQA) Environmental Review Process
California Environmental Quality Act (CEQA) Environmental Review Process Los Angeles Union Station Forecourt and Esplanade Improvements constitute a Project Los Angeles County Metropolitan Transportation
More informationEnvironmental Impact Assessment Screening Report for proposed Environmental Improvement Works to the Front of Emily Square, Athy
Environmental Impact Assessment Screening Report for proposed Environmental Improvement Works to the Front of Emily Square, Athy by CAAS Ltd for Kildare County Council July 2018 CAAS Ltd, 1 st Floor, 24-26
More informationSlot Home Task Force Meeting #5 Phase 2 June 8, 2017
Slot Home Task Force Meeting #5 Phase 2 June 8, 2017 MEETING OBJECTIVES Review Staff Recommended Strategy for Mixed Use and Main Street districts Confirm the Strategy for the Mixed Use and Main Street
More informationCOMPONENT 4 Feasibility studies. Prague Suchdol
COMPONENT 4 Feasibility studies Prague Suchdol Almada, March 12th - 13th 2012 SUMMARY Municipality Praha-Suchdol is a recipient of a public transportation services only Insufficient connection with city
More informationTOWN AND COUNTRY PLANNING ACT 1990 (AS AMENDED).
FAO: D. Williams Isle of Anglesey County Council Council Offices Llangefni Anglesey LL77 7TW 16 November 2017 DCRM Ref. No: WN0904-QUD-OS-LET-00002_English Dear Mr Williams TOWN AND COUNTRY PLANNING ACT
More informationUNEP s Role in Promoting Environmentally Sound Management of E-Waste
UNEP s Role in Promoting Environmentally Sound Management of E-Waste 2 nd E-Waste Management Forum Green Business Opportunities 23 rd 24 th November 2010 Marrakech, Morocco By: Fareed I. Bushehri 11/24/2010
More informationA Better City Request for Qualifications
A Better City Request for Qualifications Urban design proposal for the pedestrianization of Birch Street in Roslindale December 13, 2018 Responses preferred by January 8, 2019 at 11:59pm Eastern Time Request
More informationNorth Commuter Parkway and Traffic Bridge Project Market Sounding
North Commuter Parkway and Traffic Bridge Project Market Sounding Introduction KPMG LLP ( KPMG ) has been engaged by the City of Saskatoon ( the City ) to develop a P3 business case for the North Commuter
More informationAPPROPRIATE ASSESSMENT SCREENING IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE FOR THE PROPOSED VARIATION OF THE
APPROPRIATE ASSESSMENT SCREENING IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE FOR THE PROPOSED VARIATION OF THE DUBLIN CITY DEVELOPMENT PLAN 2011-2017 RANELAGH AVENUE,
More informationPresented by: Remy Norbert DUHUZE Director/ER&PC REMA
Presented by: Remy Norbert DUHUZE Director/ER&PC REMA 1 Presentation Outline What is Environment, Social and Economic Impact Assessment? Objectives and Principles of EIA EIA background & regulations Stakeholders
More informationRequired total credit : 43 All graduate students must register one of RES 501, RES 502 or RES 503, RES 504 or RES 505, RES 506 or RES 509, RES 510.
İZMİR INSTITUTE OF TECHNOLOGY GRADUATE SCHOOL OF ENGINEERING AND SCIENCES DEPARTMENT OF ARCHITECTURAL RESTORATION CURRICULUM OF THE M.S. PROGRAM IN ARCHITECTURAL RESTORATION (NON-THESIS) Fall Semester
More informationTOURIST AREA DESIGN GUIDELINES
TOURIST AREA DESIGN GUIDELINES INTRODUCTION The purpose of the Tourist Area Design Guidelines is to provide a comprehensive reference manual to the urban design principles that will be used to evaluate
More informationEnvironmental Hazards and Risk Management
Terms of Reference for ESPON-INTERACT Thematic Study Environmental Hazards and Risk Management Environmental hazards and risk management/preventions are important elements in the discussion of future Structural
More informationProposed Variation to the Midleton Town Development Plan 2013
Volume 1 Proposed Variation to the Midleton Town Development Plan 2013 Vacant Site Levy-Residential and Regeneration Areas Inclusion of new text and objective in relation to the Vacant Site Levy and Regeneration
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016
Item 11, Report No. 38, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on November 15, 2016. Regional Councillor Di Biase declared an interest
More informationZagreb. Strategic planning. City of Zagreb City Office of Strategic Planning and Development of the City
Zagreb http://www.zagreb.hr/ Strategic planning Through ZAGREBPLAN a vision of Zagreb was defined: City of Zagreb as an urban incubator of sustainable concepts, entrepreneurship and new values City of
More informationWelcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline
Welcome Green Line LRT Beltline Alignment Options Stay engaged! Follow the Green Line story at calgary.ca/greenline Green Line LRT Why are we here? Our Challenge Determine the best alignment in the Beltline.
More informationENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development
ENVIRONMENTAL ISSUES and TEN-T PROJECTS Key elements for a sustainable network development TEN-T Project Management Workshop 2010 George Kremlis DG ENV B4, European Commission 13 January 2010 Environmental
More informationArctic Council s WG PAME
Arctic Council s WG PAME Arctic Resilience Forum Meeting 10-11 September 2018 Rovaniemi, Finland Selected PAME projects that involve collaboration and point to effective practices for building resilience
More informationPlanning of offshore wind farms in Lithuania. Migl Masaityt Chief Specialist of EIA division Ministry of Environment of Lithuania
Planning of offshore wind farms in Lithuania Migl Masaityt Chief Specialist of EIA division Ministry of Environment of Lithuania Legal framework (1) General issues Law on Land of the Republic of Lithuania,
More informationStrasbourg SUMP Award: Finalist factsheet. Local Transport facts. Urban transport policy objectives of the city:
Strasbourg 2013 SUMP Award: Finalist factsheet Local Transport facts Name of the authority: Urban Community of Strasbourg, FR Website: www.strasbourg.eu Contact: Maeva Moreau Telephone: +33 388436514 Email:
More informationApplication of traffic impact studies as part of the EIA process: a case study as applied to the extension of a mineral processing plant
Urban Transport XIX 519 Application of traffic impact studies as part of the EIA process: a case study as applied to the extension of a mineral processing plant I. M. Schoeman School for Computer, Statistical
More informationTHE NEW LISBON CONGRESS CENTRE ARCHITECTURE
THE NEW LISBON CONGRESS CENTRE PARQUE EDUARDO VII Extended Abstract João Miguel Caramujo Ramos Endrenço Project Report to obtain the Master of Science Degree in ARCHITECTURE Supervisor: Teacher Teresa
More informationRequest for Qualifications. Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design
PUR872 I. Invitation Request for Qualifications Knowledge Park Pedestrian/Cyclist Connectivity Planning and Design The City of Rock Hill is requesting Statements of Qualifications from interested and qualified
More informationSustainable Urban Drainage Systems Design Manual
Manuals: Sustainable Urban Drainage Systems Design Manual Mike Revitt Deliverable 2.1.2. A design manual incorporating best practice guidelines for stormwater management options and treatment under extreme
More informationNERVIÓN LINEAR PARK GREEN WAY, SALBIO STATION-OLAKO SECTION PROVINCIAL COUNCIL OF ALAVA.
NERVIÓN LINEAR PARK GREEN WAY, SALBIO STATION-OLAKO SECTION PROVINCIAL COUNCIL OF ALAVA. Año 2017 GOOD PRACTICE PROPOSAL: NERVIÓN LINEAR PARK GREEN WAY, SALBIO STATION-OLAKO SECTION, CARRIED OUT BY THE
More informationShort Title of the Best Practice: Involving local communities with their own cultural heritage at the Nevado de Toluca
Short Title of the Best Practice: Involving local communities with their own cultural heritage at the Nevado de Toluca Presented by (State Party): México Location: Nevado de Toluca, Estado de Mexico, Mexico
More information495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012
495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference March 17, 2012 Project Process Local and Regional Priority Areas Growth Scenarios Transportation Investment Categories
More informationWhat We Heard Public Engagement - Stage 1
What We Heard Public Engagement - Stage 1 Background Early planning is underway for a potential new river crossing over the North Saskatchewan River, in the northeast part of the Edmonton region. The City
More informationRoad Safety Impact Assessment
Road Safety Impact Assessment October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving the country s national
More informationEU Guidelines on Sustainable Urban Mobility Plans
EU Guidelines on Sustainable Urban Mobility Plans UNDP Workshop on SUMP, Belgrade, 21 September 2012 Frank Wefering, Rupprecht Consult SUMP a concept promoted by the EU Sustainable Urban Mobility Plans
