Verification of hydrocarbon refining and petrochemical facilities

Size: px
Start display at page:

Download "Verification of hydrocarbon refining and petrochemical facilities"

Transcription

1 SERVICE SPECIFICATION DNVGL-SE-0469 Edition August 2017 Verification of hydrocarbon refining and petrochemical facilities The electronic pdf version of this document, available free of charge from is the officially binding version.

2 FOREWORD DNV GL service specifications contain procedural requirements for obtaining and retaining certificates and other conformity statements to the objects, personnel, organisations and/or operations in question. August 2017 Any comments may be sent by to This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document.

3 CHANGES CURRENT General This document supersedes the October 2010 edition of DNV-DSS-314. The purpose of the revision of this service document is to comply with the new DNV GL document reference code system and profile requirements following the merger between DNV and GL in Changes mainly consist of updated company name and references to other documents within the DNV GL portfolio. Some references in this service document may refer to documents in the DNV GL portfolio not yet published (planned published within 2017). In such cases please see the relevant legacy DNV or GL document. References to external documents (non-dnv GL) have not been updated. Editorial corrections Changes - current In addition to the above stated changes, editorial corrections may have been made. Service specification DNVGL-SE Edition August 2017 Page 3

4 CONTENTS Changes current... 3 Section 1 Introduction to risk based verification Introduction Risk based verification Definitions Abbreviations References Contents Section 2 Principles of risk based verification Purpose of section Verification principles Selection of level of verification Communications...19 Section 3 Service overview Purpose of section Service process Front end engineering design Project design, construction and commissioning Operations Facility modifications Appendix A Selection of verification level...35 A.1 Introduction...35 A.2 Quantitative risk assessment A.3 Trigger questions...39 Appendix B Verification documents...41 B.1 Purpose of appendix...41 B.2 DNV GL certificate of conformity B.3 Statement of conformity...42 B.4 Other verification documents B.5 Use of quality management systems B.6 Verification forms Appendix C Generic detailed verification scopes of work tables...50 C.1 Purpose of appendix...50 Service specification DNVGL-SE Edition August 2017 Page 4

5 C.2 of terms used in the scope of work tables...50 C.3 Overall project management C.4 Design...52 C.5 Construction...76 C.6 Commissioning...91 C.7 Operations C.8 Modifications or upgrades Contents Appendix D Major accident hazards versus safety-critical elements D.1 Purpose of appendix Appendix E Guidance on the development of verification plans E.1 Purpose of appendix E.2 The verification plan s part in facility risk management E.3 Independent third-party verification E.4 Verification plan E.5 Verification reporting E.6 Review and revision of the verification plan Changes historic Service specification DNVGL-SE Edition August 2017 Page 5

6 SECTION 1 INTRODUCTION TO RISK BASED VERIFICATION 1 Introduction 1 Function of this document 1 This service specification gives criteria for and guidance on third-party verification of the safety and integrity of hydrocarbon refineries and petrochemical facilities during new developments, operations and during modifications to existing facilities. 2 The experience gained from past projects specific to an oil refinery and a petrochemical plant is incorporated in this service specification. This service specification: describes DNV GL's verification services for oil refineries and petrochemical facilities, provides guidance for facility owners and others for the selection of the level of involvement of those carrying out the certification and verification activities, whether by simple trigger questions or as a result of a quantitative risk assessment provides a common platform for describing the scope and extent of verification activities. identifies typical risk critical equipment and the appropriate level of verification activities recommended to meet the verification objective and requirements. 3 This document is an object-specific service specification conforming to the philosophy defined in DNVGL-SE-0474 Risk based verification, see [5]. 2 Objectives 1 The objectives of this document are to: describe DNV GL s verification services for hydrocarbon refineries and petrochemical facilities during: design construction commissioning operations modification provide guidance for facility owners and other parties for the selection of the level of involvement of those carrying out verification activities, whether quantitatively as a result of a quantitative risk assessment or qualitatively by simple trigger questions provide a common platform for describing the scope and extent of verification activities. 3 Scope of application for verification 3.1 This SE may be adopted for the verification of all parts of all hydrocarbon refineries or types of petrochemical facilities or selected project phases. 3.2 This SE describes the principle of a levelled verification involvement, where the extent of verification involvement is linked to the risks associated with part or all of the facility. 3.3 The primary scope of DNV GL s verification work is the verification of the integrity of hydrocarbon facilities and the safety of its personnel and those in close proximity to it. Other aspects, such as the verification of the environmental impact of the facility, or its ability to meet the owner s business objectives, may be included in DNV s scope of work if desired by the owner. Service specification DNVGL-SE Edition August 2017 Page 6

7 3.4 Statutory verification (or certification) of hydrocarbon facilities to the requirements of national authorities is not included specifically in the scope of application of this SE. Such verification (or certification) shall be governed by the regulations of the relevant Authority. However, if detailed procedures are not given by these Authorities, this SE will be used by DNV GL as a guideline for its work. 4 Structure of this document 4.1 This document consists of three sections and five appendices: Sec.1, this section, explains the relationship between this document and DNV GL s overall risk based verification process. Sec.2 explains the principles of DNV GL s verification process with its risk based levels of involvement, and how the level of involvement for a particular project is defined. Sec.3 describes the verification process and the activities for each of the project phases. App.A gives guidance on the selection of verification level, preferably as the result from a quantitative risk assessment or alternatively, qualitatively as a result of the posing of trigger questions. App.B gives examples of verification documents. The use of quality management systems is addressed here. App.C gives a generic detailed scope of work tables for all phases and all levels of involvement. These tables are the basis for the development of project-specific scopes of work tables. App.D gives typical refinery hazards and their interface with safety-critical elements and risk mitigation measures. App.E gives guidance on the formulation of plans for the verification of the design, construction and commissioning of hydrocarbon facilities. 2 Risk based verification 1 General 1 This SE describes the principles of verification of the safety and integrity of hydrocarbon facilities for all phases. 2 The risk based verification concept is described in DNVGL-SE-0474 and visualized in Figure 1-1 overleaf. 3 The verification plan is the pivot element, with the asset specification, risk assessment and definition of verification involvement as input and the verification execution being the implementation. 2 Verification s role in hazard management 1 Major accident hazards are identified in a formal safety assessment by an analysis of the risks to the facility s personnel using suitable definitions of such accidents. 2 Safety-critical elements are those hardware-related measures, including computer software, designed to reduce the risk to the facility s personnel. 3 Performance standards are the definitions of how these safety-critical elements perform their risk reduction functions. 4 Verification plan is how an independent examination of these safety-critical elements is planned to confirm that they are suitable and fulfil the safety and integrity requirements of the facility s owner. A graphical representation of this process is shown in Figure 1-2 overleaf. Service specification DNVGL-SE Edition August 2017 Page 7

8 Guidance note: Further details of these terms are given in [E.2]. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- Figure 1-1 DNV GL risk based verification flow chart Service specification DNVGL-SE Edition August 2017 Page 8

9 Figure 1-2 Verification as part of hazard management 3 Risk based verification planning 3.1 The selection of the level of verification shall depend on the level of risk a particular item adds to the overall risk to the facility. The planning can be simplified or detailed. This is further described in DNVGL- SE This service specification addresses both approaches as input into the preparation of a verification plan. Guidance note: Risk may be evaluated based on safety, environmental impact, business, schedule, public relations, reputation or other criteria set by the owner. The generic scopes of work tables are generated based on safety and integrity risks. Where other risks, such as environment or business, are required by the owner to be considered during the verification process, the principles set out in this document may be used to modify the generic scopes of work tables given in App.C. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e In view of the complexity of most hydrocarbon facilities, DNV GL recommends strongly that the verification level be derived from the results of a quantitative risk assessment of the facility. Guidance note: Only in the simplest of hydrocarbon facilities, with consequently lower levels of risk would DNV GL consider that simplified qualitative verification planning using the trigger questions set out in App.A be justifiable. For novel technology for which there are no applicable standards to verify against, technology qualification according to procedures as defined in DNVGL-RP-A203 Technology qualification may be used as input for verification. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- 4 Certificate of conformity 4.1 A certificate of conformity may be issued by DNV GL to confirm compliance according to the scope of work. An example is given in App.B. 4.2 The DNV GL certificate of conformity confirms that, after performing verification according to a DNV GL defined scope of work, DNV GL has found the hydrocarbon facility to conform to a given DNV GL standard or acceptable international standard. Service specification DNVGL-SE Edition August 2017 Page 9

