1 City of Lawrence Environmental Management System (EMS) for Biosolids For more information contact: Jeanette Klamm (785)
2 Background NBP is an alliance of the National Association of Clean Water Associations (NACWA), Water Environment Federation (WEF), and Environmental Protection Agency (EPA). NBP Program Goals Advance environmentally sound and accepted biosolids management practices Gain public acceptance of biosolids
3 To help agencies like Lawrence achieve these goals, the NBP has developed several tools. Three important tools are: National Code of Good Practices National Manual of Good Practices Environmental Management System(EMS)
4 The Code of Good Practice A set of 10 principles and strategic biosolids industry goals that emphasis best practices, communication and the implementation of environmentally sound management practices. Examples: Agencies that follow the Code of Good Practice agree to develop contingency and emergency response plans for unanticipated events such as inclement weather, spills and equipment malfunctions.
5 Manual of Good Practice Designed to support agencies in the development of biosolids management programs and environmental management systems The Manual: - Links all processes that impact a biosolids management program - Recommendations to allow agencies to raise the bar relative to biosolids management - Highlights items that should be considered by biosolids management programs and during development of and EMS - Identifies sources of additional supporting information
6 Environmental Management Systems An EMS is a standardized and comprehensive framework that agencies can follow to assure that biosolids related activities are effectively managed. The remainder of the presentation focuses on environmental management systems.
7 A Biosolids EMS Promotes Four Key Outcomes Good Management Practices Ensure consistent product quality Better Regulatory Compliance Meet or exceed compliance with regulatory requirements Improved Relations with Interested Parties Establish and maintain credibility Better Environmental Performance Protect the environment for future generations
8 Agencies with an EMS commit to: An integrated approach to program management Going beyond simply meeting regulatory requirements A process of continual improvement Independent third party verification
9 What areas does an EMS address? An EMS must address 17 different areas of program operation. These areas fall into the following general categories: Policy Planning Implementation Measurement and Corrective Action Management Review
10 The 17 specific areas that an EMS covers are as follows: Development of an EMS documentation manual Biosolids management policy Critical control points Legal and other requirements Goals and objectives Public participation Roles and responsibilities Training Communication Emergency response and preparedness Documentation and document control Monitoring and measurement Nonconformances Biosolids management program performance reporting Internal auditing Management review
11 Wastewater collection and pretreatment When developing an EMS, agencies need to consider the entire biosolids value chain Wastewater treatment and solids generation Solids stabilization, conditioning and handling Solids storage and transportation Biosolids end use
12 NBP National EMS Demonstration Program Currently 80+ wastewater treatment facilities are participating in the program Facilities agree to develop and implement an EMS Facilities agree to provide feedback to NBP that can be used to fine tune EMS tools NBP provides support and guidance City of Lawrence is one of the initial 27 charter agencies for the EMS demonstration program.
13 Where is the City of Lawrence in the EMS Development Process? An EMS Manual has been developed that addresses all 17 EMS elements. The City conducted a joint EMS readiness assessment with NBP and CH2MHill (our EMS account executive assigned by the NBP). Currently operating under our EMS plan. We received an independent 3 rd party audit in September 2005, which verified our EMS program. The National Biosolids Partnership issued certification on October 12, 2005.
14 What Happens Next? We will continue to follow our EMS. We expect to fine tune the EMS as we gain some experience with our EMS. An interim audit will be scheduled for years 1 and 3. The City may receive approval to substitute internal audits for years 2 and 4. A full verification audit is required every 5 years.
