2 FBC All low-voltage system main or branch circuits entering or exiting the structure shall have surge suppressors installed for each pair of conductors and shall have visual indication for protector failure to the maximum extent feasible.
3 Does this mean TVSS must be at the device? Can TVSS be at panel serving the device? AHCA Interpretation: TVSS at Panel to be used. Maintain lead lengths per manufacturer s requirements. This would apply to: Rooftop AHU, exhaust fans, exterior lighting, exterior receptacles, exterior pumps, etc. Low voltage systems would include fire alarm, telephone system, network cabling, etc.
4 NFPA Boxes, conduit bodies, and handhole enclosures shall be installed so that the wiring contained in them can be rendered accessible without removing any part of the building or, in underground circuits, without excavating sidewalks, paving, earth, or other substance that is to be used to establish the finished grade.
5 Interpretation from Health Guidelines Revision Committee (FGI) Trough can be used. AHCA Interpretation: Trough can be used. Trough cover to be flush with floor. Flooring to be sealed at trough.
6 From new 2012, NFPA 99 - not in effect yet but once adopted Operating rooms shall be considered to be a wet location, unless a risk assessment conducted by the health care governing body determines otherwise. Who is health care governing body AHCA Interpretation Hospital s risk management group
7 Normal and Critical Power still required in OR per NEC Isolated Power Panel cannot serve multiple rooms per NEC (4) So A normal and critical isolation panel will be required in each OR Exception: Two critical isolation panels (from separate ATS can be used) see NEC Exception 2
8 Air movement is required on Equipment System Power per NEC for some areas: The following equipment shall be permitted to be arranged for delayed connection to the alternate power source: (6) Supply, return, and exhaust ventilating systems for airborne infectious/isolation rooms, protective environment rooms, exhaust fans for laboratory fume hoods, nuclear medicine areas where radioactive material is used, ethylene oxide evacuation, and anesthesia evacuation. Where delayed automatic connection is not appropriate, such ventilation systems shall be permitted to be placed on the critical branch. (7) Supply, return, and exhaust ventilating systems for operating and delivery rooms.
9 Heating is required on Equipment system power in some areas per NEC : The following equipment shall be permitted to be arranged for either delayed automatic or manual connection to the alternate power source: (1) Heating equipment to provide heating for operating, delivery, labor, recovery, intensive care, coronary care, nurseries, infection/isolation rooms, emergency treatment spaces, and general patient rooms and pressure maintenance (jockey or makeup) pump(s) for water-based fire protection systems. Exceptions where design day temp is higher than 20 deg F
10 These codes require ventilation and heat. What about air conditioning: FBC As determined by the facility these selected HVAC systems and their associated support equipment such as control air compressor essential to the maintenance of the occupied patient and patient support area(s) shall receive their power from the emergency power supply system(s). So Talk with Hospital Where is air conditioning required for operation of hospital?
11 Life Safety or Equipment System Power? NEC (H) use LS power for auto doors used for building egress NEC (B) (5) use EQ power for auto doors AHCA Interpretation: As all doors affect egress, use LS power for all auto doors
12 Per FGI Min. inside dimension of 12 x 14 No more size exceptions from AHCA Mechanical & Electrical equipment/fixtures not related to support of room shall not pass through Circuits serving rooms shall be dedicated to room Reliable cooling required (emergency power) Be careful of location Try to avoid elec rooms as conduits cannot pass through the room
13 FBC Where additions are constructed to existing buildings, the existing building s lightning protection system, if connected to the new lightning protection system, shall be inspected and brought into compliance with current standards. For Addition projects, Must meet this if you connect new LPS to existing system, or Provide independent LPS for new building addition
14 There are many issues with using Power Strips in OR environment: Loss of load control (too much equipment on one circuit) Circumvents FBC circuiting requirements (no more than 2 receptacles/circuit) Loss of redundant grounding in Critical Care area Affects access to patient Creates a trip hazard
15 Power strips should not be used in the OR See NFPA 99, (6) The attachment plug (for equipment) shall be inserted only in a fixed approved receptacle This is an issue AHCA is reviewing in more detail.
