PECO Smart Ideas for Your Business Commercial & Industrial Program Application Manual Q1, 2017

Size: px
Start display at page:

Download "PECO Smart Ideas for Your Business Commercial & Industrial Program Application Manual Q1, 2017"

Transcription

1 An Exelon Company PECO Smart Ideas for Your Business Commercial & Industrial Program Application Manual Q1, 2017 smart~ ideas ~ for your business

2 Contents Commercial & Industrial Program Application Manual... 5 Terms and Conditions... 7 Retrofit Lighting Solutions General Linear Fluorescent Lamp and Ballast Specification Requirements LED Lamps and Fixtures Minimum Watts Reduced Linear LED (Tubes) Permanent Fixture Removal LED Traffic Signals LED Traffic Signals Incentive Table New Construction Lighting Specifications New Construction Lighting Incentives Table Exterior New Construction Lighting HVAC Equipment Air-Source Air Conditioners and Air-Source Heat Pumps Package Terminal Systems (Replacements) Ductless Mini-Split Heat Pump <5.4 Tons Geothermal Heat Pump Other HVAC Equipment Hotel Guest Room Occupancy Sensor ECM Circulation Fan ECM Circulation Pump Retrocomissioning, Cooling Systems Retrocomissioning, Whole Building Energy Management System Demand Controlled Ventilation Other HVAC Incentives Table Unitary HVAC Chillers Air-Cooled Chillers, Water Cooled Positive Displacement Reciprocating Chillers, and Water Cooled Centrifugal Chillers Refrigeration Anti-Sweat Heater Controls Evaporator Fan Controls Floating Head Pressure Controls Automatic Door Closers for Walk-In Coolers and Freezers EC Motor for Walk-in/Reach-in Refrigerated cases or Freezer cases Q pg 2

3 ENERGY STAR Solid Door Freezer and Glass Door Freezer and Refrigerators Refrigeration Suction Pipe Insulation Night Cover Strip Curtain on Walk-In Cooler/Freezer Evaporator Coil Defrost Control Variable Speed Refrigeration Compressor Add Doors to Open Refrigerated Cases Door Gaskets Zero Energy Doors Air Cooled Refrigeration Condenser Oversized Condenser with VFD Case Light Occupancy Controls LED Open Case Lighting LED Enclosed Case Lighting, Refrigerated LED Enclosed Case Lighting, Freezer Food Service Beverage and Snack Machine Controls ENERGY STAR Refrigerated Beverage Vending Machines ENERGY STAR Electric Steam Cooker ENERGY STAR Electric Combination Oven ENERGY STAR Commercial Convection Oven ENERGY STAR Commercial Fryers ENERGY STAR Commercial Hot Holding Cabinet Motors and Variable Frequency Drives Early Replacement Motors Variable Frequency Drives on HVAC Fan Applications: Variable Frequency Drives on Pump Applications: Variable Speed Control for Kitchen Exhaust Hoods: Variable Speed Drives for Process or Other Equipment: Domestic Hot Water Fuel Switch: Electric Water Heater to ENERGY STAR Commercial Gas Water Heater Heat Pump Water Heater Low Flow Pre-Rinse Spray Valve Domestic Hot Water Incentive Table Compressed Air Systems No-loss Condensate Drain Air-Entraining air nozzle Q pg 3

4 Storage Tanks for Load/No Load Screw Compressors Cycling Refrigerated Thermal Mass Dryer Variable Speed Air Compressor Compressed Air System Optimization Compressed Air Systems Incentive Table Data Centers Air Cooled Chiller Air Cooled Chiller without Condenser Computer Room Air Conditioner Computer Room Air Handler, Variable Speed Replacing constant speed CRAH with VSD CRAH Water Cooled Centrifugal Chiller Water Cooled Positive Displacement or Reciprocating Chiller Uninterruptible Power Supply Mainframe Refresh Server Refresh Whole Building Systems Whole Building Systems Approach How to Apply for Whole Building Systems Incentives Customer Eligibility Project Eligibility Whole Building Systems Incentives Table Custom Project Specifications Appendix: Program Updates Summary (Q1 2017) Q pg 4

5 PECO Smart Ideas for Your Business Commercial & Industrial Program Application Manual Program is offered and incentive values and measures contained in this application are valid from June 1, 2016 to May 31, 2021, or until funds are exhausted. Incentive values and measures may be modified or terminated at any time without prior notice. Follow This Easy Process: Step 1: Verify your Eligibility Applicant must verify that they are a business customer of PECO (commercial, industrial, governmental, institutional, and non-profit). Multifamily applicants may also apply. Detailed information is posted on Project must be a new facility improvement that results in an improvement in electric energy efficiency (kwh) and/or a permanent reduction in electric energy usage. All equipment must be installed in facilities served by PECO, with a valid PECO account number on an eligible PECO non-residential rate. Refer to the technical specifications in this Application Manual to check eligibility of equipment for incentives. Step 2: Submit Pre-approval Application to Reserve Funds A pre-approval application must be submitted before you purchase equipment or technology for which the incentive is being requested. Applications can be submitted via online, mail, , or fax. pecosmartideas@dnvgl.com Mail PECO Smart Ideas for Your Business 4377 County Line Road Chalfont, PA Fax Incentive funds will be reserved when your pre approval application is approved. Complete the Applicant Information form for each of the measures that you are installing. Lighting projects require a lighting worksheet and inventory to be completed in addition to the application form. You may submit the application via mail, fax or . For some projects, a pre-installation inspection will be required. Most projects require documentation of the equipment being replaced. Incentive funds are reserved for 90 days. Contact the PECO Smart Ideas team for specific questions regarding funding reservations and extensions. Q pg 5

6 Step 3: Install Equipment or Perform Project Work The equipment installed must meet or exceed the specifications and requirements found in measures tables and detailed in the Application Manual. Equipment must be installed within the program period. Step 4: Submit Final Application Submit a final application as soon as possible after the project is completed, within 90 days of project completion but no later than May 15, The final application is the same form as the pre-approval application. Include the following documentation with your final application: customer/contractor information, a signed final application agreement, itemized invoices, specifications, and an updated scope of work. The program team will review your final application. For some projects, a final inspection will be part of the final review. The program team will send incentive checks four to six weeks after your final application is approved. If you need assistance, please contact our program hotline Please visit our website Pre-Approval Application Checklist Final Application Checklist Registration Number on Application Signed Final Agreement Form (if applicable) Itemized Invoices Documentation of existing equipment for Equipment Specifications/Cut Sheets for retrofit projects changes in equipment Lighting worksheet for lighting projects Certificate of Occupancy (for New Equipment Specifications/Cut Sheets Construction projects only) Copy of Current PECO Bill Updated Scope if project changed (please Customer Signature on Customer Acknowledgement advise program staff during installation if scope changes. Increase in incentive amount is not guaranteed). Supporting Documentation Guidelines Lighting: Please attempt to submit photos of existing lighting. Projects >750,000 kwh require lighting logging data. DLC/ENERGY STAR certification documentation submittal will streamline review process. Plans/engineering submittals will be requested for large projects. Square footage for centrally-controlled lighting control systems may be required. VFDs: Nameplate photos and/or engineering schedules of existing motors. Custom or large (>250,000 KWh) mechanical projects: M&V plan will be required for larger projects. Program engineers will contact participants to establish M&V protocols. Q pg 6

7 Terms and Conditions PECO Energy Company (PECO) is offering prescriptive and custom incentives under the PECO Smart Ideas for Your Business to facilitate the implementation of cost-effective energy efficiency measures for commercial and industrial customers. Any and all energy savings or environmental credits generated by the project described in this application will be retained by PECO. Funds are limited and subject to availability. The program may be modified or terminated without prior notice. Program Effective Dates The program is available until May 31, The current cycle year runs from June 1, 2016, through May 31, 2017 ( Program Year Eight ). Incentives are offered until approved funds are exhausted or until May 15, 2021, whichever comes first. All projects must be completed and the final applications received no later than May 15, 2021 to be eligible for incentives. Program and Project Eligibility Smart Ideas for Your Business incentives are available for the common energy efficiency measures listed in this Application Manual. Program incentives are available under PECO Smart Ideas for Your Business to non-residential customers within PECO's service territory. These incentives are available to all customers who pay into the Energy Efficiency Charge and receive their electricity over PECO s distribution network, regardless of the retail electric supplier. Most commercial projects involving energy savings are eligible. Incentives are available for both prescriptive and custom measures. Prescriptive measures are energy efficiency measures with pre-determined savings and incentive levels, and are paid on a per unit basis. These measures are available for specific Lighting, HVAC, Refrigeration and Food Service, Variable Speed/Frequency Drives, Compressed Air and Domestic Water Heater measures. Custom measures include energy efficiency measures not listed on the prescriptive application forms. Custom incentives must be approved by PECO in advance, are determined on a case-by-case basis, and are paid per unit of energy (kwh) saved. Examples of projects that are NOT eligible for PECO Smart Ideas for Your Business include on site electricity generation, projects focused primarily on power factor improvement, and renewable energy projects. Installation must be at the customer s facility and provide 100% of the energy benefits as stated in the application for a period of five years or for the life of the product, whichever is less. PECO has the right to claim a pro-rated amount of any incentive paid if the customer ceases to be a distribution customer of PECO, or removes the equipment or systems at any time during the five-year period or the life of the measure. Incentive Payment Limits Prescriptive and custom incentives cannot exceed 100% of the customer s total costs. Contractor labor costs can be considered in the total project cost, while customer internal labor costs cannot. Q pg 7

8 Application Review Process Pre-approval is required for all projects. A pre-approval application must be submitted before you purchase equipment or technology for which the incentive is being requested. Pre-approval is not a guarantee of program acceptance. Completed applications will be reviewed in the order received. The location or business name on the invoice must be the same as the application information. The incentive is reserved for the project when PECO receives a complete preapproval application and determines that the project meets the program eligibility requirements. Applicants who submit incomplete applications will be notified of deficiencies upon review of the application, and could lose their place in line in the review process until all requested information is received. Applicants are encouraged to call the program hotline if they have any questions about documentation requirements. PECO will review final applications for eligibility and completeness. The final application and all required supporting documentation must be received within 90 days of project completion but no later than May 15, 2021 to be eligible for incentives. Project documentation, including original dated invoices for the purchase and installation of the measures and/or product specification sheets, is required. The project invoice must provide sufficient detail to separate the project cost from the cost of other services such as repairs and building code compliance. PECO reserves the right to request additional supporting documentation necessary to ensure measure eligibility and verify that the expected energy savings will occur. Requested information may include, but is not limited to: equipment purchase dates, installation dates, proof that the equipment is operational, manufacturer specifications, warranty information, and proof of customer copayment. PECO will make every effort to maintain the confidentiality of customer information except that such information must be provided to the PA PUC and its contractor, as well as PECO s contractor for measurement and evaluation. The installed measures are not eligible for incentives from other PA Act 129 Phase 3 Energy Efficiency Programs. Inspections and/or PUC s Statewide Program Evaluation PECO, its agents, measurement and verification contractor, and/or the PUC statewide program evaluator have the right to audit or inspect all projects to verify compliance with the program rules and verify the accuracy of project documentation. This may include pre-installation and/or post-installation inspections, detailed lighting layout descriptions, metering, data collection, interviews, and utility bill data analyses. The customer must allow access to project documents and the facility where the measures were installed for a period of five years after receipt of incentive payment by PECO. Requirements for Custom Project Electricity Savings Calculation The annual electricity savings must be calculated for custom projects using industry accepted engineering algorithms or simulation models. The applicant must estimate the annual electricity usage of both the existing and proposed equipment based on the current operation of the facility. If the existing equipment is at the end of its rated useful life, the applicant must substitute equipment that would meet the applicable federal and local energy codes as the baseline when calculating the annual energy savings. The applicant must be able to clearly describe the method used to calculate the savings. The applicant must provide all assumptions used in the calculations and document the source for these assumptions. Further information on custom measures can be found in the Application Manual, which can be downloaded from Q pg 8

9 method and assumptions used by the applicant to calculate the annual savings will be reviewed by PECO. PECO has sole and final determination of the annual energy savings to be used in calculating the incentive amount. PECO also reserves the right to require specific measurement and verification activities including monitoring both before and after the retrofit and to base the incentive payment on the results of these activities. PECO may need to conduct inspections both before and after the retrofit projects to verify equipment and operation conditions. Pre-approval application must be submitted while the existing equipment is still in operation in order to allow PECO the opportunity to view the existing equipment. Tax Liability Incentives may be taxable for most taxpayers. If the incentive is more than $600, it will be reported to the IRS and the customer will be provided with an IRS form 1099, unless the customer is exempt. PECO is not responsible for any tax liability that may be imposed on any customer as a result of the payment of program incentives. All customers must supply their Federal Tax Identification number to PECO in order to receive a Program Incentive. Please consult with your tax professional for information on the tax treatment of the incentives. No Endorsement PECO does not endorse, support or recommend any particular manufacturer, product or system design in promoting this program and PECO does not guarantee any specific level of energy savings with respect to any product, system design or energy efficiency measure. Warranties PECO DOES NOT WARRANT THE PERFORMANCE OF INSTALLED EQUIPMENT, AND/OR SERVICES RENDERED AS PART OF THIS PROGRAM, EITHER EXPRESSLY OR IMPLICITLY. NO WARRANTIES OR REPRESENTATIONS OF ANY KIND, WHETHER STATUTORY, EXPRESSED,OR IMPLIED, INCLUDING, WITHOUT LIMITATIONS, WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE REGARDING EQUIPMENT OR SERVICES PROVIDED BY A MANUFACTURER OR VENDOR. CONTACT YOUR VENDOR/SERVICES PROVIDER FOR DETAILS REGARDING PERFORMANCE AND WARRANTIES. Limitation of Liability By virtue of participating in this program, customers agree to waive any and all claims or damages against PECO, except the receipt of the program incentive, if eligible. Participating Customers agree that PECO s liability, in connection with this program, is limited to paying the program incentive specified. Under no circumstances shall PECO, its representatives, agents or subcontractors, be liable for any lost profits, special, punitive, consequential or incidental damages or for any other damages or claims connected with or resulting from participation in this program. Assignment Customers may assign a portion or all of their program incentive payment to a specified vendor. Customer s Certification Customer certifies that he/she purchased and installed the equipment listed in the application. Customer agrees that all information is true and that he/she has conformed to all of the program and equipment requirements listed in the application. Q pg 9