More informationINTERNATIONAL KNOWLEDGE EXCHANGE PROGRAM & PLATFORM Participatory design & program strategies [Placemaking] to improve public spaces and communities
MAKING CITIES TOGETHER #Nairobi, Kenya INTERNATIONAL KNOWLEDGE EXCHANGE PROGRAM & PLATFORM Participatory design & program strategies [Placemaking] to improve public spaces and communities INVENTORY Nov
More informationLongbridge Town Centre Phase 2 Planning Application
Longbridge Town Centre Phase 2 Planning Application Non-Technical Summary of the Environmental Statement December 2013 Introduction A full application for Planning Permission has been submitted to Birmingham
More informationCONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM
CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY 1. Introduction WORK PROGRAM The Town of Caledon is a large, local municipality located in the Greater Toronto
More information7. The Landscape. 7.1 Introduction. Environmental Impact Statement (EIS) Scoping Report
7. The Landscape 7.1 Introduction The purpose of this section of the EIS Scoping Report is to describe the scope of work and methods to be applied in the identification and assessment of landscape and
More informationStrategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017
Strategic Environmental Assessment Screening Report Dublin Port Masterplan Review 2017 Table of Contents 1 Introduction... 1 2 Purpose of the Masterplan... 2 3 Task 1.1 Pre-Screening Check... 5 4 Task
More informationDiversity Impact Assessment
Name of policy, programme or project: 149934 Tovil Footbridge Name: Your job title/position: Department: Network Operations South East Route Date: 2 nd August 2016 Diversity Impact Assessments (DIA) are
More informationHEALTH SCIENCES BUILDING
HEALTH SCIENCES BUILDING DESIGN BRIEF AND PLANNING RATIONALE June 30, 2015 Montgomery Sisam / NXL / Bryden Martel Architects 1066 Somerset Street West, Ottawa, Ontario K1Y 4T3 Voice: 613-724-9914 Electronic:
More informationNOTE: The public involvement and participation program is included in the public education & outreach program.
Original version: 12/30/08 1 University of Wisconsin Green Bay Public Education & Outreach Program Goals & Objectives The major goal of the University of Wisconsin Green Bay (UWGB) s public education &
More informationvolume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments
DESIGN MANUAL FOR ROADS AND BRIDGES volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments SUMMARY This Advice Note provides
More informationSustainable urban mobility plans Overview of the concept. EPA Polis workshop 17 May Stuttgart
Sustainable urban mobility plans Overview of the concept EPA Polis workshop 17 May Stuttgart What s the core of SUMP? A planning practice and culture that aims at truly sustainable urban transport and
More informationInterim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents
Interim Advice Note 76 / 06 VOLUME 11 SECTION 1: ENVIRONMENTAL ASSESSMENT INTRODUCTION PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT Contents 1. Introduction and Application 2. Aims and Objectives
More informationSmart City Governance URBIS Solutions. David Ludlow, Assoc. Professor European Smart Cities University of the West of England, Bristol
Smart City Governance URBIS Solutions David Ludlow, Assoc. Professor European Smart Cities University of the West of England, Bristol Integrated smart city model Smart Mobility Services focused on decreasing
More informationTown of Oakville Streetscape Strategy
Town of Oakville Streetscape Strategy Endorsed by PDC on February 10, 2014 (PD-011-14) Town of Oakville Streetscape Strategy [endorsed by PDC February 10, 2014] 0 Town of Oakville Streetscape Strategy
More informationHeritage Assessment and Considerations. Tamara Anson-Cartwright Pourya Nazemi City of Toronto Urban Land Institute, November 24, 2017
Heritage Assessment and Considerations Tamara Anson-Cartwright Pourya Nazemi City of Toronto Urban Land Institute, November 24, 2017 HERITAGE INVENTORY HERITAGE REGISTER DANFORTH AVENUE More than 45 years
More information2002/ Modernisation Road N 4