16 For now, follow CMS Requirements: Power strips may not be used as a substitute for adequate electrical outlets in a facility. Power strips may be used for a computer, monitor, and printer. Power strips are not designed to be used with medical devices in patient care areas. Precautions needed if power strips are used include: installing internal ground fault and over-current protection devices; preventing cords from becoming tripping hazards; and using power strips that are adequate for the number and types of devices used. Overload on any circuit can potentially cause overheating and fire.
17 Radiology wiring separation Separation among wiring still required in troughs, conduits, etc. to the equipment 300V vs. 600V vs. 30V vs. Class 2 wire, etc. Don t let vendor tell you it s listed to be together Where necessary, use of rated sleeve material can be used to separate wiring as needed
18 NRTL Listings needed on equipment Nationally Recognized Testing Laboratory Program See CE is not an NRTL Class 1 vs. Class 2 wiring Class 1 circuits need overcurrent protection; same wiring requirements as power circuits Class 2 circuits no external overcurrent protection needed Class 1 and Class 2 wiring must be separated from each other and from power wiring
19 All receptacles shall have engraved cover plates to indicate the panel board and circuit numbers powering the device Branch circuit over-current devices shall be readily accessible to nursing staff and other authorized personnel The electrical system shall have coordinated short circuit protection.
20 Fire Alarm Systems. A fire alarm annunciator panel shall be provided at a 24-hour monitored location. The panel shall indicate the zone of actuation of the alarm, and there shall be a trouble signal indicator. Each smoke compartment shall be annunciated as a separate fire alarm zone. A fire alarm system zone shall not include rooms or spaces in other smoke compartments and shall be limited to a maximum area of 22,500 square feet (2,090 sm) Transfer switch contacts shall be of the open type and shall be accessible for inspection and replacement.
21 All low-voltage system main or branch circuits entering or exiting the structure shall have surge suppressors installed for each pair of conductors and shall have visual indication for protector failure to the maximum extent feasible Electric lighting required to provide care and service to the patient occupied areas and the necessary patient support areas shall be connected to the essential electrical system.
22 All panel boards, transfer switches, disconnect switches, enclosed circuit breakers or emergency system raceway systems required to support the occupied patient area(s), patient support area(s) or support utilities shall be contained within a protected area(s) designed and constructed to meet the structural requirements of the code and debris impact requirements of Sections through , and shall not rely on systems or devices outside of this protected area(s) for their reliability or continuation of service. The equipment system shall be kept entirely independent of all other wiring and equipment and shall not enter the same raceways, boxes, or cabinets with other wiring.
23 If the facility does not have a permanent onsite optional stand-by generator to operate the normal branch electrical system, there shall be a permanently installed predesigned electrical service entry for the normal branch electrical system that will allow a quick connection to a temporary electrical generator. This quick connection shall be installed inside of a permanent metal enclosure rated for this purpose and may be located on the exterior of the building.
Element D Services Electrical ODG010107
Element D Services Electrical ODG010107 D5090 Other Electrical Systems Part 1. General This section includes design standards and requirements for other electrical systems. This is a design standard and
More informationIn the Eye of the Beholder: Electrical Codes from the View of the AHJ and the Designer
Humanizing Health Care Environments 10/17/17 In the Eye of the Beholder: Electrical Codes from the View of the AHJ and the Designer Alex Masterton Professional Engineer II Office of Plans & Construction
More informationNFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,
NFPA CODE TESTING & INSPECTION Requirements & Recommendations for Licensed Florida Hospitals, Ambulatory Surgery Centers, ICF/IID Healthcare, & In-patient Hospice Facilities per NFPA Life Safety Code 101
More informationELECTRICAL REQUIREMENTS FOR HEALTH CARE FACILITIES
ELECTRICAL REQUIREMENTS FOR HEALTH CARE FACILITIES Review Guide for: Hospitals Nursing Facilities Clinics Office of Statewide Health Planning and Development Facilities Development Division www.oshpd.ca.gov
More informationNEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015
NEC Requirements for Standby Power Systems New England Building Officials Education Association Annual Conference October 5, 2015 Emergency & Standby Power Systems Alternative power sources are utilized
More informationSECTION ISOLATED POWER SYSTEMS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to
More informationChapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...