10 Termination PECO reserves the right to extend, modify (this includes modification of program incentive levels) or terminate this program without prior or further notice. Acknowledgement I have read, understood and am in compliance with all rules and regulations concerning this incentive program. I certify that all information provided is correct to the best of my knowledge, and I give PECO permission to share my records with the Pennsylvania PUC, and agents, representatives and contractors it selects to manage, coordinate or evaluate the program. Additionally, I hereby authorize PECO to have reasonable access to my property to inspect the installation and performance of the equipment and installations that are eligible for incentives under the guidelines of the program. Q pg 10

11 Retrofit Lighting Solutions General Linear Fluorescent Lamp and Ballast Specification Requirements 32w 4ft HPT8 and reduced wattage T8 lamps must be listed on the Consortium of Energy Efficiency (CEE) product list or must meet CEE standards. For further information, visit LED Lamps and Fixtures The integral lamp or fixture must appear on the Energy Star Qualified Products List or the Design Lights Consortium Qualified Products List. Energy Star Qualified Fixture Product List: Energy Star Qualified Integral LED lamps: Design Lights Qualified Product List: Minimum Watts Reduced Energy efficient fixtures/lamps are required to be lower in load than existing fixtures/lamps by specified levels, the Minimum Watts Reduced. Each lighting measure has its own Minimum Watts Reduced that must be met as eligibility requirement. These levels are listed in the lighting worksheet Lighting Incentives Table tab and reproduced below. Linear LED (Tubes) Linear LED lamps must be listed on the Design Lights TM Consortium (DLC) Qualified Products List. Type A LEDs Type A LED linear lamps are powered by a fluorescent ballast. If present, existing magnetic ballast must be removed and replaced with a compatible energy- efficient electronic ballast DLC Primary Use Requirement DLC-listed equipment must be classified with one of the following Primary Use designations: o Replacement Lamps ("Plug and Play") (UL Type A) Label must be affixed to the interior of fixture, in a prominent location. Label should indicate that the fixture has been retrofitted with TLEDs and that fluorescent lamps should not be installed as replacements. Type B LEDs Type B LED tubes are powered by an internal driver Existing fluorescent ballast must be removed and fixture s incoming power wires are connected directly to the lamp sockets. Strict adherence to installation instructions is critical when rewiring existing fixtures. Q pg 11

12 The LED linear lamps must be delivered as part of a UL 1598C Classified Luminaire Retrofit Kit with instructions explaining the LED linear lamps must be installed on a luminaire that is already UL Listed. The retrofitted luminaire must be clearly identified using the label included with the Retrofit Kit, indicating that the luminaire has been modified and can no longer operate the originally intended fluorescent lamp(s). Type C LEDs Type C LED linear lamps are powered by an external driver. Existing fluorescent ballast must be removed and replaced with a compatible external driver. DLC Primary Use Requirement DLC-listed equipment must be classified with one of the following Primary Use designations: o 2-lamp External Driver Lamp-Style Retrofit Kits (UL Type C) o 3-lamp External Driver Style Retrofit Kits (UL Type C) o 4-lamp External Driver Lamp-Style Retrofit Kits (UL Type C) Technical specifications (manufacturer s cut sheet) for the driver must be submitted with the application. Permanent Fixture Removal This measure is to be used only in conjunction with lighting retrofits and is intended for spaces that are currently over lit. Incentives are paid $0.10/watt reduced only on fixtures removed, not on total watts reduced for entire projects. Overall net lumen reduction must be achieved in order to qualify for a permanent fixture removal incentive. Example: (20) Existing fixtures at 10,000 lumens each = 200,000 lumens. (14) Proposed fixtures at 15,000 lumens each = 210,000 lumens Since there is not a net reduction in lumens, the six fixtures removed would not be eligible for a permanent fixture removal incentive. It is encouraged that spaces meet recommended foot-candle levels as detailed by IESNA Lighting Design Guide. A Program Engineer will evaluate lumens reduction based on the type of fixtures removed and the DLC lumens rating of the fixtures installed. Q pg 12

13 RETROFIT INTERIOR LIGHTING TABLE Measure Code CFL Lighting Min. Measure Name Watts Incentive Unit Reduced CFL1A ENERGY STAR Hard-Wired CFL fixture: Indoor Accent/Track 20 $2.50 lamp Technical Specifications CFL1B CFL1C CFL2A CFL2B CFL2C CFL2D CFL3A ENERGY STAR Hard-Wired CFL fixture: Indoor Directional Wall/Ceiling Mount ENERGY STAR Hard-Wired CFL fixture: Indoor Omni-Directional Wall/Ceiling Mount ENERGY STAR Hard-Wired CFL fixture: Indoor Portable Lamp/Torchiere ENERGY STAR Hard-Wired CFL fixture: Indoor Recessed Downlight ENERGY STAR Hard-Wired CFL fixture: Indoor Recessed Downlight Retrofit Module ENERGY STAR Hard-Wired CFL fixture: Indoor Under Cabinet/Strip ENERGY STAR Hard-Wired CFL fixture: Outdoor Directional Wall/Ceiling/Ground/Pole Mount 20 $2.50 lamp 20 $2.50 lamp 20 $1 lamp 20 $1 lamp 20 $1 lamp 20 $1 lamp 30 $3 lamp Only complete new fixtures or modular hardwired retrofits with hardwired electronic ballasts qualify. CFL ballast must be programmed start or programmed rapid start with a power factor (PF) 0.90 and a total harmonic distortion (THD) 20%. Screw-in CFLs are not eligible for this incentive. CFL3B ENERGY STAR Hard-Wired CFL fixture: Outdoor Omni- Directional Wall/Ceiling/Ground/Pole Mount 30 $3 lamp CFL3C ENERGY STAR Hard-Wired CFL fixture: Outdoor Recessed Downlight 30 $3 lamp CFL3D ENERGY STAR Hard-Wired CFL fixture: Outdoor Recessed Downlight Retrofit Module 30 $3 lamp Q pg 13

14 Fluorescent Lighting FL1 Interior T5 New Fluorescent Fixture w/ Electronic Ballast 11 $5 fixture Any T5 is eligible FL2 T5HO High-Bay Fixture 54 $25 fixture Fixture efficiency must be > 90% High bay fixtures must be installed at least 15ft above finished floor; Must use High Ballast Factor (>.96) FL3 HPT8 High-Bay Fixture 82 $20 fixture Fixture efficiency must be >= 85% High bay fixtures must be installed at least 15ft above finished floor FL4 HPT8 Fixture 20 $5 fixture Must use Low Ballast Factor (<.80) FL5 RW T8 Lamp - Lamp only 10 $3 lamp Existing T8 fixture re-ballasting to a higher ballast factor are not eligible. HID Measures HID1 Ceramic HID Watt 95 $13 fixture HID2 Ceramic HID - 70 Watt 155 $13 fixture HID3 Ceramic HID Watt 170 $15 fixture HID4 Pulse Start HID nominal Watts 72 $10 fixture HID5 Pulse Start HID nominal Watts 100 $13 fixture HID6 Pulse Start HID nominal Watts 400 $15 fixture LED1 Interior LED Fixtures ENERGY STAR Integral LED fixture: Indoor Recessed Downlight Retrofit Module LED2 ENERGY STAR Integral LED fixture: Indoor Recessed Downlight 38 $7 fixture Replacing higher wattage HID or High Pressure Sodium or Mercury Vapor Interior replacements only 38 $7 fixture Retrofit module of existing recessed fixture. LED3 ENERGY STAR Integral LED fixture: Indoor Portable Lamp/Torchiere 30 $7 fixture LED4 LED Accent/Track Lighting Fixtures 32 $6 head New indoor recessed downlight fixture LED5 LED Low-Bay Fixtures 150 $20 fixture For replacement of HID fixtures mounted 15' above LED6 LED Low-Bay Retrofit Kits 150 $20 fixture finished floor LED8 LED Troffer Fixtures and Retrofit Kits 5 $10 fixture LED9 LED Surface and Suspended Linear Fixtures 25 $10 fixture Q pg 14 Troffers typically installed in lay-in ceilings, 2x2, 2x4 configuration Examples of LED surface-mounted luminaires include: wrap, vapor tight, and strip fixtures (non-cooler).

15 Interior LED High Bay Fixtures LED10A LED High-Bay Fixtures, 20,000 LED lumens 150 $50 fixture LED10B LED High-Bay Fixtures, > 20,000 LED lumens 225 $75 fixture LED11A LED High-Bay Retrofit Kits, 20,000 LED lumens 150 $50 fixture High bay fixtures must be installed at least 15ft above finished floor; LED11B LED High-Bay Retrofit Kits, >20,000 LED lumens 225 $75 fixture LED12 LED13 LED14 LED Parking Garage and Canopy Fixtures LED Parking Garage and Canopy Fixtures and Retrofit Kits, Outdoor <= 5,000 LED lumens LED Parking Garage and Canopy Fixtures and Retrofit Kits, Outdoor 5,001-10,000 LED lumens LED Parking Garage and Canopy Fixtures and Retrofit Kits, Outdoor > 10,000 LED lumens LED Screw -in Lamps 50 $15 fixture 70 $30 fixture 150 $50 fixture Fixtures must be physically installed in a parking garage (area where vehicles are physically parked) or fuel pump canopy. Typically represents replacement of 175 W Metal Halide or equivalent. Typically represents replacement of Metal Halide or equivalent greater than 175W and less than 400W. Product must be installed in a parking garage (area where vehicles are physically parked) or fuel pump canopy Typically represents replacement of 400 W Metal Halide or equivalent. Product must be physically installed in a parking garage (area where vehicles are physically parked) or fuel pump canopy. ESLED1 ENERGY STAR Screw-in LED Bulb (Decorative: Globe) 14 $5 lamp Lamp with globe shape such as type G ESLED2 ENERGY STAR Screw-in LED Bulb (Decorative: non-globe 14 $5 lamp ESLED3 ENERGY STAR Screw-in LED Bulb and Low Voltage Mini- Reflector Bulbs (Directional/Reflector) Lamps with non-globe or candle-like shape such as type B, C, CA, F 14 $5 lamp ANSI standard PAR and MR type lamps ESLED4 ENERGY STAR Screw-in LED Bulb (Standard) 14 $5 lamp Lamp such as A series ESLED5 ENERGY STAR Screw-in LED Bulb (Standard: 3-Way) 14 $5 lamp Lamp such as A series with three light levels Q pg 15

16 ESLED6 ESLED7 ESLED8 LED Screw -in Lamps - Smart Bulbs ENERGY STAR Screw-in LED Bulb (Decorative: Globe; Smart Bulb) ENERGY STAR Screw-in LED Bulb (Decorative: non-globe; Smart Bulb) ENERGY STAR Screw-in LED Bulb (Directional/Reflector; Smart Bulb) 14 $5 lamp Lamp with globe shape such as type G 14 $5 lamp Lamps with non-globe or candle-like shape such as type B, C, CA, F 14 $5 lamp ANSI standard PAR lamps ESLED9 ENERGY STAR Screw-in LED Bulb (Standard: Smart Bulb) 14 $5 lamp Lamp such as A series LED Tubes (replacing fluorescent) TLED1 LED Replacement Lamps (Tubes), 2' 5 $2.50 lamp TLED2 LED Replacement Lamps (Tubes), 4' 10 $4 lamp Refer to Lighting Technical Specifications for requirements DLC Type A, B and C are eligible. Type B linear (Interior driver) LEDs have the following installation requirements: Existing fluorescent ballast must be removed and fixture s incoming power wires are connected directly to the lamp sockets. Strict adherence to installation instructions is critical when rewiring existing fixtures. The LED linear lamps must be delivered as part of a UL 1598C Classified Luminaire Retrofit Kit with instructions explaining the LED linear lamps must be installed on a luminaire that is already UL Listed. The retrofitted luminaire must be clearly identified using the label included with the Retrofit Kit, indicating that the luminaire has been modified and can no longer operate the originally intended fluorescent lamp(s). Q pg 16