10 4.3 Usually DNV GL performs the complete scope of work. However, in some circumstances, DNV GL may accept external independent review certificates, for example for pressure vessels. This shall be reflected in the certificate text. 4.4 A statement of conformity is issued in all instances where certificate of conformity is not applicable., see App.B for further details. 3 Definitions 3.1 Verbal forms Table 1-1 Definitions of verbal forms Terms shall should may Definition verbal form used to indicate requirements strictly to be followed in order to conform to the document verbal form used to indicate that among several possibilities one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required verbal form used to indicate a course of action permissible within the limits of the document 3.2 Terms Table 1-2 Definitions of terms Terms certificate of conformity Definition a document signed by a qualified party affirming that, at the time of assessment, the product or service met the stated requirements (BS 4778: Part 2), see [5] Guidance note: For this SE, a certificate is a short document (often a single page) stating compliance with specified requirements. The results from the associated verification activities shall be contained in a separate (single or multiple volumes) report. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- commissioning (phase) commissioning completion construction (phase) design design (phase) the phase, after mechanical completion, where the facility is made ready for operation, this phase includes any contractual performance trials is the completion of the commissioning phase where the hydrocarbon facility is capable of performing to its design specification, this may include contractual performance trials all activities during construction, including fabrication, installation and testing up to mechanical completion all related engineering to design the facility including process, structural, mechanical, electrical and instrumentation disciplines as well as materials and corrosion an initial project phase that takes a systematic approach to the production of specifications, drawings and other documents to ensure that the facility meets specified requirements (including design reviews to ensure that design output is verified against design input requirements) Service specification DNVGL-SE Edition August 2017 Page 10

11 Terms fabrication hazard hazard and operability study (HAZOP) manufacture mechanical completion modifications Definition activities related to the assembly of objects such as structural assemblies, pressure vessels, piping or tanks. These may be built fully on-site or built offsite in parts and transferred to site for assembly or integration a physical situation with the potential to cause harm, such as injury or death to workers, damage to property, disruption of business or pollution of the environment the application of a formal systematic detailed examination of the process and engineering intention of new or existing facilities to assess the hazard potential of operation outside the design intention or malfunction of individual items of equipment and their consequential effects on the facility as a whole. is the making of articles or materials for the facility. In relation to hydrocarbon facilities, this typically refers to activities for the production of various components under contracts from one or more contractor or supplier is the completion of the construction phase (qv) where all equipment, such as pumps and compressors, may be energised and pressure vessels may be filled with their contents to enable commissioning to take place alterations to an existing hydrocarbon facility by modifying an existing part of the facility or adding new parts Guidance note: In hydrocarbon facilities, this is referred to frequently as upgrading. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- operations (phase) risk risk reduction measures the phase when the facility is being used for the purpose for which it was designed the qualitative or quantitative likelihood of an accident or unplanned event occurring, considered in conjunction with the potential consequences of such a failure: in quantitative terms, risk is proportional to the quantified probability of a defined failure mode times its quantified consequence those measures taken to reduce the risks to the operation of the hydrocarbon facility and to the health and safety of personnel associated with it or in its vicinity by: reduction in the probability of failure mitigation of the consequences of failure. Guidance note: The usual order of preference of risk reduction measures is: inherent safety prevention detection control mitigation emergency response. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- safety objectives the safety goals in terms of functionality, reliability/availability and survivability for the design, construction and operation of the hydrocarbon facility including acceptance criteria for the level of risk acceptable to the owner Service specification DNVGL-SE Edition August 2017 Page 11

12 Terms verification Definition an examination to confirm that an activity, a product or a service is in accordance with specified requirements. Guidance note: The examination shall be based on information, which can be proved true, based on facts obtained through observation, measurement, test or other means. It should be noted that there is a distinct difference between verification and certification. The scope of work for verification is ultimately decided by the customer, while the scope of work for certification is ultimately decided by DNV GL (or the national authorities when DNV GL issues certificates on their behalf). ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e--- verification plan a plan, which defines the scope of the work for verification; it includes verification objectives, acceptance criteria, elements to be verified, level of involvement by party and type of verification activity 4 Abbreviations Table 1-3 Abbreviations Abbreviation CCTV D&ID D&ID ESD ESDV FEED FERA FGS FMEA HAZID HAZOP HVAC ICS NDT P&ID PCS PFD PFP PLEM closed circuit television ducting and instrumentation diagram ducting and instrumentation diagram emergency shutdown emergency shutdown valve front end engineering design fire and explosion risk assessment fire and gas system failure mode and effect analysis hazard identification hard and operability study heating, ventilation and air conditioning integrated control system non-destructive testing piping and instrumentation diagram process control system process flow diagram passive fire protection pipeline end manifold Service specification DNVGL-SE Edition August 2017 Page 12

13 Abbreviation PS PSD QRA SCE SIL SPM UFD UPS VAR VCE performance standard process shutdown quantitative risk assessment safety-critical element safety integrity level single point mooring utility flow diagram uninterruptible power supply verification activity report vapour cloud explosion 5 References Table 1-4 References Document code BS 4778 DNVGL-SE-0474 EN ISO 8402 ISO 9000 ISO 9001 ISO ISO TR Title Quality Vocabulary, Part 2 Quality Concepts and Related Definitions, 1991, British Standards Institute, London Health and Safety at Work etc Act 1974, HMSO London, ISBN The Offshore Installations (Safety Case) Regulations 2005, Statutory Instrument 2005 number 3117, HMSO London, ISBN A Guide to the Offshore Installations (Safety Case) Regulations 2005, HSE Books London, ISBN Council Decision 93/465/EEC of 22 July 1993 Concerning the Modules for the Various Phases of the Conformity Assessment Procedures and the Rules for the Affixing and Use of the CE Conformity Marking, which are Intended to be Used in the Technical Harmonisation Directives, Official Journal L 282 of 17/11/93. Risk based verification Metallic Products - Types of Inspection Documents, 2004, European Committee for Standardization, Brussels Quality -Vocabulary, 1994 (withdrawn), International Organization for Standardization, Geneva Quality Management Systems - Fundamentals and Vocabulary, 2005, International Organization for Standardization, Geneva Quality Management Systems - Requirements, 2008, International Organization for Standardization, Geneva Quality Management Systems Guidelines for Quality Plans, 2005, International Organization for Standardization, Geneva Guidelines for Quality Management System Documentation, 2001, International Organization for Standardization, Geneva Service specification DNVGL-SE Edition August 2017 Page 13