Article 90 Introduction...1 90.1 Purpose of the NEC...1 90.2 Scope of the NEC...2 90.3 Code Arrangement...4 90.4 Enforcement...5 90.5 Mandatory Requirements and Explanatory Material...6 90.6 Formal Interpretations...6
More informationElement Z General Design Requirements Existing Facilities Information
PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and Element Z for technical
More informationSECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationEC EP 14 All other electrical K-920 equipment in patient care vicinity NFPA , Chapter 10
MSL Healthcare Partners, Inc. Wild Card EPs Paraphrase K-tag # EC.02.04.03 EP 14 All other electrical K-920 equipment in patient care vicinity NFPA 992012, Chapter 10 K-924 K-928 K-931 K-tag Description
More informationElement Z General Design Requirements Existing Facilities Information
Charles M. LeMaistre PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G and
More informationNFPA 99 for Facility Managers
NFPA 99 for Facility Managers Application to Existing Facilities October 13, 2015 Jonathan Hart: Senior Fire Protection Engineer Learning Objectives Review the layout of NFPA 99 Understand the application
More informationELECTRIC and NEON SIGN STANDARDS. By Randy Wright RKW CONSULTING
SEMINAR 301 Part 1: Changes in the 2005 NEC SEMINAR RULES: There are no Rules All Questions need to be asked Stop at any time for an explanation SEMINAR PARTS: ELECTRIC and NEON SIGN STANDARDS By Randy
More informationDavid Stymiest, PE, CHFM, CHSP, FASHE cell Copyright 2014, Smith Seckman Reid, Inc.; All rights reserved
AHCA 2014 Fall Conference Changes in Emergency Power Codes & Standards David Stymiest, PE, CHFM, CHSP, FASHE DStymiest@ssr-inc.com, cell 504.232.1113 Copyright 2014, Smith Seckman Reid, Inc.; All rights
More informationGARCIA GALUSKA DESOUSA Consulting Engineers
L#57297 /Page 1/July 21, 2017 ELECTRICAL SYSTEMS NARRATIVE REPORT The following is the Electrical Systems narrative, which defines the scope of work and capacities of the Power and Lighting systems, as
More informationThe Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99
The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99 Sharon S. Gilyeat, P.E. Lauren Schrumpf August 8, 2018 Expertly Engineering
More informationPrepublication New Text Jan 2018 Changes to Environment of Care and Life Safety Chapters
Prepublication New Text Jan 2018 Changes to Environment of Care and Life Safety Chapters EC.01.01.01 EP3 Related to Life Safety Code Updates Hospital (HAP) Accreditation Program The hospital has a library
More informationORDINANCE NO
ORDINANCE NO. 2017-08-031 AN ORDINANCE OF THE CITY OF LANCASTER, TEXAS, REPEALING THE NATIONAL ELECTRICAL CODE 2014 EDITION IN ITS ENTIRETY AND REPLACING IT WITH THE ADOPTION OF THE NATIONAL ELECTRICAL
More informationNFPA Edition Review
This is a photographic template your photograph should fit precisely within this rectangle. NFPA 70 & 99 How Recent Code Changes Effect Healthcare Facilities Sam C. Terry, P.E. Application Engineer Eaton
More informationNATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY
A new twist on the National Electrical Code - a practical application workshop. If you sign up in this class, prepare to work! Day 1: Fundamentals of OSHA requirements for performing electrical work -
More informationSECTION ENCLOSED CONTROLLERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes ac,
More information16620 EMERGENCY POWER SYSTEMS
16620 EMERGENCY POWER SYSTEMS PART 1: GENERAL 1.01 SUMMARY A. This Section provides the University guidelines for the installation of Emergency Power Systems. B. This standard is developed primarily to
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between //--// if not applicable to project. Also, delete any other item or paragraph
More informationSECTION AUTOMATIC TRANSFER SWITCHES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 36 23 This section specifies the furnishing, complete installation, and connection of automatic transfer switches. 1.2 RELATED WORK A. Section 14 21 00, ELECTRIC
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018
SECTION 26 2913 - ENCLOSED CONTROLLERS GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. FLUORESCENT STRIP LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. WALL BRACKET FLUORESCENT
More informationPRINTED: 06/09/2017 FORM APPROVED CENTERS FOR MEDICARE & MEDICAID SERVICES OMB NO (X2) MULTIPLE CONSTRUCTION A. BUILDING 03 - A BUILDING
SUMMARY PROVER'S PLAN OF CORRECTION K 000 INITIAL COMMENTS K 000 A Life Safety Code Survey was conducted by the State Fire Marshal beginning on May 9th, 2017 and ending on May 10th, 2017. Adair Acute Care
More informationPDH & Professional Training
510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 PDH & Professional Training PDH Storm, by Engineers Edge, LLC An Introduction to HVAC Systems for Medical Facilities J. Paul
More informationPublic Safety in the Healthcare Facility
CABMET Study Group Public Safety in the Healthcare Facility Matt Baretich Baretich Engineering Fort Collins, Colorado mfb@baretich.com Slide 1 Public Safety: 15% of CBET Exam Electrical Chemical Radiation
More informationFIRE ALARM: BY OTHERS, IF REQUIRED.