17 ELED1 ELED2 LED Exterior Lighting ENERGY STAR Integral LED fixture: Outdoor Recessed Downlight Retrofit Module ENERGY STAR Integral LED fixture: Outdoor Recessed Downlight 24 $10 module 24 $10 fixture ELED3 LED Outdoor Flood Light Fixtures <= 5,000 LED lumens 50 $10 fixture ELED4 LED Outdoor Flood Light Fixtures > 5,000 LED lumens 70 $15 fixture ELED5 ELED6 ELED7 ELED8 ELED9 LED Pole/Arm Mounted Parking and Roadway Fixtures and Retrofit Kits, <= 5,000 LED lumens LED Pole/Arm Mounted Parking and Roadway Fixtures and Retrofit Kits, Outdoor > 10,000 LED lumens LED Pole/Arm Mounted Parking and Roadway Fixtures and Retrofit Kits, Outdoor 5,001-10,000 LED lumens LED Wall Mount Fixtures and Retrofit Kits, Outdoor <= 5,000 LED lumens LED Wall Mount Fixtures and Retrofit Kits, Outdoor > 5,000 LED lumens Permanent Fixture Removal 50 $25 fixture 150 $75 fixture 70 $50 fixture 50 $25 fixture 70 $50 fixture PFRA Indoor Permanent Fixture Removal combined with lighting retrofit. n/a $0.10 PFRB Outdoor Permanent Fixture Removal combined with lighting retrofit. n/a $0.10 LEDEXIT Other LED Lighting LED Exit Sign watt removed watt removed SIGN1A Indoor LED Channel Signage $8 letter ENERGY STAR or DLC Qualified fixtures Typically represents replacement of 175 W Metal Halide or equivalent. Fixtures must be DLC qualified. Typically represents replacement of Metal Halide or equivalent greater than 175W. Fixtures must be DLC qualified. Typically represents replacement of 175 W Metal Halide or equivalent. Product must be DLC qualified. Typically represents replacement of Metal Halide or equivalent greater than 400W. Product must be DLC listed. Typically represents replacement of Metal Halide or equivalent greater than 175W and less than 400W. Product must be DLC listed. Typically represents replacement of 175 W Metal Halide or equivalent. Product must be DLC qualified. Typically represents replacement of Metal Halide or equivalent greater than 175W. Product must be DLC qualified. Incentive only valid when units = fixture in this table. Incentive is only offered when net lumens are reduced. $2 sign Replacing Incandescent or Fluorescent SIGN1B Outdoor LED Channel Signage $8 letter n/a Replacing Neon Q pg 17

18 CTL Lighting Controls Unitary Sensor Controls CLC Interior Central Lighting Controls $ DAYOCC Controls Combination - Daylighting and Occupancy Fixture Mounted n/a $15.00 sensor square foot of area under control Passive infrared, ultrasonic detectors are eligible. Includes daylighting controls and all occupancy controls Controls can be on/off, stepped or continuous (dimming). Daylight sensor controls are required to be commissioned in order to ensure proper sensor calibration and energy savings. Minimum of 30 watts controlled per control Automated central lighting control systems with override capabilities. This measure includes centrally-controlled time clocks, wireless on off switches, bi level switches, computer based controls, pre-set scene selection, dimmable ballasts and on-off dimmer switches for non-personal tuning. Floor plan must be submitted verifying square footage. $15.00 sensor Minimum of 30 watts controlled per control Q pg 18

19 LED Traffic Signals This measure applies to the early replacement of existing incandescent traffic lights and pedestrian signals with LEDs. New LED traffic signals must comply with ENERGY STAR requirements, which can be found at LED Traffic Signals Incentive Table Round Traffic Signals 8" Red 8" Yellow 8" Green 12" Red 12" Yellow 12" Green Turn Arrow Signals 8" Red 8" Yellow 8" Green 12" Red 12" Yellow 12" Green Pedestrian Signals 9" Pedestrian Only 12" Hand Only 12" Pedestrian Only 12" Countdown Only 12" Pedestrian and Hand Overlay 16" Pedestrian and Hand Side by Side 16" Pedestrian and Hand Overlay 16" Hand and Countdown Side-by- Side Incentive per Signal $15 $13 $13 Q pg 19

20 New Construction Lighting Specifications Under the Lighting Power Density Approach, the lighting power installed is compared with the lighting power allowed by code. Incentives are available for systems where the installed lighting power is lower than the code-allowed power by at least 10%. Savings are based on the Lighting Power Density (LPD) calculated on a watts per square foot basis. Incentives will be paid only on the area of the building where the lighting installation is complete and is ready for occupancy. If a portion of a building is not built-out such that the lighting in an area is not complete and ready for occupancy, then that portion is not eligible for an incentive. Baseline lighting power density is based on ASHRAE Either the "Space-by-Space" or "Building Area" method may be used to calculate the LPD for the purposes of the incentive. Required Documentation: Lighting Worksheet COMcheck Interior Lighting Report or equivalent analysis demonstrating space-byspace or building area calculations. Reflected ceiling plans and electrical plan sheets showing lighting fixture layout Lighting fixture schedule sheet including fixture counts Fixture submittal or specification sheets showing model number and rated fixture wattage Architectural floor plans displaying floor area affected by proposed lighting installation New Construction Lighting Incentives Table Lighting Watts/sq. ft. % Improvement over of Code Incentive >= 10% and < 20% $0.035/sq. >= 20% and < 30% $0.07/sq. ft. >= 30% and < 40% $0.105/sq. >= 40% $0.21/ sq. ft. Lighting Controls that Exceed Code Requirements Incentives will be paid on a ($0.05/kWh) custom basis. Please contact Program Staff for eligibility of lighting controls for New Construction projects. Interior Occupancy Sensors Incentives are offered for occupancy-based controls in areas where they are not required by code. Passive infrared, ultrasonic detectors and fixture-integrated sensors or sensors with a combination sensor are eligible. All sensors must be hard-wired and control interior lighting fixtures. The incentive is per Watt controlled. An inventory of the controlled fixtures and their wattage must be provided for each sensor with the Final Application. Daylight Dimming System Incentives are offered for daylight sensor controls in spaces with suitable available ambient light for at least part of the day. Light may be through skylights, clerestories, windows or light tubes. The controls can be on/off, stepped or continuous dimming. The on/off controller should turn off artificial lighting when the interior illuminance meets the desired indoor lighting level. The stepped controller generally dims the artificial lighting 50% when the interior illuminance levels reach 50% of the desired lighting levels. Continuous or dimming controllers dim artificial lighting proportionally to the available ambient light. All types of daylight sensor controls are required to be commissioned in order to ensure proper sensor calibration and energy savings. Required Documentation: Cut sheets or submittals of lighting control systems, Reflected ceiling plans or schedule showing which fixtures are controlled by lighting controls. Q pg 20

21 New Construction Lighting Power Density Code Requirements Space by Space Method Building Specific Space Types LPD (W/ft2) Building Specific Space Types LPD (W/ft2) Gymnasium/Exercise Center Automotive Service/Repair 0.7 Playing Area 1.4 Manufacturing Exercise Area 0.9 Low (<25 ft Floor to Ceiling Height) 1.2 Courthouse/Police Station/Penitentiary High (>25 ft Floor to Ceiling Height) 1.7 Courtroom 1.9 Detailed Manufacturing 2.1 Confinement Cells 0.9 Equipment Room 1.2 Judges Chambers 1.3 Control Room 0.5 Fire Stations Hotel/Motel Guest Rooms 1.1 Fire Station Engine Room 0.8 Dormitory Living Quarters 1.1 Sleeping Quarters 0.3 Museum Post Office-Sorting Area 1.2 General Exhibition 1.0 Convention Center-Exhibit Space 1.3 Restoration 1.7 Library Bank/Office Banking Activity Area 1.5 Card File and Cataloging 1.1 Religious Buildings Stacks 1.7 Worship Pulpit, Choir 2.4 Hospital Reading Area 1.2 Fellowship Hall 0.9 Emergency 2.7 Retail Sales Area [For accent lighting, see (c)] Recovery 0.8 Mall Concourse 1.7 Nurse Station 1.0 Sports Arena Exam/Treatment 1.5 Ring Sports Area 2.7 Pharmacy 1.2 Court Sports Area 2.3 Patient Room 0.7 Indoor Playing Field Area 1.4 Operating Room 2.2 Warehouse Nursery 0.6 Fine Material Storage 1.4 Medical Supply 1.4 Medium/Bulky Material Storage 0.9 Physical Therapy 0.9 Parking Garage Garage Area 0.2 Radiology 0.4 Transportation Laundry Washing 0.6 Airport Concourse Air/Train/Bus Baggage Area 1.0 Terminal Ticket Counter 1.5 Q pg 21

22 New Construction Lighting Power Density Code Requirements Building Area Method Building Area Type 221 LPD (W/ft2) Automotive facility 0.9 Convention center 1.2 Courthouse 1.2 Dining: bar lounge/leisure 1.3 Dining: cafeteria/fast food 1.4 Dining: family 1.6 Dormitory 1 Exercise center 1 Gymnasium 1.1 Health-care clinic 1 Hospital 1.2 Hotel 1 Library 1.3 Manufacturing facility 1.3 Motel 1 Motion picture theater 1.2 Building Area Type LPD (W/ft2) Multifamily 0.7 Museum 1.1 Office 1 Parking garage 0.3 Penitentiary 1 Performing arts theater 1.6 Police/fire station 1 Post office 1.1 Religious building 1.3 Retail 1.5 School/university 1.2 Sports arena 1.1 Town hall 1.1 Transportation 1 Warehouse 0.8 Workshop In cases where both a common space type and a building specific type are listed the building specific space type shall apply. Q pg 22

23 Exterior New Construction Lighting Exterior New Construction savings over code lighting power density will be incentivized using custom lighting measure at $0.05/kWh rate. Participants must submit exterior lighting plans, Submittals, COMCHECK REPORT and lighting schedule for exterior lighting. Savings are calculated from the LPD (W/sq. ft.) indicated below. Additional information may be required based on the building exterior type and space description indicated below. To contribute to incentive, LEDs must satisfy program requirements for DLC, Energy Star or equivalent listing. Required Documentation: COMcheck Interior Lighting Report or equivalent analysis demonstrating space-by-space or building area calculations. Drawings showing lighting fixture layout Lighting fixture schedule sheet including fixture counts Fixture submittal or specification sheets showing model number and rated fixture wattage Q pg 23

24 Building Exterior Space Description LPD Unc,o erect Pariki Ilg Area Parlu rng ots arnd Drives 0.15 W.fW B i ing Grournds W al :1Yays less Hlan 11] e 1..0 Wltirneru- 00 W a 'Nays 10 de or greater 12 W!Plaza a reas Spec rest re areas Stain.h1ays 1.ow, 2 B i ing 8ntram:es and Exits Ma efilbies :m w,r near foot of door 'width Other d oors 2o w 1r ear foot of door width Ctmqpies and Overhi:mgs Fre e starndil'lg and a ched tmd 1.2s w m2: m erhangs 0 door sales Op en areas,(ind udi Ilg ve! id e sales 0.5 W lo ) street frontage far vehicle sales lots in addi on to ",open are-0 lo~nce 21] W /linea:r toot B i ing facades 0.2 W tfl:2 or eacil illumirnated!n311 or surface o r 5.0 W.llinear root fo r eac h m. n inated!n3l1 o r surface length Automated te lle r rnach es alld 210 W per loca tion plus 91] night de,posito l'iies W 1pern.ddiliorml A I per 1oca om Eirltrances and gatehouse inspecliion sl!atia BS a g oo~ ed acir ies 1.25 W ffl2,o uncovered area Load ing are-0s or la.w enforcement, 0.5 W 2: of u rnco1,, ered area fire, ambu rnce, and,otiher emergency service i. eh ctes Drive-through w indo'ws a taslrood restaurants Parking near 24 -h our retail entmn ces 400 W per drive-hlrough W per main entry HVAC Equipment Air-Source Air Conditioners and Air-Source Heat Pumps New unitary air conditioning units or air source heat pumps that meet or exceed the qualifying cooling efficiency shown in the HVAC Incentives Worksheet are eligible for an incentive. They can be either split systems or single package units. The efficiency of split systems is based on an ARI reference number. All packaged and split system cooling equipment must meet Air Conditioning and Refrigeration Institute (ARI) standards (210/240, 320 or 340/360), be UL listed, use a minimum ozone-depleting refrigerant (e.g., HCFC or HFC). All required efficiencies are based on the Consortium for Energy Efficiency (CEE) high-efficiency commercial air conditioning and heat pump specifications ( A manufacturer s specification sheet indicating the system efficiency must accompany the application. Disposal of the existing unit Q pg 24

25 must comply with local codes and ordinances. Package Terminal Systems (Replacements) Package terminal air conditioners and packaged terminal heat pumps are through-the-wall, self-contained units that are 2 tons (24,000 Btu/h) or less. All EER values must be rated at 95 F outdoor dry-bulb temperature. Ductless Mini-Split Heat Pump <5.4 Tons Incentives are offered for Ductless Mini-Split Heat Pump <5.4 Tons with SEER rating greater than or equal to 12.0 and EER greater than or equal to 14.5 and HSPF greater than or equal to 9.0. Geothermal Heat Pump Geothermal equipment is a high-efficiency groundwater source, water source, or ground source heat pump system that meets or exceeds the energy efficiency requirements shown in the tables below. These measures do not apply to heat pump systems coupled with non-heat pump systems such as chillers, rooftop AC units, boilers, or cooling towers, which must be filed as custom measures. All HVAC applications other than comfort cooling and heating, such as process cooling, must also be applied for as custom measures. Q pg 25