14 SECTION 2 PRINCIPLES OF RISK BASED VERIFICATION 1 Purpose of section 1 Objectives 1 The objectives of this section are to provide: an introduction to the principles of verification the safety and integrity of hydrocarbon refineries and petrochemical facilities, an introduction to the principles of risk based levels of verification activity and guidance on the selection of levels of verification. 2 Verification principles 1 Purpose of verification 1 Verification constitutes a systematic and independent examination of the various phases in the life of a hydrocarbon facility to determine whether it has sufficient integrity to meet its safety objectives. 2 Verification activities are expected to identify errors or failures in the safety and integrity-related work associated with the hydrocarbon facility and to contribute to reducing the risks to its operation and to the health and safety of personnel associated with it or in its vicinity. 3 Verification is primarily focused on integrity and human safety, but business risk (cost and schedule) may be addressed also if required by the owner. 2 Verification as a complementary activity 1 Verification shall be complementary to routine design, construction and operations activities and not a substitute for them. Therefore, although verification will take into account the work, and the assurance of that work, carried out by the owner and its contractors, it is possible that verification will duplicate some work that has been carried out previously by other parties involved in the hydrocarbon facility. 2 The verification plan shall be developed and implemented in such a way as to minimise additional work and cost, and to maximise its effectiveness. The development of the verification plan shall depend on the findings from the examination of quality management systems, the examination of documents and the examination of project activities. 3 Risk based levels of verification 3.1 To achieve a DNV GL certificate of conformity for a hydrocarbon facility a verification of the activities described by the scope of work defined within this SE first shall take place. 3.2 The level of verification activity is differentiated according to the overall risk to the facility and to individual parts of it. If the risk to the facility (or a particular part) is higher, the level of verification involvement is higher. Conversely, if the risk to the facility (or a particular part) is lower, the level of verification activities can be reduced, without any reduction in their effectiveness. Service specification DNVGL-SE Edition August 2017 Page 14

15 3.3 Verification of hydrocarbon facilities is categorised into low, medium and high. A summary of the levels of involvement is given in Table It is the prerogative of the owner of the hydrocarbon facility to choose the level of verification. The selection should consider the factors given in Sec.2 [3]. The selection of the most suitable verification level may be guided by using the information gained from a quantitative risk assessment, or alternatively qualitatively by trigger questions, as described in App.A. Further guidance is provided in DNVGL-SE-0474 Risk based verification. 3.5 Where DNV GL is issuing the certificate of conformity for the facility, DNV GL will decide on the appropriate scope and use the same type of questions to evaluate the suitability of the selected level. 3.6 Different levels of verification can be chosen for different phases of the hydrocarbon facility s design, construction or commissioning, or even within the same phase if necessary. For example, the design of a particular component or unit may be innovative and considered high risk whereas the construction and installation methods are well-known and considered low risk. The converse might be true also. 3.7 The level of verification can be reduced or increased during a phase if the originally chosen level is considered too rigorous or too lenient, as new information on the risks to the hydrocarbon facility becomes available. 3.8 Verification should be planned in close co-operation with the owner and each of its contractors, to provide a scope of work that is tailor-made to the schedule of each production process or activity, i.e. to make the verification activities, surveillance and hold points, an integrated activity and not a delaying activity. Guidance note: Many contractors have adequate quality control systems and quality control departments, with competent personnel to perform, for example, inspection at pressure vessel manufacturers. In that case, not all verification work need be done by DNV GL personnel. Where applicable, the various inspections may be carried out by competent persons other than DNV GL personnel. In that situation DNV GL s verification activities may comprise: reviewing the competence of the contractor s personnel, auditing their working methods and their performance of that work, and reviewing the documents produced by them. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e Verification will direct greatest effort at those elements of the hydrocarbon facility whose failure or reduced performance will have the most significant impact on safety and integrity The degree of confidence placed in a certificate by its users depends on their degree of confidence in the verification carried out. Therefore, the level of verification will be stated on the certificate of conformity for the facility If more than one verification level has been used for a phase, then the lowest level will be reported on the facility s certificate, and the additional verification activities will be identified and described in the verification report. Service specification DNVGL-SE Edition August 2017 Page 15

16 3 Selection of level of verification 3.1 Selection factors 3.1 The selection of the level of verification shall depend on the criticality of each of the elements that have an impact on the management of hazards and associated risk levels of the facility. This is illustrated by Figure 2-1 below. 3.2 The contribution of each element shall be judged qualitatively and/or quantitatively and shall use, where possible, quantified risk assessment data to provide a justifiable basis for any decisions made. Table 2-1 s of verification - summary of involvement Low Medium High of involvement Review of general principles and production systems during design, construction and commissioning Review of principal design documents, construction and commissioning procedures and qualification reports Site attendance only during system testing Less comprehensive involvement than level medium Review of general principles and production systems during design, construction and commissioning Detailed review of principal and other selected design documents with support of simplified independent analyses Detailed review of construction and commissioning procedures Full time attendance during (procedure) qualification and review of the resulting reports Audit-based or intermittent presence at site Review of general principles and production systems during design, construction and commissioning Detailed review of most design documents with support of simplified and advanced independent analyses Detailed review of construction and commissioning procedures Full-time attendance during (procedure) qualification and review of the resulting reports Full time presence at site for most activities More comprehensive involvement than level medium Guidance for application on the level of involvement Proven facility designs with relatively harmless contents and/or installed in benign environmental conditions Established design; manufacturing and installation by experienced contractors Low consequences of failure from a safety point of view (or environmental or commercial, if required) Relaxed to normal completion schedule Facilities in moderate or well-controlled environmental conditions Facilities with a moderate degree of novelty Medium consequences of failure from a safety point of view, (or environmental or commercial, if required Ordinary completion schedule Facilities with a high degree of novelty or large leaps in technology Extreme environmental conditions Inexperienced contractors or exceptionally tight completion schedule Very high consequences of failure from a safety point of view (or environmental or commercial, if required Service specification DNVGL-SE Edition August 2017 Page 16

17 of involvement Guidance for application on the level of involvement Guidance note: Completion schedules affect verification involvement in an indirect but important way. The effect of a tight completion schedule is pressure on the project team to take less time to carry out the various tasks. Tight completion schedules are more prone to run late, thus adding more pressure on the project team. Problems which have been encountered in this situation in the past have included: design reviews not carried out incomplete welding non-destructive testing incomplete missing structural members commissioning incomplete. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e Selection factors are the: overall safety objectives for the facility, assessment of the risks associated with the facility and the measures taken to reduce these risks, degree of technical innovation in the facility, experience of the contractors in carrying out similar work, quality management systems of the owner and its contractors. Figure 2-1 Selection of the required level of verification 3.2 Overall safety objective 3.1 An overall safety objective covering all phases of the hydrocarbon facility from design to operation shall be defined by the owner. The safety objective should address the main safety goals as well as establishing acceptance criteria for the level of risk acceptable to the owner. Depending on the facility and its location, the risk could be measured in terms of human injuries as well as environmental, political and economic consequences. Service specification DNVGL-SE Edition August 2017 Page 17

18 3.3 Assessment of risk A systematic review should be carried out to identify and evaluate the probabilities and consequences of failures in the hydrocarbon facility. The extent of the review shall reflect the criticality of the facility, the planned operation and previous experience with similar facilities. This review shall identify the risk to the operation of the facility and to the health and safety of personnel associated with it or in its vicinity Once the risks have been identified, their extent can be reduced to a level as low as reasonably practicable by means of one or both of: reduction in the probability of failure, mitigation of the consequences of failure. Guidance note: Reasonable practicability The term as low as reasonably practicable (ALARP) has come into use through the United Kingdom s The Health and Safety at Work etc. Act See sec. E109. Reasonable Practicability is not defined in the Act but has acquired meaning by interpretations in the courts. It has been interpreted to mean that the degree of risk from any particular activity can be balanced against the cost, time and trouble of the measures to be taken to reduce the risk. Therefore, it follows that the greater the risk the more reasonable it would be to incur substantial cost, time and effort in reducing that risk. Similarly, if the risk were very small it would not be reasonable to expect great expense or effort to be incurred in reducing it. Further guidance on the principles and application of ALARP may be obtained from the United Kingdom s Heath and Safety Executive web-site at (July 2009). ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e The result of the systematic review of these risks is measured against the safety objectives and used in the selection of the appropriate verification activity level. 3.4 Technical innovation and contractor experience The degree of technical innovation in the hydrocarbon facility system shall be considered. Risks to the facility are likely to be greater for a facility with a high degree of technical innovation than with a facility designed, manufactured and installed to well-known criteria in well-known locations Similarly, the degree of risk to the facility should be considered where contractors are inexperienced or the work schedule is tight Factors to be considered in the selection of the appropriate verification level include: degree of difficulty in achieving technical requirements knowledge of similar facilities knowledge of contractors general experience knowledge of contractors experience in similar work. 3.5 Quality management systems Adequate quality management systems shall be implemented to ensure that gross errors in the work for facility design, construction and operations are limited. Service specification DNVGL-SE Edition August 2017 Page 18

