INTEGRATED AUTOMATION FACILITY CONTROLS

Size: px
Start display at page:

Download "INTEGRATED AUTOMATION FACILITY CONTROLS"

Transcription

1 PART 1 - GENERAL 1.01 GENERAL A. Washington State University operates and maintains a state-of-the-art Building Automation System (BAS). The WSU BAS utilizes the Siemens Building Technologies Apogee system and the Alerton Ascent Building Management System. The BAS is capable of, but not limited to, global campus controlling of electrical demand, heating demand and cooling demand using duty cycling, chiller optimization, peak demand limiting and start stop time optimization programs, lighting controls, irrigation, security, domestic water wells and reservoirs, metering condensate, metering chilled water, metering domestic water, metering electricity, and other applications. The control is provided via Ethernet connections. The field panels report analog and digital value changes to the BAS server for alarm management and trending. The field panels are programmed to be fully-stand alone and power recoverable after electrical failures or loss of communication with the BAS server. B. Building Automation Systems (BAS) Design Criteria: 1. Communications: The WSU BAS is a physically and logically separate series of networks and security protocols that operate in a closed system. Therefore, no ingress or egress routes are available for use in any communications. All communications with centralized systems such as Siemens or Alerton applications shall be connected to and configured to operate within the private network space. 2. Telecommunications Infrastructure: Because the WSU BAS is a closed system, several design standards are critical to maintain its overall health and security: i. BAS Switches and UPSs: All switches and UPS devices used in the BAS will be specified, procured and installed by WSU Finance and Administration Information Systems (FAIS). Not all projects will require BAS infrastructure, as it may already exist. Contact FAIS through the WSU Project Manager to identify the closest BAS annexation point. ii. Rack Space: In order to accommodate building automation networks and associated equipment, the BAS will need at least 8 rack units of space per Telecomm Closet and 10 rack units per MCF. This specification will accommodate all BAS switches, UPS, and surveillance servers. iii. Power: WSU BAS will require at least four (4) 120v power outlets in each Telecomm Closet and in each MCF to accommodate power for BAS network components.

2 iv. Gigabit Passive Optical Network (GPON): No GPON equipment shall be used as part of the BAS infrastructure, and BAS devices shall not be connected to Optical Line Terminal (OLT) devices. Since GPON buildings contain significant fiber cable plans, allocating fiber per the BAS standard will allow for proper configuration and deployment. v. Fiber Optic: WSU BAS networks require 4 strands of single mode fiber feeding each new building or remodeled building and 4 strands of single mode fiber between each MCF and Telecomm Closet. This will accommodate a redundant pair of network uplinks for critical network components. All fiber media shall be 62.5 microns. 1) If single mode fiber is not available in the building s distribution media, then this standard can be applied to multi-mode media instead. 3. Digital Direct Control: Control system shall be Digital Direct Control (DDC) to control building HVAC systems, pumps, converters, chillers, cooling towers, room VAV systems, VAV fume hood systems and other support systems on and off campus. 4. Individual Room Controls: Individual room controls are required in all office, classrooms, laboratories and other occupied areas. 5. System Controls: All BAS shall be electronic with electronic final control elements. Renovations/modifications requiring compressed air shall have a pneumatic module controlled by a BAS electronic signal converting electric to pneumatic. 6. Provide 10-minute Uninterruptable Power Supply (UPS) for each BAS panel (see Section Static Uninterruptable Power Supply ). i. Pre-Approved Manufacturer/Model: Functional Devices PSC100 C. This system utilizes single point, campus global controlling (this ability shall be maintained) to directly manage the following systems as a minimum: 1. Staggered power recovery after outages. 2. Heating demand for limiting purposes during emergency conditions. 3. Cooling demand for chilled water tank storage management. 4. Campus chilled water loop pumping function at multiple locations. 5. Central Chiller Plant operation. 6. Operation / integration of campus chillers into the chilled water loop.

3 Snowmelt system for outside stairways and walkways of campus. 8. Ice-melt systems for gutters, downspouts and pipe protection. 9. Domestic water wells and reservoirs. D. To ensure a fully functional system, the Consulting Engineer shall specify end devices and equipment that are capable of interfacing with the Siemens or Alerton BAS to provide the points listed below. E. The following is a listing of typical points to be controlled or monitored by BAS. This list is not intended to be all-inclusive, and shall be customized to meet the project sequence of operations. 1. HVAC Systems: i. AHU: fan; stop/start/proof; reclaim air; outside air; heating and cooling discharge air; mixed air; supply air; return air; coil pump stop/start/proof; heating and cooling coil valve modulation; duct and building static pressure monitoring; static pressure control; low temperature detection; supply duct humidity; and ventilation. ii. Converter: inlet and outlet temp; pump start/stop/proof and alternation or speed control. iii. Cooling tower: inlet and outlet temp; dampers or VFD control; pump start/stop/proof. iv. Chilled Water: building inlet and outlet temp, flow and decoupling operation; room temperature by fan system; process cooling system inlet and outlet temp and pump start/stop/proof. v. Terminal reheat valve; Terminal ventilation control; Terminal discharge air temperature sensor. vi. Laboratories fume hoods and room pressurization. vii. Process Cooling systems. 2. Alarm Systems: i. The controls vendor shall furnish a complete list of proposed sensors and controls (AO, AI, DO, DI) to coordinate proper alarm value settings with the WSU Controls Shop. ii. Filter banks; clean room pressure, temperature and humidity; condensate pump operation & high levels; sump pump high level alarm; compressed air system low press; fire alarm zone alarm and trouble indicator; elevator trouble and elevator machine room temperature.