15 City of Lawrence Department of Utilities For more information Visit the National Biosolids Partnership s website Contact Jeanette Klamm jklamm@ci.lawrence.ks.us (785) Utilities of Department Department City City of Lawrence Lawrence ecity of Lawrence Departm nt of Utilities
Integration of safety and security for effective control and protection of radioactive sources
Integration of safety and security for effective control and protection of radioactive sources International Conference on the Safety and Security of Radioactive Sources Ahmed Al Zaabi Overview 1. UAE
More informationVCA Guidance Note. Contents
Contents 1. Introduction... 2 2. Who can register a VCA?... 2 3. VCAs and sustainable development... 3 4. Verifying conservation performance... 4 4.1 Transparent, voluntary commitments... 4 4.2 Independent
More informationFIRA Technical Services. Suzie Radcliffe-Hart Technical Manager
FIRA Technical Services Suzie Radcliffe-Hart Technical Manager Primary roles Association Research and information Government lobbying Development of technical standards Product and process improvement
More informationCITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA
CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA Agenda Date: December 16, 2013 Action Required: Adoption of Resolution Presenter: Staff Contacts: Title: James E. Tolbert, AICP, Director of NDS James
More informationThis is a preview - click here to buy the full publication. IEC Quality Assessment System for Electronic Components (IECQ System)
QC 080000 Edition 3.0 2012-05 IECQ PUBLICATION IEC Quality Assessment System for Electronic Components (IECQ System) Hazardous Substance Process Management System Requirements (HSPM) INTERNATIONAL ELECTROTECHNICAL
More informationSUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:
Page 1 of Report PB-23-18 SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building Report Number: PB-23-18 Wards Affected: 2 File Numbers:
More informationPSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION
PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION KITSAP COUNTY COUNTYWIDE PLANNING POLICIES July 2, 2012 BACKGROUND A major emphasis of the Washington State Growth Management Act (GMA) is the need to
More informationEnclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary
Policy and Resources Committee 23 February 2017 Title Report of Wards Status Urgent Key Golders Green Station Draft Planning Brief Cath Shaw Commissioning Director - Growth & Development Interim Deputy
More informationTimber Guidelines. Our Products and Services
Timber Guidelines Our Products and Services Contact For further information please contact: corporateresponsibility@kingfisher.com Kingfisher plc 3 Sheldon Square, Paddington London W2 6PX +44 (0)20 7372
More informationCOMMISSION DELEGATED REGULATION (EU) /... of
EUROPEAN COMMISSION Brussels, 29.6.2017 C(2017) 4408 final COMMISSION DELEGATED REGULATION (EU) /... of 29.6.2017 amending Commission Delegated Regulation (EU) No 151/2013 of 19 December 2012 supplementing
More informationSupplier Handbook. InSinkErator st Street Racine, WI
Supplier Handbook InSinkErator 4700 21st Street Racine, WI 53406 262-554-5432 Table of Contents SECTION 1: Introduction... 2 1.1 InSinkErator... 2 1.2 InSinkErator Expectations for a Suppliers Quality
More informationAwarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734
Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734 2008 Qualifications and Curriculum Authority 2 Contents Introduction...4 Regulating external qualifications...4
More informationTECHNICAL INFORMATION BULLETIN. RISO, INC Waste Ink Guidelines
RISO, INC Waste Ink Guidelines Riso Kagaku Corporation and its global subsidiaries are dedicated to responsible environmental practices and believe that all who make, distribute, use and dispose of products
More informationJune 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited
June 2017 (Updated 18 January 2018) Fire Safety Policy Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited Trusted provider of quality homes, excellent landlord and support services,
More informationThe next frontier SWEDISH LIBRARY ASSOCIATION KENYA LIBRARY ASSOCIATION
The next frontier 2018 2020 SWEDISH LIBRARY ASSOCIATION KENYA LIBRARY ASSOCIATION Swedish Library Association Kenya Library Association, KLA P.O.Box 70380 P.O.Box 46031 107 24 Stockholm 00100 Nairobi Sweden
More informationENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE
ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE Russ Yurek, Maryland SHA July 20, 2015 AASHTO SOC Des Moines, IA Traditional Roadside Stewardship SHA Integrated Roadside Vegetation Management (IRVM)
More informationA global view of integrated closure and legacy planning
18 September 2013 A global view of integrated closure and legacy planning Mine Closure 2013, Eden Project, Cornwall Dr. William Adams General manager, Legacy and Closure A changing business climate The
More informationISO 9001:2015 TRANSITIONS
Copyright 2015 MAS Solutions LLC. All Rights Reserved. 1 ISO 9001:2015 TRANSITIONS Transition Strategies Copyright 2015 MAS Solutions LLC. All Rights Reserved. 2 TRANSITION STRATEGIES Andy Warhol, Butterfly,
More informationRegulatory Perspective for Fire Protection and Emergency Management at Nuclear Facilities in Canada
Regulatory Perspective for Fire Protection and Emergency Management at Nuclear Facilities in Canada Peter Elder, Vice-President and Chief Science Officer Canadian Nuclear Safety Commission 2 nd International
More informationENERGY STAR Testing. Pilot Verification Program for Selected ENERGY STAR Products. Richard Karney, P.E.