x x x x x x OS LIGHTING S FLUORESCENT LIGHT FIXTURE, SEE LIGHT FIXTURE SCHEDULE FOR SIZE AND MOUNTING. CAPITAL LETTER DENOTES TYPE, LOWER CASE LETTER DENOTES SWITCH LEG. FLUORESCENT STRIP LIGHT FIXTURE,
More informationTABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51
TABLE OF CONTENTS About This Textbook...xi How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More information9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.
Chapter 1 GROUNDING AND BONDING 1 Proper grounding practices protect people from the hazards of electric shock and ensure the correct operation of overcurrent protection devices. Grounding is the intentional
More information2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.
2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge. Exception: Manual fire alarm boxes are not required where the building is
More informationVACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES
Part One General 1.01 Scope A. It is the intent of this specification to provide a medium voltage automatic transfer system. B. All components, testing and services specified and required for a complete
More informationSECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.
SECTION 26 0553 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electrical identification requirements. B. Identification nameplates and labels. C. Wire and cable markers. D. Voltage markers. E. Underground warning
More informationSECTION EXTERIOR LIGHTING
SECTION 26 56 00 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of exterior luminaries, controls, poles and supports. 1.2 RELATED WORK A. Section 26
More informationTONY ESPOSITO LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY
LIGHTING/ELECTRICAL TECHNICAL REPORT II SEPTEMBER 15, 2011 HUNTER S POINT SOUTH INTERMEDIATE SCHOOL AND HIGH SCHOOL QUEENS, NY 1 1A. POWER DISTRIBUTION SYSTEMS a. EXECUTIVE SUMMARY b. SUMMARY DESCRIPTION
More informationFirst Aspen Federal Regulation Set: K LSC 2000 Health Existing
First Aspen Federal Regulation Set: K 01.01 LSC 2000 Health Existing K 0000 Title CFR Type INITIAL COMMENTS Memo K 0011 If the building has a common wall with a nonconforming building, the common wall
More informationAgency for Health Care Administration. Eddie Alday Life Safety Code Lead 30 th AHCA Seminar 23 September 2014
Agency for Health Care Administration Eddie Alday Life Safety Code Lead 30 th AHCA Seminar 23 September 2014 CMS S&C Letter Interpretation CMS- S&C: 13-58-LSC Dated: 08/30/2013 Several Categorical LSC
More informationNORTH CAROLINA. Downloaded (l) For each nursing unit, or fraction thereof on each floor, the following shall be provided:
Housekeeping/Laundry/Maintenance NORTH CAROLINA Downloaded 01.15.11 (l) For each nursing unit, or fraction thereof on each floor, the following shall be provided: (3) a soiled utility room with counter,
More informationDemystifying Power Tap Use in Healthcare Settings John Garbarino Sr. Marketing Manager, Commercial/Industrial Leviton Manufacturing Co.
Demystifying Power Tap Use in Healthcare Settings John Garbarino Sr. Marketing Manager, Commercial/Industrial Leviton Manufacturing Co. Product Safety Standards Nationally Recognized Testing Laboratory
More informationSchool Fire Safety Checklist
Community Risk Reduction The (SFSC) includes many of the most common fire prevention and life safety issues found in schools. The SFSC is not intended to be an all inclusive list, but rather highlights
More informationMachinery Room Electrical Best Practices
Machinery Room Electrical Best Practices Brad Heeres Angus-Young Associates February 8, 2007 Understand and comply with applicable codes and standards The National Electrical Code requirements for a safe
More informationBuilding Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS
BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used
More informationNFPA Changes
Chapter 12, Circuits and Pathways Summary. Chapter 12, Circuits and Pathways, is a new chapter. It brings together requirements that were formerly found in SIG-FUN, Fundamentals of Fire Alarm Systems regarding
More informationCONNECTICUT. Downloaded
Housekeeping/Laundry/Maintenance J. Laundry. CONNECTICUT Downloaded 01.15.11 (1) This service, if provided, shall be used exclusively for laundry and shall be remote from resident and food service areas,
More informationIs the address of your property clearly visible and marked in large numbers that can be easily seen from the street?