4 iii. Computer room A/C units: filters; high and low temperature and humidity. iv. Research chambers and museum storage. 3. Building Systems: i. Snow melt heat exchangers ii. De-icing cable iii. Steam metering, pressure and conductivity monitoring iv. Chilled water flow v. Spa and saunas vi. CO and CO2 building and parking monitors vii. NO2 monitors required in enclosed areas known to operate diesel vehicles viii. Research chambers ix. Domestic wells and reservoirs 4. BAS shall be able to reset the following Operations: i. Facilities Scheduling F. Sequence of Operation (TYPICAL APPLICATION) 1. The following example illustrates the standards favored by WSU Facilities Services. Specific Sequences of Operations for new construction shall be submitted and reviewed for approval by the WSU Integrated Engineering and Infrastructure Group (IEIG). 2. Air Handling Units: i. The BAS shall signal the starting sequence. ii. Warmup Cycle: Upon a start signal, in a mixed air system, the outside air and exhaust air dampers shall remain closed and the return air dampers shall remain open and will slowly ramp into operation over a six (6) minute period allowing a controlled ease-in of operation. A reset schedule for the mixed air control loop will be based on the return or exhaust air temperature for the associated air handler unit. 1) Any variance from this standard requires specific approval from the WSU IEIG.

5 ) A typical reset schedule (mixed air system) is RA 72 o MA 58 o F and RA 68 o MA 66 o F. iii. Pressurization and Volume Control: 1) The supply fan speed shall operate from a duct static pressure control transmitter and a fan plenum static pressure high limit transmitter. 2) The duct static pressure set point shall be established by the TAB and shall be the lowest pressure required to meet airflow requirements. The duct static pressure control transmitter shall be located in a main duct, two-thirds of the total distance from the air handler. 3) A supply air flow monitoring station shall signal the BAS to modulate exhaust fan speed to maintain the correct exhaust airflow. The air flow monitoring station shall be designed and installed in a location to measure the full air volume delivered by the AHU fan or blower assembly. iv. Mixed Air Operations 1) The mixed air control shall switch from economizer mode to minimum OSA ventilation rate when the OSA temperature is above 76 o F and the OSA-RA temperature difference is greater than 2 o F. 2) Use supply volume, return air temperature and outside air temperature to calculate the mixed air set-point based on the required ventilation rate. This mixed air set-point will be a minimum setting in conjunction with the normal economizer control and CO2 control or other occupancy strategy. 3) Only the temperature low limit (described above) shall override the pressurization volume control. 4) The TAB contractor shall provide a minimum ventilation rate damper setting to be used only when the OSA and return air temperature sensors measure within 1 o F of each other. 5) The mixed air sensor shall be placed in a manner that promotes accuracy, despite stratification. More than one sensor may be used.

6 ) The mixed air temperature control shall be controlled from a temperature sensor located beyond air filters to control mixed air directly. v. Air Handler Coil Controls: 1) An analog temperature sensor in the discharge air stream of each coil shall signal the BAS to modulate the preheat coil and chilled water coil valves in order to maintain the correct discharge temperature set points. 2) The preheat coil discharge set point shall be 2 o F lower than the mixed air temperature control set point, and no lower than 52 o. The preheat coil circulating pump shall start operating at a call for heating, and shall run at least 15 minutes after the call for heat has been satisfied. 3) The cooling set point shall be 2 o F higher than the mixed air temperature control set point. The chilled water coil circulating pump shall start operating at a call for cooling, and shall run at least 15 minutes after the call for cooling has been satisfied. vi. Exhaust Air: 1) BAS analog temperature sensors in the inlet and discharge air streams shall monitor the heat recovery system. 2) Design and install an air flow monitoring station in a location to measure the full air volume delivered by the exhaust fan or blower assembly. 3) If fume-hoods or other safety ventilation devices are included in a combined general exhaust, use duct static control to maintain the ventilation rates of those devices. 4) For general exhaust (not including safety ventilation devices), modulate the exhaust volume in sequence with the supply air volume to maintain building pressurization. 5) Designers shall make provisions for Supply Fan failure by reducing Exhaust Air volume. vii. Heat Recovery: 1) The heat recovery set point shall be 2 o higher than the mixed air set point.