ENERGY STAR Testing The Parker Ranch installation in Hawaii Pilot Verification Program for Selected ENERGY STAR Products September 15, 2010 Richard Karney, P.E. Department of Energy Energy Efficiency and
More informationPERIODIC ELECTRICAL TESTING POLICY
PERIODIC ELECTRICAL TESTING POLICY Originator: Policy and Strategy Team Approval date: 19 July 2016 Review date: d July 2017 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health
More informationValue Paper Authors: Stuart Nunns CEng, BSc, FIET, FInstMC. Compliance to IEC means more than just Pfd!
Value Paper Authors: Stuart Nunns CEng, BSc, FIET, FInstMC Compliance to IEC 61508 means more than just Pfd! Compliance to IEC 61508 means more than just Pfd! Market environment Statistics relating to
More informationEmergency Response Plan
Emergency Response Plan Developing an Emergency Response Plan As a practice owner, you likely already have some form of an emergency response plan developed for your practice. Our desire here is to guide
More information3 Urban Design and the State Highway Network
NZ Transport Agency Page 1 of 14 Urban Design Professional Services Guide 1 Introduction This is a professional services guide on urban design, which provides direction to the NZ Transport Agency (NZTA)
More informationAtomic Energy Licensing Board
Atomic Energy Licensing Board MALAYSIA STRATEGIES ON MANAGEMENT OF DSRS ZUL HELMI BIN GHAZALI IAEA International Workshop on Sustainable Management of Disused Sealed Radioactive Sources Lisbon, Portugal,
More informationFire prevention and protection
Fire prevention and protection The Fire Service College With over 40 years experience, the Fire Service College is a leading organisation for fire prevention, protection and response, providing assessed,
More informationFire prevention and protection
Fire prevention and protection The Fire Service College With over 40 years experience, the Fire Service College is a leading organisation for fire prevention, protection and response, providing assessed,
More informationUnderstanding Passive Fire Protection
ASFP Response to Hackitt Report/Scottish Regulatory Review What is Passive Fire Protection and why is it important? Niall Rowan Chief Executive Officer Association for Specialist Fire Protection Contents
More informationRE: QUEENSLAND GOVERNMENT PLANNING POLICY REVIEW
Planning Group Department of Infrastructure, Local Government and Planning PO Box 15009 CITY EAST QLD 4002 Via email: planningpolicy@dilgp.qld.gov.au 9 February 2017 Dear Sir/ Madam, RE: QUEENSLAND GOVERNMENT
More informationPeriodic Electrical Testing Policy
Periodic Electrical Testing Policy Originator: Executive Management Team Approval Date: Policy and Strategy Team 18 July 2017 Review date: July 2018 1 Introduction 1.1 1.2 OVH treats the health and safety
More informationSupplier Handbook. InSinkErator st Street Racine, WI
Supplier Handbook InSinkErator 4700 21st Street Racine, WI 53406 262-554-5432 Table of Contents SECTION 1: Introduction... 2 1.1 InSinkErator... 2 1.2 InSinkErator Expectations for a Suppliers Quality
More informationTo: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard
SOCIAL ACCOUNTABILITY ACCREDITATION SERVICES To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard Background: After an
More informationImplementation Guidance for ISO 9001:2008
Document: ISO/TC 176/SC 2/N 836 Our ref Secretariat of ISO/TC 176/SC 2 Date: 15 October 2008 Implementation Guidance for ISO 9001:2008 CONTENTS 1.0 INTRODUCTION 2.0 BACKGROUND ON ISO 9001:2008 REVISION
More informationCO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE
CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 PPE-R/00.017 Version 2 RECOMMENDATION FOR USE Number of pages: 5 Approval stage : Approved on : Origin : Horizontal Committee, C2D Ad hoc group
More informationIFLA Strategic Plan
INTRODUCTION The role and position of libraries is rapidly changing to match the growing influence of the Internet, the digitisation of knowledge, and the expanding impact of online social networking tools.