PRE-INSPECTION CHECKLIST THE FOLLOWING INFORMATION IS PROVIDED TO YOU TO ASSIST YOUR FACILITY IN BECOMING COMPLIANT WITH THE NEW YORK STATE FIRE CODE, LOCAL LAWS, AND ORDINANCES GOVERNING THE TOWN OF BABYLON.
More informationSECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)
SECTION 26 05 21 PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing, installation, and connection of the low voltage power and lighting wiring. 1.2 RELATED WORK A. Excavation and backfill
More information27th Annual AHCA Seminar
27th Annual AHCA Seminar NFPA 99 2012 Edition Overview and Discussion Presented by James Peterkin, PE Sr. Fire Protection Engineer Heery International Monday September 26, 2011 Disclaimer Not Speaking
More informationNFPA 101 Code Update from 2012 Edition to the 2015 Edition
NFPA 101 Code Update from 2012 Edition to the 2015 Edition Presented by: Gary Furdell AHCA Fire Protection Specialist 1 2 2012 Update to 2015 Chapter 18 New Health Care Occupancies 4 18.1.3.2 Atrium walls
More informationB. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).
SECTION 28 13 00 - ACCESS CONTROL PART I - GENERAL 1.1 SUMMARY A. This specification section describes the furnishing, installation, commissioning, and programming of a complete, turnkey, hardwired Andover
More informationCHAPTER 20 SERVICE EQUIPMENT
SERVICE EQUIPMENT CHAPTER 20 SERVICE EQUIPMENT Service equipment includes service cabinets and the equipment and materials necessary for installation. 20.1 Signal Service Cabinet For MnDOT traffic control
More informationSECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL
SECTION 16400 AUTOMATIC TRANSFER SWITCHES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General Conditions and Division 1 Specification sections, apply
More informationCommon Building Code Misinterpretations
Common Building Code Misinterpretations Presented by: Ron Melucci, P.E. Technical Manager, FP Division Engineering Planning and Management, Inc. rbm@epm inc.com www.epm inc.com 508 875 2121 Engineering
More informationFire Alarm Wiring. Circuit types, styles and limitations
Fire Alarm Wiring Circuit types, styles and limitations What we will cover Types Classes Notification Appliance Circuits (NAC) Initiating Device Circuits (IDC) Signaling Line Circuits (SLC) Class A, B,
More informationNational Electrical Code
National Electrical Code 409.30 Disconnecting Means Disconnecting means that supply motor loads shall comply with Part IX of Article 30. 410.81 Control (A) Disconnection Luminaires (fixtures) or lamp installation
More informationCHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017
CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017 The City of Portsmouth adopts the State Building Code, which adopts by reference The National Electrical Code, 2017(NEC), as Chapter 15, Part IV, of the
More informationBrown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA
PART 1 - GENERAL 1.1 Background SECTION 26 00 10- ELECTRICAL DESIGN CRITERIA A. Brown University maintains it own campus electrical distribution system which serves the majority of the buildings and facilities
More informationTABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19
TABLE OF CONTENTS About This Textbook...xiii How to Use the National Electrical Code... 1 Article 90 Introduction to the National Electrical Code... 7 90.1 Purpose of the NEC... 7 90.2 Scope of the NEC...
More informationThe following information shall become and form part of the contract documents.