7 ) If the heat recovery device is located upstream of the mixed air plenum, the heat recovery device discharge air temperature shall be accounted for in any mixed air calculations as the OSA temperature would be. viii. Freeze Stats: Low limit manual reset protecting thermostats shall be physically wired in series in the AHU start string. If preheat discharge temperature decreases below 40 o F, these thermostats shall stop the fan and close the outside air dampers. A secondary contact shall show the status of the low limit thermostat, alarming the BAS under these conditions. ix. Smoke Detection: If products of combustion are detected, duct mounted smoke detectors shall stop the fan and close the outside air dampers. The Electrical Contractor responsible for the fire alarm system shall provide and install the necessary duct smoke detectors. Smoke detectors shall not be located in a path directly affected by steam injection or other humidification systems. x. Boiler Hot Water Systems: These systems shall be controlled in accordance with the boiler manufacturer s recommendations. Sequence of Operations shall not include a reset schedule. 3. Heating Converter - Steam to Hot Water: i. An immersion temperature sensor with well in the HWS line shall signal the BAS to modulate the 1/3-2/3 valve arrangements in order to maintain a reset schedule based on Outside Air Temperature. 4. VAV Terminal Boxes and Fin Tube Heaters: i. Utilizing direct digital control, room sensors shall control VAV boxes and fin tube radiators in sequence. 1) On a call for cooling, the VAV box damper shall modulate open. Both the radiator and reheat coil valves shall be closed. 2) On a call for heating, the VAV box damper shall modulate closed to minimum position. The VAV reheat valve and fin tube shall then begin to modulate open. 3) Occupied / unoccupied logic shall be applied. VAV reheat valve shall close when supply fan is off. 5. Toilet and Other Exhaust Fans:

8 i. Exhaust fans serving toilet areas shall be start/stop/proofed and scheduled by time of day scheduling through the BAS. Start/Stop time schedule shall be provided to Contractor by the WSU PM and will be adjustable from the WSU Controls Shop. 6. Computer Room HVAC Units: i. BAS shall monitor and enable control packaged computer room units; alarm and report & record any alarm/failures to WSU Facilities Services Operations Center for response Percent Outside Air HVAC Systems: i. Dampers shall be provided with an end switch on the damper blades to shut down the fan if the outside air dampers close for any reason. Adjustment of the end switch will allow the dampers to be open 50 percent before fan shall startup. 8. Domestic and Laboratory Hot Water Heater: i. Instantaneous water heaters shall be DDC controlled and the control valve shall be sized and supplied by the BAS contractor. Reference the specific requirements of WSU Design Standard ii. The re-circulation pump(s) shall be operated and scheduled from the BAS. The WSU PM will provide this schedule to the BAS Contractor. 9. Snowmelt Systems: i. Snowmelt for all campus exterior stairs and walkways shall be single point controlled through the WSU Facilities Services Procedures Panel. See also sections (Electric) and (Hydronic) Pavement Snow Melting Systems. 10. Laboratory Fume Hoods: i. Fume hoods shall incorporate VAV function through the use of a Venturi valve. Measuring the open area via sash position will control the fume hood volume and then setting the air volume to the value required to maintain 100 FPM; the action time will be less than 3 seconds. ii. The fume hood controller will incorporate an alarm that will indicate low / high velocity alarms and will display the airflow in feet per minute. The alarm will be a locally audible indicated alarm, with a local silence, and report alarm condition to the BAS Operations center.

9 iii. The makeup air requirements will be controlled by the lab room controller to provide the correct laboratory pressure and ventilation rates. 11. Chilled Water Metering: i. The BAS system shall query and display the following points from the building chilled water meter, accessible at the BAS Operations Center through BACnet MSTP Connection: 1) Supply and return temperature (degrees Fahrenheit) 2) Flow rate (GPM) 3) Totalized flow (gallons) 4) Instantaneous BTU value (tons) 5) Totalized tons 12. Steam Metering, Pressure Monitoring, and Condensate Conductivity: i. The BAS system shall query and display the following points from the building steam meter, accessible at the BAS Operations Center through BACnet MSTP Connection: 1) Temperature (degrees Fahrenheit) 2) Flow rate (pounds/hour) 3) Pressure (psi) ii. The BAS system shall query and display the following points from the building condensate meter, accessible at the BAS Operations Center: 1) Flow rate (pounds/hour) 2) Conductivity (microohms) 13. Heating Hot Water Metering i. The BAS system shall query and display the following points from the Heating HW energy meter, accessible at the BAS Operations Center through BACnet MSTP Connection: 1) Temperature (degrees Fahrenheit) 2) Flow rate (GPM) 3) Totalized flow (gallons) 4) Instantaneous BTU value (BTU) 5) Totalized BTUs 14. Domestic Water Metering i. The BAS system shall query and display the following points from the building water meter(s), accessible at the BAS Operations Center through BACnet MSTP Connection:

10 ) Flow rate (GPM) 2) Totalized flow (gallons) 1.02 LABORATORY CONTROLS SYSTEMS A. Provide and install a laboratory airflow control system (LACS) to maintain laboratory airflow, pressurization, temperature and fume hood average face velocity. Room pressurization control shall utilize airflow tracking to vary the volume of supply air into the room and general exhaust air from the room to maintain both minimum ventilation and airflow balance. The room pressurization control system shall also maintain laboratory temperature. B. The exhaust air volume of laboratory fume hoods shall be controlled by a standalone fume hood controller that is, seamlessly, incorporated into the room pressurization control system. The system shall include room controllers, fume hood controllers, supply and exhaust air flow control devices and control valves, all associated low voltage wiring, all pneumatic air lines and equipment if needed, and all necessary accessories to implement an integrated system as specified herein. Fume hood alarm monitor shall be an integral part of the system and sound a local user notification. System verification and documentation as specified under the commissioning section shall also be included. C. All laboratory airflow control system components shall be products of a single manufacturer and be the responsibility of that manufacturer. Siemens Building Technologies or Alerton / Phoenix Lab Controls shall manufacture the laboratory airflow control system WARRANTY A. Provide all services, materials and equipment necessary for the successful operation of the new BAS system for a period of one year after acceptance by WSU. Provide an extended warranty on all products for an additional 12 months for a total warranty of 24 months. Extended warranty applies to material components only; installation labor (if required) will be charged on an hourly basis. B. All damper and valve actuators shall have a 5-year materials component warranty. PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Siemens Building Technologies B. Alerton Ascent Building Management System