More informationReport to: Development Services Committee Report Date: September 11, 2017
~RKHAM Report to: Development Services Committee Report Date: September 11, 2017 SUBJECT: PREPARED BY: Conceptual Master Plan for the Future Urban Area - Community Structure Plan and Key Policy Direction
More informationPractice Advisory 18: Fire safety design for tall buildings
Practice Advisory 18: Fire safety design for tall buildings It s important that reliable and resilient fire design features are used in the design of tall buildings. This advisory highlights the specific
More informationfor Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment
WALMART SUPPLIER FACTORY SAFETY ASSESSMENT OVERVIEW Wal-Mart Stores, Inc. ( Walmart ) engaged Bureau Veritas to conduct fire, building and electrical safety assessments at factories in Bangladesh designated
More information// Reform of the Land Use and Building Act in Finland. PowerPoint template 16:9
// Reform of the Land Use and Building Act in Finland PowerPoint template 16:9 Finnish land use planning system starting from 1 January 2000 National Land Use Guidelines Approved by the Council of State
More informationTOP R4 Unknown Operating State
TOP-004-2 R4 Unknown Operating State September 30, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Outline Requirement Language Study Outcomes and Limitations Self-Check
More informationFire FY Performance Plan
I. Mission Statement In partnership with our community, we will; Be prepared Respond quickly Solve problems Be nice Get home safely Fire II. Department Overview The Marin County Fire Department was established
More informationfor Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment
WALMART SUPPLIER FACTORY SAFETY ASSESSMENT OVERVIEW Wal-Mart Stores, Inc. ( Walmart ) engaged Bureau Veritas to conduct fire, building and electrical safety assessments at factories in Bangladesh designated
More informationRhode Island Shoreline Change Special Area Management Plan
Rhode Island Shoreline Change Special Area Management Plan Draft Document Outline REVISED 10/12/2017 VOLUME 1 Executive Summary & How to Use this Document (Draft by Dec 2017) 1. Introduction (Revised draft
More informationfor Walmart suppliers. About Bureauu Veritas laboratories in building and Phase 1: Pre- Assessment until the factory Phase 2: Initial Assessment
WALMART SUPPLIER FACTORY SAFETY ASSESSMENT OVERVIEW Wal-Mart Stores, Inc. ( Walmart ) engaged Bureau Veritas to conduct fire, building and electrical safety assessments at factories in Bangladesh designated
More informationLand Use Regional Planning in Alberta Collaborating with Stakeholders
Land Use Regional Planning in Alberta Collaborating with Stakeholders Trevor Lema, Land & Integrated Management Planner September 2018 Overview Why Regional Planning? An Integrated Perspective Integrated
More informationGreen Networks in Planning Policy and Management
Promoting green networks in the Lothians & Fife delivering economic, social & ecological benefits in partnership, as part of the Central Scotland Green Network funded by: Green Networks in Planning Policy
More informationThe Social Accountability International (SAI) Fire Safety Checklist
The Social Accountability International (SAI) Fire Safety Checklist Introduction The Social Accountability International (SAI) Fire Safety Checklist is a guidance tool prepared for SA8000 & BSCI Auditors
More informationSOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ROLE OF THE FIRE PROTECTION ENGINEER IN THE CONSTRUCTION DESIGN PROCESS
SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P-02-07 THE ROLE OF THE FIRE PROTECTION ENGINEER IN THE CONSTRUCTION DESIGN PROCESS March, 2007 Society of Fire Protection Engineers - 1 - Position
More informationProtocol between Local Housing Authorities and Fire and Rescue Authorities to improve fire safety
Protocol between Local Housing Authorities and Fire and Rescue Authorities to improve fire safety Foreword by Communities and Local Government Ministers It is always a priority to ensure safety from the
More informationWHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014
WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014 Dear Resident This Special Edition of the Whiteley Voice which has been prepared in conjunction with the North Whiteley Consortium is to
More informationNEW CENELEC STANDARDS & CSM-RA NEW CENELEC STANDARDS & CSM-RA 2017
NEW CENELEC STANDARDS & CSM-RA AGENDA New EN 501xx Standards What is new/changed/improved The use of CENELEC in CSM-RA process CENELEC & CSM-RA TIMELINE EN61508 EN61508 ENV50126 EN50126 EN50128 EN50129
More informationHazard Mitigation Planning. Association of New Jersey Environmental Commissions Workshop Edison, New Jersey October 20, 2012
Hazard Mitigation Planning Association of New Jersey Environmental Commissions Workshop Edison, New Jersey October 20, 2012 Mitigation Planning NJ Hazard Mitigation Plan? What is the status of the HMP
More informationBedfordshire & Luton Fire & Rescue Service. Reducing Arson Across Schools Thomas Warner, Area Community Safety Officer (Arson)
Bedfordshire & Luton Fire & Rescue Service Using BB100 Reducing Arson Across Schools Thomas Warner, Area Community Safety Officer (Arson) Building Bulletin 100 Published Sept 2007. This Building Bulletin
More informationIndependent Verification of Nestlé s Compliance With the World Health Organisation Code of Breastmilk Substitutes (1981) and Subsequent Resolutions
Independent Verification of Nestlé s Compliance With the World Health Organisation Code of Breastmilk Substitutes (1981) and Subsequent Resolutions in Jamaica Independent Assurance Statement by Bureau
More informationEN54 Part 23 Made Easy CPD PRESENTED BY SIMON ADAMS GENT BY HONEYWELL
EN54 Part 23 Made Easy CPD PRESENTED BY SIMON ADAMS GENT BY HONEYWELL EN54 Part 23 Intent Standardise output levels from Visual Alarm Devices Improve designs & safety through ensuring enough light is generated
More informationGreen Infrastructure and LID Practice Construction Workshop
Technical Workshops Sunday, August 12, 2018 8:00 a.m. 12:00 p.m. - $195.00 Green Infrastructure and LID Practice Construction Workshop Make Sure Your BMPs are Constructed Properly: Green Infrastructure
More informationWELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP!