19 3.5.2 Factors to be considered when evaluating the adequacy of the quality management system include: whether or not an ISO 9001, see [5] or equivalent certified system is in place results from external audits results from internal audits experience with contractors previous work project work-force familiarity with the quality management system, e.g. has there been a rapid expansion of the work force or are all parties of a joint venture familiar with the same system. 4 Communications 4.1 Notification of verification level 4.1 An assessment of the required level of verification for a project should be made by the owner before preparing tender documents for design and construction activities. The owner can then specify this level in invitations to tender. This will give contractors clear guidance and reference when estimating the extent and cost of efforts associated with verification activities. 4.2 The required level of verification can be assessed by the owner using this SE. However, if the owner requires the contractor to carry out this assessment as part of his response to an invitation to tender the owner should provide the necessary information to enable the contractor to carry out this work. This information should include overall safety objectives for the hydrocarbon facility as well as particulars, such as temperatures, pressures, contents and environmental criteria, commonly contained in a design brief. 4.2 Obligations 4.1 To achieve the purpose and benefits of verification the involved parties shall be mutually obliged to share and act upon all relevant information pertaining to the verification scope. 4.2 The owner shall be obliged to: Inform DNV GL about the basis for selecting the level of verification and the investigations and assumptions made in this context. Give DNV GL full access to all information concerning the verification scope for the hydrocarbon facility and ensure that clauses to this effect are included in contracts for parties acting on behalf of the owner and parties providing products, processes and services covered by the verification scope. If information is proprietary and not available, exclusion from verification shall be mutually agreed with DNV GL. Ensure that DNV GL is involved in the handling of deviations from specified requirements within the verification scope. Act upon information provided by DNV GL with respect to events or circumstances that may jeopardise the safety or integrity of the facility and/or the purpose and benefit of verification Ensure that the safety objective established for the facility is known and pursued by parties acting on behalf of the owner and parties providing products, processes and services covered by the verification scope. 4.3 Second parties shall be obliged to: Perform their assigned tasks in accordance with the safety objectives established for the project. Provide the owner and DNV GL with all relevant information pertaining to the verification scope. Service specification DNVGL-SE Edition August 2017 Page 19

20 4.4 DNV GL will be obliged to: Inform the owner if, in the opinion of DNV GL, the basis for selecting the level of verification or the assumptions made in this respect are found to be in error or assessed incorrectly. Inform the owner of events or circumstances that, in the opinion of DNV GL, may jeopardise the safety or integrity of the facility and/or the purpose and benefit of verification. Effectively perform all verification work and adjust the level of involvement according to the actual performance of parties providing products, processes and services covered by the verification scope. Service specification DNVGL-SE Edition August 2017 Page 20

21 SECTION 3 SERVICE OVERVIEW 3.1 Purpose of section 3.1 Objectives 3.1 The objectives of this section are to provide, for hydrocarbon refining and petrochemical facilities: an overview of verification activities details of DNV GL s verification activities for aspects of the facility s development, operation or modification. 3.2 Service process 3.1 General principles 3.1 The process of DNV GL s verification of hydrocarbon facilities is based on distinct project phases and the recognition of key milestones. 3.2 The risk based verification process follows the common project phases: FEED (optional): conceptual design. Project design and construction: project management detail design construction manufacturing and fabrication of components and assemblies site assembly and integration. Project completion: commissioning issue of as-built and as-installed documentation. Facility operations: operations, maintenance and inspection. Facility modifications: design, construction and commissioning of modifications and alterations. Verification tasks need not be performed as part of a complete verification (or certification) of a hydrocarbon facility but can be stand-alone service for all or part of a project. 3.2 Scopes of work 3.1 An overview of the scopes of work for verification, at the three levels of verification low (L), medium (M) and high (H), are given in the tables in this section. 3.2 Note that the activity audit of the quality management system may be omitted if there exists a quality management system in accordance with ISO 9001, certified by an accredited third party for the scope of work being carried out in the project. Service specification DNVGL-SE Edition August 2017 Page 21

22 3.3 Typical generic detailed scopes of work descriptions, which show all the activities to be verified, are given in App.C. 3.4 A specific scope of work description shall be made for each particular project. This description should be similar to the tables in App.C and will be part of the final DNV GL verification report. 3.5 For operations which are not mentioned specifically in the tables but which are still found critical for a particular project the same general levels will be described. 3.3 Front end engineering design Verification during front end engineering design Verification during front end engineering design (FEED), or the conceptual and/or feasibility studies of a project, is not a prerequisite for verification. However, verification of the early stages of a project can reduce the extent, depth and cost of verification required during the design, construction and commissioning phases or indicates areas where verification would be difficult to achieve without further work being undertaken Design verification during FEED can be combined with additional reviews, where required by the owner, of: environmental aspects project schedule cost The FEED design documents shall be reviewed on a sample basis to ensure that the requirements of the project s specifications and standards have been incorporated Verification during FEED is the examination of the assumptions, methods and results of the design process and is performed to ensure that the specified requirements of the project will be achieved FEED verification will consist of one, or more, of reviewing: specifications for design design reports and drawings calculations specifications for construction and operation, resulting from design Definition of the scope of work for verification of FEED will follow Table 3- Table 3-1 Scope of work for verification of FEED Verification activity L M H Review of reports and specifications for construction and operation 1) spot check of critical aspects x x x spot check review of main specifications and reports x x thorough review of main specifications and reports x Service specification DNVGL-SE Edition August 2017 Page 22

23 Verification activity L M H 1) Services related to safety and integrity risks only. However, optional verification services, relating to environmental, business or other risks, when requested by the owner, may be carried out in the same manner. 3.4 Project design, construction and commissioning General All design, construction and commissioning aspects, relevant to hydrocarbon facility safety and integrity, shall be covered by the verification process Verification describes the individual activities undertaken by DNV GL at the various stages of the design, construction and commissioning of the hydrocarbon facility to confirm that the safety and integrity requirements of the owner have been fulfilled Verification of overall project management Verification of the overall project management is the examination of the means of controlling the whole hydrocarbon facility project This verification is to ensure that the necessary controls are in place to ensure information flows between the various interfaces. This is especially important where separate contractors have been employed for different phases of the project Definition of the scope of work for verification of overall project management will follow Table 3- Table 3-2 Scope of work for verification of overall project management Verification activity L M H Review of the project management process review of project quality management documentation. x x x audit of the quality management system x x review of sub-contractor control x x review of interface controls x x review of methods of information flow including document control x x Service specification DNVGL-SE Edition August 2017 Page 23

24 3.4.3 Verification during design Design verification is the examination of the assumptions, methods and results of the design process and is performed at the specified level of verification to ensure that the specified requirements of the hydrocarbon facility will be achieved Design verification will consist of one or more, of the following: reviewing the design process reviewing specifications for design reviewing design reports and drawings review of technology qualification program and associated results (for new technology) performing independent parallel calculations audit of project quality management system reviewing specifications for construction and operation, resulting from design Typical design aspects that shall be verified during the design of hydrocarbon processing are: Civil and structural: geotechnical report civil works and foundations structures. Plant facilities: general plant layout and equipment process safety systems emergency shutdown and alarm systems hazardous area classification and ventilation. passive and active fire protection philosophy fire and gas detection and alarm system electrical system emergency lighting process and utility piping systems mechanical system material selection and corrosion management Definition of the scope of work for verification of design will follow Table 3-3. Table 3-3 Scope of work for verification of design Verification activity L M H Review of the design process review of design quality management documentation x x x audit of design quality management system x x Review of specifications for design review of the design basis with emphasis of the survey results and environmental data: evaluation of the design criteria x x x Service specification DNVGL-SE Edition August 2017 Page 24

