1 National Smart Metering Program NSMP Business Requirements Work Stream Direct Load Control for Priority Appliances Version number: Version 1.0 Status: Author: Final Dr Martin Gill Date published: 20 October 2010 File name: NSMP Direct Load Control Priority Appliances v1.0.doc

2 Table of Contents 1 DOCUMENT CONTROL VERSION CONTROL APPROVAL REFERENCES INTRODUCTION DIRECT LOAD CONTROL PRIORITY APPLIANCES CONNECTING THE PRIORITY APPLIANCE AS TAMPER DETECTION COST OF INSTALLATION FUTURE AVAILABILITY OF SMART APPLIANCES RECOMMENDATIONS APPENDIX A GLOSSARY File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 2 of 17

3 1 Document Control 1.1 Version Control Version Date Description Amended by /09/2009 First Draft Dr Martin Gill /02/2010 Update Dr Martin Gill /05/2010 Added status of developments Dr Martin Gill 0.4 9/06/2010 Minor modifications after June 2010 Dr Martin Gill /10/2010 Revised recommendations section endorsed by NSSC on 6 August 2010 and again on 25 August 2010 M. Gill update on diagrams: New figure 2 showing the single phase meter with ONE load control and one relay AS4755 only REQUIRES one mode, the other two are optional and will not be supported by most appliances The meter to the AS4755 appliance now shows ONE control wire with a statement that must select the mode at time of installation Update version 0.4 for release to SCO /10/2010 Baselined post NSSC approval on 20 October 2010 H. Koller H. Williams 1.2 Approval Authorised by Signature Date Program Director, NSMP 20 October 2010 File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 3 of 17

4 1.3 References The following documents are referred to in this document. Document Name Version Business Requirements Working Group Terms of Reference Version September 2009 ADVANCED METERING INFRASTRUCTURE Minimum AMI Functionality Specification (Victoria) The National Smart Metering Program and the AS4755 Appliance Interface: Establishing a Direct Connection Prepared for the BRWG by Dr George Wilkenfeld Release 1.1 September 2008 Version 3 NSMP Smart Metering Infrastructure Functionality Specification Version 0.24 NSMP Home Area Network Research Study Version 0.7 File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 4 of 17

5 2 Introduction The Terms of Reference of the Businesses Requirements Working Group include: Item (n) recommend to the MCE how direct load control capability can be integrated into priority appliances - this analysis should be undertaken in conjunction with the existing appliance energy standards work currently being conducted by both the Equipment Energy Efficiency (E3) Committee of the National Framework for Energy Efficiency, and Standards Australia. This paper considers how functionality already included in the National Minimum Functional Specification meets the requirements for direct load control of Priority Appliances. It builds on an earlier paper which presented the possibilities offered by AS4755. (Note: The aim of AS4755 is to set standards for physical connections to the appliance and a minimum level of Demand response functionality.) 3 Direct Load Control 3.1 Priority Appliances Priority appliances are considered to be those which contribute to energy demand and offer scope for controlling or shifting their demand. Table 1 is taken from Dr George Wilkenfeld s paper, The National Smart Metering Program and the AS4755 Appliance Interface and presents the priority appliances for direct load control recommended by the Equipment Energy Efficiency (E3) Committee of the National Framework for Energy Efficiency: Table 1: Demand and Load-Shifting Characteristics of Appliances, and corresponding Demand Response Mode (DRM)(a) Electrical products covered by Potential to timeshift energy AS4755 (b) use Potential to impact on summer peak demand Potential to Impact on winter peak demand Refrigerative air conditioner Yes; DRM 1,2,3 Yes if heating; No (c) DRM 1,2,3 Pool pump Yes; DRM 1,2 Yes; DRM 1,2,3 Yes; DRM 4 Electric resistance water heater Yes; DRM 1,2,3 Yes; DRM 1,2,3 Yes; DRM 4 Heat pump water heater Yes; DRM 1,2,3 Yes; DRM 1,2,3 Yes; DRM 4 Solar-electric water heater Yes; DRM 1 Yes; DRM 1,4 (d) Yes; DRM 4 (a) DRM 1 = cycling on/off. DRM 2,3 = part load operation. DRM 4 = Forced on (b) The structure of AS4755 allows the development of interface standards for additional appliances. There has been preliminary discussion about possible coverage of Electric Vehicle Recharging Points. (c) Pre-cooling not compatible with Australian product types, patterns of AC use, dwelling thermal properties or with greenhouse gas reduction objectives. (d) DRM 4 can also be used to avoid late afternoon winter load by pre-heating. The three appliance types (air conditioners, pool pumps and water heaters) were selected because they contribute significantly to peak demand, are readily curtailable at times of peak demand, and/or (in the case of pool pumps and water heaters) can offer time-shifting or energy storage services when renewable energy availability is high or demand is low (See Table 1). Also, air conditioners, pool pumps and water heaters are permanently installed in the dwelling, so any inbuilt Demand Response (DR) capability will be retained at the site even if customers move. This is not the case with portable appliances such as whitegoods, where the scope for curtailment or timeshifting is much lower, and even if a DR capability is established, it may well be lost when the customer File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 5 of 17

6 moves house (when they take their whitegoods with them). The next customer may not have the appliances or the HAN components required to re-establish the capability. The ability to defer energy consumption allows utilities to utilize generation and distribution assets more effectively. Present hot water programs give utilities access to large amounts of controllable load. Government incentive programs are leading to a reduction in the number of electric storage hot water services, reducing the total amount of controlled load available to the network operator. These considerations provide a stimulus to finding alternative methods for controlling additional load on the network through the Smart Meter deployment. One of the largest contributors to the rapid rise in peak demand is domestic air-conditioner ownership, leading to a strong desire to implement a means of controlling this load. When combined with pool pumps (and water heaters) there is a potential to reduce reliance on expensive short term peaking assets. This paper does not currently consider Plug in Electric Vehicles (PEV). It is acknowledged with the potential growth of PEV this load should also be considered in any discussion about Direct Load Control. 3.2 Connecting the Priority Appliance In the ideal world a consumer would purchase a new Smart Appliance and when it is plugged into the home for the first time it would automatically identify itself and register with the home network. There are currently a number of barriers to this ideal vision, most significantly the lack of a global (or even National Australian) standard for home networking. Without a single standard appliance manufacturers would be required to offer a number of different solutions incurring additional development expense and complication for the consumer determining which solution is supported in their distribution area. The other barrier is that security concerns mean that only trusted appliances can share information with the Smart Meter, so the consumer will still be required to contact the utility to authorize the Smart Appliance. A number of Australian distribution businesses have successfully trialled demand reduction programs targeting two of the priority appliances, namely air-conditioners and pool pumps. Demand reduction for pool pumps is handled in a very similar manner to that employed for hot water services today, the pool pump is simply turned on during the hours of least demand ensuring that it runs for a predefined number of hours per day. Demand reduction is achieved by ensuring that the pool pump is turned off during peak hours. For air-conditioners it is not desirable to offer a simple all on or off selection. Instead these programs reduce the demand presented by air-conditioners by cycling the air-conditioner compressor whilst leaving the fan in the unit unaffected. A simple means of achieving this is depicted in Figure 1. The trialled systems have used broadcast messaging and require an external interface to be fitted to the airconditioner. The Smart Meter Communications Networks (SMCN) necessary to support SMI offers the opportunity to expand these programs. File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 6 of 17

7 Figure 1: Direct Control of a/c compressor Direct Interface to the Meter The National Smart Metering Infrastructure Functional Specification provides two methods of directly controlling priority appliances. The first is through an integrated load control contactor (rated at 31.5A) and the second supports external load control contactors via integrated 2A relays (supplied voltage free). The functionality of the contactor and relays is described in Section 7.6 Load Management through a controlled load contactor or relay (MCE recommended function 8 & 14 dedicated load control) of the SMI Minimum Functionality Specification. Figure 2 shows the configuration for single phase single element meters (note that a similar single phase two elements and three phase configuration is also described in the SMI Functionality Specification). Figure 2: Single Phase Metering Configurations shown in the SMI Functionality Specification The 31.5A contactor can be utilised for direct control of appliances, able to turn power to the appliance on or off. It is important to note that this requires mains wiring to connect the appliance to the Smart Meter. This solution is suitable for existing dedicated load control circuits or for new installations as it is generally considered too expensive to rewire an existing premise to connect loads back to the Smart Meter. Figure 3: Direct Load Control using a Dedicated Circuit Direct Load Control via an integrated dedicated circuit (Function 8/14) turns off power to the whole circuit. For example while large air-conditioning units require their own dedicated power circuit it is not possible to simply connect this wire to the meter s direct load control circuit, as this would turn off the whole air- File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 7 of 17

8 conditioner, including the fan needed to circulate air. So while simple, dedicated load control is limited because of the need to run separate wiring, it only offers very coarse control of appliances (on or off) and meters only offer one Dedicated Load Control circuit, so it is not possible to connect different appliance types, such as an air-conditioner and hot-water service as they would operate at different times. The inclusion of voltage free relays (as shown in Figure 2) supports an alternative load control option. In the simplest form a control wire is connected from the meter to the appliance and carries a simple on/off signal. The relays required in the smart meter are lower cost than the dedicated load control contactor, since the meter is only required to switch low voltages and currents. The control wire should also be less expensive than mains wiring (this does not consider installation costs which are discussed in Section 3.5). For this system to work each appliance must be able to interpret the signals being sent on the control wire. Figure 4 depicts this solution with an external box interpreting simple on and off commands to switch power to the appliance. More comprehensive control is possible if the interface is built into the appliance, which will be explored further under the section covering the AS4755 interface. Figure 4: Appliance Control using separate control wire Home Area Network Interface The National Smart Metering Infrastructure Functionality Specification requires the meter to support a Home Area Network (HAN) using an Open Standard (MCE Function 16). As such the meter will already contain a modem capable of supporting communications around customer premises. The HAN will enable appliances fitted with a similar modem to communicate with the smart meter. The Smart Metering Infrastructure supports communications with devices located on the HAN, offering utilities the ability to control the demand of priority appliances. Figure 5: Scope of the SMI showing the HAN As shown in Figure 5 devices on the HAN are not provided as part of the SMI. The provision and installation of these devices falls to the Customer. This is not to say that the Customer will have to File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 8 of 17

9 purchase the devices, they could be offered to the customer as an incentive to allow external control of their appliances. Controlling appliances via the HAN offers a solution which comes very close to the ideal vision presented in Section 3.2. The appliances are attached to the mains but control is via the HAN. This is depicted in the following figure. File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 9 of 17 Figure 6: Connecting Appliances to the HAN At this stage the National SMI has not agreed on a technology implementing the HAN, however the HAN Research Study states Ideally the standard should support the transmission of information over both power-line and Radio Frequency (RF) physical layers. Both physical layers should be specified but only one will be implemented in the Minimum Functionality. It is worthwhile exploring the two physical media Wired or Wireless Interfaces. Wired HAN Interface The existing mains wiring can be used to provide the physical connection between the device and the Smart Meter, so called Power-Line Communications (PLC). A PLC modem in the meter is able to send signals along the power cable to modems located in appliances, without the need for separate wiring. It is a safe assumption that priority appliances are attached to the power cable making this an attractive option. There are a large number of PLC standards arguably with no clear leader in the direct load control market. Another potential issue is that the PLC modem must have access to mains wiring (so that it can detect the signals) which limits where the modem can be located in the appliance (this is discussed further under the section covering AS4755). Wireless HAN Interface Wireless interfaces have the advantage that they do not require any wiring between the device and the Smart Meter. The most common form of wireless communications is Radio Frequency (RF). An RF modem in the meter is able to send signals to RF modems located in appliances. Widespread acceptance of this solution comes from everyday use of Wi-Fi and Bluetooth devices. The Victorian AMI has specified that all meters will contain a HAN based on the ZigBee RF standard with the Smart Energy Profile. The ZigBee Smart Energy Profile already provides support for load control. 3.3 AS4755 Australian Standard AS4755 offers an interface on priority appliances enabling a controller to adjust the demand of the device. The standard does not detail the communications between the controller and the appliance, it provides a simple interface located on the appliance. While simple the interface provides a sufficiently rich set of commands to provide required load control. In essence the AS4755 appliance interface is a terminal block with 4 screw terminals. An external controller is required to apply a signal on one of the terminals in order to initiate load curtailment. The

10 three signal options (the fourth wire is a Signal Common used to by all signals) enables the controller to allow the device to continue running, but using lower power (think of a microwave oven being run on medium power instead of full power). The advantage of reducing the peak demand is that consumer acceptance is likely to be higher given that the appliance will continue to run. Figure 7: AS4755 Control Signals Before the AS4755 interface can be used there are two vital components: firstly external hardware is required to control the appliance (Shown in Figure 7 as the AS4755 Controller) and secondly communications is required to the AS4755 Controller. This is shown in Figure 8: Figure 8: Components required to utilize the AS4755 interface on Appliances As previously mentioned the Smart Meter already contains a communications link back to the utility control centre so here we consider several means of connecting the smart meter to the AS4755 equipped Appliance. Figure 9: Direct Connection between Smart Meter and AS4755 Appliance Interface The attraction of the solution shown in Figure 9 is that no additional interface module is required between the meter and the AS4755 equipped device. Another advantage is that the meter will store all the required load switching schedules (as detailed in Section 7.6 of the SMI F.S.). There are a number of disadvantages to this solution: File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 10 of 17

11 the smart meter must include the relays 1 to interface to AS4755; a dedicated control wire 2 must be installed between the meter and each appliance; and AS4755 has been designed assuming that only one appliance can be connected to each relay limiting the number of appliances can be controlled by the meter. Figure 10: Use of the HAN to connect Smart Meter and AS4755 Appliance Figure 10 shows an appliance connected to the Smart Meter via a HAN Device. The HAN Device is required to interpret commands sent from the Smart Meter and apply the appropriate signal to the Appliance. There are a number of advantages to this solution; significantly a larger number of different Priority Appliances can be included in a demand response program (the Victorian AMI Specification states that the HAN must support up to 16 devices). It is also possible to include different device types operating at different times (and potentially with different levels of demand reduction). What is unclear is how many of the load control options specified in Section 7.6 of the SMI F.S. will be supported by the HAN device. One advantage for control of devices via the HAN is the simplicity of including customer options for participation in the planned Demand Reduction. Via another device on the HAN, typically assumed to be an In Home Display the customer might offer the ability to opt out of the current demand reduction period (for example after 5 days of extremely hot weather the customer may want to run their air-conditioner at full capacity). It is assumed that giving customers the ability to opt out (or opt in) will provide greater customer acceptance. It must be stated that AS4755 considers providing the customer the ability to override demand reduction commands. Power for HAN devices Even for HANs utilizing RF communications the HAN Device should be mains powered to avoid the need for battery maintenance. Two methods are considered: the AS4755 standard allows the Appliance to supply power to the HAN Device, unfortunately this option is not being offered by most appliance manufacturers. In the second option the HAN Device must be able to directly access mains power, the potential disadvantage is that the mains connection may compromise isolation barriers provided in the Appliance to meet safety requirements. This is in addition to any issues associated with physically fitting the HAN device to the appliance. For HANs utilizing PLC communications the HAN Device must be directly connected to the mains wiring. It therefore has similar issues to that stated for the RF HAN interface, including that the HAN Device must be designed to ensure that it does not compromise any isolation barriers used in the appliances to meet safety requirements. 1 Several of meter configurations described in the SMI F.S. include voltage free 2A relays suitable for this application 2 Point of clarification: It is not necessary to support all three signal modes at each appliance File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 11 of 17

12 Status of the AS4755 standard At the time of writing compliance with AS 4755 (specifically Part.3.1) by suppliers of air conditioners is not mandatory. There is proposal to mandate the inclusion of AS4755 into all air conditioners sold in Australia after October The Equipment Energy Efficiency (E3) Committee has commissioned a regulation impact assessment (RIA) on the proposed mandate. It is expected that the RIA will be released for public consultation by mid 2010, and is subject to the usual E3 processes. Note that AS4755 is actually described in a series of standards. AS 4755: Framework for demand response capabilities and supporting technologies for electrical products, Published April 2007 AS : Demand response capabilities and supporting technologies for electrical products, Part 3.1: Interaction of demand response enabling devices and electrical products Operational instructions and connections for airconditioners Published December Other standards are in preparation: AS : Intends to provide demand response for swimming pool pump controllers AS : Intends to provide demand response for electric, solar-electric and heat pump water heaters. The RIA currently in preparation will include air-conditioners, pool pumps and hot water heaters, It has been confirmed that there are already a number of large ducted (central) and split system airconditioning units offering an optional AS4755 interface. It has also been reported that there are no split system air-conditioners (around 2kW capacity) available with the AS4755 interface, however appliance manufacturers are preparing to expedite development of these products in anticipation of the mandate in Tamper detection There is nothing new about offering consumers lower tariffs in exchange for utility control of appliance demand, this is what off-peak hot-water services currently do in Australia today. Similar programs have also been run in California, where consumers are offered a different tariff depending on the amount of cycling that they will allow the utility to perform on their air-conditioner. Unfortunately rumours abound that on hot days some Californian consumers have discovered that wrapping the antenna fitted to their airconditioner in aluminium foil prevents the air-conditioner receiving the cycling commands allowing them to enjoy full use of their air-conditioner at a reduced tariff. Running a dedicated mains circuit means that the consumer must adjust mains wiring. In most installations the dedicated circuit is connected to the meter under a sealed terminal cover. The terminal cover is protected with a visual meter seal, the removal of which is easily detected during the quarterly meter read. Running a long low voltage cable is considered more susceptible to tamper, especially when carrying AS4755 signals. The reason is that while the connection to the meter might be located under the terminal cover the attachment point to the Priority Appliance is certainly unprotected. By disconnecting the wire the Appliance will not receive or respond to signals sent from the meter. Additional hardware would be required in the meter in order to detect that the wiring has been modified. There is an argument being presented that communications via the HAN is reliable since the HAN Device will acknowledge the message. While this is certainly true for a totally integrated product it is not the case for connection via the AS4755 interface. In the extreme we consider purchasing a HAN Device but not installing it in the AS4755 equipped appliance: While powered on it will acknowledge all messages from the HAN, but is unable to send the command to the Priority Appliance. It is possible for the HAN Device to include additional circuitry to validate that it is at least connected to something, but even this is not tamper proof. File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 12 of 17

13 It is highlighted that the meter is able to measure electrical demand, as such it can be used to validate that a particular demand reduction has occurred. While possible there are some challenges including: The meter is measuring total household load, of which only a percentage is controlled; Depending on the type of appliance, cycling may still use the same peak power, but for shorter time periods; and the settings on the device may affect the actual demand (as an extreme example consider the unfortunate situation in which the appliance is only turned on when the system initiates demand reduction, as a result while the appliance is operating correctly, the meter will still measure an increase in electrical demand). 3.5 Cost of Installation Technology that provides control of priority appliances whilst minimising changes to fixed wiring within consumers premises will provide a significant cost saving. As such the cost to install the system must be considered when determining the viability of the solution. Direct Load Control using a dedicated circuit is a well proven technology but requires separate mains wiring to be run from the appliance back to the meter. It is only suitable for appliances that the customer will accept complete on or off load cycling (for example storage hot water services). It is not particularly suitable for connecting many existing priority appliances in the home as it requires the installation of a new dedicated circuit (for example to connect an existing pool-pump). While at first the simplicity of adding a direct AS4755 connection appears attractive there is the complexity of installation. For a new appliance being installed with its own dedicated circuit (as required for most new air-conditioners) the cost to run the required control cable is minimal, however for existing appliances or those which do not need a dedicated circuit (e.g. pool-pumps) further costs are incurred. The most logical place for the cable to be connected to the meter is under the meter terminal cover. In all states, other than NSW, this requires the distribution business to perform a site visit adding to the installation costs. Connecting Priority Appliances via the HAN theoretically incurs the lowest additional cost. This assumes that the HAN Device can be purchased at minimal cost. Once the purchase price and costs of installing the device into the Priority Appliance are included it is estimated that the total cost would be similar to the distributor site visit to connect a dedicated wire. While it avoids the need for a separate control wire it may incur the cost of HAN repeaters to ensure that the Priority Appliance receives the signal (for example a pool-pump located in a tin shed somewhere in the domestic backyard is unlikely to reliably receive RF signals without the use of repeaters). Returning to the original vision, the Smart Appliance with integrated HAN interface avoids the need for special installation. This leaves only the issue of ensuring reliable HAN communications from the Smart Meter to the appliance (e.g. wrapping the aerial in foil as discussed in the Tamper section). 3.6 Future Availability of Smart Appliances The dedicated load control circuit is well understood and is already available in many jurisdictions. Ripple control systems enable the remote switching of a large number of loads in both NSW and Queensland (and a small number in South Australia). The expansion of these systems to provide more flexible (real time) control of loads might not be possible (especially in NSW where the infrastructure is nearing the end of its economic life). With the Victorian AMI Rollout well underway there is a growing number of meters capable of supporting control of devices via the HAN 3 (the Victorian deployment uses ZigBee). By 2013 in excess of 2million meters will support this option. Demand reduction is an active area of research and development. It is anticipated that in the next years significant advances in the number and type of devices available for load control will occur. The enabler for control of these devices will be communications to the home. Under the NSMP it is anticipated 3 It should be stated that the Victorian AMI Specification does not support the 2A voltage free relays allowed in the SMI F.S. File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 13 of 17

14 that the Smart Meter Communications Network will provide the connectivity, however this is not the only possibility. The announcement of the National Broadband Network (NBN) highlights that other communications links to appliances in the home may become available. There is a move in some jurisdictions to mandate the inclusion of demand reduction for new installations. As an example the Queensland government is considering mandating that all new pool pumps must operate outside peak hours (see Installing the fixed wiring to support load control at the time of construction provides a cost effective means of growing the capacity of demand reduction within consumers premises, As part of President Obama s stimulus package funding has been provided to a number of appliance manufacturers to assist them in the development of smart appliances capable of being controlled via the HAN. An update will be provided as more information becomes available. As outlined in Section 0 there is currently no requirement to provide appliances with the AS4755 standard. Despite this some air-conditioner manufacturers are offering solutions with the capability. It is also highlighted that many large ducted air-conditioners are compatible with Programming Communicating Thermostats which are being developed in overseas markets to provide load control via the HAN. 4 Recommendations Under its terms of reference the NSSC is to prepare a guidelines paper for MCE describing how the recommended national minimum functionality requirements for smart metering infrastructure (SMI F.S.) will support direct load control in priority consumer appliances. The recommended minimum SMI functionality is to be developed in collaboration with the Equipment Energy Efficiency (E3) Committee of the National Framework for Energy Efficiency and Standards Australia. The BRWG has reviewed the proposed Australian Standard AS4755 intended to offer an interface on priority appliances enabling a controller to adjust the demand of the device. This interface standard describes four load control commands for an appliance (e.g. an air conditioner) which are: Turn on, Run at 50% capacity, Run at 75% capacity or Turn off. In the AS4755 standard the 50% and 75% modes are optional. The NSSC notes that currently AS 4755 (specifically Part.3.1) is not mandatory. There is a proposal to mandate the inclusion of AS4755 into all air conditioners sold in Australia after October The Equipment Energy Efficiency (E3) Committee has commissioned a regulation impact assessment (RIA) on the proposed mandate which is expected to be released for public consultation by mid Discussions with representatives from both the E3 Committee and Standards Australia lead the NSSC to understand that the AS4755 standard will eventually consist of separate standards for swimming pool pump controllers and electric, solar-electric and heat pump water heaters. The NSSC wishes to advise the MCE that the recommended minimum SMI functionality will support direct load control in priority appliances either by turning power to an appliance off and on or via a direct connection to the AS4755 interface. There will be three methods available for the connection of consumer appliances for direct load control via a smart meter: Via a Dedicated Load Control Circuit (an optional feature in the SMI F.S. that allows one appliance to be controlled by running a wire from the smart meter to the appliance) Via a voltage free relay (optional feature in SMI F.S. that allows one appliance to be controlled by running a wire from the smart meter to the appliance) Via the Home Area Network (HAN) (mandatory capability in SMI F.S. that will allow more than one appliance to be controlled via the home area network established by the smart meter) The dedicated load control circuit and voltage free relay option will provide a cost effective option for legacy load control appliances (predominantly hot water heaters) to be transferred from existing ripple File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 14 of 17

15 control and time switches to smart meters. Connection of existing devices can be achieved during the smart meter installation without the need for further site visits. The HAN is expected to provide a cost effective mechanism for direct load control for a wide range of new consumer appliances that are not currently suitable for direct load control. The NSSC notes that a recommendation to MCE on a HAN Interface Standard will be made in May File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 15 of 17

16 Appendix A Glossary The following acronyms are in the NSMP Glossary. ACOSS AEMC AEMO AER AMI AS B2B BPRG BPPWG BRDRG BRWG CATS COAG DNSP DRET EEEC ENA ERAA ESC FRC FRMP HAN IEC IHD LNSP MCE MDA MDF MDFF MOU MRG MSATS MTWG NCRE Australian Council of Social Services Australian Energy Market Commission Australian Energy Market Operator Australian Energy Regulator Advanced Metering Infrastructure (Victorian smart metering program) Australian Standard Business to Business B2B Procedures Reference Group (established under the IEC) Business Processes and Procedures Working Group (established under the NSSC) Business Requirements Definition Reference Group (established under the AMI program) Business Requirements Working Group (established under the NSSC) Consumer Administration and Transfer Solution Council of Australian Governments Distribution Network Service Provider Commonwealth Department of Resources, Energy and Tourism (also referred to as RET) Equipment Energy Efficiency (E3) Committee Energy Networks Association Energy Retailers Association of Australia Essential Services Commission Full Retail Contestability Financially Responsible Market Participant Home Area Network Information Exchange Committee (established under section 7.2A.2 of the Rules) In-home Display Local Network Service Provider Ministerial Council on Energy (established under the COAG) Metering Data Agent Metering Data File Metering Data File Format Memorandum of Understanding Metrology Reference Group (established under the RMEC) Market Settlement and Transfer Solution Metering Technology Working Group (established under the AMI program) National Consumer Roundtable on Energy File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 16 of 17

17 NECF NEL NEM NEMMCO NEO NER NSMP NSSC NT OMRV PDRG PwC PTWG RET RIS RFP RMEC RP RPWG RWG SCO SM SMCN SME SMI SMMS SMWG SWIS TFWG TOR TRWG WA WAIMO WEM WIGS WG National Energy Consumer Framework National Electricity Law National Electricity Market which excludes Western Australia and Northern Territory National Electricity Market Management Company National Electricity Objective (as set out in section 7 of the NEL) National Electricity Rules National Smart Metering Program National Stakeholder Steering Committee (National Smart Metering Program) Northern Territory Operating Model Requirements Version (Victorian AMI Program) Business Process & Data Reference Group (established under the RMEC) PricewaterhouseCoopers Pilots and Trials Working Group (established under the NSSC) Commonwealth Department of Resources, Energy and Tourism Regulatory Impact Statement Request for Proposal Retail Market Executive Committee (an advisory committee to AEMO) Responsible Person Retail Policy Working Group (established under the MCE) Regulation Working Group (established under the NSSC) Standing Council of Officials (as established under the MCE) Smart Metering Smart Metering Communication Network Subject Matter Expert Smart Metering Infrastructure Smart Metering Management System Smart Metering Working Group (established under the SCO) South Western Interconnected System in Western Australia Testing Framework Reference Group Terms of Reference Technical and Regulatory Working Group (established under the AMI Program) Western Australia Western Australian Independent Market Operator Wholesale Electricity Market (Western Australia) Wholesale Inter-connector Generator and Sample Working Group File Name: NSMP Direct Load Control Priority Appliances v1.0.doc Page 17 of 17

The National Smart Metering Program and the AS4755 Appliance Interface: Establishing a Direct Connection

The National Smart Metering Program and the AS4755 Appliance Interface: Establishing a Direct Connection Paper for Business Requirements Working Group The National Smart Metering Program and the AS4755 Appliance Interface: Establishing a Direct Connection Background The Terms of Reference of the Businesses

More information

Efficiency Program. Andrew Fairs Manager, Business and Government Programs

Efficiency Program. Andrew Fairs Manager, Business and Government Programs The Equipment Energy Efficiency Program Andrew Fairs Manager, Business and Government Programs Minimum Energy Performance Standards MEPS programs are made mandatory in Australia by state government legislation

More information

Business Process and Procedures Workstream. Event Log Collection, Processing & Delivery process (BP05)

Business Process and Procedures Workstream. Event Log Collection, Processing & Delivery process (BP05) Business Process and Procedures Workstream Options Paper Collection, Processing & Delivery process (BP05) Version Number: Status: Author: Version 0.1 Draft P Egger Date Published: 07 February 2011 File

More information

Smart Metering Infrastructure (SMI)

Smart Metering Infrastructure (SMI) Smart ing Infrastructure () meter Components Context Diagram Utility HAN HAN Environment secure tunnel possible later feature metrology function other functions customer service function Internet SMART

More information

Energy Efficiency Requirements for Air Conditioners, Chillers and Close Control Units

Energy Efficiency Requirements for Air Conditioners, Chillers and Close Control Units Energy Efficiency Requirements for Air Conditioners, Chillers and Close Control Units Simone Tiele, Assistant Director Appliance Energy Efficiency Section DEWHA AIRAH 21 April 2009 Air Conditioners Air

More information

AS/NZS :2014

AS/NZS :2014 AS/NZS 4755.3.3:2014 Australian/New Zealand Standard Demand response capabilities and supporting technologies for electrical products Part 3.3: Interaction of demand response enabling devices and electrical

More information

Draft Eastern District Plan

Draft Eastern District Plan Draft Eastern District Plan Submission_id: 31238 Date of Lodgment: 13 Dec 2017 Origin of Submission: Online Organisation name: Turrulla Gardens Pty Ltd C/- Mecone Organisation type: Industry First name:

More information

Smart Metering Infrastructure (SMI)

Smart Metering Infrastructure (SMI) Smart ing Infrastructure () meter Components Context Diagram HAN Environment Expected to overlap Utility HAN HAN Environment Customer HAN Legend: HAN Home Area Network MDM Management System MSATS ing,

More information

CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT

CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT CONDITIONS OF SERVICE - NBN SERVICES 1. ABOUT These Conditions of Service apply to all NBN Services. These Conditions of Service form part of our Standard Form of Agreement found at www.adam.com.au/legal.

More information

IT S NOT JUST SOLAR IT S SOLAHART

IT S NOT JUST SOLAR IT S SOLAHART IT S NOT JUST SOLAR IT S SOLAHART Solar Hot Water Systems WHY SOLAR HOT WATER MAKES SENSE The biggest household energy saving Hot water is one the greatest energy drains on your house. A solar water heater

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 4692.1:2005 (Incorporating Amendment Nos 1 and 2) Reconfirmed 2016 AS/NZS 4692.1:2005 A2 Australian/New Zealand Standard Electric water heaters Part 1: Energy consumption, performance and general

More information

AS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009

AS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009 AS/NZS 4474.2:2009 (Incorporating Amendment Nos 1 and 2) Australian/New Zealand Standard Performance of household electrical appliances Refrigerating appliances Part 2: Energy labelling and minimum energy

More information

Australian Standard. Security screen doors and security window grilles AS AS 5039

Australian Standard. Security screen doors and security window grilles AS AS 5039 AS 5039 2003 AS 5039 Australian Standard Security screen doors and security window grilles This Australian Standard was prepared by Committee CS-023, Security Screen Doors and Security Window Grilles.

More information

CONSULTATION ON THE VICTORIAN GOVERNMENT S PROPOSAL TO BAN E-WASTE FROM LANDFILL

CONSULTATION ON THE VICTORIAN GOVERNMENT S PROPOSAL TO BAN E-WASTE FROM LANDFILL 25 January 2018 Waste and Resource Recovery Team Department of Environment, Land, Water and Planning Level 1, 8 Nicholson Street East Melbourne VIC 3002 wastepolicy@delwp.vic.gov.au Dear Sir / Madam CONSULTATION

More information

STTM INTERFACE PROTOCOL

STTM INTERFACE PROTOCOL PREPARED BY: Regulatory DOCUMENT REF: s-35-68 VERSION: 10.0 ISSUE DATE: 20 March 2017 EFFECTIVE DATE: 22 March 2017 FINAL Version History Version Effective date Author(s) Changes and comments 10.0 22 March

More information

New Zealand e-waste. The Joint Aus/NZ Standard for E-waste Recycling Helen Bolton

New Zealand e-waste. The Joint Aus/NZ Standard for E-waste Recycling Helen Bolton New Zealand e-waste The Joint Aus/NZ Standard for E-waste Recycling Helen Bolton Outline of Presentation New Zealand and e-waste Australia Product Stewardship Standards The process Scope and content Benefits

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 4692.1:2005 AS/NZS 4692.1:2005 Australian/New Zealand Standard Electric water heaters Part 1: Energy consumption, performance and general requirements AS/NZS 4692.1:2005 This Joint Australian/New

More information

South of Eastern Strategic Direction Status Update

South of Eastern Strategic Direction Status Update STAFF REPORT ACTION REQUIRED South of Eastern Strategic Direction Status Update Date: July 10, 2014 To: From: Planning and Growth Management Committee Chief Planner and Executive Director, City Planning

More information

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James

More information

SEVENTH SESSION. (Strasbourg, May 2000) Resolution 98 (2000) 1 on historic towns in Europe

SEVENTH SESSION. (Strasbourg, May 2000) Resolution 98 (2000) 1 on historic towns in Europe CONGRES DES POUVOIRS LOCAUX ET REGIONAUX DE L'EUROPE CONGRESS OF LOCAL AND REGIONAL AUTHORITIES OF EUROPE SEVENTH SESSION (Strasbourg, 23-25 May 2000) Resolution 98 (2000) 1 on historic towns in Europe

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017 National Grid Residential Active Demand Reduction Demonstration Project MA EEAC Demand Reduction Sub-Committee February 23, 2017 What are we testing? Impact of calling DR events using Direct Load Control

More information

Developments in Australian Standard AS (Emergency Lighting)

Developments in Australian Standard AS (Emergency Lighting) Developments in Australian Standard AS2293.2 (Emergency Lighting) Russell Porteous Chief Executive Officer, Firewize Australian Standards Committee LG-007 Disclaimer Firewize policy is one of continuous

More information

Q Series. Inverter Split Systems

Q Series. Inverter Split Systems Q Series Inverter Split Systems Creating comfort in the home. Australians have been enjoying the comfort, convenience and reliability of Rinnai household appliances in their homes for over 40 years. Our

More information

Update - Home Improvement

Update - Home Improvement 12 August 2014 Update - Home Improvement Woolworths Limited (Woolworths) today provided an update to the market on its Home Improvement business. Key points Update on financial results with losses in FY14

More information

Victorian Solar Hot Water Rebate Guidelines for Applicants and Suppliers (Updated 4 September 2009)

Victorian Solar Hot Water Rebate Guidelines for Applicants and Suppliers (Updated 4 September 2009) Victorian Solar Hot Water Rebate Guidelines for Applicants and Suppliers (Updated 4 September 2009) The Solar Hot Water Rebate program, administered by Sustainability Victoria, is part of the Victorian

More information

Attention ASX Company Announcements Platform. Lodgement of Open Briefing.

Attention ASX Company Announcements Platform. Lodgement of Open Briefing. Attention ASX Company Announcements Platform. Lodgement of Open Briefing. Wesfarmers Limited Wesfarmers House 40 The Esplanade Perth Western Australia 6000 Date of Lodgement: 16-May-2003 Title: Open Briefing.

More information

Substations and high voltage installations exceeding 1 kv a.c.

Substations and high voltage installations exceeding 1 kv a.c. AS 2067:2016 AS 2067:2016 Substations and high voltage installations exceeding 1 kv a.c. This Australian Standard was prepared by Committee EL-043, High Voltage Installations. It was approved on behalf

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND THE PURSUIT OF SUSTAINABLE DEVELOPMET IOME CHRISTA 1

ENVIRONMENTAL IMPACT ASSESSMENT AND THE PURSUIT OF SUSTAINABLE DEVELOPMET IOME CHRISTA 1 ENVIRONMENTAL IMPACT ASSESSMENT AND THE PURSUIT OF SUSTAINABLE DEVELOPMET IOME CHRISTA 1 ABSTRACT Meeting the goals of sustainable development has officially been an aim of those in control of the Environmental

More information

Ebbsfleet Development Corporation

Ebbsfleet Development Corporation Title of Paper Planning and Housing Delivery Report September 2018 Presented by Sub-Committee Mark Pullin, Chief Planning Officer Planning Committee Purpose of Paper and Executive Summary This paper provides

More information

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and 2. Number: PRC-005-1.1b 3. Purpose: To ensure all transmission and generation Protection Systems affecting the reliability

More information

BUSINESS PLAN CEN/TC 58 SAFETY AND CONTROL DEVICES FOR BURNERS AND APPLIANCES BURNING GASEOUS OR LIQUID FUELS EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 58 SAFETY AND CONTROL DEVICES FOR BURNERS AND APPLIANCES BURNING GASEOUS OR LIQUID FUELS EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 58 SAFETY AND CONTROL DEVICES FOR BURNERS AND APPLIANCES BURNING GASEOUS OR LIQUID FUELS Scope EXECUTIVE SUMMARY Safety and control devices for equipment burning gaseous or

More information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Town of Cobourg Heritage Master Plan. Statutory Public Meeting Town of Cobourg Heritage Master Plan Statutory Public Meeting April 25 th 2016 Presentation Overview 1. Introduction 2. Project background and schedule overview 3. Review of strategic direction content

More information

FTTN Business Readiness Testing Special Terms

FTTN Business Readiness Testing Special Terms NBN Co Limited [Customer] FTTN Business Readiness Testing Special Terms This document is a Standard Form of Access Agreement for the purposes of Part XIC of the Competition and Consumer Act 2010. NBN Co

More information

Electrical Safety Policy

Electrical Safety Policy Electrical Safety Policy By acting with a business head and social heart, together we achieve our mission to enhance life chances by helping people to fulfil their potential and live better, more independent

More information

NBN Co New Developments

NBN Co New Developments NBN Co New Developments Scott Edwards Technical Analyst (New Developments) Disclaimer This document sets out NBN Co s proposals in respect of certain aspects of the National Broadband Network. The contents

More information

COMMUNICATIONS ALLIANCE LTD INDUSTRY GUIDELINE G652:2016 NBN MIGRATION MANAGEMENT

COMMUNICATIONS ALLIANCE LTD INDUSTRY GUIDELINE G652:2016 NBN MIGRATION MANAGEMENT COMMUNICATIONS ALLIANCE LTD INDUSTRY GUIDELINE G652:2016 NBN MIGRATION MANAGEMENT G652:2016 NBN Migration Management Industry Guideline Communications Alliance Ltd was formed in 1997 to provide a unified

More information

National Grid Residential & C&I Active Demand Reduction Demonstration Projects. MA EEAC March 15, 2017

National Grid Residential & C&I Active Demand Reduction Demonstration Projects. MA EEAC March 15, 2017 National Grid Residential & C&I Active Demand Reduction Demonstration Projects MA EEAC March 15, 2017 Residential DR: What are We Testing? Impact of calling DR events using Direct Load Control of Wi-Fi

More information

Smart Appliances: Path to a Smart Grid Enabled Home. Charlotte Skidmore, Dir Energy & Environmental Policy. June 4, 2012

Smart Appliances: Path to a Smart Grid Enabled Home. Charlotte Skidmore, Dir Energy & Environmental Policy. June 4, 2012 Smart Appliances: Path to a Smart Grid Enabled Home Charlotte Skidmore, Dir Energy & Environmental Policy June 4, 2012 About AHAM Represents manufacturers of major, portable and floor care home appliances.

More information

Advisory Brief to Prince George City Council On the Matter of Bylaw 8727, 2013, Fire Protection and Emergency Response Bylaw

Advisory Brief to Prince George City Council On the Matter of Bylaw 8727, 2013, Fire Protection and Emergency Response Bylaw Advisory Brief to Prince George City Council On the Matter of Bylaw 8727, 2013, Fire Protection and Emergency Response Bylaw November 11, 2013 John Leech, AScT, CAE Executive Director Applied Science Technologists

More information

Implementing sustainable water strategy through development industry engagement

Implementing sustainable water strategy through development industry engagement Implementing sustainable water strategy through development industry engagement Ian Director, Organica Engineering, Melbourne, Australia E-mail: iadams@organicaeng.com.au Edward Cotter Sustainability Leader,

More information

Appliance. energy labelling. Retailer Training Kit REACH FOR THE STARS

Appliance. energy labelling. Retailer Training Kit REACH FOR THE STARS Appliance energy labelling Retailer Training Kit REACH FOR THE STARS Credits and Copyright Prepared by the Sustainable Energy Development Authority, MLW Training Consultants and the Templar Group, for

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3500.4:2003 (Incorporating Amendment Nos 1 and 2) AS/NZS 3500.4:2003 Australian/New Zealand Standard Plumbing and drainage Part 4: Heated water services AS/NZS 3500.4:2003 This Joint Australian/New

More information

Candidate APCO/CSAA ANS x: Alarm Monitoring Company to PSAP CAD External Alarm Interface Exchange

Candidate APCO/CSAA ANS x: Alarm Monitoring Company to PSAP CAD External Alarm Interface Exchange Candidate APCO/CSAA ANS 2.101.1-200x: Alarm Monitoring Company to PSAP CAD External Alarm Interface Exchange Frequently Asked Questions published November 19, 2008 1. Are PSAPs required to adhere to the

More information

RadioLINK + Module EIB600MRF for Battery Powered Smoke / Heat Alarms EIB600 Series

RadioLINK + Module EIB600MRF for Battery Powered Smoke / Heat Alarms EIB600 Series RadioLINK + Module EIB600MRF for Battery Powered Smoke / Heat Alarms EIB600 Series EIB600MRF Module (for use with EIB600 Series compatible Alarms only) Instructions Read and retain carefully for as long

More information

Ducted Gas Heating. The effective way to heat your whole home

Ducted Gas Heating. The effective way to heat your whole home Ducted Gas Heating The effective way to heat your whole home Whole home heating Zoning Bonaire zoning technology allows you to choose the rooms that you wish to heat Low Running Costs Bonaire provides

More information

BERLIN MARCH 2017

BERLIN MARCH 2017 BERLIN 21-22 MARCH 2017 1 New Policy & Industry Initiatives & Opportunities: Government Regulatory & Voluntary Hans-Paul Siderius Netherlands Enterprise Agency 2 Contents Network Standby Govt Regulatory

More information

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY Scope CEN/TC 250 covers the standardization of structural and geotechnical design rules for building and civil engineering works

More information

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 4: Heated water services. Australian/New Zealand Standard

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 4: Heated water services. Australian/New Zealand Standard AS/NZS 3500.4:2015 Incorporating Amendment No. 1 Australian/New Zealand Standard Plumbing and drainage Part 4: Heated water services Superseding AS/NZS 3500.4:2003 AS/NZS 3500.4:2015 AS/NZS 3500.4:2015

More information

Functional Safety: the Next Edition of IEC 61511

Functional Safety: the Next Edition of IEC 61511 HazAus2015/1507 Functional Safety: the Next Edition of IEC 61511 Mirek Generowicz Engineering Manager I&E Systems Pty Ltd Level 2, 445 Hay Street Perth WA 6000 Abstract The functional safety standard IEC

More information

Client Advisory Note June 2015:

Client Advisory Note June 2015: Client Advisory Note June 2015: Topics: 1. Substantially revised Fire Alarm and Smoke Control Standards for proposed adoption in NCC Volume One BCA 2016; 2. Independent review of Building Professionals

More information

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

1.0 Purpose of a Secondary Plan for the Masonville Transit Village Report to Planning and Environment Committee To: Chair and Members Planning & Environment Committee From: John M. Fleming Managing Director, Planning and City Planner Subject: Masonville Transit Village

More information

For personal use only TOUCHCORP 1H2015 RESULTS PRESENTATION DATED: THURSDAY, 27TH AUGUST 2015

For personal use only TOUCHCORP 1H2015 RESULTS PRESENTATION DATED: THURSDAY, 27TH AUGUST 2015 TOUCHCORP 1H2015 RESULTS PRESENTATION DATED: THURSDAY, 27TH AUGUST 2015 DISCLAIMER The material in this presentation has been prepared by Touchcorp Limited ARBN 603 731 184 (Touchcorp) and is general background

More information

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT The interaction of fire protection systems can be extremely complex. The detection of a fire in a building by an automatic device

More information

c. DTAH Toronto Complete Streets Guidelines

c. DTAH Toronto Complete Streets Guidelines c. DTAH Toronto Complete Streets Guidelines 164 166 C.1 Project Delivery Process 168 C.5 This section provides a summary of the overarching process for delivering street projects in Toronto. The conclusion

More information

The U.S. Appliance Standards Program. Building Technologies Office Energy Efficiency and Renewable Energy United States Department of Energy

The U.S. Appliance Standards Program. Building Technologies Office Energy Efficiency and Renewable Energy United States Department of Energy The U.S. Appliance Standards Program Building Technologies Office Energy Efficiency and Renewable Energy United States Department of Energy AGENDA 1 2 3 IMPACT OF APPLIANCE STANDARDS PROGRAM HISTORY AND

More information

THE NEXT SMART HOME GENERATION

THE NEXT SMART HOME GENERATION THE NEXT SMART HOME GENERATION She just finished installing her smart home system. Simply installed. Simply expanded. Simply secure. Homematic IP is the next generation of the Homematic technology by eq-3,

More information

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment Amendment No. 4 to Lake Macquarie Local Environmental Plan 2014 (PP_2014_LAKEM_005_00) Local Government Area: Name of Draft LEP: Lake

More information

Preparing for the network. Fibre to the Premises (FTTP) guide

Preparing for the network. Fibre to the Premises (FTTP) guide Preparing for the nbntm network Fibre to the Premises (FTTP) guide 2016 Thanks for switching to the MyNetFone TM nbn service You re only days away from enjoying the benefits of Australia s exciting new

More information

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File # 0 'O DI Lan-171-14 1 - THE CORPORATION OF THE TOWN OF COBOURG..,. STAFF REPORT TO: FROM: Mayor and Members of Council Dean A. Hustwick, Director of Recreation and Culture DATE OF MEETING: Committee of

More information

BP MAINTENANCE WORK INSTRUCTIONS FREQUENTLY ASKED QUESTIONS

BP MAINTENANCE WORK INSTRUCTIONS FREQUENTLY ASKED QUESTIONS BP MAINTENANCE WORK INSTRUCTIONS FREQUENTLY ASKED QUESTIONS The following FAQ was last updated 30/3/2016. This material is guidance only. If any of the content contradicts with requirements within the

More information

ENERGY STAR Product Specification for Residential Water Heaters. Eligibility Criteria Draft 1 Version 3.0

ENERGY STAR Product Specification for Residential Water Heaters. Eligibility Criteria Draft 1 Version 3.0 ENERGY STAR Product Specification for Residential Water Heaters Eligibility Criteria Draft 1 Version 3.0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

More information

Baseline Data Required for AS

Baseline Data Required for AS Baseline Data Required for AS 1851-2012 Name: Brett Dundules Position: Technical Officer Organisation Fire Protection Association Australia Introduction Brief History of AS 1851-2012 Introduction of Baseline

More information

FAQs Radio Equipment Directive (RE-D)

FAQs Radio Equipment Directive (RE-D) FAQs Radio Equipment Directive (RE-D) What is the objective of the RE-D? The Radio Equipment Directive (2014/53/EU) was adopted in 2014 and Member States had to transpose it into their national law before

More information

Fire Protection, Inspection and Testing Qualifications Forums. Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia)

Fire Protection, Inspection and Testing Qualifications Forums. Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia) Fire Protection, Inspection and Testing Qualifications Forums Presenters: Jeremy Rose (Artibus Innovation) Chris Wyborn (FPA Australia) Welcome Agenda New arrangements for training package development

More information

Council is committed to its groups working together, and to working closely with other relevant agencies, including the Queensland Police Service.

Council is committed to its groups working together, and to working closely with other relevant agencies, including the Queensland Police Service. Strategic policy Public Space Closed Circuit Television (CCTV) Corporate Plan reference: Endorsed by Council on: Manager responsible for policy: A Strong Community In all our communities, people are included,

More information

secure signalling systems for I&HAS

secure signalling systems for I&HAS installation of IP-based secure signalling systems for I&HAS an industry guide May 2008 For other information please contact: British Security Industry Association t: 0845 389 3889 f: 0845 389 0761 e:

More information

Preparing for the NBN Fibre Connections

Preparing for the NBN Fibre Connections Preparing for the NBN Fibre Connections July 2013 1 Thanks for switching to the National Broadband Network (NBN) You re only days away from enjoying the benefits of Australia s leading-edge fibre optic

More information

DGE 2 EUROPEAN UNION. Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008

DGE 2 EUROPEAN UNION. Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Brussels, 20 September 2017 (OR. en) 2016/0287 (COD) PE-CONS 28/17 TELECOM 158 FC 54 CODEC 1008 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: REGULATION

More information

BETTER URBAN PLANNING

BETTER URBAN PLANNING BETTER URBAN PLANNING SUBMISSION TO THE PRODUCTIVITY COMMISSION 3 OCTOBER 2016 BACKGROUND TO IPENZ The Institution of Professional Engineers New Zealand (IPENZ) is the lead national professional body representing

More information

BUSINESS PLAN CEN/TC 49 GAS COOKING APPLIANCES EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 49 GAS COOKING APPLIANCES EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 49 GAS COOKING APPLIANCES Business Environment EXECUTIVE SUMMARY The market scenario is the domestic one and product typology concerned is very wide. The products within the

More information

PREPARING FOR THE NBN FIBRE CONNECTIONS

PREPARING FOR THE NBN FIBRE CONNECTIONS PREPARING FOR THE NBN FIBRE CONNECTIONS WELCOME TO TPG AND THANK YOU FOR CHOOSING TPG NBN SERVICE! You re only days away from enjoying the benefits of Australia s leading-edge fibre optic network To help

More information

Pool heating, efficiently

Pool heating, efficiently Pool heating, efficiently Swimming Pool Heat Pump Get more enjoyment from your pool with a Midea heat pump pool heater from Chromagen The heat pump advantages: Extends your swimming season by maintaining

More information

Session Four Functional safety: the next edition of IEC Mirek Generowicz Engineering Manager, I&E Systems Pty Ltd

Session Four Functional safety: the next edition of IEC Mirek Generowicz Engineering Manager, I&E Systems Pty Ltd Abstract Session Four Functional safety: the next edition of IEC 61511 Mirek Generowicz Engineering Manager, I&E Systems Pty Ltd The functional safety standard IEC 61511 provides a framework for managing

More information

ener$ave October EnerSave Proprietary

ener$ave October EnerSave Proprietary October 2011 www.enersave.com EnerSave Proprietary Signature Analytics Electricity $275 Non-Itemized Electric Bill No Plug-Level Hardware Sensors Appliance Level Itemized Electric Bill (for Residential

More information

Ducted Gas Heating. The effective way to heat your whole home

Ducted Gas Heating. The effective way to heat your whole home Ducted Gas Heating The effective way to heat your whole home Office Locations Dubbo Rogers Industries 6 Richard Ryan Place, Dubbo NSW 2830 02 6882 2733 Perth office 32 Walters Way Forrestfield WA 6058

More information

Monitoring solutions

Monitoring solutions Monitoring solutions Grade A1. Latest monitoring technology. Providing 24/7 coverage 365 days a year, our highly skilled monitoring teams offer vigilant protection. Valued and strong relationships With

More information

PERIODIC ELECTRICAL TESTING POLICY

PERIODIC ELECTRICAL TESTING POLICY PERIODIC ELECTRICAL TESTING POLICY Originator: Policy and Strategy Team Approval date: 19 July 2016 Review date: d July 2017 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health

More information

Streets for People, Place-Making and Prosperity. #TOcompletestreets

Streets for People, Place-Making and Prosperity.  #TOcompletestreets COMPLETE STREETS FOR TORONTO Streets for People, Place-Making and Prosperity COMPLETE STREETS: A NEW APPROACH A Complete Streets design approach considers the needs of all users people who walk, bicycle,

More information

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 DESIGN MANUAL FOR ROADS AND BRIDGES CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009 SUMMARY OF CORRECTION HA 200/08 VOLUME 11, SECTION 1, PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL

More information

Local Growth Planning in North Central Green Line Communities

Local Growth Planning in North Central Green Line Communities 2018 April 30 Page 1 of 6 EXECUTIVE SUMMARY This report outlines a high-level scope for local growth planning for north central Green Line communities. The catalyst for this review is the significant investments

More information

Household and similar electrical appliances Safety

Household and similar electrical appliances Safety AS/NZS 60335.2.69:2012 (IEC 60335-2-69 Ed 4, MOD) Australian/New Zealand Standard Household and similar electrical appliances Safety Part 2.69: Particular requirements for wet and dry vacuum cleaners,

More information

AS/NZS 3111:2009. Approval and test specification Miniature overcurrent circuitbreakers AS/NZS 3111:2009. Australian/New Zealand Standard

AS/NZS 3111:2009. Approval and test specification Miniature overcurrent circuitbreakers AS/NZS 3111:2009. Australian/New Zealand Standard AS/NZS 3111:2009 Incorporating Amendment No. 1 and 2 Australian/New Zealand Standard Approval and test specification Miniature overcurrent circuitbreakers AS/NZS 3111:2009 AS/NZS 3111:2009 This joint Australian/New

More information

BGE s Experience Starting Conservation Programs

BGE s Experience Starting Conservation Programs BGE s Experience Starting Conservation Programs March 31, 2008 Presented by Ruth Kiselewich Director Conservation Programs 1 Implementing Conservation Supports Our Customers The transition to higher, market-based

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 2201.1:2007 AS/NZS 2201.1:2007 Australian/New Zealand Standard Intruder alarm systems Part 1: Client s premises Design, installation, commissioning and maintenance AS/NZS 2201.1:2007 This Joint

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3666.2:2011 AS/NZS 3666.2:2011 Australian/New Zealand Standard Air-handling and water systems of buildings Microbial control Part 2: Operation and maintenance AS/NZS 3666.2:2011 This Joint Australian/New

More information

1 Descriptions of Function

1 Descriptions of Function The Use Case #4 implements integrated management of s 1 Descriptions of Function 1.1 Function Name Date 12-15-2009, Version 1.13 implements integrated management of s 1.2 Function ID L-11.1.4 1.3 Brief

More information

REPORTING BACK TO YOU ON THE RIG NETWORK SURVEYS A snapshot of findings

REPORTING BACK TO YOU ON THE RIG NETWORK SURVEYS A snapshot of findings REPORTING BACK TO YOU ON THE RIG NETWORK SURVEYS A snapshot of findings We d like to thank everyone who participated in RIG Network s recent surveys and who sent the survey information on to other people.

More information

Smart Grid Tables. Exploring the Electrical Infrastructure Grades 9-12

Smart Grid Tables. Exploring the Electrical Infrastructure Grades 9-12 Smart Grid Tables Exploring the Electrical Infrastructure Grades 9-12 Exploration 1 1. There are three power plants represented on the end of the grid table. List them here. Estimate how much (%) of the

More information

City of Ann Arbor Page 1

City of Ann Arbor Page 1 City of Ann Arbor Text File 301 E. Huron St. Ann Arbor, MI 48104 http://a2gov.legistar.com/cal endar.aspx Agenda # Introduced: Version: 3/3/2014 Current Status: Passed 5 Matter Type: Resolution Resolution

More information

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment AS/NZS 3820:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

Report to: Development Services Committee Report Date: September 11, 2017

Report to: Development Services Committee Report Date: September 11, 2017 ~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction

More information

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN 12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following report August

More information

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose: Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:

More information

Medical devices and electromagnetic compatibility. Addressing the requirements of IEC , 4 th Edition

Medical devices and electromagnetic compatibility. Addressing the requirements of IEC , 4 th Edition Medical devices and electromagnetic compatibility Addressing the requirements of IEC 60601-1-2, 4 th Edition Executive Summary Risk of electromagnetic interference and immunity have long been important

More information

Alarm Signalling Equipment: Connection Requirements (Victoria) TAN 06. Technical Advisory Note. Version 1 October 2018

Alarm Signalling Equipment: Connection Requirements (Victoria) TAN 06. Technical Advisory Note. Version 1 October 2018 TAN 06 Alarm Signalling Equipment: Connection Requirements (Victoria) Version 1 October 2018 1 1 Purpose statement The purpose of this is to provide advice concerning the legislative requirements for the

More information

A global view of integrated closure and legacy planning

A global view of integrated closure and legacy planning 18 September 2013 A global view of integrated closure and legacy planning Mine Closure 2013, Eden Project, Cornwall Dr. William Adams General manager, Legacy and Closure A changing business climate The

More information

Summary of 60-Day Notice: Heating Efficiency

Summary of 60-Day Notice: Heating Efficiency Notification Date: November 5, 2015 Summary of 60-Day Notice: Heating Efficiency Public Service Company of Colorado ( the Company ) posts this 60-Day Notice to add a new measure to the Heating Efficiency

More information

Boztek Solutions` PLAYSTATE

Boztek Solutions` PLAYSTATE Boztek Solutions` PLAYSTATE REMOTE MONITORING & CONTROL SYSTEM FOR PLAYING FIELDS & OPEN SPACE Contact Details: Boztek Solutions Pty Ltd PO Box 272, Windsor, NSW 2756 Unit 12/124 Ham Street, South Windsor,

More information

Australia ICOMOS submission on the Greater Sydney Commission s (GSC) Vision and District Plans

Australia ICOMOS submission on the Greater Sydney Commission s (GSC) Vision and District Plans Australia ICOMOS Secretariat Faculty of Arts & Education Deakin University 221 Burwood Highway Burwood Vic 3125 Ph: +61 3 9251 7131 austicomos@deakin.edu.au www.icomos.org/australia ABN: 85 073 285 798

More information