WELCOME TO THE CHOUTEAU GREENWAY EQUITY WORKING GROUP! Chouteau Greenway Steering Committee and Working Groups Overview Overview January 9, 2019 Chouteau Greenway will transform St. Louis by connecting
More informationThe Macro Quallty Assurance System for Fire Safety Engineering
VIEWPOINT The Macro Quallty Assurance System for Fire Safety Engineering Xuefeng Xiao, Eric Marcha-nt, and Alan Griß'th Xiao and Marchant are with the Unit of Fite Safety Engineering at the University
More informationWELSH GOVERNMENT SPRINKLER PILOT STUDY
WELSH GOVERNMENT SPRINKLER PILOT STUDY Colin Blick Building Standards Technical Manager Welsh Government THE VISION FOR SPRINKLERS IN WALES June 2007 : AM Ann Jones won an assembly ballot to be the first
More informationGRAND VALLEY REGIONAL BIOSOLIDS AUTHORITY (GVRBA)
City of Grand Rapids City of Wyoming GRAND VALLEY REGIONAL BIOSOLIDS AUTHORITY (GVRBA) A Solids Processing Partnership MWEA Process Seminar December 8, 2010 Mike Lunn Gary De Kock GVRBA MISSION It is the
More informationMoving Beyond Compliance: Campaigns & Corporate Strategies
Moving Beyond Compliance: Campaigns & Corporate Strategies The Mind the Store Campaign Challenging & Engaging Retailers to Develop Comprehensive Chemical Policies Mike Schade, Mind the Store Campaign Director
More informationFire Safety Management Audit Specification August 2017
Fire Safety Management Audit Specification August 2017 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page 1 Introduction to the Fire Safety Management Audit
More informationKeele Finch Plus Downsview Airport Operational Needs Assessment Executive Summary
City of Toronto Keele Finch Plus Downsview Airport Operational Needs Assessment Executive Summary It is not intended for and should not be relied upon by any third party and no responsibility is undertaken
More information2600SEG103 STANDARDS FOR EMERGENCY EVACUATION PLANS FOR BUILDINGS, OFFICES, AND OTHER WORK AREAS
1.0 PURPOSE This standard establishes the requisites for developing evacuation plans as well as the responsibility of periodically maintaining and exercising said plan. 2.0 BACKGROUND Some ACP units have
More informationOntario Invasive Plant Council
Ontario Invasive Plant Council Ontario Invasive Plant Council What is the problem? How it all began 2007 AGM Highlights from the framework Mission statement Objectives What has the council be up to? Council
More informationCONFORMITY ASSESSMENT GUIDELINES. Version 1.0
CONFORMITY ASSESSMENT GUIDELINES Version 1.0 638264345212619823672356354638264345126198236723563784235635457986068647547253651243563874685635778964543212255677879898977544957534235635 GENERAL CONFORMITY
More informationISO and services ANSI Conference: Standards and the Service Economy. Presented by Kevin McKinley Acting Secretary-General, ISO
2015 ANSI Conference: Standards and the Service Economy ISO and services Presented by Kevin McKinley Acting Secretary-General, ISO September 29, 2015 1 Part of the World Standards Week 2015 series of events
More informationDocument Preparation Profile (DPP)
1 Document Preparation Profile (DPP) 1. IDENTIFICATION Document Category Working ID: Proposed Title: Proposed Action: Safety Guide DS471 Radiation Safety of X-ray Generators and Radiation Sources Used
More information7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.
Rev. 1 03/05/2015 ANNEX A to the Yokogawa Corporation of America Quality Assurance Manual For Additional Requirements selectively applied to ATEX and IECEx certified products CONTENTS 1. Scope 2. Purpose
More informationHealth and Safety Plans Health and Safety Policy Statement Fire Prevention Plan Objective
Health and Safety Plans Health and Safety Policy Statement It is the policy of Prospect College to provide and maintain a safe environment free of injuries and other impairments to the health of the students,
More informationCertifiedSafetyPassion. CertifiedSafetyPassion. Distributors and UL AML
CertifiedSafetyPassion SAFETY HI - TECH. Founded in 1990, Safety Hi-Tech is a customer-focused provider of innovative fire suppression solutions, focusing on Clean Agent Extinguishing Systems. Safety Hi-Tech
More informationSMB/4676/R STRATEGIC BUSINESS PLAN (SBP) Title of TC TC 62: Electrical equipment in medical practice
SMB/4676/R IEC/TC or SC TC 62 Secretariat Germany STRATEGIC BUSINESS PLAN (SBP) Date 2011-09-23 Please ensure this form is annexed to the Report to the Standardization Management Board if it has been prepared
More informationWestern Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018
Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018 Proposal Information The Western Pennsylvania Conservancy (WPC) is seeking proposals
More informationGRI White Paper #8. - on - Construction Quality Assurance-Inspectors Certification Program (CQA-ICP)
Geosynthetic Certification Institute 475 Kedron Avenue Folsom, PA 19033-1208 USA TEL (610) 522-8440 FAX (610) 522-8441 GEI GRI GSI GAI GCI GII GRI White Paper #8 - on - Construction Quality Assurance-Inspectors
More informationDraft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room
Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates Committee for the Future October 27, 2015 Police Department Training Room AGENDA 1. Welcome and Call to Order
More informationRegional Training Workshop on Human Settlement indicators
Regional Training Workshop on Human Settlement indicators Donatien Beguy, PhD Research and Capacity Development Branch UN-HABITAT Overview of 2030 Agenda for Sustainable Development and New Urban Agenda
More informationA Review of EU Legislation on EP&R
A Review of EU Legislation on EP&R IAEA 8th Meeting of the Representatives of Competent Authorities 6 June 2016 Costas Constantinou DG ENER Directorate D - Nuclear, Safety and ITER Unit D3 Radiological
More informationWELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP!
WELCOME TO THE CHOUTEAU GREENWAY ECONOMIC DEVELOPMENT WORKING GROUP! Chouteau Greenway Steering Committee and Working Groups Overview Overview January 9, 2019 Chouteau Greenway will transform St. Louis
More informationAustralian Packaging Covenant Action Plan 2014/2016
Australian Packaging Covenant Action Plan 2014/2016 John Danks & Son 17 October 2013 Australian Packaging Covenant Action Plan 2014/2016 Table of Contents Executive Summary Page 1 Introduction... 2 2 Description
More informationCoastal Climate Change Vulnerability and Flexible Adaptation Planning: the Cockburn Sound Coastal Alliance Experience
Coastal Climate Change Vulnerability and Flexible Adaptation Planning: the Cockburn Sound Coastal Alliance Experience Presentation to Climate Change Forum by Doug Vickery Manager Infrastructure Services,
More informationWELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!
WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP! Chouteau Greenway Steering Committee and Working Groups Overview Overview January 9, 2019 Chouteau Greenway will transform
More informationThe Role of Market Surveillance
Certification and Marking for Europe The Role of Market Surveillance Jan Deconinck, M.Sc. PROSAFE Chairman 1. Marks 1. Marks 1. Marks - It is prohibited to affix other markings or marks which might be
More informationStatus Report of the SPE Oil and Gas Reserves Committee Where Is Our Focus?
Status Report of the SPE Oil and Gas Reserves Committee Where Is Our Focus? John Ritter Chair Society of Petroleum Engineers (SPE), Oil and Gas Reserves Committee (OGRC) Ad Hoc Group of Experts on the
More informationFIRE SAFETY 2013 ANNUAL REPORT. Author: Senior Fire Safety Advisor Contact Details for further information: Frank Barrett
AGENDA ITEM 4.1 FIRE SAFETY 2013 ANNUAL REPORT Executive Lead: Director of Planning Author: Senior Fire Safety Advisor Contact Details for further information: Frank Barrett 02920742292 SITUATION This
More informationrisk management and assessment for business Lessons Learned from Real World Application of Bow-tie Method 2010 International Symposium
risk management and assessment for business Risktec Solutions Lessons Learned from Real World Application of Bow-tie Method 2010 International Symposium BEYOND REGULATORY COMPLIANCE, MAKING SAFETY SECOND
More information1. Terms defined in the Construction Products Regulation (CPR)
CEN/TC 351 Glossary of relevant terms related to the CPR The following list of terms provides definitions of terms related to the CPR (EU/305/2011) which are relevant for the work of CEN/TC 351 Construction
More informationConsolidated Workshop Proceedings Report
United Nations International Strategy for Disaster Reduction Regional Office for Arab States THE WORLD BANK Syrian Ministry of Local Administration Consolidated Workshop Proceedings Report Regional Workshop
More informationCITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)
CITY CLERK Clause embodied in Report No. 10 of the, as adopted by the Council of the City of Toronto at its meeting held on November 6, 7 and 8, 2001. 10 Parkland Acquisition Strategic Directions Report
More informationIFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office
IFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office Introduction The International Federation of Library Associations and Institutions http://www.ifla.org
More informationWest Yorkshire Fire & Rescue Authority. Fire Protection Policy
West Yorkshire Fire & Rescue Authority Fire Protection Policy Risk Based Inspection Program 2017-2020 West Yorkshire Fire & Rescue Service Oakroyd Hall Birkenshaw Bradford BD11 2DY Date Issued: 28/03/2018
More informationCOMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE
Attachment 1 COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE Priorities and Key Initiatives Committee May 2013 Page E-1 How we grow Goal 2: To ensure sustainable development
More informationRecognising & encouraging conservation in the areas where we live & work
Verified Conservation Areas Recognising & encouraging conservation in the areas where we live & work Conservation Optimism Summit London, UK 20-21 May 2017 ConserveAreas.org @ConserveAreas Verified Conservation
More informationConsolidated Workshop Proceedings Report
Consolidated Workshop Proceedings Report Regional Workshop on Urban Risk Damascus, Syria, November 4. 5. 2009 UNISDR, the Global Facility for Disaster and Recovery (GFDRR) of the World Bank, UNDP Syria
More informationMetal Detection. High Performance Metal Detection Delivering Efficiency and Reliability SAFELINE
SAFELINE Metal Detection Metal Detection Signature 300 Signature Touch Increasing Productivity Reducing Costs Improving Competitiveness Proven Technology and Features High Performance Metal Detection Delivering
More informationPOLICY The Trillium Park Master Plan was approved by the Board on April 4, 2012.
TO: FROM: SUBJECT: Date: June 2, 2014 Board Members Vancouver Park Board General Manager Parks and Recreation Proposed Trillium North Park Artists Garden RECOMMENDATION THAT the Board approve the new arts-focused
More informationProgress On The Implementation Of A Program To Assist In Properly Installing Child Safety Car Restraints
STAFF REPORT ACTION REQUIRED Progress On The Implementation Of A Program To Assist In Properly Installing Child Safety Car Restraints Date: April 23, 2007 To: From: Wards: Reference Number: Community Development
More informationIntelligence Community Campus- Bethesda (ICC-B)
Intelligence Community Campus- Bethesda (ICC-B) MNCPPC Presentation June 20, 2013 US Army Corps of Engineers 1 NCPC Informational Agenda ICC-B Project Opening Remarks Community Engagement ICC-B Development
More informationA New Plan For The Calgary Region June calgary.ca call 3-1-1
A New Plan For The Calgary Region June 2009 calgary.ca call 3-1-1 Introduction Since January 2006, The City of Calgary has been actively participating with the member municipalities of the Calgary Regional
More informationPhilip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects
Date August 5, 2015 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects Nicole Avril,
More informationBuilding with nature
Building with nature Prioritising ecology and biodiversity for better buildings and cities Executive Summary May 2018 National Strategic Sponsor Research and evidence demonstrating the positive impacts
More information