26 HVAC Incentives Table Incentive HVAC Heating Qualifying Equipment Type and Cooling Capacity Cooling Qualifying Efficiency ($ per cooling Measure Code Efficiency ton) Air Cooled Air Conditioner H01 < 5.4 tons (< 65,000 Btu/hr) 15 SEER N/A $22 H02 <'. 5.4 and < tons 12.5 IEER (<' Btu/h and < Btu/hr) N/A $22 H03 <' and < 20 tons (<'. 135,000 Btu/h and < 240,000 Btu/hr) 12.3 IEER N/A $22 H04 <'. 20 and < tons (~ 240,000 Btu/h and < 760,000 Btu/hr) 11.1 IEER N/A $22 HOS ~ Ions (~ 760,000 Btu/hr) 10.3 IEER N/A $22 Air Cooled Heat Pumps H06 < 5.4 tons (< 65,000 Btu/hr) 14.3 SEER 8.7 HSPF $30 H07 HOS <'. 5.4 and < tons (<'. 65,000 Btu/h and < 135,000 Btu/hr) <' and < 20 tons (<'. 135,000 Btu/h and < 240,000 Btu/hr) 12.3 IEER 3.3 COP $30 1U IEER 3.2 COP $30 H09 <' tons (240,000 Btu/hr) 10.5 IEER 3.2 COP $30 Packaged Terminal Systems (PTAC and PTHP) (PTHP only) H10 < 8000 Btu/hr (<0.66 tons) 11.8 EER 3.3 $17 H11 ~8,000 and <10,500 Btu/hr (~0.66 and < tons) 11.4 EER 3.2 $17 H12 >10,500 Btu/hr (.875 tons) 10.7 EER 3.1 $17 H22 < 5.4 tons (< 65,000 Btu/hr) 12.1 EER, 12.3 IEER N/A $22 H23 <'. 5.4 and < tons 12.1 EER, 12.3 IEER (<'. 65,000 Btu/h and < 135,000 Btu/hr) N/A $22 H24 <' and < 20 tons 12.0 EER, 12.2 IEER (<'. 135,000 Btu/h and < 240,000 Btu/hr) N/A $22 H25 <'.20 and < 63.3 tons 11.9 EER, 12.2 IEER (<'. 240,000 Btu/h and < 760,000 Btu/hr) N/A $22 H26 ~ 63.3 tons( <'.760,000 Btu/hr) 11.0 EER, IEER N/A $22 Q pg 26

27 Other HVAC Equipment Hotel Guest Room Occupancy Sensor Incentives are offered for occupancy-based controls that control electric air conditioning, air source heat pumps, and / or electric heating units for individual hotel rooms. Systems with nonelectric heat are not eligible. Sensors must be controlled by automatic occupancy detectors or a key-card system, and the default setting for controlled units differ by at least 5 degrees (or shut the unit fan and heating or cooling off completely) from the operating set point during unoccupied periods. The control system may also be tied into other electric loads, such as lighting and plug loads to shut them off when occupancy is not sensed. The incentive is per room. Replacement or upgrades of existing occupancy-based controls are not eligible as a prescriptive incentive. Economizer, Integrated Dual Enthalpy Economizer Controls This measure is targeted to non-residential establishments whose HVAC equipment is not equipped with a functional economizer. Circulation Fan: High-Volume Low-Speed Fans must be greater than 16 feet in diameter and have variable speed control. ECM Circulation Fan This measure is targeted to non-residential customers whose air handling equipment currently uses a SP or PSC fan motor rather than an ECM. This measure applies only to circulating fan motors of 1 HP or less. Above 1 HP motors are governed by NEMA standards and would see little to no efficiency benefit by adding an ECM. The targeted fan can supply heating or cooling only, or both heating and cooling. ECM Circulation Pump This measure is targeted for replacement of a shaded pole or permanent split capacitor pump or motor with an electronically commutated pump or motor, 7.5 HP Retrocomissioning, Cooling Systems Confined to chiller plant and/or isolated packaged units. For reservation: must contain proposal with defined scope at equipment level that demonstrates energy savings. For final approval: required final commissioning report including raw data (TAB reports) demonstrating actual scope. This prescriptive measure can be used for facilities with maximum cooling demand less than 1,687 tons. Larger systems require the use of custom HVAC measure. Retrocomissioning, Whole Building Covers all relevant major mechanical systems, such as chiller plant, air side systems, compressed air, and/or process systems. For reservation: must contain proposal with defined scope at equipment level that demonstrates energy savings. For final approval: required final commissioning report including raw data (TAB reports) demonstrating actual scope. This prescriptive measure can be used for facilities less than 404,858 square feet. Larger facilities require the use of custom HVAC measure. Q pg 27

28 Energy Management System For installing a web-based building automation system in existing buildings that currently have no digital automated HVAC controls or have outdated pneumatic control systems with inoperable time control functions. Existing HVAC control systems must not have time-of-day scheduling. Upgrading obsolete EMS HVAC system with inoperable time clock functions will be reviewed on a case-by-case basis for incentive eligibility. This incentive cannot be combined with incentives for programmable thermostats or setback-setup controls. Must include the controls strategy and a scaled floor-plan with controlled areas highlighted. HVAC BAS systems must be new and include: Central time clock control Web-based interface with PC-based controls and graphic Building performance Tracking Open-protocol architecture controls system shall consist of either LonTalk (ANSI/CEA 709.1) or BACNet (ASHRAE/ ANSI 135) protocol being used between all controlled and controlling devices and every node on the network Minimum setback period must exceed 2,200 hours per year A minimum setback space temperature of at least 10 F when heating and 5 F when cooling. Ability to adjust schedules and settings remotely over the internet Report generation describing energy and operating trends This prescriptive measure can be used for facilities with maximum cooling demand less than 456 tons. Larger systems require the use of custom HVAC measure. Demand Controlled Ventilation New ventilation controls must use carbon dioxide levels to measure occupancy and modify the percentage of outside air based on occupancy levels. Only buildings with space heating and cooling requirements are eligible. Conditioned spaces must be kept between 65ºF and 75ºF during occupied operating hours. Carbon dioxide sensors must be installed in conjunction with fully functioning motor operated outside air dampers. Dual temperature air-side economizers with zone-level CO 2 sensors for rooftop units are eligible. This prescriptive measure can be used for facilities with maximum cooling demand less than 2,210 tons. Larger systems require the use of custom HVAC measure. Q pg 28

29 Other HVAC Incentives Table Other HVAC Measures- consult project manual for eligibility specifications HVAC Measure Incentive Unit Quantity Measure Code Incentive er Unit H1 8 Hotel Guest Room Occupancy Sensor Room $20 H1 9 Economizer, Integrated Dual Enthalpy Economizer Controls Ton $1 5 H20 Circulation Fan: High-Volume Low-Speed Unit $30 H21 ECM Circulation Fan Fan $1 5 H27 ECM Circulation Pump Pump $50 H28 H29 Retrocommissioning, Cooling Systems Retrocommissioning, Whole Buidling Ton $7.50 Square Foot $0.10 H29 Energy Management System Ton $25.00 H30 Demand Controlled Ventilation Ton $25.00 Q pg 29

30 Unitary HVAC Chillers Air-Cooled Chillers, Water Cooled Positive Displacement Reciprocating Chillers, and Water Cooled Centrifugal Chillers Chiller applications including existing multiple chiller configurations (including redundant or stand-by chillers), existing chillers serving multiple load groups, and chillers in industrial applications are defined as non-standard applications and must follow a site-specific custom protocol, $0.05/kWh) rate. Incentives are offered for chillers with an IPLV value (expressed in kw per ton) that is less than or equal to the qualifying efficiency shown in the table below. The chiller efficiency rating must be based on ARI Standard 550/ for IPLV conditions. The chillers must meet ARI standards 550/ , be UL listed, and use a minimum ozone-depleting refrigerant (e.g., HCFC or HFC). The ARI net capacity value should be used to determine the chiller tons. A manufacturer s specification sheet with the rated kw/ton-iplv or COP-IPLV must accompany the application, along with the four point performance data that is the basis for the IPLV. The application must include a certification that the chiller is appropriately sized for site design load conditions. Chillers must satisfy efficiency requirements for both full load and IPLV efficiencies for either Path A or Path B. The table shows the minimum efficiency ratings to qualify for the prescriptive incentive, which must be consistent with the expected operating conditions of the efficient chiller. For example, if the efficient chiller satisfies Path A and generally performs at part load, the appropriate baseline chiller efficiency is the IPLV value under Path A. If the efficient chiller satisfies Path B and generally performs at full load, the appropriate baseline chiller efficiency is the full load value under Path B. Generally, chillers operating above 70 percent load for a majority (50% or more) of operating hours should use Path A and chillers below 70% load for the majority of operating hours should use Path B. Q pg 30

31 Unitary Chiller Incentive Table Path A Path B I Qualifying Full Load Efficiency Qualifying IPLV Efficiency Qualifying Full Load Efficiency Qualifying IPLV Efficiency Incentive ($/ton) C3 < 75 tons kw/ton kw/ton kw/ton kw/ton C4.: 75 tons and < 150 tons cs ~ 150 tons and < 300 tons C6 ~ 300 tons Water Cooled Centrifugal Chillers C7 < 300 tons ~ 300 tons and < 600 tons CB C9 ~ 600 tons kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton kw/ton $17 $17 Q pg 31

32 Refrigeration Anti-Sweat Heater Controls Incentives are offered for devices that sense the relative humidity in the air outside of the display case and cycles or turns off the glass door (if applicable) and frame anti-sweat heaters when the ambient dew point is below a preset set point. Technologies that can turn off anti-sweat heaters based on sensing condensation (on the inner glass pane) also qualify. Incentive is based on the number of doors. Evaporator Fan Controls This measure is for the installation of controls in medium temperature walk-in coolers. The controller reduces airflow of the evaporator fans when there is no refrigerant flow. The measure must control a minimum of 1/20 HP where fans operate continuously at full speed. The measure also must reduce fan motor power by at least 75% during the off cycle. This measure is not applicable if any of the following conditions apply: 1) Compressor runs all the time with high duty cycle 2) Evaporator fan does not run at full speed all the time 3) Evaporator fan motor runs on poly-phase power 4) Evaporator fan motor is not shaded-pole or permanent split capacitor (PSC) 5) Evaporator fan does not use off-cycle or time-off defrost Floating Head Pressure Controls Controls must vary head pressure to adjust condensing temperatures in relation to outdoor air temperature. Must replace existing constant pressure or manually controlled systems to achieve reduced head pressure in order to maintain a minimum saturated condensing temperature of 70 F, or a 20 F variance below design heat pressure during mild weather conditions. Compressor size must be at least 5 HP Automatic Door Closers for Walk-In Coolers and Freezers The auto-closer should be applied to the main insulated opaque door(s) of a walk-in cooler or freezer. The auto-closer must be able to firmly close that door when it is within one inch of full closure. This must be a newly installed automatic door closer, replacements on previously installed door closers are not eligible for an incentive. EC Motor for Walk-in/Reach-in Refrigerated cases or Freezer cases Incentives are offered for replacement of an existing standard-efficiency shaded-pole or permanent split capacitor evaporator fan motor in refrigerated display cases or fan coil in walk-ins. The replacement unit must be an Electronically Commutated Motor (ECM). This measure cannot be used in conjunction with the Evaporator Fan Controller measure. ENERGY STAR Solid Door Freezer and Glass Door Freezer and Refrigerators Incentives are offered for replacement of existing self-contained, refrigerators and freezers with units that are ENERGY STAR listed. Only units with built-in refrigeration systems are qualified. Units with remote refrigeration systems or units do not qualify. Customers must provide proof that the appliance meets the CEE or ENERGY STAR efficiency specifications using ASHRAE Standard (38 F ± 2 F). Incentive is per unit. Q pg 32

33 Refrigeration Suction Pipe Insulation 1. Must insulate bare refrigeration suction lines of 1 5/8 inches in diameter or less on existing equipment only 2. Cooler lines require ¾ inch of flexible, closed-cell, nitrite rubber or an equivalent insulation 3. Freezer lines require 1-inch of flexible, closed-cell, nitrite rubber or an equivalent insulation 4. Insulation exposed to the outdoors must be protected from the weather (i.e. jacketed with a mediumgauge aluminum jacket). Night Cover 1. Must install a cover on an existing open refrigerated display case to decrease its cooling load during off hours. 2. The equipment manufacturer must not object to the use of night covers for the existing display case model. 3. This rebate is based on the linear footage of the installed 4. The cover must be applied for a period of at least six hours. Strip Curtain on Walk-In Cooler/Freezer 1. New strip curtains or plastic swinging doors must be installed on doorways of refrigerated spaces (conditioned to less than 50 F). 2. Rebate is based on the linear footage of the doorway that the strip curtains are being installed in. 3. Opening between the strip curtain and bottom of doorway must be no larger than 1 inch. 4. Strips must have an overlay greater than 1 inch. Evaporator Coil Defrost Control 1.The current system must include an operating electric defrost system with a functional electromechanical time clock 2. Evaporator coil temperature and pressure must be monitored by controller in order to determine optimal defrost cycles 3. New intelligent control systems to control the defrost systems will typically replace timed- defrost controls. Variable Speed Refrigeration Compressor This measure, VSD control for refrigeration systems and its eligibility targets applies to retrofit construction in the commercial and industrial building sectors; it is most applicable to grocery stores or food processing applications with refrigeration systems. This protocol is for a VSD control system replacing a slide valve control system. Add Doors to Open Refrigerated Cases The eligible retrofit equipment is either no sweat doors or doors with anti-sweat heaters. If a lighting retrofit is included with the new doors, it must consume the same amount of energy or less energy than the old lighting. Upgrades to lighting or other system components should be processed separately. Horizontal cases are not eligible and should be processed as custom. Door Gaskets Q pg 33