October 4, 206 To: Attention: Re: All Bidders All Bidders JCBE Gymnasium HVAC Upgrades BC#: 206433 Edmonds Project No.: BHM6090 All bidders, The following information shall become and form part of the
More informationEmployee Health Protection
Osha Self-Inspection Checklist for General Industry General Is there a copy of the Maryland Occupational Safety and Health Law in your place of business, and is it accessible to all employees? Is the "MOSH
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Workforce Development ELECTRICAL BULLETIN 2011-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 6 Provincial Chief Electrical Inspector Date: January 5,2011
More informationChanges to Environment of Care, Equipment Management, and Life Safety Chapters Related to Life Safety Code Updates
Issued September 20, 2017 Changes to Environment of Care, Equipment Management, and Life Safety Chapters Related to Life Safety Code Updates Environment of Care (EC) Chapter Home Care (OME) Accreditation
More informationChapter 1 General... 5
About This Textbook...xi About the National Electrical Code...xv About the Authors and Illustrator...xix About the Team...xxi Article 90 Introduction to the National Electrical Code... 1 90.1 Purpose of
More informationFacility Manager Training
Joint Base Elmendorf-Richardson I n t e g r i t y - S e r v i c e - E x c e l l e n c e Facility Manager Training OVERVIEW Fire Safety Deficiencies Facility Manager Responsibilities Fire Prevention Folder
More informationSECTION INSPECTION AND TESTING OF WORK
SECTION 01455 PART I - GENERAL 1.01 SECTION INCLUDES A. Project Inspections and Procedures B. Scheduling Inspectors Notification requirements 1.02 RELATED SECTIONS A. Section 01310 COORDINATION B. Section
More informationGPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators
GPS 140 NEC Requirements for Generators WHAT YOU WILL LEARN NEC requirements for on-site power generation. Recent events have created increased interest in standby power This module organizes NEC requirements
More informationICC CODE CORNER 2015 International Fire Code
PART II GENERAL SAFETY PROVISIONS CHAPTER 4 EMERGENCY PLANNING AND PREPAREDNESS SECTION 401 GENERAL 401.1 Scope. Reporting of emergencies, coordination with emergency response forces, emergency plans and
More informationCompliance w/ the 2012 Life Safety Code
Compliance w/ the 2012 Life Safety Code Implications of the 2012 NFPA Code Set for Existing & New ASCs William E. Lindeman, AIA http://www.weldesigns.com Financial Interest Disclosure The presenter provides
More informationAre there any policies regarding outlets that contain USB ports?
Answers to the Questions Mark J. Blackburn, P.E., CFPS February, 2016 Question 1 Are there any policies regarding outlets that contain USB ports? There is no direct reference in code about these types
More informationRenovation Program. Renovation Program GENERAL
Renovation Program GENERAL This program provides guidance and protocols for renovation projects in occupied, operational acute hospitals. Team building is essential to quality control and HFD Services
More informationSECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Nameplates and labels B. Wire and cable markers C. Conduit markers 1.2 REFERENCES A. NFPA 70 - National Electrical
More informationSECTION 907 FIRE ALARM AND DETECTION SYSTEMS
SECTION 907 FIRE ALARM AND DETECTION SYSTEMS 907.1 General. This section covers the application, installation, performance and maintenance of fire alarm systems and their components in new and existing
More informationMOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School
MOUNT PLEASANT MIDDLE SCHOOL HVAC M-01 Heating Plant: The existing boilers have recently been upgraded. (3) steam boilers (8660 mbh each) manufactured by Weil- McLain have been installed. Newer hot water
More informationCITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST
CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant Phone
More informationEnclosure 4- RISK ASSESSMENT
Enclosure 4- RISK ASSESSMENT RISK ASSESSMENT Risk is a potential that a chosen action or activity will lead to a loss of human or property. Risk assessment is a step for Risk Management. Risk assessment
More informationTHE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #5
THE 2012 EDITION OF THE LIFE SAFETY CODE HOSPITAL EDITION SESSION #5 AGENDA: Ambulatory Health Care & Business Occupancies Definitions / Examples Mixed & Contiguous Occupancies Ambulatory Health Care &
More informationInformational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017
Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017 It has come to the attention of the electrical authorities having jurisdiction (AHJs) at the DOE sites there is inconsistency
More informationBuilding Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1
Building Codes & Standards for Healthcare Building Codes and Standards AHJs Codes Defend in Place Walls Sprinklers Fire Alarm Important Dates for Healthcare Facilities 7/5/16 NFPA Life Safety Code 101