25 Verification activity L M H Review of design reports and drawings review of the main documentation to ensure that the main criteria have been accounted for in design, that the governing conditions are identified, and that the chosen design philosophies are in accordance with specified codes and standards x x x evaluation of the main methods used and spot checks of the input data and the calculation results x x detail review of main design reports x Performing independent parallel calculations check of pressure containment or overall integrity x x x simplified independent analysis/ calculation(s) performed by spot checks x x advanced independent analysis/ calculation(s) performed by spot checks x Review of specifications for construction and operation spot check of critical aspects x x x review of main specifications x x thorough review of main specifications x Review of specific operational challenges general principles x x x review of main documents supported by simplified analyses x x Guidance note: Design verification activities may be split up between basic design and detailed design, or other sub-phase, depending on type of contract. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e Verification during construction Verification during construction is carried out by means of full time attendance, audits, inspection or spot checks of the work, as appropriate, in sufficient detail to ensure that the specified requirements of the hydrocarbon facility will be achieved Verification of these activities relates not only to the contractor s work but also to the monitoring of this work carried out by the owner During construction verification shall consist of one, or more, of: reviewing the construction process reviewing construction procedures reviewing qualification processes and results surveillance during construction activities reviewing final documentation. Service specification DNVGL-SE Edition August 2017 Page 25

26 Typical site activities to be verified during construction and up to mechanical completion are: Civil and structural: civil and structural works equipment supports storage tank foundations structural fire protection. Mechanical: mechanical equipment installation process piping installation welding procedures qualification and control welders qualification and welders identification control welding quality records non-destructive testing methods and reports pressure and leak tests of process piping system set pressures for relief valves. Electrical and instrumentation: electrical equipment and instrumentation in hazardous areas insulation resistance and continuity tests on equipment and cables equipment earthing electrical installation work relevant tests of electrical and instrumentation equipment, especially calibration of instruments and setting of protective devices if any. Common: material control and identification system final inspection reports of procured items The documents that should be produced in the project and submitted for review typically are: construction procedures and method statements; including test requirements, test procedures and acceptance criteria, repairs, personnel qualification records, etc. material specifications and data sheets drawings quality plans including Inspection and test plans welding procedure specifications and welding procedure qualification record NDT procedures The final documentation to be submitted after construction that should reflect the as-built status of the facility, should include but not be limited to: construction test records; visual, NDT, test samples, dimensional, heat treatment, etc. hydrostatic test reports as-built drawings Definition of the scope of work for verification of construction shall follow Table 3-4 for manufacturing and fabrication of critical, high-risk, components, Table 3-5 for manufacturing and fabrication of components not considered to be high-risk and Table 3-6 for site construction activities Component risk of shall be defined preferably by a quantitative risk assessment but qualitative methods may be used for lower-risk facilities. Service specification DNVGL-SE Edition August 2017 Page 26

27 Table 3-4 Scope of work for verification of manufacturing and fabrication of HIGH-RISK components Verification activity L M H Review of the manufacturing and fabrication process Review of manufacturing and fabrication management systems x x x Audit of the quality management system x x Review of manufacturing and fabrication procedures Review manufacturing, fabrication and inspection procedures for confirmation of compliance with the manufacturing specification x x x Review method statements x x Review of qualification process Review the manufacturing procedure specification, (MPS), manufacturing procedure qualification test (MPQT), if applicable x x x Full time attendance during MPQT, if applicable, or first day production x x Surveillance during manufacturing and fabrication activities Visit-based attendance during testing, to ensure, based on spot checks, that the delivered products have been produced in accordance with the manufacturing specification x x x Visit-based or full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the delivered products have been produced in accordance with the manufacturing specification Full-time attendance during manufacturing and fabrication to ensure, based on spot checks, that the delivered products have been produced in accordance with the manufacturing specification x x x Review of final documentation x x x Guidance note: Materials may be ordered with certificates of independent third-party verification (e.g. 3.2 according to EN 10204, see [5]). This can this be integrated in the overall verification activities, so not to duplicate work. Additionally, credit may be given to components that are CE-marked, providing that the appropriate conformity assessment modules have been used, e.g. for equipment for which the verification plan requires verification of design, Module H is insufficient and Module H1 is required, irrespective of the requirement of the particular directive see [5]. ---e-n-d---o-f---g-u-i-d-a-n-c-e---n-o-t-e Verification during commissioning Verification during commissioning is carried out by means of full time attendance, audits, inspection or spot checks of the work, as appropriate, in sufficient detail to ensure that the specified requirements of the hydrocarbon facility will be achieved. Service specification DNVGL-SE Edition August 2017 Page 27

Shipboard incinerators with capacities up to 4000 kw

Shipboard incinerators with capacities up to 4000 kw STANDARD FOR CERTIFICATION No. 2.9 Approval Programmes Type Approval Programmes for Marine Equipment Directive (MED) No. 431.90 - MED A.1/2.7 Shipboard incinerators with capacities up to 4000 kw JANUARY

More information

Assessment of the Safety Integrity of Electrical Protection Systems in the Petrochemical Industry

Assessment of the Safety Integrity of Electrical Protection Systems in the Petrochemical Industry Assessment of the Safety Integrity of Electrical Protection Systems in the Petrochemical Industry 1. Introduction Author: Colin Easton ProSalus Limited ~ Independent Safety Consultants Within the United

More information

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision... CONTENTS Schedule of amendments for this part of the scheme document Page 1 of 14 3-O Introduction...3 3-O.1 Scope of Maintenance and Supervision...3 3-O.2 Certification conditions...5 3-O.3 LPS 1233 Service

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61511-3 First edition 2003-03 Functional safety Safety instrumented systems for the process industry sector Part 3: Guidance for the determination of the required safety integrity

More information

Technical Paper. Functional Safety Update IEC Edition 2 Standards Update

Technical Paper. Functional Safety Update IEC Edition 2 Standards Update Technical Paper Functional Safety Update IEC 61511 Edition 2 Standards Update Functional Safety Update Table of Contents 1.0 Introduction 2.0 IEC 61511-1 changes 3.0 IEC 61511-2 changes 4.0 IEC 61511-3

More information

2015 Functional Safety Training & Workshops

2015 Functional Safety Training & Workshops HAZAN RISK SIS SIF - IEC 61508/61511 - SIL PFD SFF CCF 2015 Functional Safety Training & Workshops Select the right course for your organisation from our extensive choice of Functional Safety related training

More information

Is your current safety system compliant to today's safety standard?

Is your current safety system compliant to today's safety standard? Is your current safety system compliant to today's safety standard? Abstract It is estimated that about 66% of the Programmable Electronic Systems (PES) running in the process industry were installed before

More information

ADIPEC 2013 Technical Conference Manuscript

ADIPEC 2013 Technical Conference Manuscript ADIPEC 2013 Technical Conference Manuscript Name: Heidi Fuglum Company: ABB AS Job title: Deployment Manager Address: Ole Deviksvei, Oslo, Norway Phone number: +47 91 36 98 70 Email: Heidi.Fuglum@no.abb.com

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61508-2 First edition 2000-05 BASIC SAFETY PUBLICATION Functional safety of electrical/electronic/ programmable electronic safety-related systems Part 2: Requirements for electrical/electronic/

More information

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY World-class services help reduce incidents, protect the environment, and keep people and plants safe White Paper PAGE 1 Introduction

More information

Value Paper Authors: Stuart Nunns CEng, BSc, FIET, FInstMC. Compliance to IEC means more than just Pfd!