34 This measure is applicable to commercial refrigeration and applies to the replacement of worn- out gaskets with new better-fitting gaskets. Applicable gaskets include those located on the doors of walk-in and/or reach-in coolers and freezers. This protocol applies to the main doors of both low temperature ( freezer below 32 F) and medium temperature ( cooler above 32 F) walk-ins. Zero Energy Doors For this measure, a no-heat/low-heat clear glass door must be installed on an upright display case. It is limited to door heights of 57 inches or more. Doors must have either heat reflective treated glass, be gas filled, or both. This measure applies to low temperature cases only those with a case temperature below 0 F. Doors must have 3 or more panes. Total door rail, glass, and frame heater amperage (@ 120 volt) cannot exceed amps per door for low temperature display cases. Rebate is based on the door width (not including case frame). Air Cooled Refrigeration Condenser Approach temperature <8F for low temperature loads, <13F for medium temperature loads. Oversized Condenser with VFD New standalone condenser must no more than 150% larger than load. Case Light Occupancy Controls Acceptable for freezer or refrigerated cases as well as open cases or cases with doors. LED Open Case Lighting For replacing open case T8 or T12 fluorescent fixtures with DLC listed LEDs on refrigerators, coolers, and freezers LED Enclosed Case Lighting, Refrigerated LED case lighting with or without motion sensors on enclosed refrigerated vertical displays. The baseline equipment is assumed to be cases with uncontrolled T8 or T12 linear fluorescent lamps. LED Enclosed Case Lighting, Freezer LED case lighting with or without motion sensors on enclosed freezer vertical displays. The baseline equipment is assumed to be cases with uncontrolled T8 or T12 linear fluorescent lamps. Q pg 34

35 Refrigeration Measures Ref Measure Code Refrigeration Incentives Table Measure Incentive Unit Incentive/Unit R01 Anti-Sweat Heater Controls Door $30 R02 Evaporator Fan Controls Controller $50 R03 Floating-head Pressure Controls HP $20 R04 Automatic Door Closers for Walk-in Coolers Door $75 R05 Automatic Door Closers for Walk-in Freezers Door $75 R06 Evaporator Fan EC Motor for Reach-in Cases Motor $35 RO? Evaporator Fan EC Motor for Walk-in Cases Motor $50 R08 ENERGY STAR Glass Door Freezer <15 Cu. Ft Unit $100 R09 ENERGY STAR Glass Door Freezer Cu. Ft Unit $125 R10 ENERGY STAR Glass Door Freezer ~ 50 Cu. Ft Unit $145 R11 ENERGY STAR Solid Door Freezer Unit $75 R12 ENERGY STAR Glass Door Refrigerator <50 Cu. Ft Unit $30 R13 ENERGY STAR Glass Door Refrigerator >= 50 Cu. Ft Unit $50 K14 t NtKGY ~ I AK ~Olld Uoor Ketngerator $ OU Cu. t-t Unit $~0 R15 Suction Pipe Insulation Walk-in Coolers Linear Foot $0.50 R16 Suction Pipe Insulation Walk in Freezers Linear Foot $0.75 R17 Night Cover Linear Foot $8.00 R18 Strip Curtains on Walk-in Cooler Linear Foot $2.50 R19 Evaporator Coil Defrost Control Controller $75.00 R20 Variable Speed Refrigeration Compressor Compressor $85 R21 Add Doors to Open Refrigerated Cases Door $55 R22 Door Gaskets Door $2.50 R23 Zero Energy Doors Door $50 R24 A ir Cooled Refrigeration Condenser Ton $10 R25 Oversized Condenser with VFD Ton $10 R26 Case Light Occupancy Controls Door $8 R27 LED Open Cose Lighting Cose $10 R28 LED Enclosed Case Lighting, Refrigerated Door $30 R30 LED Enclosed Case Lighting, Freezer Door $30 Q pg 35

36 Food Service Beverage and Snack Machine Controls Incentives are offered for refrigerated vending machines that contain non-perishable bottled and canned beverages. Controller for both types of systems must include a passive infrared occupancy sensor to turn off fluorescent lights and other energized machine systems when the surrounding area is unoccupied for 15 minutes or longer. For the refrigerated machines, the control logic may include periodic power up at 2-hour intervals or longer to maintain product temperature and provide compressor protection. ENERGY STAR Refrigerated Beverage Vending Machines Incentives are offered for ENERGY STAR beverage vending machines. Qualifying machines can be found at: ENERGY STAR Electric Steam Cooker This measure applies to the installation of electric ENERGY STAR steam cookers as either a new item or replacement for an existing unit. Gas steam cookers are not eligible. The steam cookers must meet minimum ENERGY STAR efficiency requirements. A qualifying steam cooker must meet a minimum cooking efficiency of 50 percent and meet idle energy rates specified by pan capacity. ENERGY STAR Electric Combination Oven This measure applies to electric ovens capable of handling single 12" x 20" x 2.5" pan per rack ENERGY STAR Commercial Convection Oven The oven must meet or exceed heavy load potato cooking energy efficiency of greater than 70% utilizing ASTM Standard F149. Applies only to electric ovens ENERGY STAR Commercial Fryers The commercial fryer must have a tested heavy load (French fry for large vats) cooking energy efficiency of greater than 80% utilizing American Society for Testing and Materials (ASTM) Standard F1361 for commercial fryers and ASTM Standard F2144 for large vat fryers. Multiple vat configurations are paid per qualifying vat. ENERGY STAR maintains a list of qualifying products and specifications at ENERGY STAR Commercial Hot Holding Cabinet Energy STAR rating, electric. Q pg 36

37 Food Service & Other Measures Food Service Incentive Table Food/Other Incentive/ Measure Incentive Unit Measure Code Unit F01 Beverage Machine Controls Unit $25 F02 Snack Machine Controls Unit $20 F03 ENERGY STAR Refrigerated Beverage Vending Machir Unit $125 F04 ENERGY STAR Commerc ial Steam Cooker Unit $200 F05 ENERGY STAR Electric Combination Oven Unit $200 F06 ENERGY STAR Commercial Electric Convection Oven Unit $150 F07 ENERGY STAR Commerc ial Fryers Unit $100 F08 ENERGY STAR Commerc ial Hot Holding Cabinet Unit $200 Q pg 37

38 Motors and Variable Frequency Drives Early Replacement Motors For constant speed and uniformly loaded motors, this measure applies to the replacement of old motors with new energy efficient motors of the same rated horsepower. Old motors must be less than 15 years. Replacements where the old motor and new motor have different horsepower ratings are considered custom measures. Motors with variable speeds, variable loading, or industrial-specific applications are also considered custom measures. Motors Measure Code Motors Incentive Table HP Incentive per Motor M $40 M $100 M $150 M04 >100 $300 Only VFDs on unitary systems are eligible. Non-unitary systems must be submitted as a custom measure. Soft start motors are not eligible. Variable Frequency Drives on HVAC Fan Applications: Incentives are offered for installing VFDs on existing HVAC fans that do not have pre-existing VFDs. This measure applies to HVAC supply and return fans only. All other fans including cooling tower fans must be submitted as custom measures. Manually fixed speed settings on HVAC fans must be submitted via custom application. The VFD must control motor speed automatically in response to pressure, flow, temperature, or other variable signal. The installation of a VSD must accompany the permanent removal or disabling of any throttling devices such as inlet vanes, bypass dampers, and throttling valves, etc. The incentive is offered per controlled HP. Variable Frequency Drives on Pump Applications: Incentives are offered for installing VFDs on existing chilled water pumps and heating hot water pumps that do not have existing VFDs. This measure applies to chilled water pumps and heating hot water pumps only. All other pumps must be submitted as custom measures. Manually fixed speed settings on pumps must be submitted via custom application. The VFD must control motor speed automatically in response to pressure, flow, temperature, or other variable signal. The installation of a VSD must accompany the permanent removal or disabling of any throttling devices such as throttling valves. The incentive is offered per controlled HP. Variable Speed Control for Kitchen Exhaust Hoods: The measure consists of installing a new VSD in conjunction with a sensor / control system that varies the exhaust rate of kitchen ventilation (exhaust and/or makeup air fans) based on the heat and effluent output from the cooking appliances (i.e., the more heat and smoke/vapors generated, the more ventilation needed). This involves installing a temperature sensor in the hood exhaust collar and/or an optic sensor on the end of the hood that senses cooking conditions and allows the system to automatically vary the rate of exhaust to match requirements by adjusting the fan speed accordingly. Variable Speed Drives for Process or Other Equipment: VFD must be used in conjunction with a process (non HVAC) application. To qualify for this incentive, the driven equipment must operate at least 2,000 hours per year. Redundant or back- up units do not qualify. VFDs replacing existing VFDs do not qualify. The VFD must control motor Q pg 38

39 speed automatically in response to pressure, flow, temperature, or other variable signal. VFDs installed as soft start without automatic, manual, closed loop speed control do not qualify. The installation of a VFD must accompany the permanent removal or disabling of any throttling devices such as throttling valves. The incentive is per controlled HP and only applies to controlled motors less than 50 HP. VSD/VFD Incentives Table VFD Measure Code Fan Application Measure Unit Incentive per Unit V01 VFD on HVAC Fan HP $25 Pump Application V02 VFD on Chilled Water Pumps HP $25 V03 VFD on Heating Hot Water Pumps HP $25 Variable Speed Control for Kitchen Exhaust Hoods V04 Kitchen Exhaust Fan: Retrofit Hood HP $500 Variable Speed Drives for Process or Other Equipment V05 Process Motor < 50 HP HP $50 Domestic Hot Water Fuel Switch: Electric Water Heater to ENERGY STAR Commercial Gas Water Heater This measure documents the energy savings attributed to converting from a standard electric water heater to an ENERGY STAR natural gas/propane-fired water heater or a standard oil-fired water heater with an Energy Factor of Heat Pump Water Heater This includes heat pump water heaters with energy factors meeting ENERGY STAR criteria. The measure described here involves a direct retrofit of a resistive electric water heater with a heat pump water heater. It does not cover systems where the heat pump is a pre-heater or is combined with other water heating sources. More complicated installations can be treated as custom projects. Low Flow Pre-Rinse Spray Valve This measure applies to efficient low flow pre-rinse sprayers in grocery and food service applications. The most likely areas of application are kitchens in restaurants and hotels. Only premises with electric water heating may qualify for this incentive. In addition, the replacement pre-rinse spray nozzle must use less than 1.6 gallons per minute with a cleanability performance of 26 seconds per plate or less. Low flow pre-rinse sprayers reduce hot water usage and save energy associated with water heating. Domestic Hot Water Incentive Table Measure Code Measure Unit Retrofit Incentive per Unit W01 Fuel Switch: Electric Water Heater to ENERGY STAR Commercial Gas Water Heater Unit $100 W02 Heat Pump Water Heater Unit $100 W03 Low-Flow Pre-Rinse Spray Valve Valve $17 Q pg 39

40 Compressed Air Systems No-loss Condensate Drain No-loss Condensate Drains are controlled by a sensor that monitors the level of condensate and only open when there is a need to drain condensate. They close before compressed air is allowed to escape. This measure is targeted to non-residential customers whose equipment is a timed drain that operates on a pre-set schedule. Acceptable baseline conditions are compressed air systems with standard condensate drains operated by a solenoid and timer. Air-Entraining air nozzle This measure is targeted to non-residential customers whose compressed air equipment uses stationary air nozzles in a production application with an open copper tube of 1/8 or 1/4 orifice diameter. Energy efficient conditions require replacement of an inefficient, non-air entraining air nozzle with an energy efficient air-entraining air nozzle that use less than 15 CFM at 100 psi for industrial applications. Storage Tanks for Load/No Load Screw Compressors This measure protocol applies to the installation of air receivers with pressure/flow controls to load/no load compressors. Load/no load compressors unload when there is low demand. The process of unloading is done over a period of time to avoid foaming of the lubrication oil. Using a storage tank with pressure/flow control will buffer the air demands on the compressor. Reducing the number of cycles in turn reduces the number of transition times from load to no load and saves energy. The baseline equipment is a load/no load compressor with a 1 gal/cfm storage ratio or a modulating compressor with blowdown. The high efficiency equipment is a load/no load compressor with a minimum storage ratio of 4 gallons of storage per cfm. Cycling Refrigerated Thermal Mass Dryer When air is compressed, water vapor in the air condenses and collects in liquid form. Some of this condensate collects in the air distribution system and can contaminate downstream components such as air tools with rust, oil, and pipe debris. Refrigerated air dryers remove the water vapor by cooling the air to its dew point and separating the condensate. Changes in production and seasonal variations in ambient air temperature lead to partial loading conditions on the dryer. Standard air dryers use a hot gas bypass system that is inefficient at partial loads. A Cycling Thermal Mass Dryer uses a thermal storage medium to store cooling capacity when the system is operated at partial loads allowing the dryer refrigerant compressor to cycle. This measure is targeted to non-residential customers whose equipment is a non-cycling refrigerated air dryer with a capacity of 600 cfm or below. Acceptable baseline conditions are a non-cycling (e.g. continuous) air dryer with a capacity of 600 cfm or below. The replacement of desiccant, deliquescent, heat-of-compression, membrane, or other types of dryers does not qualify under this measure. Variable Speed Air Compressor This type of compressor uses a special drive to control the speed (RPM) of the unit, which in turn saves energy compared to a fixed speed equivalent. Q pg 40

41 Compressed Air System Optimization The submitted optimization measures must be identified in an Air System Audit or equivalent study to be eligible. The measures must demonstrate energy savings as evaluated by a Program Engineer. Additionally, measures must also fall under one or more of the category below to be eligible: 1.) Install storage Receivers (new receivers only, replacing existing storage receivers are ineligible) 2.) Compressor control (must demonstrate improvement in partial load efficiency of the compress air system, including reduce/eliminate partially loaded units) 3.) Dryer control 4.) Source pressure reduction 5.) Right-sizing distribution components such as piping, filters, regulators, connectors and hoses (routine maintenance replacements are ineligible). 6.) Leakage detection and repair 7.) Eliminate low-efficiency end-usages of compressed air 8.) Heat recovery (most reduce electricity consumption of the replaced heat source) Compressed Air Systems Incentive Table No-loss Condensate Drain Air-Entraining Air Nozzle Cycling Refrigerated Thermal Mass Dryer Compressor Equipment Type Units Quantity Daily Operating Hours Incentive per Unit CA04 CA05 CA06 Storage Tanks for Load/No Load Screw Compressors Vari able Speed Air Compressor Compressed Air System Optimization Compressor HP $10 Compressor HP $30 Compressor HP $50 Q pg 41