More informationIEC and NCCER Mapping for Year 1
Craft: 26102-14 Safety IEC and NCCER Mapping for Year 1 Perform a visual inspection on various types of ladders 102.4 STATE GENERAL SAFETY CONSIDERATIONS IN ELECTRICAL INSTALLATIONS (LADDER SAFETY, SLECTION
More informationB. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
More informationMichigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013
Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013 1. Is a standard wire-nut approved for a wet location as in an outside j-box? Is there a listed
More informationElectrical Safety Requirements
Electrical Safety Requirements Purpose This document defines the minimum required control measures to reduce the risk of injury or illness related to electricity. Scope Applicable to all Coca-Cola system
More informationEMERGENCY POWER SYSTEMS
263213 EMERGENCY POWER SYSTEMS PART 1: GENERAL 1.01 SUMMARY A. Section includes: 1. University guidelines for the installation of Emergency Power Systems (EPS). 2. Addresses the design and installation
More informationPLAN REVIEW SUBMITTAL GUIDE
PLAN REVIEW SUBMITTAL GUIDE Plans, specifications and other construction documentation for the initial plan review should be as complete as possible at the time of submittal. Use this convenient guide
More informationFire Alarm System Fundamentals
Fire Alarm System Fundamentals Mircom is the largest and oldest privately owned fire alarm and life safety manufacturer in North America and 5th largest overall with 50 years of industry experience. Mircom
More informationMetasys System Extended Architecture Smoke Control UL 864 UUKL Compliance
Metasys System Extended Architecture Smoke Control UL 864 UUKL Compliance Checklist Code No. LIT-1201754 Release 1.2 Issued February 10, 2005 Document Introduction.................................................
More informationSCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL
SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm
More informationState of North Carolina Department of Environment and Natural Resources Division of Waste Management. Safety and Risk Management Program
State of North Carolina Department of Environment and Natural Resources Division of Waste Management Safety and Risk Management Program Revised: January 5, 2015 FOREWORD This North Carolina Division of
More informationTABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2
Division 28 ELECTRONIC SAFETY AND SECURITY TABLE OF CONTENTS 28 0000 GENERAL... 2 A. DEFINITIONS...2 28 3111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2 A. DESIGN REQUIREMENTS...2 B. CONSTRUCTION REQUIREMENTS...2
More informationELECTRICAL POWER SYSTEMS
Scope The various Codes applicable to the University's electrical power system are mainly based upon a model of a single utility service, connected to a single premise. The University s electrical system,
More informationSubcontract Agreement No.
ATTACHMENT G TRADE INTERFACE AGREEMENT Subcontract Agreement No. PROJECT: TEXASTECH UNIVERSITY HEALTH SCIENCES CAMPUS, EL PASO, TEXAS MEDICAL SCIENCE BUILDING II PARTICIPANTS: Sundt Construction, Inc.
More informationINITIAL ELECTRICAL ASSESSMENT REPORT (EAR)
INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory C-13, South Badda, Gulshan-1, Badda, Dhaka Dhaka Dhaka 22 May 2014 The Alliance for Worker Safety Page 1/21 22 May 2014 Introduction to the Report The
More informationWritten Fire Safety Plans
Written Fire Safety Plans 2012 LSC KATHARINE ACHOR SEPTEMBER 2016 NFPA Standard: 2012 NFPA 101, 19.1.1.3.1 All health care facilities shall be designed, constructed, maintained, and operated to minimize
More informationFACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH)
FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH) Presented by: Alise Howlett, Assoc. AIA, CFPE, CHFM Standards Advisor, EM/PE/LS HFAP A better healthcare survey experience 1 FREQUENT
More informationGROUP SR SPECIAL (ASSISTED SELF-PRESERVATION) OCCUPANCIES
[B] APPENDIX SR GROUP SR SPECIAL (ASSISTED SELF-PRESERVATION) OCCUPANCIES The provisions contained in this appendix are adopted by the Building Codes Division of the State of Oregon. SECTION SR101 GENERAL
More informationKINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION
SECTION 237433, PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps
Note: The A/E must choose all design values in brackets below before using in project specifications 1 General 1.1 Provide UL listed and FM approved fire pump complete with pump, driver, controller and
More informationIMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016
IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS June 17th, 2016 RE: City Council Adopts 2014 National Electrical Code with Pool Alarm Requirements On April 25th, 2016 the
More informationAPPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL
This Appendix (2000 IRC Appendix-L) is produced, copyrighted, and maintained by the National Fire Protection Association Association, all rights reserved. Use of this Appendix is pursuant to license with
More information