Value Paper Authors: Stuart Nunns CEng, BSc, FIET, FInstMC. Compliance to IEC means more than just Pfd! Value Paper Authors: Stuart Nunns CEng, BSc, FIET, FInstMC Compliance to IEC 61508 means more than just Pfd! Compliance to IEC 61508 means more than just Pfd! Market environment Statistics relating to

More information

Session Four Functional safety: the next edition of IEC Mirek Generowicz Engineering Manager, I&E Systems Pty Ltd

Session Four Functional safety: the next edition of IEC Mirek Generowicz Engineering Manager, I&E Systems Pty Ltd Abstract Session Four Functional safety: the next edition of IEC 61511 Mirek Generowicz Engineering Manager, I&E Systems Pty Ltd The functional safety standard IEC 61511 provides a framework for managing

More information

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax: STANDARD FOR CERTIFICATION No. 2.9 MARINE GYRO COMPASS JANUARY 2003 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous and independent Foundation

More information

Where Process Safety meets Machine Safety

Where Process Safety meets Machine Safety Where Process Safety meets Machine Safety A document to aid understanding between the end-user and machine builder for functional safety issues. by The 61508 Association Overriding key principle...it must

More information

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems BAFE Scheme: SP203-1 Version 7.1: January 2019 FIRE SAFETY REGISTER Fire Protection Industry Scheme, Reference SP203-1 For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire

More information

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY

AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY AVOID CATASTROPHIC SITUATIONS: EXPERT FIRE AND GAS CONSULTANCY OPTIMIZES SAFETY World-class services help reduce incidents, protect the environment, and keep people and plants safe White Paper PAGE 1 Introduction

More information

DNVGL-CP-0398 Edition December 2015

DNVGL-CP-0398 Edition December 2015 CLASS PROGRAMME Type approval DNVGL-CP-0398 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS

SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS STANDARD FOR CERTIFICATION No. 2.9 SHOP PRIMERS FOR CORROSION PROTECTION OF STEEL PLATES AND SECTIONS OCTOBER 2009 Veritasveien 1, NO-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 4645.2:2008 AS/NZS 4645.2:2008 Australian/New Zealand Standard Gas distribution networks Part 2: Steel pipe systems AS/NZS 4645.2:2008 This Joint Australian/New Zealand Standard was prepared by

More information

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax: STANDARD FOR CERTIFICATION No. 2.9 RADAR REFLECTOR JANUARY 2003 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous and independent Foundation with

More information

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

Circuit Breakers JANUARY The electronic pdf version of this document found through   is the officially binding version STANDARD FOR CERTIFICATION No. 2.9 Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-E001 Circuit Breakers JANUARY 2013 The electronic pdf version

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard LPS 1531: Issue 1.1 companies installing or applying passive fire protection This Loss Prevention Standard is the property of BRE Global Ltd. and is made publicly available for

More information

Functional Safety: the Next Edition of IEC 61511

Functional Safety: the Next Edition of IEC 61511 HazAus2015/1507 Functional Safety: the Next Edition of IEC 61511 Mirek Generowicz Engineering Manager I&E Systems Pty Ltd Level 2, 445 Hay Street Perth WA 6000 Abstract The functional safety standard IEC

More information

Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU

Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU GNB-CPR AG Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU NB-CPR/AG/03/002r3 Issued: 24 May 2013 APPROVED GUIDANCE GNB-CPR AG position paper Guidance to

More information

PRIMATECH WHITE PAPER CHANGES IN THE SECOND EDITION OF IEC 61511: A PROCESS SAFETY PERSPECTIVE

PRIMATECH WHITE PAPER CHANGES IN THE SECOND EDITION OF IEC 61511: A PROCESS SAFETY PERSPECTIVE PRIMATECH WHITE PAPER CHANGES IN THE SECOND EDITION OF IEC 61511: A PROCESS SAFETY PERSPECTIVE Summary From the perspective of process safety, the most notable change is the addition of requirements for

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC/TS 62443-1-1 Edition 1.0 2009-07 colour inside Industrial communication networks Network and system security Part 1-1: Terminology, concepts and models INTERNATIONAL ELECTROTECHNICAL

More information

USER APPROVAL OF SAFETY INSTRUMENTED SYSTEM DEVICES

USER APPROVAL OF SAFETY INSTRUMENTED SYSTEM DEVICES USER APPROVAL OF SAFETY INSTRUMENTED SYSTEM DEVICES Angela E. Summers, Ph.D., P.E, President Susan Wiley, Senior Consultant SIS-TECH Solutions, LP Process Plant Safety Symposium, 2006 Spring National Meeting,

More information

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P-01-05 THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS October, 2005 Society of Fire Protection Engineers - 1 - Position Statement

More information

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems BAFE Scheme: SP203-1 Version 5: May 2011 Fire Protection Industry Scheme, Reference SP203 Part 1 For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems British

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61511-2 First edition 2003-07 Functional safety Safety instrumented systems for the process industry sector Part 2: Guidelines for the application of IEC 61511-1 Reference number

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61508-1 First edition 1998-12 BASIC SAFETY PUBLICATION Functional safety of electrical/electronic/ programmable electronic safety-related systems Part 1: General requirements

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60079-29-2 Edition 2.0 2015-03 Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen INTERNATIONAL

More information

Prescription of qualifications. ARB Criteria at Part 2

Prescription of qualifications. ARB Criteria at Part 2 Prescription of qualifications ARB Criteria at Part 2 Approved: January 2010 Effective From: 2011/2012 Introduction Under the Architects Act 1997, the Architects Registration Board (ARB) has the responsibility

More information

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC CLASS PROGRAMME Type approval DNVGL-CP-0396 Edition December 2015 Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC The electronic pdf version of this document,

More information

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems Building Standards Division Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems Crown Copyright 2015 Produced by the Buildings Standards Division February 2015 Version

More information

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY Page: 1 BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY Scope CEN/TC 250 covers the standardization of structural and geotechnical design rules for building and civil engineering works

More information

TECHNICAL REPORT IEC TR 62987

TECHNICAL REPORT IEC TR 62987 TECHNICAL REPORT IEC TR 62987 Edition 1.0 2015-09 colour inside Nuclear power plants Instrumentation and control systems important to safety Use of Failure Mode and Effects Analysis (FMEA) and related

More information

Process Safety - Market Requirements. V.P.Raman Mott MacDonald Pvt. Ltd.

Process Safety - Market Requirements. V.P.Raman Mott MacDonald Pvt. Ltd. Process Safety - Market Requirements V.P.Raman Mott MacDonald Pvt. Ltd. Objective of Process Safety Protect personnel Protect the environment Protect the plant equipment / production. Multiple Layers

More information

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.017 Version 2 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group

More information

Glass fibre rovings - Non-metallic materials

Glass fibre rovings - Non-metallic materials CLASS PROGRAMME Type approval DNVGL-CP-0082 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

DNVGL-CP-0407 Edition February 2016

DNVGL-CP-0407 Edition February 2016 CLASS PROGRAMME Type approval DNVGL-CP-0407 Edition February 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems

BRL-K21030/02 5 August Certification of Alarm Communication. Certification Alarm Transmission Systems (ATS) Alarm Transmission Systems 5 August 2014 Certification of Alarm Communication Certification (ATS) Kiwa N.V. - 1-5 Augustus 2014 Preface This Evaluation Guideline (Certification Scheme) has been accepted by the Kiwa Board of Experts

More information

GASTEC QA. Approval Requirements 31-1

GASTEC QA. Approval Requirements 31-1 KE 31-1 March 2012 GASTEC QA Approval Requirements 31-1 for the GASTEC QA product certificate for Sealing materials for metallic threaded joints in contact with 2nd and 3rd family gases and hot water Part

More information

Safety Integrity Verification and Validation of a High Integrity Pressure Protection System to IEC 61511

Safety Integrity Verification and Validation of a High Integrity Pressure Protection System to IEC 61511 TÜV Rheinland International Symposium in China Functional Safety in Industrial Applications October 18 19, 2011 in Shanghai China Safety Integrity Verification and Validation of a High Integrity Pressure

More information

Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen

Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen IEC 60079-29-2 Edition 2.0 2015-03 REDLINE VERSION colour inside Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen

More information

Council Directive 93/68/EEC of 22 July 1993 amending Directives

Council Directive 93/68/EEC of 22 July 1993 amending Directives Council Directive 93/68/EEC of 22 July 1993 amending Directives 87/404/EEC (simple pressure vessels), 88/378/EEC (safety of toys), 89/106/EEC (construction products), 89/336/EEC (electromagnetic compatibility),

More information

AS AS Australian Standard. Industrial fuel-fired appliances. This is a free 9 page sample. Access the full version online.