42 Data Centers Data Center incentives are available for facilities ranging in size from office server closets to large standalone facilities. Air Cooled Chiller Path A/Path B EER (Btu/Wh) <150 tons 10.1 FL/9.7 FL and 13.7 IPLV/15.8 IPLV 150 tons 10.1 FL/9.7 FL and 14.0 IPLV/16.1 IPLV Air Cooled Chiller without Condenser Air-cooled chillers without condenser must be rated with matching condensers and comply with air-cooled chiller efficiency requirements. Computer Room Air Conditioner <65,000 Btu/h ~ 65,000 Btu/h and <135,000 Btu/h.: 135,000 Btu/hand <240,000 Btu/h.: 240,000 Btu/h and <760,000 Btu/h.: 760,000 Btu/h Computer Room Air Handler, Variable Speed Replacing constant speed CRAH with VSD CRAH Water Cooled Centrifugal Chiller Chiller Capacity Path A/Path B efficiency (kw/ton ) < 150 tons FU0.695 FL and IPLV/0.440 IPLV ~150 tons and <300 tons FU0.635 FL and IPLV/0.400 IPLV.:300 tons and <400 tons FU FL and IPLV/0.390 IPLV.:400 tons and <600 tons FU0.585 FL and IPLV/0.380 IPLV.:600 tons FU0.585 FL and IPLV/0.380 IPLV Water Cooled Positive Displacement or Reciprocating Chiller <75 tons ~75 tons and <150 tons ~150 tons and <300 tons ~300 tons and <600 tons.:600 tons P.ath A/P.ath B efficiency (kw/ton ) FU FL and IPLV/0.500 IPLV FU0.750 FL and IPLV/0.490 IPLV FU0.680 FL and IPLV/0.440 IPLV FU0.625 FL and IPLV/0.410 IPLV FU0.585 FL and IPLV/0.380 IPLV Uninterruptible Power Supply Must be Energy Star Certified UPS or have full load efficiency rating: 94.8% for kva 97.8%for 100 kva Mainframe Refresh The rated efficiency of the replacement Mainframe's power supply must be at least 8% more Q pg 42

43 efficient compared to the existing Mainframe's power supply. The replacement Mainframe, if Inactive, must be decommissioned and removed from the Data Center Server Refresh Replacement servers must be ENERGY STAR certified. Replacement servers' power supply must be 5% more efficiency compared to the power supply of the replaced servers. The replaced server must be decommissioned and removed from the data center. HVAC System Optimization Final system must have these features: -Implementation of free cooling by the addition of an economizer system, -Conversion of constant speed CRAC/CRAH into variable speed operations using VFDs and additional control functionalities, and -Elevation of exhaust air temperature Hot/Cold Aisle Containment Includes both Hot and Cold Aisles. Installing new containment measures not replacing already existed aisle containment. Plenum-only installations not eligible. Must result in higher difference between the return air (hot aisle) and supply air (cold aisle) temperatures, measured at rack intake and exhaust locations. Server Virtualization Minimum of consolidating 5 Servers virtualized into one Server. The virtualized servers, if inactive, are removed from the Data Center. Thin Clients Must be ENERGY STAR certified thin clients. Decommissioned clients are removed from the Data Center. Data Center Incentive Table.. - Equipment Type Units Incentive/Unit D1 Air Cooled Chiller Ton $40.00 D2 Air Cooled Chiller W ithout Condenser Ton $20.00 D3 Computer Room Air Conditioner Ton $30.00 D4 Computer Room Air Handler, Variable Speed Ton $10.00 D5 W ater Cooled Centrifugal Chiller Ton $30.00 D6 Water Cooled Positive Displacement or Reciprocatin $30.00 D7 Uninterruptible Power Supply, kva $10.00 D8 Uninterruptible Power Supply, > 100 kva $10.00 D9 Mainframe Refresh $20.00 D10 Server Refresh $20.00 D11 PC Power Managment System $6.00 D12 HVAC System Optimization $0.05 D1 3 HoUCold Aisle Containment kwh saved $0.05 D14 Server Virtualization kw reduction $ D1 5 Thin Clients Units $5.00 Q pg 43

44 Whole Building Systems Whole Building Systems Approach The Whole Building Systems approach is intended to encourage integrated energy efficient designs by providing enhanced incentives to the customer who addresses overall energy performance. Owners of eligible and qualifying new construction and major renovation projects can receive Whole Building Systems incentives when energy modeling indicates the project s performance is over 10% better than the ASHRAE Savings from eligible electric end-uses in kilowatt hours define the amount of financial incentive. Energy savings achieved through renewable energy sources are not counted toward project energy savings and are not included in the savings basis. Incentive reservations obtained during the design phase of a project will be honored for up to 24 months. How to Apply for Whole Building Systems Incentives Before construction begins: A Pre-notification Application must be submitted documenting the Owner's intention to seek Whole Building Systems incentives. The Owner must confirm the goals and energy efficiency strategies being pursued by the design team on the completed Pre-notification Worksheet (Checklist tab) and in the project Summary (Whole Building Performance Summary tab). Submit executable building modeling software files Submit the Whole Building Performance Summary worksheet, energy simulation model inputs and outputs, and supporting documentation Receive confirmation and eligibility notification from the PECO Smart Ideas team and receive an incentive reservation. The final incentive paid may differ from the reserved incentive amount. The final incentive will be calculated based on site-verified equipment installation and performance. The Owner's final application and complete documentation must be received within 6 months of equipment installation or certificate of occupancy, whichever is later. An executable energy model and model output demonstrating compliance with the criteria of ASHRAE Appendix G will be required, and the equipment data sheets. LED lighting fixtures must be on the DLC or Energy STAR qualified products list (QPL) to be eligible. LED fixtures not on the DLC or Energy STAR QPL has the option of submitting LM79 and LM80 test reports for evaluation against DLC and Energy STAR eligibility criteria. During the construction period: Owner and design team continue to work closely with their chosen contractor to assure energy efficiency measures are included and installed in the completed building. When the building is constructed and operational: Complete the Owner final application. Request an equipment verification site visit by the PECO Smart Ideas team. Equipment must be installed and fully operational. o Program staff will schedule a site visit and utilize submitted documentation and measurement tools to verify that the installation follows the submitted energy simulation model. When PECO confirms that there are no significant changes to the installed equipment, payment of the reserved incentive will be made to the Owner within 6 weeks. If changes from the proposed design energy simulation are found, the Owner and design team will be notified of the reduced incentive amount; a period of 20 calendar days will Q pg 44

45 be allowed for supplemental information to be provided; if no additional information is received by PECO Smart Ideas team, the reduced incentive payments will be made and sent to the Owner; if additional clarification and information is available, program staff will work diligently to resolve the discrepancies and arrive at a reasonable incentive adjustment with the customer. Payments made by PECO Smart Ideas are final. Customer Eligibility The Owner of the proposed new building project must be a customer of PECO and receive delivery of electric service from PECO to receive kilowatt-hour based incentives. Please note that electricity supply can be provided by any vendor. Project Eligibility The project must be a new construction or major renovation. Major renovations involving the removal and redesign of at least two building systems (such as interior lighting and mechanical systems) may apply for Whole Building Systems incentives. To qualify for incentives, projects must demonstrate energy efficiency enhancements that achieve at least 11% improvement in the proposed design versus the standard baseline. The Owner must submit a Pre-approval Application to the program at the stage where changes for increased energy efficiency are still feasible and construction has not been completed. Projects receiving Whole Building Systems incentives are not eligible to receive other incentives such as the prescriptive or custom program incentives for the same scope. Project components that are NOT eligible for consideration as a basis for PECO Smart Ideas include the following: o Alternative fuel sources (e.g. use of gas or oil equipment in lieu of electric). Please note that combined heat and power (CHP) systems will be incentivized for the electricity they produce. o Renewable energy sources (e.g. solar, wind, biomass) Ineligible savings include exterior lighting*, process, receptacle, miscellaneous loads and other unregulated end-uses. *Custom incentives are available for new construction exterior lighting. Whole Building Systems Incentives Table % Improvement over Code Incentive per Sq. Ft. ~11% to <20% $0.155 ~20% to <30% $0.233 ~30% to <40% $0.350 ~40% to <60% $0.525 ~60% $0.700 Q pg 45

Incentive & Measure Specifications

Incentive & Measure Specifications Incentive & Measure Specifications Commercial Energy Solutions EasySave Program Prescriptive Incentives RETROFIT LIGHTING Incandescent to LED Lighting T12/T8 Fluorescent Tubes to LED Tubes HID to LED Fixtures

More information

2018 Commercial Lighting Retrofit Rebate Program

2018 Commercial Lighting Retrofit Rebate Program 2018 Commercial Lighting Retrofit Rebate Program HOW TO APPLY 1. AMU provides energy efficiency rebates for the purchase and installation of qualifying lighting equipment. Additional lighting rebates,

More information

Lighting Rebates Rebate Application

Lighting Rebates Rebate Application Rebate Application Business Member Information Business Name Installation Address City, State, Zip Contact Name Email Phone Number Account Number Rebate Recipient To release the rebate incentive check

More information

PSO Business Rebates Retrofit Lighting Technical Requirements

PSO Business Rebates Retrofit Lighting Technical Requirements PSO Business Rebates Retrofit Lighting General LED Requirements LED replacement and LED luminaires must be listed on the Design Lights Consortium (DLC) or ENERGY STAR Qualified Products List (QPL). DLC

More information

2017 Lighting Incentive

2017 Lighting Incentive Commercial & Industrial Retrofit 2017 Lighting Section A: CUSTOMER INFORMATION Customer Name Electric Account Number Rate Application Number Facility Address City State Zip Service Location Identification

More information

* Peak kw is determined by the average kw load reduction occurring between 1PM and 4PM on weekdays during June, July and August.

* Peak kw is determined by the average kw load reduction occurring between 1PM and 4PM on weekdays during June, July and August. overview Summary of Services & Incentives Effective through March 31, 2014 Last updated April 1, 2013 business programs The goal of the Focus on Energy Business Programs is to help Wisconsin s non-residential

More information

Direct Install Program Eligible Measures Listing:

Direct Install Program Eligible Measures Listing: Direct Install Program Eligible Measures Listing: a) Lighting: - DLC qualified LED Luminaires including LED linear tube replacements - Energy Star Approved LED Screw In Lamps - T8 fixture replacements

More information

2017 Commercial & Industrial Program C&I Lighting Prescriptive Rebate Application

2017 Commercial & Industrial Program C&I Lighting Prescriptive Rebate Application MEMBER INFORMATION Member Name Company Name Mailing Address City State ZIP Phone Email Electric Cooperative/REMC Name (MUST be completed) Electric Cooperative/REMC Account Number (MUST be completed) Check

More information

Focus on Energy Business Programs Summary of Services and Incentives July 2009

Focus on Energy Business Programs Summary of Services and Incentives July 2009 Focus on Energy Business Programs Summary of Services and Incentives July 2009 OVERVIEW Focus on Energy Business Programs goals are to educate Wisconsin s farmers, businesses, industry, schools and local

More information

LED Retrofit Lighting Rebate 2017 Rebate Application

LED Retrofit Lighting Rebate 2017 Rebate Application Commercial and Industrial LED Retrofit Lighting Rebate 2017 Rebate Application Business Member Information Connexus Energy 14601 Ramsey Blvd NW Ramsey, MN 55303 ConnexusEnergy.com 763.323.2600 Company

More information

SUMMARY OF SERVICES & INCENTIVES

SUMMARY OF SERVICES & INCENTIVES BUSINESS PROGRAMS 2016 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2016 Last updated February 1, 2016 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Business Programs offer both

More information

2018 Rebate Catalog and Application

2018 Rebate Catalog and Application BUSINESS 2018 Rebate Catalog and Application Save money on qualified Lighting, Refrigeration, Appliances and more. Read about rebates for your home and business at mid.org/rebates REV01.2018 Refrigeration

More information

LED Retrofit Lighting Rebate 2018 Rebate Application

LED Retrofit Lighting Rebate 2018 Rebate Application Commercial and Industrial LED Retrofit Lighting Rebate 2018 Rebate Application Business Member Information Connexus Energy 14601 Ramsey Blvd NW Ramsey, MN 55303 ConnexusEnergy.com 763.323.2600 Company

More information

CL001 >400 Watt lamp basecase, up to 600 Watt replacement fixture $95.00 Fixture

CL001 >400 Watt lamp basecase, up to 600 Watt replacement fixture $95.00 Fixture Lighting Specifications Business Please read the details below to ensure you are installing a qualifying product(s). An MID inspection of the pre-existing lighting scheme is required prior to the installation

More information

C&I Prescriptive Lighting

C&I Prescriptive Lighting C&I Prescriptive Lighting Program Details & Instructions Central Hudson Gas & Electric s (CHGE) SavingsCentral Commercial / Industrial Electric and Gas Programs are designed to help non-residential customers

More information

2018 Lighting Retrofit Rebate Instructions. City of Arlington

2018 Lighting Retrofit Rebate Instructions. City of Arlington If you have questions while completing this form, please contact your hometown electric utility weekdays during business hours for assistance. Phone: 507-964-2378 Fax: 507-964-5973 Email: cityhall@arlingtonmn.com

More information

Eligible Prescriptive Measures List:

Eligible Prescriptive Measures List: Eligible Prescriptive Measures List: Business, Non-Profit, Institutional Energy Savings Program Products must meet the Canadian Certification Standards as outlined by the Standards Council Canada for product

More information

IMPA Energy Efficiency Program

IMPA Energy Efficiency Program June 2016 IMPA Energy Efficiency Program tools and incentives for residential, commercial and industrial customers to reduce energy use and save money Reduce energy use. Save money. Earn incentives. The

More information

Lighting Retrofit Rebate

Lighting Retrofit Rebate Lighting Retrofit Rebate 2017 Rebate Application Elk River Municipal Utilities, PO Box 430, Elk River, MN 55330 Ph: 763-441-2020 Business Information Company name Billing address Installation address (if

More information

Business Rebate Catalog

Business Rebate Catalog Refrigeration Specifications Business 2011 Rebate Catalog Please read the details below to ensure you are installing a qualifying product(s). Door Gaskets Must replace a worn gasket on the insulated opaque

More information

2018 Business Lighting Rebate Application

2018 Business Lighting Rebate Application 2018 Business Application LIMITED FUNDING: Contact your local Utility to confirm rebate availability. CUSTOMER INFORMATION rth Branch Check here if you are applying for multiple Business s and the information

More information

2018 Lighting New Construction Rebate Instructions. City of Buffalo

2018 Lighting New Construction Rebate Instructions. City of Buffalo If you have questions while completing this form, please contact your hometown electric utility weekdays during business hours for assistance. Phone: 763-682-5370 Fax: 763-682-6504 Web: www.ci.buffalo.mn.us

More information

2017 Lighting New Construction Rebate Instructions. City of Brownton

2017 Lighting New Construction Rebate Instructions. City of Brownton If you have questions while completing this form, please contact your hometown electric utility weekdays during business hours for assistance. Phone: 320-328-5318 Fax: 320-328-5318 Email: brownton@centurylink.net

More information

Business Member Information Company name Billing address. City State ZIP. Installation address (if different from above) Account number.