11 NETWORKING COMMUNICATIONS A. The design of the BAS shall network operator workstations and stand-alone DDC Controllers. The network architecture shall consist of three levels, a campus-wide (Management Level Network) Ethernet network based on TCP/IP protocol, high performance peer-to-peer building level network(s) and DDC Controller floor level local area networks with access being totally transparent to the user when accessing data or developing control programs. B. The design of BAS shall allow the co-existence of new DDC Controllers with existing DDC Controllers in the same network without the use of third-party gateways or protocol converters. C. Peer-to-Peer Building Level Network: 1. All operator devices shall have the ability to access all point status and application report data or execute control functions via the peer-to-peer network. 2. The peer-to-peer network shall support a minimum of 100 DDC controllers and PC workstations. 3. The system shall support integration of third party systems (PLC, chiller, boiler, etc.) via panel-mounted open protocol processor. This processor shall exchange data between the two systems for process control. All exchange points shall have full system functionality as specified herein for hardwired points. D. Management Level Network: 1. All PCs shall simultaneously direct connect to the Ethernet and Building Level Network without the use of an interposing device. 2. Operator Workstation shall be capable of simultaneous direct connection and communication with BACnet and Apogee or Encompass networks without the use of interposing devices. 3. The Management Level Network shall not impose a maximum constraint on the number of operator workstations. E. If the system will provide any Ethernet connectivity, it shall leverage the IP stack and be able to communicate with other devices in the same subnet and therefore must be layer 2 adjacent. 1. IP-based Protocols currently supported are limited to the following: i. TCP/IP

12 ii. BACnet-IP (BACnet Ethernet is prohibited) iii. DNP3-IP iv. Modbus IP v. All other IP protocols in use must be pre-approved by WSU Finance and Administration Information Systems (FAIS) DDC AND HVAC MECHANICAL EQUIPMENT CONTROLLERS A. The DDC and HVAC Mechanical Equipment Controllers shall reside on the Building Level Network. B. DDC and HVAC Mechanical Equipment Controllers shall use the same programming language and tools. DDC and HVAC Mechanical Equipment Controllers, which require different programming language or tools on a network, are not acceptable DDC CONTROLLER A. DDC Controllers shall be a 32-bit stand-alone, multi-tasking, multi-user, and real-time digital control processors. Controller size shall be sufficient to fully meet the requirements of this section, with built-in capacity for expansion of additional points. B. Each DDC Controller shall have sufficient memory to support its own operating system and databases, including: 1. Control processes 2. Energy management applications 3. Alarm management applications including custom alarm messages for each level alarm for each point in the system. 4. Historical/trend data for points specified 5. Maintenance support applications 6. Custom processes 7. Operator I/O 8. Manual override monitoring C. Each DDC Controller shall support firmware upgrades without the need to replace hardware.

13 D. DDC controllers shall provide a serial data communication port or USB port for operation of operator I/O devices such as industry standard printers, operator terminals, modems and portable laptop operator's terminals. DDC Controllers shall allow temporary use of portable devices without interrupting the normal operation of permanently connected modems, printers or terminals. E. As indicated in the point I/O schedule, the operator shall have the ability to manually override automatic or centrally executed commands at the DDC Controller via local, point discrete, on-board hand/off/auto operator override switches for digital control type points and gradual switches for analog control type points. 1. Switches shall be mounted either within the DDC Controllers key-accessed enclosure, or externally mounted with each switch keyed to prevent unauthorized overrides. 2. DDC Controllers shall monitor the status of all overrides and inform the operator that automatic control has been inhibited. DDC Controllers shall also collect override activity information for reports. F. DDC Controllers shall provide local LED status indication for each digital output for constant, up-to-date verification of all point conditions without the need for an operator I/O device. G. Each DDC Controller shall continuously perform self-diagnostics, communication diagnosis and diagnosis of all panel components HVAC MECHANICAL EQUIPMENT CONTROLLERS A. HVAC Mechanical Equipment Controllers shall be a 32-bit stand-alone, multi-tasking, multi-user, real-time digital control processors consisting of modular hardware with plug-in enclosed processors and built-in capacity for expansion of additional points. B. Each HVAC Mechanical Controller shall have sufficient memory to support its own operating system and databases. C. HVAC Mechanical Equipment Controllers shall provide local LED status indication for each digital output for constant, up-to-date verification of all point conditions without the need for an operator I/O device. D. Each HVAC Mechanical Equipment Controller shall continuously perform self-diagnostics, communication diagnosis and diagnosis of all components. The HVAC Mechanical Equipment Controller shall provide both local and remote annunciation of any detected component failures, low battery conditions or repeated failure to establish communication.