2002/000-606.02 - Modernisation Road N 4 1. Basic Information 1.1. CRIS Number 2002/000-606.02 1.2. Title: Modernisation of the national road No 4 1.3 Sector : Cross Border Co-operation / Infrastructure
More informationDiversity Impact Assessment
Name of policy, programme or project: Great Western Electrification Programme Pilning Station Footbridge Department: Infrastructure Projects Date: February 2016 Diversity Impact Assessments (DIA) are the
More information3.0 PROJECT DESCRIPTION
3.0 PROJECT DESCRIPTION 3.1 BACKGROUND Under California law (Government Code Section 65300 et seq.), every city and county is required to have a general plan. The general plan is to be comprehensive and
More informationKENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015
KENDALL SQUARE INITIATIVE Planned Unit Development Special Permit Application - SoMa September 8, 2015 GENERAL DEVELOPMENT GOALS Kendall Square PUD 2 PRE-ZONING PUBLIC ENGAGEMENT 2008-2009 2010-2012 2013
More informationROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document
ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment Non Technical Summary Rochford Core Strategy Preferred Options Document October 2008 SUSTAINABILITY APPRAISAL
More informationKick-off Meeting,: September 11, 2014
Town of Midland Downtown Master Plan Study Kick-off Meeting,: September 11, 2014 PRESENTATION OVERVIEW 1. Trip Agenda 2. Introduction 3. Work Program & Schedule Consultation Strategy Project Phases and
More informationJASPERS lessons learnt. Adina Relicovschi, EIA Coordinator
JASPERS lessons learnt Adina Relicovschi, EIA Coordinator Current portfolio Key issues Some 450 assignments in the Action Plans 2011, it is expected that JASPERS will complete about 100 Assignments in
More informationDOWNLOAD OR READ : URBAN TRANSPORT AND THE ENVIRONMENT FOR THE 21ST CENTURY IV PDF EBOOK EPUB MOBI
DOWNLOAD OR READ : URBAN TRANSPORT AND THE ENVIRONMENT FOR THE 21ST CENTURY IV PDF EBOOK EPUB MOBI Page 1 Page 2 urban transport and the environment for the 21st century iv urban transport and the pdf
More information11/04/2016. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128. NPPF Paragraph 128
Good practice in the preparation and understanding of NPPF-compliant heritage assessments/statements Stephen Bond, Heritage Places 1 NPPF Paragraphs 133-135 133: Where a proposed development will lead
More informationPUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017
PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications February 21, 2017 PURPOSE OF TONIGHT S MEETING Engage the community on the Don Mills Crossing Study and development
More informationCONSERVATION PLAN BASED ON THE CONCEPT OF INTEGRITY
CONSERVATION PLAN BASED ON THE CONCEPT OF INTEGRITY Y. N. Yen a C. F. Cheng a, * a China University of Technology, 56 Sec. 3 Shin Long Rd., 116 Taipei, Taiwan - (alexyen, aabbyy)@ cute.edu.tw KEY WORDS:
More informationECOS Position Paper: Further recommendations
Consultation Forum according to Art. 23 of Regulation (EU) No 517/2014 on fluorinated greenhouse gases: Barriers to the uptake of low-gwp alternatives to HFCs related to standards, codes and legislation
More informationIntervention in the historical center of São Paulo
EXTENDED ABSTRACT Intervention in the historical center of São Paulo Place Between Places João Infante Lisbon November 2013 The present work was developed within the project subjects performed during the
More informationNewsletter. Life Zaragoza Natural. Ongoing actions. Project. Inside: Implementation Actions (B shares) p. 2. p. 2. p. 3. p. 4. p.
# 2 DECEMBER 2014 www.zaragoza.es/life-zaragozanatural Life Zaragoza Newsletter Natural Inside: Improving connectivity matrix Blue p. 2 Ongoing actions Life Zaragoza Natural Project Implementation Actions
More informationFinal Master Plan and Development Control Regulations
1. INTRODUCTION CHECK LIST a. Introduction b. Table of contents c. Definitions. d. scope of works. 2. FINAL OVERALL MASTER PLAN a. SITE ANALYSIS and OVERVIEW: i. Existing and Proposed Site Plan Levels.
More informationTown Center (part of the Comprehensive Plan)
Town Center (part of the Comprehensive Plan) Mercer Island Town Center Looking North (2014) In 1994, a year-long process culminated in a set of design guidelines and code requirements for the Town Center
More informationImplementation of European Landscape Convention in Portugal insights from regional and local planning practice
Implementation of European Landscape Convention in Portugal insights from regional and local planning practice Filipa Pinto Monteiro fpm.work@gmail.com Isabel Loupa Ramos isabel.ramos@tecnico.ulisboa.pt
More informationCase Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development)
Case Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development) Project Division, Urban Development Bureau and Development Cooperation Division, International
More informationHighland Village Green Design Guidelines
Highland Village Green Design Guidelines Publishing Information Title Highland Village Green Design Guidelins Author The City of Calgary Status DRAFT - Proposed document subject to changes Additional Copies
More informationUrban Planning and Land Use
Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning
More informationCIVINET SLOVENIJA-HRVATSKA Planovi održive mobilnosti koncept i primjena u Sloveniji, Hrvatskoj i susjednim zemljama
CIVINET SLOVENIJA-HRVATSKA Planovi održive mobilnosti koncept i primjena u Sloveniji, Hrvatskoj i susjednim zemljama 4. studeni 2014 Zagreb Iskustva grada Judenburga i Graza, Štajerska Fred DOTTER Austrian
More informationCity of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01
City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01 July 27, 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Plan Area Location & Context... 1 1.2 Ownership
More informationCarleton University. Nicol Building New Sprott School of Business. Design Brief and Planning Rationale. Carleton University
Carleton University Nicol Building New Sprott School of Business Design Brief and Planning Rationale Carleton University Design Team Proposal New Sprott School of Business Academic Building 2019 October
More informationARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE
ARLINGTON COUNTY PLANNING COMMISSION SITE PLAN REVIEW COMMITTEE SITE PLAN CHAIR GUIDE Excerpts from the SPRC Operating Guide, 1/31/04 Revised March 17,2010 1. Site Plan Chair Responsibilities 1 1, The
More informationLANDSCAPE PLANNING MUNICIPAL LEVEL (OTNM) (Code UC: 1616)
LANDSCAPE PLANNING MUNICIPAL LEVEL (OTNM) (Code UC: 1616) Degree: 2nd cycle Landscape Architecture Curricular Year: 1º Semester: 2º ECTS: 7 Compulsory Academic year 2016/2017 Scientific coordinator: Prof.
More informationKENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015
KENDALL SQUARE INITIATIVE Planned Unit Development Special Permit Application - SoMa September 8, 2015 GENERAL DEVELOPMENT GOALS Kendall Square PUD 2 PRE-ZONING PUBLIC ENGAGEMENT 2008-2009 2010-2012 2013
More information// Reform of the Land Use and Building Act in Finland. PowerPoint template 16:9
// Reform of the Land Use and Building Act in Finland PowerPoint template 16:9 Finnish land use planning system starting from 1 January 2000 National Land Use Guidelines Approved by the Council of State
More informationDeliverable D9.5. Dissemination Material
EU COMMUNITY ICT-2013.5.4 ICT for Governance and Policy Modelling EU COMMUNITY MERGES ICT AND SOCIAL MEDIA NETWORKING WITH ESTABLISHED ONLINE MEDIAAND STAKEHOLDER GROUPS TO CULTIVATE TRANSPARENCY, ENHANCE
More informationTORONTO COMPLETE STREETS GUIDELINES
TORONTO COMPLETE STREETS GUIDELINES Presentation by Fiona Chapman, Manager, Pedestrian Projects Public Realm Section, Transportation Services, City of Toronto June 2017 PURPOSE OF THE PROJECT To develop
More informationINTERNATIONAL SEMINAR
UNDER THE DISTINGUISHED PATRONAGE OF THE Ministry of Environment, Nature Protection and Sustainable Development (MINEPDED) INTERNATIONAL SEMINAR THEME "Evolution of Environmental Assessment systems in
More informationDefinition of Cumulative Landscape and Visual Effects
SECTION 5: GUIDANCE FOR ASSESSING CUMULATIVE LANDSCAPE AND VISUAL EFFECTS 5.1 Although this landscape sensitivity and capacity study has identified that parts of the National Park may be able to accommodate
More informationCity of Toronto. Emery Village Transportation Master Plan
City of Toronto Emery Village Transportation Master Plan May 2009 Emery Village Transportation Master Plan Toronto, ON May 2009 Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel:
More informationPortage Parkway Environmental Assessment Public Information Centre No. 1
City of Vaughan Portage Parkway Environmental Assessment Public Information Centre No. 1 November 25, 2015 Welcome to the Public Information Centre This first Public Information Centre (PIC) introduces
More informationHandout Material. Invitation to Developers for Second Zone, Umekita Area
December 21, 2017 West Branch Office Urban Renaissance Agency Handout Material Invitation to Developers for Second Zone, Umekita Area We hereby notify the opening of an Invitation to Developers for the
More information1.0 Purpose of a Secondary Plan for the Masonville Transit Village
Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village
More informationiwater project Holistic, Sustainable and Cost-Effective Stormwater Management
iwater project Holistic, Sustainable and Cost-Effective Stormwater Management Nika Kotoviča Copenhagen, 30 November 2017 Urban Climate Adaptation in the Baltic Sea Region Training Workshops Integrated
More information