Business Member Information Company name Billing address. City State ZIP. Installation address (if different from above) Account number. Business Member Information Company name Billing address Installation address (if different from above) Account number Contact name Email Vendor Information Vendor name Vendor address City, State, ZIP

More information

InvestSmart Business Energy Upgrades Lighting Equipment Catalog 01/01/2018

InvestSmart Business Energy Upgrades Lighting Equipment Catalog 01/01/2018 2018 InvestSmart Business Energy Upgrades 01/01/2018 Table of Contents 1 Lighting Improvement Measures...1-1 1.1 Lighting... 1-1 1.2 Occupancy Sensors... 1-3 1 Lighting Improvement Measures This Equipment

More information

Consumers Energy Business Solutions Program

Consumers Energy Business Solutions Program Consumers Energy Business Solutions Program Everyone has the power to save. Measure Specifications (2009 Program Year) These specifications cover the measures that are available within the Consumers Energy

More information

Business Customer Information. Account Number (9 digits) Account Holder Name Phone (As shown on your utility bill) Service Street Address

Business Customer Information. Account Number (9 digits) Account Holder Name Phone  (As shown on your utility bill) Service Street Address Commercial Lighting Rebate Application Please complete the application including existing and installed information. Application will be returned without valid purchase receipt/invoice or if equipment

More information

2 Building Type. 3 Trade Ally/Contractor Information. Refrigeration Rebate Worksheet. Retrofit New Construction

2 Building Type. 3 Trade Ally/Contractor Information. Refrigeration Rebate Worksheet. Retrofit New Construction Refrigeration Rebate Worksheet Before you start Instructions: Complete all relevant information for your project. Include with completed final application package. All rebates are paid per unit and are

More information

High Performance Building Guide 1

High Performance Building Guide 1 Description This Guide is intended to be used for projects with a Vermont Certified: High Performance energy efficiency goal. This High Performance goal is a whole-building efficiency approach rather than

More information

Pacific Gas and Electric Company Energy Efficiency Rebates for Your Business. Lighting Rebate Catalog Saving energy for a brighter future

Pacific Gas and Electric Company Energy Efficiency Rebates for Your Business. Lighting Rebate Catalog Saving energy for a brighter future Pacific Gas and Electric Company Energy Efficiency Rebates for Your Business Lighting Rebate Catalog Saving energy for a brighter future Customers may be eligible to participate in Pacific Gas and Electric

More information

Massachusetts COOL SMART

Massachusetts COOL SMART Massachusetts COOL SMART 2015 RESIDENTIAL DUCTLESS MINI-SPLIT HEAT PUMP Rebate Application Ductless Mini-Split Heat Pump REBATE COOL SMART is offering residential customers of program sponsors up to a

More information

HIGH-EFFICIENCY EQUIPMENT TECHNICAL SHEET

HIGH-EFFICIENCY EQUIPMENT TECHNICAL SHEET GENERAL INFORMATION SMECO's Business Solutions program is designed to help commercial and industrial customers maximize energy efficiency and manage energy costs. With cost-saving financial incentives

More information

SDG&E s Business Energy Solutions Program 2018 Product Catalog

SDG&E s Business Energy Solutions Program 2018 Product Catalog SDG&E s Business Energy Solutions Program 2018 Product Catalog ID Product Unit LIGHTING LED Integral Lamp (Bulb) Cost Discount 463036 LED Candelabra 4W Lamp 13.00 13.00-463052 LED Globe 7.5W Lamp 15.00

More information

Business Express Rebate Catalog

Business Express Rebate Catalog Refrigeration Specifications Business 2012 Express Rebate Catalog Door Gaskets Must replace a worn gasket on the insulated opaque door of a walk-in or reach-in cooler or freezer. Replacement gasket must

More information

REFRIGERATION Open case to New Reach-in Low or Medium Temperature Low Temp Coffin to New High Efficiency Reach-In...

REFRIGERATION Open case to New Reach-in Low or Medium Temperature Low Temp Coffin to New High Efficiency Reach-In... Contents REFRIGERATION... 3 1. Open case to New Reach-in Low or Medium Temperature... 3 2. Low Temp Coffin to New High Efficiency Reach-In... 3 3. Low Temperature Reach-in to High Efficiency Reach-in...

More information

REBATE. Ductless Mini-Split Heat Pump

REBATE. Ductless Mini-Split Heat Pump Ductless REBATE COOL SMART is offering residential customers of program sponsors up to a $500 rebate for purchasing and installing a ductless mini-split heat pump that meets the program s energy efficiency

More information

Equipment Efficiency Guide

Equipment Efficiency Guide Equipment Efficiency Guide Commercial New Construction Effective July 1, 2018 Introduction This guide is meant to be used for commercial new construction and major renovation projects in Vermont, pursuing

More information

RE: Supplement to Tariff Advice No Schedule 89 Commercial and Industrial Energy Efficiency and New Cost- Effectiveness Exceptions

RE: Supplement to Tariff Advice No Schedule 89 Commercial and Industrial Energy Efficiency and New Cost- Effectiveness Exceptions LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com July 12, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 RE: Supplement to

More information

Summary of Energy Program Incentives

Summary of Energy Program Incentives Energy Incentive Quick Guide www.connexiones.com 1700 Leider Lane Buffalo Grove, IL 60069 Summary of 2013-2014 Energy Program Incentives and Energy Conservation Measures Forward Working with our Energy

More information

9. LIGHTING. 9.1 General Scope. This section shall apply to the following: Exceptions:

9. LIGHTING. 9.1 General Scope. This section shall apply to the following: Exceptions: 8. POWER 8.1 General. This section applies to all building power distribution systems. 8.2 Compliance Path(s) 8.2.1 Power distribution systems in all projects shall comply with the requirements of Section

More information

2018 Electric Rebate Catalog

2018 Electric Rebate Catalog Savings brought to you by Upper Peninsula Power Company. Commercial and Industrial Energy Efficiency Program Upper Peninsula Power Company 2018 Electric Rebate Catalog Savings brought to you by Upper Peninsula

More information

If pre-approval is required - work with your Energy Advisor to obtain pre-approval prior to purchasing equipment.

If pre-approval is required - work with your Energy Advisor to obtain pre-approval prior to purchasing equipment. REMINDER! AGRICULTURE, SCHOOLS AND GOVERNMENT PROGRAM Submit your prescriptive application within 60 days of installation. OVERVIEW 2017 SUMMARY OF SERVICES AND INCENTIVES FOR AGRICULTURE, SCHOOLS AND

More information

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances Rebate not to exceed cost of high efficiency equipment. Equipment must be purchased or recycled in 2015. Installed equipment must be on cooperative's lines. Submit the documentation listed below no later

More information

2007 Itemized (Express Efficiency) Measures

2007 Itemized (Express Efficiency) Measures Business Incentives & Services 2007 Itemized (Express Efficiency) s ITEMIZED MEASURE TERMS AND CONDITIONS Lighting L-A. Screw-In Compact Fluorescent lamps CFL s must replace incandescent lamps. Replacing

More information

General HVAC Recommendations

General HVAC Recommendations General HVAC Recommendations DESIGN GUIDELINES FOR ENERGY EFFICIENT HVAC SYSTEMS Thank you for your interest in energy efficiency! Energy efficient heating, ventilation, and air conditioning (HVAC) equipment

More information

RE: Second Supplement to Tariff Advice No Schedule 89 Commercial and Industrial Energy Efficiency and New Cost- Effectiveness Exceptions

RE: Second Supplement to Tariff Advice No Schedule 89 Commercial and Industrial Energy Efficiency and New Cost- Effectiveness Exceptions LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com August 2, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 RE: Second Supplement

More information

TITLE 24 ICONOGRAPHY. Iconography System

TITLE 24 ICONOGRAPHY. Iconography System TITLE 24 ICONOGRAPHY Iconography System The icons symbolize specific language found in the code requirements. They represent product and space characteristics. Icons not only represent the requirements

More information

2018 SUMMARY OF SERVICES AND INCENTIVES

2018 SUMMARY OF SERVICES AND INCENTIVES Agriculture, Schools and Government Program 2018 SUMMARY OF SERVICES AND INCENTIVES Effective through December 31, 2018 Updated January 1, 2018 FOCUS ON YOUR FACILITIES WHILE WE FOCUS ON YOUR ENERGY Program

More information

Food Service Incentive Application for Business Customers

Food Service Incentive Application for Business Customers 2017 Food Service Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and

More information

Food Service Incentive Application for Business Customers

Food Service Incentive Application for Business Customers 2018 Food Service Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and

More information

Equipment Specifications and Required Information Quantity Rebate

Equipment Specifications and Required Information Quantity Rebate Rebate not to exceed 50% of the cost of equipment. Recycling rebates qualify for the entire rebate, regardless of the recycling cost. Equipment must be purchased or recycled in 2016. Installed equipment

More information

Food Service Incentive Application for Business Customers

Food Service Incentive Application for Business Customers 2019 Food Service Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is required

More information

Colorado November 1, Take advantage of. LED rebates. and start saving

Colorado November 1, Take advantage of. LED rebates. and start saving Colorado November 1, 2017 Take advantage of LED rebates and start saving 2 LED rebates available To help our customers save on up-front costs as they transition to energy-saving LED technology, we ve increased

More information

2018 Rebate Catalog and Application

2018 Rebate Catalog and Application 2018 Rebate Catalog and Application Save money on qualified Home Cooling Systems, Appliances and more. Read about rebates for your home and business at mid.org/rebates REV 01.2018 Modesto Irrigation District

More information

2017 Express Energy Solutions (EES) Procedures Manual and Rebates

2017 Express Energy Solutions (EES) Procedures Manual and Rebates 2017 Express Energy Solutions (EES) Procedures Manual and Rebates Sacramento Municipal Utility District January 1, 2017 Table of Contents 1.0 Introduction... 4 2.0 Important Features of Express Energy

More information

NEW CONSTRUCTION INCENTIVE APPLICATION

NEW CONSTRUCTION INCENTIVE APPLICATION SECTION 1: CUSTOMER (BUILDING OWNER) LEGAL INFORMATION Company Legal Name Mailing Address Tax Identification Number complete only one (must be 9 digits) FEIN #: OR SS #: City State ZIP Code Business Classification

More information

Prescriptive Program Rebate Application

Prescriptive Program Rebate Application Application Prescriptive Program Application Check the appropriate program box for your rebate. Cooling FSO (Fluid System Optimization) Foodservice equipment Heating Lighting Motors & drives Customer information

More information

Instructions for completing the NE&C LIGHTING Rebate Worksheet

Instructions for completing the NE&C LIGHTING Rebate Worksheet Instructions for completing the NE&C LIGHTING Rebate Worksheet General Note: 1. This application is for new high efficiency lighting fixtures, systems and controls. 2. All non code 10 fixture equipment

More information

Rebate Catalog. Save money on qualified Home Cooling Systems, Appliances and more. Read about rebates for your home and business at mid.