14 DDC & HVAC MECHANICAL EQUIPMENT CONTROLLER RESIDENT SOFTWARE FEATURES A. General: 1. The same names shall be used at the PC workstation. 2. All digital points shall have user defined two-state status indication (i.e. summer/winter). 3. The point naming scheme shall be generated by the WSU Environmental Controls Shop and supplied through the WSU Construction Manager. B. Control Software Description: 1. The DDC and HVAC Mechanical Equipment Controllers shall have the ability to perform the following pre-tested control algorithms: i. Two-position control ii. Proportional control iii. Proportional plus integral control iv. Proportional, integral, plus derivative control C. DDC and HVAC Mechanical Equipment Controllers shall provide the following energy management routines for the purpose of optimizing energy consumption while maintaining occupant comfort. 1. The system shall be capable of SSTO. Start-Stop Time Optimization (SSTO) shall automatically be coordinated with event scheduling. The SSTO program shall start HVAC equipment at the latest possible time that will allow the equipment to achieve the desired zone condition by time of occupancy. The SSTO program shall also shut down HVAC equipment at the earliest possible time before the end of the occupancy period, and still maintain desired comfort conditions. i. The SSTO program shall operate in both the heating and cooling seasons. ii. It shall be possible to apply the SSTO program to individual fan systems. iii. The SSTO program shall operate on both outside weather conditions as well as inside zone conditions and empirical factors. iv. The SSTO program shall meet the local code requirements for minimum outside air while the building is occupied.

15 Event Scheduling: Provide a comprehensive menu driven program to automatically start and stop designated points or groups of points according to a stored time. i. It shall be possible to individually command a point or group of points. ii. For points assigned to one common load group, it shall be possible to assign variable time delays between each successive start or stop within that group. iii. The operator shall be able to define the following information: 1) Time, day 2) Commands such as on, off, auto, and so forth. 3) Time delays between successive commands. 4) There shall be provisions for manual overriding of each schedule by an appropriate operator. iv. It shall be possible to schedule events up to one year in advance. 1) Scheduling shall be calendar based. 2) Holidays shall allow for different schedules. 3. Economizer Operation: The BAS shall control the position of the air handler relief, return, and outside air dampers. If the outside air-dry bulb temperature falls below changeover set point, the BAS will modulate the dampers to provide 100 percent outside air. The user will be able to quickly changeover to an economizer system based on dry bulb temperature and will be able to override the economizer cycle and return to minimum outside air operation at any time. 4. Automatic Daylight Savings Time Switchover: The system shall provide automatic time adjustment for switching to/from Daylight Savings Time. 5. Night setback control: The system shall provide the ability to automatically adjust setpoints for night control. D. DDC and HVAC Mechanical Equipment Controllers shall be able to execute custom, job-specific processes defined by the user, to automatically perform calculations and special control routines. 1. A single process shall be able to incorporate measured or calculated data from any and all other DDC and HVAC Mechanical Equipment Controllers on the network. In addition, a single process shall be able to issue commands to points in any and all other DDC and HVAC Mechanical Equipment Controllers on the network. Database shall support 30 characters, English language point names, structured for searching and logs.

16 A process shall be able to directly send remote notifications via phone, text, or . This process shall occur within the application layer of communications. 3. DDC and HVAC Mechanical Equipment Controller shall be capable of comment lines for sequence of operation explanation. E. Alarm management shall be provided to monitor and direct alarm information to operator devices. Each DDC and HVAC Mechanical Equipment Controller shall perform distributed, independent alarm analysis and filtering to minimize operator interruptions due to non-critical alarms, minimize network traffic and prevent alarms from being lost. At no time shall the DDC and HVAC Mechanical Equipment Controllers ability to report alarms be affected by either operator or activity at a PC workstation, local I/O device or communications with other panels on the network. 1. All alarm or point change reports shall include the point's English language description and the time and date of occurrence. 2. The user shall be able to define the specific system reaction for each point. Alarms shall be prioritized to minimize nuisance reporting and to speed operator response to critical alarms. A minimum of six priority levels shall be provided for each point. Point priority levels shall be combined with user definable destination categories (PC, printer, DDC Controller, etc.) to provide full flexibility in defining the handling of system alarms. Each DDC and HVAC Mechanical Equipment Controller shall automatically inhibit the reporting of selected alarms during system shutdown and start-up. Users shall have the ability to manually inhibit alarm reporting for each point. 3. Alarm reports and messages will be directed to a user-defined list of operator devices or PCs based on time (after hours destinations) or based on priority. 4. In addition to the point's descriptor and the time and date, the user shall be able to print, display or store a 200 character alarm message to more fully describe the alarm condition or direct operator response. 5. In dial-up applications, operator-selected alarms shall initiate a call to a remote operator device. F. A variety of historical data collection utilities shall be provided to manually or automatically sample, store and display system data for points as specified in the I/O summary. 1. Any point, physical or calculated may be designated for trending. Any point, regardless of physical location in the network, may be collected and

17 stored in each DDC and HVAC Mechanical Equipment Controllers point group. Two methods of collection shall be allowed: either by a pre-defined time interval or upon a pre-defined change of value. Sample intervals of l minute to 7 days shall be provided. Each DDC and HVAC Mechanical Equipment Controller shall have a dedicated RAM-based buffer for trend data and shall be capable of storing a minimum predetermined number of data samples. All trend data shall be available for transfer to a Workstation without manual intervention. 2. DDC and HVAC Mechanical Equipment Controllers shall also provide high-resolution sampling capability for verification of control loop performance. G. DDC and HVAC Mechanical Equipment Controllers shall be capable of automatically accumulating and storing run-time hours for digital input and output points and automatically sample, calculate and store consumption totals for analog and digital pulse input type points, as specified in the point I/O schedule. H. The peer-to-peer network shall allow the DDC and HVAC Mechanical Equipment Controllers to access any data from or send control commands and alarm reports directly to any other DDC and HVAC Mechanical Equipment Controller or combination of controllers on the network. DDC and HVAC Mechanical Equipment Controllers shall send alarm reports to multiple workstations. The peer-to-peer network shall also allow any DDC and HVAC Mechanical Equipment Controller to access, edit, modify, add, delete, back up, and restore all system point database and all programs. I. The peer-to-peer network shall allow the DDC and HVAC Mechanical Equipment Controllers to assign a minimum of 50 passwords access and control priorities to each point individually. The logon password (at any PC workstation or portable operator terminal) shall enable the operator to monitor, adjust and control the points that the operator is authorized for. All other points shall not be displayed on the PC workstation or portable terminal (e.g. all base building and all tenant points shall be accessible to any base building operators, but only tenant points shall be accessible to tenant building operators). Passwords and priorities for every point shall be fully programmable and adjustable FLOOR LEVEL NETWORK APPLICATION SPECIFIC CONTROLLERS (ASC) A. Each DDC Controller shall be able to extend its performance and capacity through the use of remote application specific controllers (ASCs) through Floor Level LAN Device Networks.

18 B. Each ASC shall operate as a stand-alone controller capable of performing its specified control responsibilities independently of other controllers in the network. Each ASC shall be a microprocessor-based, multi-tasking, and real-time digital control processor CENTRAL SYSTEM CONTROLLERS: A. Provide for control of central HVAC systems and equipment. B. Each controller shall support a standalone, real-time operating system. Provide a time clock with battery backup to allow for stand-alone operation in the event communication with its DDC Controller is lost and to ensure protection during power outages. C. All programs shall be field-customized to meet the user's exact control strategy requirements. Central System controllers utilizing pre-packaged or canned programs shall not be acceptable. As an alternative, provide DDC Controllers for all central equipment in order to meet custom control strategy requirements. D. Programming of central system controllers shall utilize the same language and code as used by DDC Controllers to maximize system flexibility and ease of use. Should the system controller utilize a different control language, provide a DDC Controller to meet the specified functionality FLOOR LEVEL CONTROLLERS: A. Provide for control of each piece of equipment, including, but not limited to, the following: 1. Variable Air Volume (VAV) boxes 2. Constant Air Volume (CAV) boxes 3. Dual Duct Terminal Boxes 4. Unit Conditioners 5. Heat Pumps 6. Unit Ventilators 7. Room and or Laboratory Pressurization B. Each controller shall be capable of controlling the terminal device, independent of the terminal device manufacturer.

19 C. Controllers shall include all point inputs and outputs necessary to perform the specified control sequences. Analog outputs shall be industry standard signals such as 24V floating control, 3-15 psi pneumatic, 0-10VDC or 4-20 ma, allowing for interface to a variety of modulating actuators. D. All controller sequences and operation shall provide closed loop control of the intended application. Closing control loops over the FLN, BLN or MLN is not acceptable PORTABLE OPERATOR'S TERMINAL (POT) A. BAS shall allow for use of industry standard, commercially available portable operator terminals with a LCD display and a full-featured keyboard. The POT shall be handheld and shall connect directly (or via wireless network) with all DDC Controllers, HVAC & Mechanical Equipment Controllers, and Floor Level Network Controllers as described below. Provide a user-friendly, English language-prompted interface for quick access to system information, not codes requiring look-up charts. B. Functionality of the Portable Operator's Terminal when accessing system information from any DDC Controller: 1. Access all DDC Controllers and ASCs on the network. 2. Backup and/or restore DDC Controller databases for all system panels, not just the DDC Controller connected to. 3. Display all point, selected point and alarm point summaries. 4. Display trending and totalization information. 5. Add, modify and/or delete any existing or new system point. 6. Command, change setpoint, enable/disable any system point. 7. Program and load custom control sequences as well as standard energy management programs. 8. Acknowledge alarms. C. Functionality of the Portable Operator's Terminal when accessing system information from any application specific controller: 1. Provide status, setup and control reports. 2. Modify, select and store controller database. 3. Command, change setpoint, enable/disable any controller point.

20 D. Connection of a POT to a DDC or HVAC & Mechanical Equipment Controller, or ASC Controller shall not interrupt nor interfere with normal network operation in any way, prevent alarms from being transmitted or preclude centrally initiated commands and system modification. E. Portable operator terminal access to controller shall be password-controlled. Password protection shall be configurable for each operator based on function, points (designating areas of the facility), and edit/view capability WORKSTATION OPERATOR INTERFACE A. Basic Interface Description 1. Operator workstation interface software shall minimize operator training through the use of English language prompting, 30-character English language point identification, on-line help, and industry standard PC application software. Interface software shall simultaneously communicate with Building Level Networks and share data between any of the networks. The software shall provide, as a minimum, the following functionality: i. Real-time graphical viewing and control of environment ii. Scheduling and override of building operations iii. Collection and analysis of historical data iv. Point database editing, storage and downloading of controller databases. v. Alarm reporting, routing, messaging, and acknowledgment vi. Display dynamic data trend plot. vii. Must be able to run multiple plots simultaneously. viii. Each plot must be capable of supporting 10 pts/plot minimum. ix. Must be able to command points directly off dynamic trend plot application. x. Definition and construction of dynamic color graphic displays. xi. Program editing xii. Transfer trend data to third-party software. xiii. Scheduling reports xiv.operator Activity Log xv. Open communications via web-based technologies.

21 xvi.compatible with Windows 7 or higher operating systems. 2. Use existing graphical user interface, which shall minimize the use of keyboard through the use of a mouse or similar pointing device and "point and click" approach to menu selection. 3. The software shall provide a multi-tasking type environment that allows the user to run several applications simultaneously. BAS software shall run on current and supported Windows server software such as Windows 2012 or higher. These Windows applications shall run simultaneously with the BAS software. The mouse or Alt-Tab keys shall be used to quickly select and switch between multiple applications. The operator shall be able to work in Microsoft Word, Excel, and other Windows-based software packages while concurrently annunciating on-line BAS alarms and monitoring information. 4. Provide functionality such that any of the following may be performed simultaneously on-line, and in any combination, via user-sized windows. Operator shall be able to drag and drop information between applications, reducing the number of steps (i.e. Click on a point on the alarm screen and drag it to the dynamic trend graph application to initiate a dynamic trend). i. Dynamic color graphics and graphic control. ii. Alarm management, routing to designated locations, and customized messages. iii. Year in advance event and report scheduling. iv. Dynamic trend data definition and presentation. v. Graphic definition and construction. vi. Program and point database editing on-line. 5. Report shall be accomplished via Windows Print Manager, allowing use of network printers. 6. Operator specific password access protection shall be provided to allow the user/manager to limit workstation control, display and data base manipulation capabilities as deemed appropriate for each user, based upon an assigned password. Operator privileges shall "follow" the operator to any workstation logged onto (up to 999 user accounts shall be supported). 7. Reports shall be generated on demand or via pre-defined schedule and directed to CRT displays, printers or disk. As a minimum, the system shall allow the user to easily obtain the following types of reports:

22 i. A general listing of all or selected points in the network ii. List of all points currently in alarm iii. List of all points currently in override status iv. List of all disabled points v. List of all points currently locked out vi. List of user accounts and access levels vii. List all weekly schedules viii. List of holiday programming ix. List of limits and dead bands x. Custom reports from 3 rd party software xi. System diagnostic reports including, list of DDC panels on line and communicating, status of all DDC terminal unit device points xii. List of programs B. Scheduling and Override: 1. Provide a calendar type format for simplification of time-of-day scheduling and overrides of building operations. Schedules reside in the PC workstation, DDC Controller, and HVAC Mechanical Equipment Controller to ensure time equipment scheduling when PC is off-line; PC is not required to execute time scheduling. Provide override access through menu selection or function key. Provide the following spreadsheet graphic types as a minimum: i. Weekly schedules ii. Zone schedules, minimum of 200 unique zones iii. Scheduling for up to 365 days in advance iv. Schedule reports to print at PC v. Collection and Analysis of Historical Data vi. Provide trending capabilities that allow the user to easily monitor and preserve records of system activity over an extended period of time. Any system point may be trended automatically at time-based intervals or change of value, both of which shall be user-definable. Trend data may be stored on hard disk for future diagnostics and reporting. Additionally, trend data may be archived to network drives or removable disk media for future retrieval.

23 vii. Trend data reports shall be provided to allow the user to view all trended point data. Reports may be customized to include individual points or predefined groups of at least six points. Provide additional functionality to allow predefined groups of up to 250 trended points to be easily transferred on-line to Microsoft Excel. DDC contractor shall provide custom designed spreadsheet reports for use by the owner to track energy usage and cost, equipment run times, equipment efficiency, and/or building environmental conditions. DDC contractor shall provide setup of custom reports including creation of data format templates for monthly or weekly reports. C. Dynamic Color Graphic Displays: 1. Create color graphic floor plan displays and system schematics for each piece of mechanical equipment, including air handling units, chilled water systems and hot water boiler systems, and room level terminal units, shall be provided by the BAS contractor as indicated in the point I/O schedule of this specification to optimize system performance, analysis and speed alarm recognition. Contact WSU Representative for color selection input. 2. The operator interface shall allow users to access the various system schematics and floor plans via a graphical penetration scheme, menu selection or text-based commands. Graphics software shall permit the importing of AutoCAD or scanned pictures for use in the system. 3. Dynamic temperature values, humidity values, flow values and status indication shall be shown in their actual respective locations and shall automatically update to represent current conditions without operator intervention and without pre-defined screen refresh rates. i. Sizable analog bars shall be available for monitor and control of analog values; high and low alarm limit settings shall be displayed on the analog scale. The user shall be able to "click and drag" the pointer to change the setpoint. ii. Provide the user the ability to display blocks of point data by defined point groups; alarm conditions shall be displayed by flashing point blocks. iii. Equipment state can be changed by clicking on the point block or graphic symbol and then selecting the new state (on/off) or setpoint. iv. State text for digital points can be defined up to eight characters. 4. The windowing environment of the PC operator workstation shall allow the user to simultaneously view several applications at a time to analyze total building operation or to allow the display of a graphic associated with an alarm to be viewed without interrupting work in progress.

24 D. System Configuration and Definition: 1. Network wide control strategies shall not be restricted to a single DDC Controller or HVAC Mechanical Equipment controller, but shall be able to include data from any and all other network panels to allow the development of Global control strategies. 2. Provide automatic backup and restore of all DDC controller and HVAC Mechanical Equipment controller databases on the workstation hard disk. In addition, all database changes shall be performed while the workstation is on-line without disrupting other system operations. Changes shall be automatically recorded and downloaded to the appropriate DDC Controller or HVAC Mechanical Equipment Controller. Changes made at the DDC Controllers or HVAC Mechanical Equipment Controllers shall be automatically uploaded to the workstation, ensuring system continuity. 3. System configuration, programming, editing, graphics generation shall be performed on-line. If programming and system back up must be done with the PC workstation off-line, the BAS contractor shall provide at least 2 operator workstations. E. Alarm Management: 1. Alarm Routing shall allow the user to send alarm notification to selected printers or PC location based on time of day, alarm severity, or point type. 2. Alarm Notification shall be provided via two alarm messages to distinguish between routine maintenance-type alarms and critical alarms. These alarm messages shall be displayed when user is working in other Windows programs. The BAS alarm display screen shall be displayed when the user clicks on the alarm message. 3. Alarm Display shall list the alarms with highest priority at the top of the display. The alarm display shall provide selector buttons for display of the associated point graphic and message. The alarm display shall provide a mechanism for the operator to sort alarms. 4. Alarm messages shall be customizable for each point to display detailed instructions to the user regarding actions to take in the event of an alarm FIELD DEVICES A. Provide instrumentation as required for monitoring, control or optimization functions. B. Temperature Sensors:

25 Digital room sensors shall have LCD display, day / night override button, and setpoint adjustment override options. The setpoint adjustment can be software limited by the automation system to limit the amount of room adjustment. 2. Monitoring range: 55 to 95 F (13 to 35 C) 3. Liquid immersion temperature: Monitoring range: -40/240 F 4. Duct (single point) temperature: Monitoring range: -40/240 F 5. Duct Average temperature: Monitoring range: Sensor Probe Length: -40/240 F 25 L (7.3m) 6. Outside air temperature: Monitoring range: -40/240 F C. Liquid Differential Pressure Transmitter: 1. Provide with a 3-way valve manifold 2. Ranges: As Needed 3. Output: 4 20 ma DC 4. Calibration Adjustments: Zero and span 5. Accuracy: +-0.2% of span 6. Linearity: +-0.1% of span 7. Hysteresis: % of span D. Differential pressure: 1. Unit for fluid flow proof shall be Penn P74. Range: Differential: 8 to 70 psi 3 psi

26 Maximum differential pressure: 200 psi Maximum pressure: 325 psi 2. Unit for airflow shall be Siemens Building Technologies SW141. Set point ranges: 0.5 WG to 1.0 WG (124.4 to Pa) 1.0 WG to 12.0 WG (248.8 to Pa) E. Static pressure sensor: 1. Range: 0 to.5 WG (0 to Pa) 0 to 1 WG (0 to Pa) 0 to 2 WG (0 to Pa) 0 to 5 WG (0 to 1.2 kpa) 0 to 10 WG (0 to 2.5 kpa) 2. Output signal: 4 20 ma VDC 3. Combined static error: 0.5% full range 4. Operating temperature: -40º to 175º F (-40C to 79.5ºC) F. Air Pressure Sensor: 1. Range: 0 to 0.1 in. water (0 to 24.9 Pa) 0 to 0.25 in. water (0 to 63.2 Pa) 0 to 0.5 in. water (0 to Pa) 0 to 1.0 in. water (o to 249 Pa) 0 to 2.0 in water 90 to 498 Pa) 0 to 5.0 in. water (0 to 1.25 kpa) 0 to 10.0 in. water (0 to 2.49 kpa) 2. Output signal: 4 to 20 ma 3. Accuracy: +1.0% of full scale

27 G. Humidity Sensors: 1. Range: 0 to 100% RH 2. Sensing element: Bulk polymer 3. Output signal: 4 20 ma DC 4. Accuracy: At 77 F (25ºC) + 2% RH H. Insertion Flow Meters (Equal to Onicon Series F-1210 or Sparling Tiger Mag FM 656): 1. Sensing method: Impedance Sensing 2. Accuracy: + 2% of Actual Reading 3. Maximum operating pressure: 400 PSI 4. Output signal: 4 20 ma I. Pressure to Current Transducer: Adjustable and sized accordingly 1. