SECTION SANITARY SEWAGE PUMP STATIONS
|
|
- Marlene Wright
- 5 years ago
- Views:
Transcription
1
2 SECTION SANITARY SEWAGE PUMP STATIONS PART 1 GENERAL 1.1 DESCRIPTION: This work shall include the construction of a sewage pumping station complete with all pumping and electrical equipment, all piping and valves within the structure, electrical service for the pumping station, and all miscellaneous work and appurtenances required to complete and test the pumping station. PART 2 PRODUCTS 2.1 LIFT STATION STRUCTURE: The precast reinforced concrete structure as specified shall conform to the SECTION PRECAST MANHOLES. All joints shall be watertight and shall be sealed with preformed flexible joint sealant. A watertight seal is required at openings through the wall for entrance and exit piping. The exterior surface of the precast reinforced concrete basin below the finish ground line shall be treated with an application of hot liquid asphalt in accordance with the SECTION PRECAST MANHOLES. 2.2 PUMPS AND ACCESSORIES: The principal items of equipment shall include: two submersible sewage pumps, piping with valves, electrical control panel with control circuit and motor starters, automatic pump control floats, and all internal wiring, flashing light high water alarm, audible high water alarm horn, pump guide rail system, vent piping, hinged access doors, and incidental accessories as required and shown on the Plans to provide a complete and functioning system PUMPS AND MOTORS: Pumps and motors shall be as specified in Section 11214, SUBMERSIBLE PUMP AND ACCESSORIES AUTOMATIC DISCHARGE CONNECTION: Each pump shall be furnished with a submersible discharge connection system to permit removal and installation of the pump without the necessity of an operator entering the wet well. The design must insure an automatic and firm connection of the pump to the discharge piping when lowered into place. A gray iron cast base with integral guide rail pilots shall be provided along with all hardware and anchor bolts required for permanent installation to the wet well floor. The base shall be designed with an integral 90 degree elbow, or adapt to a commercially available elbow for connection to the vertical discharge piping utilizing standard ANSI 125 lbs. flanges. The base shall be coated with coal tar epoxy for corrosion resistance. The manufacturer shall provide all necessary drawings to insure proper installation and alignment of baseplate within the sump CRANE AND LIFTING CABLE: The lift station lid will include a Thern 5124 davit crane with a M2 worm gear hand winch. The crane will be powder coated with 20 feet of stainless steel wire rope. Pump access components inside the lift station will include the Flygt Pump Lift Grip Eye and Chain Sling units rated for a 540 lbs load, or approved equivalent VALVES AND PIPING: Each pump shall be equipped with a full flow type check valve, capable of passing a 3" spherical solid, with flanged ends and be fitted with an external lever, weight, and spring. The valve seat shall be constructed of stainless steel and shall be replaceable. The valve body shall be cast iron and incorporate a 3" cleanout port. Valve clapper shall have a molded neoprene seating surface incorporating low pressure sealing rings. Valve hinge pin and internal hinge arm shall be stainless steel supported on each end in Section Page 1
3 brass bushings, sealing bushing shall have double o-rings. O-rings shall be easily replaceable without requiring access to interior of valve body. Valve shall be rated at 175 PSI water working pressure, 350 PSI hydrostatic test pressure. Valves other than full flow type or valves mounted in such a manner that prevents the passage of a 3" spherical solid shall not be acceptable. Each discharge line shall be equipped with a 2-way plug valve to permit isolation of the pumps from the common discharge header. The plug valve shall as specified in Section WET WELL ACCESS: The wet well access shall be a Halliday S2R4848 with a Series X Retro Gate, or approved equal. 2.4 ELECTRICAL EQUIPMENT: GENERAL: Pump control and monitoring equipment shall be Multitrode, Inc CONTROL PANEL: The duplex control panel shall be mounted in a NEMA 4X enclosure. The NEMA 4X enclosure shall have a separate inside hinged door to provide for mounting control switches, lights and overload reset buttons. The outer door on the NEMA 4X enclosure shall have a hasp for padlock CIRCUIT BREAKERS: A three-pole main circuit breaker for each pump shall be mounted with the operating handles through the inside door and shall have a lock arrangement that prevents the door from being opened when the breakers are in the "ON" position. When the breakers are off, all power shall be killed to the control elements PUMP CONTROL EQUIPMENT (PRIMARY CONTROLLER) A. Pump Control and Monitoring Equipment shall be Multitrode, Inc. B. Include line-voltage surge protection in all control equipment. Comply with UL 1449 and ANSI C62.41 Standards. C. Description: Microprocessor based, intelligent pump controller with pre-configured pump control logic and fault handling. The Pump Control Equipment shall be Multitrode MultiSmart Model MSU3PC. F. User Interface: The field hardware shall include a user interface for operations and configuration. The display shall provide status of the pump station, control of pumps, resetting of faults and configuration of parameters HAZARDOUS LOCATION PROTECTIVE DEVICE (INTRINSICALLY SAFE BARRIER): A. Equipment Description: The Hazardous Area Protective Device is intended to protect equipment and personnel in areas where hazardous conditions may be present. The Hazardous Area Protective Device shall be Multitrode Model MTISB, or approved equal. The intrinsically safe device shall be supplied according to the following specifications: 1. The intrinsically safe barrier shall be 5 or 10 channels (project specific). The device shall be panel mounted and designed to protect a multi-sensored conductive probe. The barrier shall be certified intrinsically safe for use with Multitrode equipment in installations up to and including Class 1 Zone O. 2. The intrinsically safe barrier shall have screw terminals for wire connections. Section Page 2
4 3. The intrinsically safe barrier shall be protected and current limited according to the requirements of UL Class I (Groups A, B, C & D), Class II (Groups E, F, & G) and Class III certification. 4. The intrinsically safe barrier shall allow for a maximum short circuit current of 10 ma. B. Mounting and Installation: The intrinsically safe barrier shall be surface mounted using the attached mounting flanges on either side of the unit assembly. The unit shall be fastened with approved screws or bolts in accordance with NEC requirements CONTROL PANEL CONSTRUCTION & ASSEMBLY A. General Requirements: 1. Control Panels shall be manufactured in accordance with ISO specifications and shall be so constructed for the application of a UL Listing Label by an approved UL Control Panel Assembly Facility. 2. Control Panel wiring shall be installed and arranged in an organized, efficient manner. All control panel wiring shall be inspected for safety and verified by performing a point to point test. 3. All electrical connections shall be properly inspected and torqued in compliance with ISO specifications. External connections to the control panel shall be by way of numbered terminal blocks. 4. Control Panels shall be properly checked and load tested with power applied. A control panel assembly and test log shall be supplied with the panel in order to indicate the scope and the extent of the final control panel test. The assembly and test log shall include all of the appropriate detail to demonstrate compliance with UL Labelling and ISO construction standards. 5. Control Panels shall be dispatched from the UL approved control panel assembly facility with all of the necessary or required UL Labels, Warning Labels, etc. properly attached. D. Control Panel Enclosure Specific Construction Requirements: 1. Enclosure shall be sized according to physical and functional device requirements. 2. Enclosure seams shall be continuously welded and ground smooth. 3. Enclosure door opening flange trough shall exclude liquids and contaminants. 4. Enclosure shall include an integral body grounding stud and sub-panel mounting studs. 5. Enclosure shall be wall mounted, unless otherwise specified. 6. Enclosure door shall have hidden hinges for a clean, aesthetic appearance. 7. Enclosure door opening angle shall be standard, full access, 135 degree opening radius. 8. Enclosure door shall be interchangeable and easily removable by pulling captive hinge pins. 9. Enclosure door shall have a high-impact thermoplastic data pocket mounted on the inner side of the enclosure door. 10. Enclosure door shall have a seamless, foam-in-place, one-piece gasket to provide an oiltight, dust-tight seal against contaminants. 11. Enclosure shall have a three-point latching system with a zinc die-cast handle that is painted with black textured polyester powder paint. 12. Enclosure handles shall be capable of being padlocked. Section Page 3
5 13. Steel sub-panel shall be white. 14. When enclosure cut-outs for instruments and other devices are required, holes shall be cut, punched, or drilled and finished with rounded edges. 15. A door stiffener shall be used where applicable to prevent door deflection under instrument loading or operation. E. Instrument Location Requirements: 1. Instruments or control devices designated for sub-panel (back) mounting shall be located in a manner that will allow for maintenance and adjustment. 2. Instrument mounting height shall not exceed 6-6 to the top of the instrument and shall not be lower than 3-0 to the bottom of the instrument (unless otherwise specified). O. Power Supply 1. The 12 Volt DC Power Supply shall be rated for 120VAC Input and 12VDC Regulated Output according to the following specifications: a VAC Input Range b. High Efficiency (70%) or Better c. Short Circuit Protection d. Over Voltage Protection e. EMI Input Filter f. DIN Rail Mountable 2. The Power Supply shall be Astrodyne Model AD55-A/DRL. P. Backup Battery 1. The 12 Volt DC Backup Batttery shall be sealed lead acid type. 2. The battery shall be rated for a minimum of 12 Amp Hours. 3. The battery shall be Powersonic Model PS-12120, or approved equal. Q. GFCI Convenience Recepatcle 1. There shall be a 120VAC, 15 Amp GFCI rated convenience receptacle mounted on the dead front swing door of the control panel. 2. The receptacle shall be Pass & Seymour Model #1594-W or approved equal. R. Enclosure Heater 1. There shall be a 120VAC, 50 watt enclosure heater inside the control panel. 2. The heater shall be a silicone rubber, insulated strip type enclosure heater. 3. The heater shall be Chromalox Model #SL-B P, or approved equal MOTOR STARTERS: An open frame, across-the-line, NEMA rated magnetic motor starter shall be furnished for each pump motor. Starters of NEMA size 1 and above shall be designed for addition of at least two auxiliary contacts. Starters rated "O", "OO", or fractional size shall not be acceptable. Power contacts shall Section Page 4
6 be double-break and made of cadmium oxide silver. Coils shall be epoxy molded for protection from moisture and corrosive atmospheres. The starter assembly shall be equipped with a metal mounting plate for durability. All motor starters shall be equipped to provide under-voltage release and overload protection on all three phases. Motor starter contacts and coils shall be easily replaceable without removing the motor starter from its mounted position OVERLOAD RELAYS: Overload relays shall be of block type utilizing melting alloy type spindles, and shall have visual trip indication with trip free operation. Pressing the overload reset lever shall not actuate the control contact until such time as the overload spindle has reset. Resetting of the overload reset lever will cause a snap-action control contact to reset, thus re-establishing a control circuit. Overload relays shall be of manual reset only and not convertible to automatic reset. Trip settings shall be determined by the heater element only and not by adjustable settings. Heater elements shall provide NEMA class 10 trip times and shall be selected in accordance with the actual motor nameplate data. An overload reset pushbutton shall be mounted through the door of the control panel in such a manner as to permit resetting the overload relays without opening the control panel door. Alternate styles of overload relays may be used only with explicit approval of the Engineer PUMP ALTERNATOR: A pump alternator equal to Furnas Electric Alternator, Catalogue No. 47AB10AF, or an approved equal, shall be supplied to alternate pumps on each successive cycle H-O-A SELECTOR SWITCHES: H-O-A selector switches shall be industrial, oiltight switches equivalent to General Electric CR104B with black knob and bright metallic ring. Factory engraved metallic nameplates shall be provided with the marking HAND-OFF-AUTO. H-O-A switches, alarm switch, run lights, seal leak lights and overload reset buttons shall be mounted on the inside door ALARM LIGHT: A weatherproof alarm light shall be mounted on the outside of the NEMA 4X enclosures AUDIBLE HORN: A weatherproof audible horn shall be mounted on the outside of the NEMA 4X enclosures LEVEL CONTROLS: A 10-point Level Sensing Device designed to detect liquid level at specified intervals in tanks or sumps and interface with an electronic controller for pump control and liquid level display. Probe length shall be determined by the operating range of the pumps as specified in the station drawing and supplied with 100 of cable. The Level Sensing Equipment shall be Multitrode (Level Sensing Probe). Mounting connections shall be stainless steel. The mounting assembly for probes shall include a device available to maintenance personnel to clean the level sensing probe at desired maintenance intervals PUMP RUN INDICATORS: Control panel shall be equipped with one oil-tight pilot light for each pump motor. Light shall be wired in parallel with the related pump motor starter to indicate that the motor is on or should be running. Run lights shall be equipped with lamps providing a minimum of 15,000 hours ELAPSED TIME INDICATORS: Six digit elapsed time indicators (non-reset type) shall be connected to each motor starter to indicate the total running time of each pump in "hours" and "tenth of hours" TELEMETRY: The Control Panel shall include a telemetry system conforming to SECTION LIFT STATION TELEMETRY SYSTEM, and shall be installed by the pre-approved system integrator. The Section Page 5
7 control panel and telemetry system shall be capable of providing the status of the pump station including at a minimum the following conditions: PUMP 1: ON / OFF and TOTAL RUN TIME PUMP 2: ON / OFF and TOTAL RUN TIME LAG PUMP (BOTH PUMPS CALLED): ON / OFF HIGH WATER ALARM: ON / OFF POWER FAILURE ALARM: ON / OFF BACKUP GENERATOR: ON / OFF The telemetry system shall be integrated into the existing telemetry system and shall send text alerts to maintenance personnel for all alarm conditions. PART 3 EXECUTION 3.1 EXCAVATION AND BACKFILL: Excavating, backfilling, filling and grading for the lift station structure shall conform to the applicable requirements of the SECTION EXCAVATION FOR STRUCTURES. The Contractor shall remove all materials encountered within the required limits of excavation for the structure regardless of the nature of the materials. 3.2 ELECTRICAL CONSTRUCTION REQUIREMENTS: All electrical work shall conform to the 1990 National Electrical Code (or most current revision), local city codes and local utility company requirements as well as applicable state statutes and federal regulations. If two codes pertain to the same work, the more stringent requirement shall apply. The basic general electrical specification requirements for the sewage pump station and the related equipment shall conform to the requirements as set forth in the technical specifications found in Division 16 Electrical. 3.3 TESTS AND INSPECTION: The Contractor shall provide labor, material and test equipment, except as noted to the contrary herein, to test all wiring and equipment for continuity, proper polarity, proper phase relation, dielectric strength, operation and alignment after installation. Test equipment and methods shall meet the Engineer's approval. The Engineer shall be notified at least two working days prior to tests. The Engineer reserves the right to witness any and all such tests and shall interpret test results and determine on the acceptability. The Contractor-supplied work which does not test to the Engineer's satisfaction shall be corrected and retested as required without additional cost to the Owner. The Engineer reserves the right to perform any test on any phase of the installation utilizing Contractor's personnel and test equipment. All wiring installed shall be megger tested. Insulation resistance shall not be less than one megohm. Where such tests indicate the possibility of faulty insulation, the Contractor shall locate the point of such faulty insulation and shall replace the conductor and shall retest the insulation. 3.4 FACTORY TEST: All components of the lift stations shall be given an operational test of all equipment at the factory to check for excessive vibration, for leaks in all piping or seals, and for correct operation of the control system and all auxiliary equipment. 3.5 INSTALLATION AND OPERATING INSTRUCTIONS: Installation of the pumping units shall be done in accordance with the written instructions provided by the manufacturer. Six (6) copies of an operation and maintenance manual shall be provided for the Owner's use. Section Page 6
8 3.6 DRAWINGS AND DATA: Complete assembly and installation drawings, together with detailed specifications and data covering material used, parts, devices, and other accessories forming a part of the equipment furnished, shall be submitted. The data and specifications for each unit shall include, but shall not be limited to, the following: A. Submersible Pumps: Name of Manufacturer. Type and model. Rotative speed. Size of discharge. Type of bearings. Net weight of submersible pump. Complete performance curves showing capacity, head, and bhp requirements. Rated size of motor (hp). Temperature rating. Full load rotative speed. Full load current. Locked rotor current. 3.6 SEWER LIFT STATION TESTING: The Contractor will be required to test the submersible pumps' rated pump capacity, plus all the other equipment within the lift station. The water required to test the submersible pumps shall be furnished by the Contractor at his own expense. END OF SECTION Section Page 7
EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G
E SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF DATE: 11/13/06 2/1/07 1 Copyright, E, Inc. E 1. ENERAL...4 1.1 Scope Of Work... 4 1.2 Codes and Standards... 4 2. PRODUCTS...5
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to define the general installation and minimum product
More informationSECTION WASTEWATER PUMPING STATION DESCRIPTION
SECTION 33 3200 WASTEWATER PUMPING STATION DESCRIPTION The contractor shall furnish and install one submersible sewage lift station with concrete wet well and valve vault, pumps, 4 piping and valves, and
More informationCITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT
CITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT The City of Mexico Beach is requesting quotes for replacement of 18 lift station control panels. The lift stations range from 2
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph
More informationCALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.
CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S. NAME OF TENDER: CONSTRUCT, DELIVER AND COMMISSION 3 (THREE) LIFT STATION ELECTRICAL LOCATION OF WORK: 3 Separate work sites in
More informationFUEL OIL DAY TANKS. SST Level Controller: UL 508 LISTED
FUEL OIL DAY TANKS SST Series - Engineering Submittal SST Series - Advanced Line Day Tanks Construction: UL 142 aboveground steel tank all seam welded, square, atmospheric tank of heavy gauge steel with
More informationSECTION EXTERIOR LIGHTING
SECTION 26 56 00 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of exterior luminaries, controls, poles and supports. 1.2 RELATED WORK A. Section 26
More informationSECTION HEATING BOILER FEEDWATER EQUIPMENT
SECTION 23 53 00 HEATING BOILER FEEDWATER EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes boiler feedwater pumps, de-aerators, accessories, controls and tanks. 1.2 REFERENCES A. ASME (American
More informationC. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.
SECTION 22 10 00 PLUMBING PIPING AND PUMPS PART 1 - GENERAL 1.1 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design.
More informationC. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.
SECTION 236426 - ROTARY-SCREW WATER CHILLERS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes packaged, water cooled or air cooled as scheduled, electric-motor-driven, rotary-screw water chillers
More informationPART GENERAL 1.01 SECTION INCLUDES
Specification Number: 26 24 16.06 Product Name: Emergency Lighting Control NQ Circuit Panelboards: 240 Vac, 48 Vdc Maximum SECTION 26 24 16.06 Emergency Lighting Control NQ Circuit Panelboards: 240 Vac,
More informationSECTION LOW VOLTAGE LIGHTING CONTROLS
SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section
More informationCONTENTS AUTOMATIC TRANSFER SWITCHES
CONTENTS AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.1 Related Documents 1.2 Summary 1.3 References 1.4 Quality Assurance 1.5 Submittals 1.6 Delivery, Storage and Handling 1.7 Instructions And Training
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC
More informationSECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY
SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where
More informationGRUNDFOS SEWAGE & EFFLUENT PUMP ACCESSORIES
GRUNDFOS SEWAGE & EFFLUENT PUMP ACCESSORIES GRUNDFOS CONTROL PANELS Simplex Panel Duplex Panel Standard Features LISTING: Underwriters Laboratories, UL 508. RATINGS: Model S1 rated up to 120 VAC, 1 Hp,
More informationSpecial Provision No. 682S27 June This Special Provision refers to the following standards, specifications or publications:
CONTROLLER CABINETS, POLE MOUNTED - Item No. Special Provision No. 682S27 June 2017 1. SCOPE This Special Provision covers the requirements for the installation of pole mounted controller cabinets and
More informationA. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.
SECTION 15622 DIRECT GAS-FIRED BURNER & MANIFOLD SYSTEM PART 1: GENERAL 1.1 Section includes: A. Direct gas-fired heater modules B. Controls C. Equipment schedule 1.2 Related Sections A. Section 01655:
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS. A. This Section includes basic electrical materials and methods including:
SECTION 16050 BASIC ELECTRICAL MATERIALS AND METHODS PART 1 - GENERAL 1.01 SUMMARY A. This Section includes basic electrical materials and methods including: 1. Conduit, fittings and accessories. 2. Wire,
More informationSECTION 4000 LIFT STATIONS
SECTION 4000 LIFT STATIONS LIFT STATIONS PART 1 GENERAL 1.01 Section Summary A. Lift station control panels. B. Related requirements include those established in the General Requirements Division 1, Division
More informationSECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES
PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Lighting and appliance panelboards 1.02 RELATED SECTIONS A. 16475,
More informationRevitalize Building Mechanical Systems (4619)
SECTION 235216 FIRE-TUBE CONDENSING BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL
SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply
More informationSECTION STEAM CONDENSATE PUMPS
SECTION 23 22 23 - STEAM CONDENSATE PUMPS PART I - GENERAL 1.1 SECTION INCLUDES A. Steam Condensate Return Units, Gravity Return Type 1. Receiver 2. Pumps 3. Control Panel 4. Accessories Note to PSC: Although
More informationANCHOR BOLT DETAIL. Non-Shrink Grout. Poured In Place, After Equipment Setting. "L" Type Anchor Bolt Carbon Steel AISI 304 S.S.
ANCHOR BOLT DETAIL Heavy Flat Washer Heavy Hex Nut UNC Th'd Mounting Flange Of Equipment To Be Mounted C B A D Non-Shrink Grout. Poured In Place, After Equipment Setting. Heavy Flat Washer Heavy Hex Nut
More informationSECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA
PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low voltage power panelboards 1.02 RELATED SECTIONS 1.03 REFERENCES
More informationTYPE POS Oil Shield Sump Pump
Type POS Oil Shield Provides protection for the environment by preventing oil products from entering sewer systems, environmentally Sensitive River and waterways, while protecting equipment and areas from
More informationA. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.
B B11.0 DIVISION 08 - OPENINGS SECTION 08 17 00 INTEGRATED DOOR OPENING ASSEMBLIES Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section numbers and
More informationSPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS
SECTION 23 34 16 CENTRIFUGAL HVAC FANS PART 1 - GENERAL 1.01 RELATED DOCUMENT A. Drawings and general provisions of the contract, including General and Special Conditions and Division 01 Specification
More informationSECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.
SECTION 16470 PANELBOARDS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16120 - Wire and Cable. 3. 16475 - Overcurrent Protective Devices. 1.02 SYSTEM DESCRIPTION A. Performance
More informationReliable Long-Term Solutions For Your Toughest Pump
Reliable Long-Term Solutions For Your Toughest Pump Municipal Raw Sewage Grit Handling Sludge Recirculation Digester Cleaning Thickened Sludge Storm Water Sump Pump (Pipe Gallery) Head Works Industrial
More informationINSTALLATION INSTRUCTIONS FOR MOUNTING KIT
RV Products Division INSTALLATION INSTRUCTIONS FOR 8330-5501 MOUNTING KIT 8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 9330B755 CONTROL BOX KIT (12 VDC HEAT/COOL) 8530-750 CONTROL BOX KIT (24 VAC COOL ONLY)
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018
SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationDLKF. EBARA Submersible Sewage Pumps Specifications Project: Model: Chk d: Date:
DLKF A. General: Provide submersible sewage pumps suitable for continuous duty operation underwater without loss of watertight integrity to a depth of 65 feet. Pump system design shall include a guide
More informationA. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.
DIVISION 26 ELECTRICAL SECTION 26 27 26 PART 1 GENERAL 1.01 DESCRIPTION A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings. B. Specialty switches and outlets
More informationPUMP CONTROL CENTER (PCC)
PART 1 SUMMARY A. In accordance with the plans and specifications, the Contractor shall provide and install a complete pre-fabricated, pre-tested ArcSafe Pump Control Center including all required equipment,
More informationSECTION STEAM CONDENSATE PUMPS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 22 23 STEAM CONDENSATE PUMPS SPEC WRITER NOTES: 1. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable
More informationUniversity of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL
SECTION 21 30 00 FIRE PROTECTION PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00,
More informationSECTION AUTOMATIC TRANSFER SWITCHES
SECTION 26 36 23 AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationBarnes Oil Sensor Switch
Elevator sump basins Transformer vaults Leachate wells Garages Barnes BOSS Barnes Oil Sensor Switch Model BOSS BOSS PLUS RPM 3450 3450 Oil Water Switch Cord Length 10 10 Enclosure Rated Options Automatic
More informationOPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"
OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER Electric Heater Company Base Model "BWXP" HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203)
More informationWATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00
I&M NUMBER: 316-42-2-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to elements
More informationINSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT
RV Products Division INSTALLATION INSTRUCTIONS FOR 8330*5511 MOUNTING KIT 8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 9330A755 CONTROL BOX KIT (12 VDC HEAT/COOL) 8530-750 CONTROL BOX KIT (24 VAC COOL ONLY)
More informationVSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.
Brochure# 228E 122011 TYPE VSA SEWAGE PUMP Capacities to 100 gpm, Heads to 120, Horsepower range 3/ thru 0, 3 thru discharge, 1750 and 1150 operation. HIGHLIGHTS Wet-Pit Installations Pumps Suspend From
More informationSoft Start Series MP700 Solid State, Reduced Voltage
Metron Fire Pump Controls and Accessories Soft Start Series MP700 Solid State, Reduced Voltage Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps
Note: The A/E must choose all design values in brackets below before using in project specifications 1 General 1.1 Provide UL listed and FM approved fire pump complete with pump, driver, controller and
More informationSTATION MODEL: KPCG21-24x48 PUMP MODEL: KEEN KPCG21 VOLTAGE: 230 PHASE: 1 TANK DIMENSIONS: 24 DIAMETER X 48 DEEP
STATION MODEL: KPCG21-24x48 PUMP MODEL: KEEN KPCG21 VOLTAGE: 230 PHASE: 1 TANK DIMENSIONS: 24 DIAMETER X 48 DEEP PUMP Grinder Pumps KPCG-21 1HP Dual Seal, High Performance Progressive Cavity Grinder Pump,
More informationWATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00
I&M NUMBER: 316-42-8-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to
More informationOPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D
OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE:
More informationCP1-C5 COMPACTOR SPECS 2009
SECTION 11172 / 14560 TRASH COMPACTOR This section is based on a system produced by: Architectural Refuse Solutions, LLC 525 Kennedy Road Akron, Ohio 44305 Part 1 GENERAL 1.1 RELATED DOCUMENTS A. The general
More informationINSTRUMENTATION AND CONTROL DEVICES FOR HVAC
PART 1 GENERAL 1.01 RELATED REQUIREMENTS SECTION 23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC A. Section 26 2717 - Equipment Wiring: Electrical characteristics and wiring connections. 1.02 ADMINISTRATIVE
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.01 SECTION INCLUDES A. Water heaters. B. Packaged water heating systems. C. Domestic water heat exchangers. D. Water storage tanks. E. Water softeners. F. Reverse osmosis equipment. G.
More informationCustom Duct Heaters. Special Applications
Special Applications Air Conditioning & Air Handling Units For more than 55 years, INDEECO has been supplying special heaters for use in air handling and air conditioning equipment (Figure 49). A wide
More informationD. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationCustom Duct Heaters. Special Applications
Special Applications Air Conditioning & Air Handling Units For more than 50 years, INDEECO has been supplying special heaters for use in air handling and air conditioning equipment (Figure 50). A wide
More informationTOTAL SOLUTIONS. Liquid Level Control Product Guide. MATELEC AUSTRALIA innovative by design
TOTAL SOLUTIONS Liquid Level Control Product Guide MATELEC innovative by design Liquid Level Control Contents Dual Pump Controllers Section 1 The Range Common Features Operating Data Control Logic Setup
More informationVACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES
Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete
More informationFEATURES. Other Fed-Flush Arrangements
Brochure # 0710 TYPE TYPE... VSAF SEWAGE EJECTOR SYSTEM Flows to 600 gpm, Heads to 120, 1 thru 40 HP. Discharge size 4, 1750 and 1150 RPM, strainer in discharge pipe. HIGHLIGHTS Installations where rags
More informationCondensate Boiler Feed Water Make-Up
1144 Utica Ave, Brooklyn, NY 1103 July 0 New Catalogue Release Bulletin 9C.01 Low Inlet Condensate Receiver (7 from floor) Close Grained Cast Iron Simplex and Duplex Design To 0,000 SQ-Ft EDR Pump Capacity
More informationApplications and Features
120 VAC 18x16x8 Inch Weatherproof Enclosure with Mounting Plate, Cooling Fans, Heaters & Solid State Dual Point Temperature Controller Model: NB181608-1HFS Applications and Features Features: Molded Fiberglass
More informationCustom Pump Controls. The Custom Controls Solution Provider. A New Generation. Complete Management. Page 2
The Custom Controls Solution Provider Hydromatic has a reputation for providing dependable submersible pumps for wastewater lift stations and has continually raised the bar for quality products and customer
More informationCHAPTER 20 SERVICE EQUIPMENT
SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION
SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to
More informationType VSA Suspended Wet Pit Sewage Pumps BULLETIN 228E-1 September 2014
Wet Pit Installations Pumps suspended from pit or basin cover. Up to 3 Solids Handling 1750 and 1150 RPM Selections. Fiberglass and steel basins available. Steel covers and grouting frames for concrete
More informationSECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.
SECTION 15481 COMPRESSED AIR SYSTEM PART 1 - GENERAL 1.1 SECTION INCLUDES A. Pipe and pipe fittings, including valves, unions and couplings. B. Air compressor. C. After cooler. D. Refrigerated air dryer.
More information.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.
Fitness Facility Addition Page 1 1.1 CODES AND STANDARDS.1 Do complete installation in accordance with the latest edition of the CSA C22.1 as amended by the latest editions of the National Building Code
More informationMission Critical. Fuel Supply Systems
Fuel Supply Systems Insight Onsite Fuel Supply Systems Page 2 Simplex Mission Critical Fuel Supply Systems are comprehensive, integrated, project-matched fuel management systems for diesel and turbine
More informationWATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00
I&M NUMBER: 316-42-5-1 Page: 1 Pre Installation Check to make sure that heater received is the same as that ordered. Watlow heaters are built to comply with UL and CSA dielectric requirements, it may be
More informationUHD Heavy Duty Disconnect Enclosures - NEMA 12 ABB Controls, Allen Bradley, Cutler Hammer, General Electric, Siemens I-T-E Max-Flex, Square D
UHD Heavy Duty Enclosures - NEMA 12 3UHD Shown Application Designed to accept the following disconnect switches and circuit breakers: ABB Controls flange mounted variable depth operating mechanisms for
More informationService Manual Model 3163
Service Manual Model 3163 Contents Important Safety Information.......... 1 Specifications.................. 2 General Information.............. 2 Direct Vent Requirements........... 2 Propane System................
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S
Revised 04/13/16 SPECIFICATIONS - DETAILED PROVISIONS Section 17210 - Magnetic Flowmeters C O N T E N T S PART 1 - GENERAL... 1 1.01 GENERAL REQUIREMENTS... 1 1.02 PROJECT SPECIFIC REQUIREMENTS... 1 1.03
More informationTM Series. Induced Draft, Counter Flow Optional Accessories
ANTIFREEZE PACKAGE / RESISTANCE HEATING OPTION The antifreeze package is supplied to provide protection against freezing of standing water in the cooling tower sump due to shutdown during winter operation.
More informationSIMPLEX WEATHERPROOF CONTROL PANELS
TECHNICAL BROCHURE BCP3 R10 FEATURES Rugged, NEMA 4X construction withstands even the most severe weather con ditions and prevents corrosion. Solid-state control board displays float status for ease of
More informationMINIMUM REQUIREMENTS FOR ADOPTABLE WASTEWATER PUMP STATIONS
MINIMUM REQUIREMENTS FOR ADOPTABLE WASTEWATER PUMP STATIONS Date: Site Name: Address: Note that this document is not a technical specification and is not a complete checklist for all the specified requirements.
More informationSETION EMERGENCY LIGHTING NATIONAL FIRE PROTECTION ASSOCIATION (NEPA) (2006) Life Safety Code, 2006 Edition
SETION 16420 PART 1 - GENERAL 1.01 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation
More informationUltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW
12/23/16 Rev 9 UltraLITE Model ELU General Specification 4.2 KW to 5 KW UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW 1.0 General General Specification This specification describes
More information1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.
Issued 2006/08/01 Section 13920 Packaged Fire Pumps and Controllers Page 1 of 7 PART 1 GENERAL 1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1
More informationAddendum for STI-6406 with Dual Access Control
Addendum for STI-6406 with Dual Access Control Description: This system contains a STI-6400 with a DPDT key switch to be mounted on one side of a door or wall; and a similar looking housing, also with
More informationARCHITECTURAL SPECIFICATIONS
1 B9.1 In Ground Page 1 of 6, Aug 12 DIVISION 08 - OPENINGS SECTION 08 71 13 POWER DOOR OPERATORS Specifier Note: Coordinate and edit articles and paragraphs below to suit project requirements. Add section
More informationAcross-the-Line SERIES MP300 Combined Manual and Automatic
Across-the-Line SERIES MP300 Combined Manual and Automatic Metron Fire Pump Controllers conform to the latest requirements of National Fire Protection Association s Standard for Centrifugal Fire Pumps
More informationCOMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods
1. BASIC ELECTRICAL MATERIALS 1. All conduit and raceway must be 3/4" or larger. Exposed raceway in finished areas shall be in 700 or larger wiremold. Exception: runs to individual devices 10 or less,
More informationUser's Manual: Series 260A Model 260A Process Current Loop-Powered Alarm
User's Manual: Series 260A Model 260A Process Current Loop-Powered Alarm Table of Contents Page Introduction 1 Description 1 Specifications 2 Installation 3 Calibration 4 General Maintenance 5 List of
More informationMaxGard. Interconnection Systems. Durability. Performance. Safety
8Russellstoll Pin and Sleeve Power Connectors Safety Different power supply ratings can t mix: 24 single-rate device polarizations ensure exact voltage, frequency and phase differentiation Safe connections:
More informationSECTION ISOLATED POWER SYSTEMS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to
More informationPhiloWilke Partnership Addendum No. 2 A/E Project No April 2016
SECTION 23 21 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.
More informationINSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS
RV Products Division INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS 8330-752 CONTROL BOX KIT (12 VDC COOL ONLY) 9330C755 CONTROL BOX KIT (12 VDC HEAT READY) 8530-750 CONTROL BOX KIT
More informationConstruction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
Construction Standards Page 233423-1 Copyright 2009 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Modified
More informationINSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS
INDEECO Circulation Heaters are designed to provide years of trouble free operation if properly installed and maintained. Please read and follow these instructions for installing and maintaining the heater.
More informationGASGUARDIAN Channel Controller OPERATING & INSTALLATION MANUAL
GASGUARDIAN 2 3 2-Channel Controller OPERATING & INSTALLATION MANUAL GasGuardian 2 3 Operating and Installation Manual Table of Contents General description.... 3 Installation. 3 Locating the GasGuardian-2..
More informationDate: August 21, Proposal Number: G Engineer: Payment Terms: Net 30 Days
Proposal Trane A Division of American Standard Inc. Prepared For: John Weston Desmet Ballestra Job Name: LAUER1 Biodiesel Chiller Pennsylvania Date: August 21, 2006 Proposal Number: G1-95502-1 Engineer:
More informationWe ve Got Panels Under Control.
We ve Got Panels Under Control Table of Contents CONTROL PANELS Page # RK Series Single Phase Simplex... A.1 RK Series Single Phase Duplex... A.3 RK Series Three Phase Simplex... A.5 RK Series Three Phase
More informationSubmersible A Series Wastewater Pumps AMX, AV and AK Hydraulic Ranges
Submersible A Series Wastewater Pumps AMX, AV and AK Hydraulic Ranges TM High Performance in Wastewater Pumping HOMA submersible water and wastewater pumps operate worldwide in numerous domestic, municipal
More informationKITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM
PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete automatic fire suppression system for the exhaust hood, including necessary accessories.
More informationSECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM
PART 1 GENERAL 1.01 SUMMARY SECTION 15371 KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM A. Section Includes: A complete wet chemical automatic fire suppression system for the exhaust hood, including necessary
More informationCommercial and Light Industrial Fire Alarm Control Panel
FireSystem 2000 Commercial and Light Industrial Fire Alarm Control Panel Features Easily expandable. All new plug-in board design Two supervised audible circuits Lamp and system trouble circuit test Ground
More informationSECTION PLUMBING EQUIPMENT
PART 1 GENERAL 1.1 SECTION INCLUDES A. Water heaters B. Packaged water heating systems C. Water storage tanks D. Water softeners E. Pumps F. Circulators 1.2 REFERENCES SECTION 22 30 00 PLUMBING EQUIPMENT
More information2408/2900. Fire Guard. SARGENT Manufacturing Company 2004, 2007 All rights reserved
Fire Guard SARGENT Manufacturing Company 2004, 2007 All rights reserved Fire Guard Table of Contents Features and Additional Fire Opening Devices............................1 2408 Single-Point Hold Open
More informationWATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2
I&M NUMBER: 316-42-15-1 Page: 1 _ Pre Installation Check to make sure that heater received is the same as that ordered. Elements may come in contact with each other during shipment. Minor adjustments to
More informationStancor Duplex Oil-Minder System Submittal SE Volt Single Phase Duplex SE-100 Pumps with Floats and Oil-Minder Probe
Stancor Duplex Oil-Minder System Submittal SE-100 115 Volt Single Phase Duplex SE-100 Pumps with Floats and Oil-Minder Probe Solid State, NEMA 4x Duplex Oil-Minder Control The Stancor Duplex Oil-Minder
More information