Rebate Catalog. Save money on qualified Home Cooling Systems, Appliances and more. Read about rebates for your home and business at mid. Rebate Catalog Save money on qualified Home Cooling Systems, Appliances and more. Read about rebates for your home and business at mid.org/rebates REV 12.31.2018 How to apply Modesto Irrigation District

More information

HEATING AND COOLING REBATES

HEATING AND COOLING REBATES Thank you for choosing to increase your customer's home energy efficiency with heating and cooling rebates. Follow the steps below to ensure eligibility to receive a rebate from the ComEd Energy Efficiency

More information

HEATING AND COOLING REBATES

HEATING AND COOLING REBATES Thank you for choosing to increase your customer's home energy efficiency with heating and cooling rebates. Follow the steps below to ensure eligibility to receive a rebate from the ComEd Energy Efficiency

More information

Empower. Savings Growth Community. Second Edition, June small business. Energy Management Solutions Reference Guide NR-634-V2-0610

Empower. Savings Growth Community. Second Edition, June small business. Energy Management Solutions Reference Guide NR-634-V2-0610 Second Edition, June 2010 Empower Savings Growth Community Come in, we re small business Energy Management Solutions Reference Guide NR-634-V2-0610 Apply Table of Contents Energy Efficiency s Lighting

More information

2018 Instant Lighting Rebates Product Catalog

2018 Instant Lighting Rebates Product Catalog MIDSTREAM LIGHTING PRODUCTS Product Code 463993 Interior 4 LED T8 Lamp Product Description Rebate/Unit Page # $5.00/Lamp 8 464791 Commercial LED Candelabra: 1 to

More information

Code Compliance. Lightcloud. Guides for California Title 24 & ASHRAE

Code Compliance. Lightcloud. Guides for California Title 24 & ASHRAE Guides for California Title 24 & ASHRAE Code Compliance Lightcloud Makes Compliance Easy What are California Title 24 & ASHRAE? Links to Energy Codes Interior Lighting Controls Exterior Lighting Controls

More information

A Guide for Applicants and Lighting Designers

A Guide for Applicants and Lighting Designers Sustainable Office Design Program: A Guide for Applicants and Lighting Designers Inside this Guide: Introduction... 2 Organize Your Space... 3 Select Lighting Solutions... 4 Select Controls... 5 Open Offices...

More information

HEATING AND COOLING REBATES

HEATING AND COOLING REBATES Thank you for choosing to increase your customer's home energy efficiency with heating and cooling rebates. Follow the steps below to ensure eligibility to receive a rebate from the ComEd Energy Efficiency

More information

Advances in Non-Residential Lighting Technologies

Advances in Non-Residential Lighting Technologies Advances in Non-Residential Lighting Technologies CABEC conference San Diego, CA October 21, 2011 Steven Mesh, LC, IESNA Lighting Education & Design 140 Gardenside Drive, #304 San Francisco, CA 94131 415-516-8126

More information

What You Need to Know About California Compliance T20, T24 and JA8 Chris Primous VP OEM National Accts and Industry Relations April 18, 2018

What You Need to Know About California Compliance T20, T24 and JA8 Chris Primous VP OEM National Accts and Industry Relations April 18, 2018 What You Need to Know About California Compliance T20, T24 and JA8 Chris Primous VP OEM National Accts and Industry Relations April 18, 2018 WHAT YOU NEED TO KNOW ABOUT CALIFORNIA COMPLIANCE T20, T24,

More information

PPL Electric Utilities Energy Efficiency and Conservation Program

PPL Electric Utilities Energy Efficiency and Conservation Program Installation of High-Efficiency High Efficiency Evaporator Fans Evaporator Fans That have Highfor Walk-ins Efficiency Permanent Split $50/fan motor Capacitor (PSC) Motor or ECM High Efficiency Compressors

More information

BUSINESS PROGRAMS LIGHTING

BUSINESS PROGRAMS LIGHTING 2018 BUSINESS PROGRAMS LIGHTING REDUCING ENERGY WASTE ACROSS WISCONSIN For more information, call 800.762.7077 or visit focusonenergy.com Focus on Energy, Wisconsin utilities statewide program for energy

More information

Application Information

Application Information 1. Complete the National Fuel Application, review the terms and conditions and sign the application form on page 2. New construction is also now eligible for this program in 2018. 2. Include the following

More information

Save energy at home residential natural gas rebate form

Save energy at home residential natural gas rebate form New York City (Brooklyn, Queens & Staten Island) Save energy at home residential natural gas rebate form Energy saving offers for residential natural gas heating customers from National Grid. High-Efficiency

More information

CONSUMERS ENERGY BUSINESS ENERGY EFFICIENCY PROGRAMS

CONSUMERS ENERGY BUSINESS ENERGY EFFICIENCY PROGRAMS CONSUMERS ENERGY BUSINESS ENERGY EFFICIENCY PROGRAMS 2018 Incentive Catalog HELPING MICHIGAN BUSINESSES SAVE ENERGY. THAT S OUR PROMISE. November 2017 Table of Contents List of Measures About This Program

More information

BUSINESS PROGRAMS COMMERCIAL REFRIGERATION

BUSINESS PROGRAMS COMMERCIAL REFRIGERATION 2018 BUSINESS PROGRAMS COMMERCIAL REFRIGERATION REDUCING ENERGY WASTE ACROSS WISCONSIN For more information, call 800.762.7077 or visit focusonenergy.com Focus on Energy, Wisconsin utilities statewide

More information

2019 Smart Energy Existing Homes Program Manual

2019 Smart Energy Existing Homes Program Manual 2019 Smart Energy Existing Homes Program Manual Reduce the Use: Residential Table of Contents INTRODUCTION... 1-1 1.1 PROGRAM OVERVIEW... 1-1 1.2 PROGRAM ASSISTANT... 1-1 1.3 SANTEE COOPER RESIDENTIAL

More information

Oregon Non-Residential Building Energy Code

Oregon Non-Residential Building Energy Code Oregon Non-Residential Building Energy Code Interior Connected Lighting Power Requirements The requirements for interior lighting power are one of the most important sections of the Oregon Energy Code.

More information

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment.

Small Commercial Business Energy Audits. Recognizing and addressing the special requirements of the small business market segment. Small Commercial Business Energy Audits Recognizing and addressing the special requirements of the small business market segment. Class 7 Class 7: Refrigeration Fundamentals The Vapor-compression cycle

More information

Lighting Catalog Energy Efficiency Rebates for Your Business

Lighting Catalog Energy Efficiency Rebates for Your Business Pacific Gas and Electric Company Lighting Catalog Energy Efficiency Rebates for Your Business Carefully read the specifications below to determine that you are installing a qualifying product(s). You must

More information

Heavy Industrial Rebate Catalog

Heavy Industrial Rebate Catalog Pacific Gas and Electric Company Energy Efficiency s for Your Business Heavy Industrial Catalog Saving energy for a brighter future Considering a new construction or upgrade project? You may be eligible

More information

2014 ELECTRIC EFFICIENCY REBATE APPLICATION

2014 ELECTRIC EFFICIENCY REBATE APPLICATION 2014 ELECTRIC EFFICIENCY REBATE APPLICATION 1. REBATE APPLICATION CHECKLIST This program offers rebates for the purchase of new energy-efficient products. Use this checklist to complete the steps to receive

More information

LIGHTING EQUIPMENT 2017 IOWA FOR YOUR BUSINESS REBATE APPLICATION

LIGHTING EQUIPMENT 2017 IOWA FOR YOUR BUSINESS REBATE APPLICATION LIGHTING EQUIPMENT 2017 IOWA FOR YOUR BUSINESS REBATE APPLICATION Instructions: Fill out form completely and sign. Attach itemized invoices and supporting documentation, if applicable. Failure to complete

More information

Lighting Summary - Interior

Lighting Summary - Interior Lighting Summary - Interior LTG-SUM Project Info Date: For Building Department Use Applicant Name: Applicant Address: Applicant Phone: Project Description F New building Addition Alteration Compliance

More information

Non-Cutoff and Semi-Cutoff Wall Pack Primary Use and Edits to Outdoor Wall-Mounted Luminaire Primary Use

Non-Cutoff and Semi-Cutoff Wall Pack Primary Use and Edits to Outdoor Wall-Mounted Luminaire Primary Use Non-Cutoff and Semi-Cutoff Wall Pack Primary Use and Edits to Outdoor Wall-Mounted Luminaire Primary Use DLC proposes to include non-cutoff and semi-cutoff (or "open face") wall packs in the Technical

More information

CAPABILITIES TRANSFORM THE WAY PEOPLE EXPERIENCE LIGHT APPROACHING 25 YEARS OF LIGHTING EXPERTISE FAST DELIVERY

CAPABILITIES TRANSFORM THE WAY PEOPLE EXPERIENCE LIGHT APPROACHING 25 YEARS OF LIGHTING EXPERTISE FAST DELIVERY TRANSFORM THE WAY PEOPLE EXPERIENCE LIGHT Our company vision guides every aspect of the MaxLite business, from the innovative products we provide, to the lifetime commitment we make to our customers. APPROACHING

More information

August 15, 2013 Page 1 of 19

August 15, 2013 Page 1 of 19 Section C401 Application Compliance with C402, C403, C404 and C405 AND (either C406.2, C406.3 or C406.4) Compliance with C402, C403, C404 or C405 Section C402 Building Envelope (Climate Zone 5A) Space-Conditioning

More information

COMMERCIAL. Oregon Incentives

COMMERCIAL. Oregon Incentives COMMERCIAL Oregon Incentives SEE WHAT SAVING ENERGY AND MONEY CAN DO FOR YOUR BUSINESS. EXISTING BUILDINGS STANDARD INCENTIVES FOR OREGON BUSINESS CUSTOMERS EFFECTIVE JANUARY 2018 Contents 1 Standard Incentives

More information

2018 Rebate Catalog and Application

2018 Rebate Catalog and Application 2018 Rebate Catalog and Application Save money on qualified Home Cooling Systems, Appliances and more. Read about rebates for your home and business at mid.org/rebates REV 01.2018 Modesto Irrigation District

More information

PG&E 2014 Title 24 Extension Products Products were extended through July 1, 2014

PG&E 2014 Title 24 Extension Products Products were extended through July 1, 2014 Midstream PG&E 2014 Title 24 Extension Products Products were extended through July 1, 2014 FAMILY CODE DESCRIPTION IMPACTED DISCONTINUATION LED Refrigerated Case Lights with Occupancy Sensors occupancy

More information

M E M O. Our proposed changes to the measure lives presented in the Protocols were based on the following:

M E M O. Our proposed changes to the measure lives presented in the Protocols were based on the following: 120 Water St., Suite 350 North Andover, MA 01845 Phone: (978) 521-2550 Fax: (978) 521-4588 www.ers-inc.com M E M O DATE: September 5, 2017 UPDATE: October 11, 2017, October 18, 2017 TO: FROM: RE: Frank

More information

Multifamily Energy Efficiency Rebates Application Package

Multifamily Energy Efficiency Rebates Application Package Application Package Cash rebates are available for the installation of qualified energy efficiency products in apartment dwelling units and in the common areas of apartment complexes, condominium complexes,

More information

Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard & 2013

Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard & 2013 WHITE PAPER Dissecting Lighting Control Requirements ANSI/ASHRAE/IES Standard 90.1-2010 & 2013 JUNE 2016 DT213 (Rev.10.2.17) Executive Summary ASHRAE Standard 90.1 is developed with the Illuminating Engineering

More information

INSPECTION REQUIREMENTS: ENERGY CODE LIGHTING & ELECTRICAL NON-RESIDENTIAL

INSPECTION REQUIREMENTS: ENERGY CODE LIGHTING & ELECTRICAL NON-RESIDENTIAL Energy Code Lighting & Electrical Non-Residential Page 1 of 14 Revision Date: 2/12/2018 INSPECTION REQUIREMENTS: ENERGY CODE LIGHTING & ELECTRICAL NON-RESIDENTIAL INSPECTION CODE: N/A SCOPE: NON-RESIDENTIAL,

More information

Save energy at home residential natural gas rebate form

Save energy at home residential natural gas rebate form Long Island & Rockaway Peninsula Save energy at home residential natural gas rebate form Energy saving offers for residential natural gas heating customers from National Grid. High-Efficiency Heating Equipment

More information

Farm Energy IQ. Farms Today Securing Our Energy Future. Tom Manning, New Jersey Agricultural Experiment Station

Farm Energy IQ. Farms Today Securing Our Energy Future. Tom Manning, New Jersey Agricultural Experiment Station Farm Energy IQ Farms Today Securing Our Energy Future Energy Efficiency for Direct Market Farms Tom Manning, New Jersey Agricultural Experiment Station Farm Energy IQ ENERGY EFFICIENCY FOR DIRECT MARKET

More information

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012 HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O INTRODUCTION HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.

More information

SECTION INTERIOR AND EXTERIOR LIGHTING FIXTURES

SECTION INTERIOR AND EXTERIOR LIGHTING FIXTURES SECTION 26 50 00 INTERIOR AND EXTERIOR LIGHTING FIXTURES PART 1: GENERAL 1.1 WORK INCLUDED: A. Interior lighting fixtures and accessories B. Exterior lighting fixtures and accessories C. Emergency battery

More information

SBEC Residential Energy Efficiency Rebate Programs for New Homes

SBEC Residential Energy Efficiency Rebate Programs for New Homes SBEC Residential Energy Efficiency Rebate Programs for New Homes There are several energy efficiency measures that you can incorporate into your new home during the building process to help reduce the

More information

Pacific Gas and Electric Company Energy-Efficiency Rebates for Your Business. Lighting Rebate Catalog Saving energy for a brighter future

Pacific Gas and Electric Company Energy-Efficiency Rebates for Your Business. Lighting Rebate Catalog Saving energy for a brighter future Pacific Gas and Electric Company Energy-Efficiency Rebates for Your Business Lighting Rebate Catalog Saving energy for a brighter future Table of Contents The advantages of light-emitting diode (LED) technologies...

More information

ASHRAE/IESNA Standard

ASHRAE/IESNA Standard ASHRAE/IESNA Standard 90.1-1999 An inside look at the requirements of Standard 90.1-1999 Energy Standard for Building Except Low-Rise Residential Building Mick Schwedler, PE Sr. Principal Applications

More information

2018 Smart Energy Existing Homes Program Manual

2018 Smart Energy Existing Homes Program Manual 2018 Smart Energy Existing Homes Program Manual Reduce the Use: Residential Table of Contents Section 1 Section 2 Section 3 Section 4 Appendix A Appendix B Appendix C Introduction... 1-1 1.1 Program Overview...

More information