AS AS Australian Standard. Industrial fuel-fired appliances. This is a free 9 page sample. Access the full version online. AS 1375 2013 AS 1375 2013 Australian Standard Industrial fuel-fired appliances This Australian Standard was prepared by Committee AG-011, Industrial and Commercial Gas Fired Appliances. It was approved

More information

Terminal lugs for LV power cables with aluminum conductors

Terminal lugs for LV power cables with aluminum conductors CLASS PROGRAMME Type approval DNVGL-CP-0409 Edition January 2018 Terminal lugs for LV power cables with aluminum conductors The content of this service document is the subject of intellectual property

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61511-1 First edition 2003-01 Functional safety Safety instrumented systems for the process industry sector Part 1: Framework, definitions, system, hardware and software requirements

More information

GASTEC QA. Approval Requirements 31-2

GASTEC QA. Approval Requirements 31-2 KE 31-2 March 2012 GASTEC QA Approval Requirements 31-2 for the GASTEC QA product certificate for Sealing materials for metallic threaded joints in contact with 2nd and 3rd family gases and hot water Part

More information

SELF PRESERVATION SOCIETY By Jim Creak

SELF PRESERVATION SOCIETY By Jim Creak SELF PRESERVATION SOCIETY By Editor of the Means of Escape Magazine and Chairman of The Health & Safety Signs Association. w w w. m e a n s - of- e s c a p e. c o m Agenda Regulatory Reform Fire Safety

More information

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA - TF N 687rev1 2015-06-02 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA - 1 I - Drafting

More information

Measurement of Safety Integrity of E/E/PES according to IEC61508

Measurement of Safety Integrity of E/E/PES according to IEC61508 Measurement of Safety Integrity of E/E/PES according to IEC61508 Mr. Chen Zhenkang TUV Rheinland Singapore 18. May. 2018 Singapore World Metrology Day 2018 1 Agenda 1. TÜV Rheinland: a Certification Body

More information

Design & Use of Ground Based Pumps Guidance Document

Design & Use of Ground Based Pumps Guidance Document Design & Use of Ground Based Pumps The information and recommendations in this guidance are given in good faith and belief in their accuracy at the time of publication, but do not imply any legal liability

More information

Contents. EN :2012 (E) Issue 5 ( ) Page

Contents. EN :2012 (E) Issue 5 ( ) Page Contents Page Foreword... 4 1 Scope... 6 2 Normative references... 6 3 Terms and definitions... 7 4 Symbols and abbreviations... 7 5 Determination of inspection and testing requirements... 8 5.1 General...

More information

Electrical Management

Electrical Management 5 WHS PROCEDURE P23-01 Page 1 of 9 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD IEC 61892-7 INTERNATIONAL STANDARD Edition 2.0 2007-11 Mobile and fixed offshore units Electrical installations Part 7: Hazardous areas INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE XA ICS 47.020.60

More information

Strathayr, Rhu-Na-Haven Road, Aboyne, AB34 5JB, Aberdeenshire, U.K. Tel: +44 (0)

Strathayr, Rhu-Na-Haven Road, Aboyne, AB34 5JB, Aberdeenshire, U.K. Tel: +44 (0) Strathayr, Rhu-Na-Haven Road, Aboyne, AB34 5JB, Aberdeenshire, U.K. Tel: +44 (0)1339 886618 www.silsupport.com 2012 TRAINING TÜV FS Engineer Certification Training (4 days) This 4 day course is run in

More information

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment

AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment AS/NZS 3820:2009 (Incorporating Amendment 1) Essential safety requirements for electrical equipment AS/NZS 3820:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60335-2-90 Edition 4.0 2015-08 Household and similar electrical appliances Safety Part 2-90: Particular requirements for commercial microwave ovens INTERNATIONAL ELECTROTECHNICAL

More information

FINAL DRAFT INTERNATIONAL STANDARD

FINAL DRAFT INTERNATIONAL STANDARD IEC 62443-4-1 Edition 1.0 2017-11 FINAL DRAFT INTERNATIONAL STANDARD colour inside Security for industrial automation and control systems Part 4-1: Secure product development lifecycle requirements INTERNATIONAL

More information

Guidelines. Safety Integrity Level - SIL - Valves and valve actuators. February Valves

Guidelines. Safety Integrity Level - SIL - Valves and valve actuators. February Valves Valves Guidelines Safety Integrity Level - SIL - Valves and valve actuators February 2009 VDMA German Engineering Federation Valves Manufacturers Association Chairman: Prof.-Dr.-Ing. Heinfried Hoffmann

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 62941 Edition 1.0 2016-01 Terrestrial photovoltaic (PV) modules Guidelines for increased confidence in PV module design qualification and type approval INTERNATIONAL ELECTROTECHNICAL

More information

SIL DETERMINATION AND PROBLEMS WITH THE APPLICATION OF LOPA

SIL DETERMINATION AND PROBLEMS WITH THE APPLICATION OF LOPA SIL DETERMINATION AND PROBLEMS WITH THE APPLICATION OF LOPA Alan G King Hazard & Reliability Specialist, ABB Engineering Services, Billingham, Cleveland UK. TS23 4YS For a number of years, industry has

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure D. EVALUATION ASSESSMENT PROCEDURES Guideline D-01 Guideline related to: Annex III, module G Is design approval by a notified body required under module G? Module G does not explicitly require formal design

More information

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA - TF N 530 Rev.2 2012-04-13 CONSTRUCTION SECTOR STANDARDIZATION GUIDANCE DOCUMENT Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA - 1 Drafting

More information

The Macro Quallty Assurance System for Fire Safety Engineering

The Macro Quallty Assurance System for Fire Safety Engineering VIEWPOINT The Macro Quallty Assurance System for Fire Safety Engineering Xuefeng Xiao, Eric Marcha-nt, and Alan Griß'th Xiao and Marchant are with the Unit of Fite Safety Engineering at the University

More information

Coatings for protection of FRP structures with heavy rain erosion loads

Coatings for protection of FRP structures with heavy rain erosion loads CLASS PROGRAMME Type approval DNVGL-CP-0424 Edition May 2016 Coatings for protection of FRP structures with heavy rain erosion loads The content of this service document is the subject of intellectual

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC/TS 62647-21 Edition 1.0 2013-07 Process management for avionics Aerospace and defence electronic systems containing lead-free solder Part 21: Program management Systems engineering

More information

IEC an aid to COMAH and Safety Case Regulations compliance

IEC an aid to COMAH and Safety Case Regulations compliance IEC 61511 an aid to COMAH and Safety Case Regulations compliance C R Timms, Director, C&C Technical Support Services Limited INTRODUCTION There are specific safety related regulations for the UK offshore

More information

AS/NZS :2008

AS/NZS :2008 AS/NZS 60079.29.2:2008 Australian/New Zealand Standard Explosive atmospheres Part 29.2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen AS/NZS 60079.29.2:2008

More information

GK/GN0612. Guidance on Signalling Lockout Systems to Protect Railway. Undertaking Personnel. Railway Group Guidance for GK/RT0212.

GK/GN0612. Guidance on Signalling Lockout Systems to Protect Railway. Undertaking Personnel. Railway Group Guidance for GK/RT0212. GN Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2007 Rail Safety and Standards Board Limited GK/GN0612 Issue One: August 2007 Railway Group Guidance

More information

Overview of Emerging Safety Standards Machinery Sector By Phill Carroll Business Development Manager Topics Historical Situation Introduction of New Standards Terminology Safety Integrity identification

More information

IEC61511 Standard Overview

IEC61511 Standard Overview IEC61511 Standard Overview Andre Kneisel Instrumentation Engineer Chevron C.T. Refinery SAFA Symposium 2011 August 5 th, 2011 Presentation Overview Provide some understanding of the key aspects of Functional

More information

GASTEC QA. Approval Requirements 15. for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas. KE 15 January 2012

GASTEC QA. Approval Requirements 15. for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas. KE 15 January 2012 KE 15 January 2012 GASTEC QA Approval Requirements 15 for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas Foreword These GASTEC QA Approval requirements have been

More information

Procedure for the Approval of New Fire Detection and Alarm Technologies

Procedure for the Approval of New Fire Detection and Alarm Technologies VdS Guidelines for Automatic Fire Detection and Fire Alarm Systems VdS 3469en Procedure for the Approval of New Fire Detection and Alarm Technologies VdS 3469en : 2016-01 (01) Publisher and publishing

More information

Cable Ties JULY The electronic pdf version of this document found through is the officially binding version

Cable Ties JULY The electronic pdf version of this document found through  is the officially binding version p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-E012 Cable

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60335-2-13 Edition 6.0 2009-12 Household and similar electrical appliances Safety Part 2-13: Particular requirements for deep fat fryers, frying pans and similar appliances INTERNATIONAL

More information

GROUNDING AVOIDANCE SYSTEM (GAS)

GROUNDING AVOIDANCE SYSTEM (GAS) STANDARD FOR CERTIFICATION No. 2.9 GROUNDING AVOIDANCE SYSTEM (GAS) JANUARY 2003 Veritasveien 1, N-1322 Høvik, Norway Tel.: +47 67 57 99 00 Fax: +47 67 57 99 11 FOREWORD is an autonomous and independent

More information

The new Gas Appliances Regulation (EU) 2016/426

The new Gas Appliances Regulation (EU) 2016/426 The new Gas Appliances Regulation (EU) 2016/426 Background and overview A Whitepaper What is happening? As of 21 April 2018, the Gas Appliances Directive 2009/142/EC (GAD) will be replaced by the new Gas

More information

Baseline Data Required for AS

Baseline Data Required for AS Baseline Data Required for AS 1851-2012 Name: Brett Dundules Position: Technical Officer Organisation Fire Protection Association Australia Introduction Brief History of AS 1851-2012 Introduction of Baseline

More information

Fire and gas safety systems:

Fire and gas safety systems: 26 Functional safety Fire and gas safety systems: Conquering the complexities of functional safety products and systems certifications Owners and operators of hazardous processes need their fire and gas

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard LPS 1500: Issue 2.1 provide compartmentation in buildings This standard defines the requirements for companies installing fire resisting compartment systems approved by LPCB to

More information

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034 Guidance Note No 21/1 CE Marking Windows and doorsets to BS EN 16034 Introduction CE Marking of construction products has been a legal requirement since July 2013. It is a European requirement for all

More information

Health and Safety Documents in connection with offshore oil and gas operations

Health and Safety Documents in connection with offshore oil and gas operations Health and Safety Documents in connection with offshore oil and gas operations DWEA guideline 65.1.13 January 2017 The most important rules on Health and Safety Documents for installations with connected

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 21 0800 - COMMISSIONING OF FIRE SUPPRESSION SYSTEMS GENERAL 1.1 SUMMARY General 1. Work under this contract shall meet the requirements of Division 01, General Requirements, Conditions of Contract,

More information

(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland

(1135/2016) Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland Translation from Finnish Legally binding only in Finnish and Swedish Ministry of Economic Affairs and Employment, Finland Electrical Safety Act (1135/2016) By decision of Parliament, the following is enacted:

More information

This is a preview - click here to buy the full publication

This is a preview - click here to buy the full publication TECHNICAL REPORT IEC/TR 62267-2 Edition 1.0 2011-03 Railway applications Automated urban guided transport (AUGT) Safety requirements Part 2: Hazard analysis at top system level INTERNATIONAL ELECTROTECHNICAL

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60335-2-30 Edition 5.0 2009-11 Household and similar electrical appliances Safety Part 2-30: Particular requirements for room heaters INTERNATIONAL ELECTROTECHNICAL COMMISSION

More information

BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION EXECUTIVE SUMMARY

BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION EXECUTIVE SUMMARY BUSINESS PLAN CEN/TC 305 POTENTIALLY EXPLOSIVE ATMOSPHERES EXPLOSION PREVENTION AND PROTECTION CEN/TC 305 Business Plan Page: 1 Business environment, benefits and priorities EXECUTIVE SUMMARY CEN/TC 305

More information

Valve Manufacturers Association of America

Valve Manufacturers Association of America BUSINESS ASSURANCE Valve Manufacturers Association of America 2016 Technical Seminar: EU s New Legislation Framework (NLF) - What this means to you. Mike Norman 1 VMA Technical Session - March 2016 SAFER,

More information

AS/NZS 4745:2012. Code of practice for handling combustible dusts AS/NZS 4745:2012. Australian/New Zealand Standard. Superseding AS/NZS 4745:2004

AS/NZS 4745:2012. Code of practice for handling combustible dusts AS/NZS 4745:2012. Australian/New Zealand Standard. Superseding AS/NZS 4745:2004 AS/NZS 4745:2012 (Incorporating Amendment No. 1) Australian/New Zealand Standard Code of practice for handling combustible dusts Superseding AS/NZS 4745:2004 AS/NZS 4745:2012 AS/NZS 4745:2012 This Joint

More information

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) TESTING STANDARD

ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) TESTING STANDARD Planning and Capability Group Mechanical and Electrical Services ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS (EEHA) Document No.: VERSION 1 REVISION 3 AUGUST 2014 FOREWORD Electrical Equipment in Hazardous

More information

Implementation Guidance for ISO 9001:2008

Implementation Guidance for ISO 9001:2008 Document: ISO/TC 176/SC 2/N 836 Our ref Secretariat of ISO/TC 176/SC 2 Date: 15 October 2008 Implementation Guidance for ISO 9001:2008 CONTENTS 1.0 INTRODUCTION 2.0 BACKGROUND ON ISO 9001:2008 REVISION

More information

GAS SAFETY Information Bulletin

GAS SAFETY Information Bulletin GAS SAFETY Information Bulletin June 2016 G-02-13 [Rev1] Page 1 of 6 (File number 16090-G01) ENGINEERED DESIGNS FOR SITE SPECIFIC GAS-FIRED PROCESS EQUIPMENT This bulletin has been jointly developed by

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61784-5-14 Edition 1.0 2010-07 colour inside Industrial communication networks Profiles Part 5-14: Installation of fieldbuses Installation profiles for CPF 14 IEC 61784-5-14:2010(E)

More information

Guidelines for designating and monitoring notified bodies in Norway

Guidelines for designating and monitoring notified bodies in Norway Guidelines for designating and monitoring notified bodies in Norway Version 13.12.2010 The Ministry of Trade and Industry has also prepared a Norwegian version of these guidelines. Questions may be directed

More information

AS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009

AS/NZS :2009. Performance of household electrical appliances Refrigerating appliances AS/NZS :2009 AS/NZS 4474.2:2009 (Incorporating Amendment Nos 1 and 2) Australian/New Zealand Standard Performance of household electrical appliances Refrigerating appliances Part 2: Energy labelling and minimum energy

More information

The New EMC Directive 2004/108/EC

The New EMC Directive 2004/108/EC The New EMC Directive 2004/108/EC In the process of the review I have tried to spell out in words what is often referred to as a section number. This helps reduce the need to flip pages as one reads this.

More information

FAQs Radio Equipment Directive (RE-D)

FAQs Radio Equipment Directive (RE-D) FAQs Radio Equipment Directive (RE-D) What is the objective of the RE-D? The Radio Equipment Directive (2014/53/EU) was adopted in 2014 and Member States had to transpose it into their national law before

More information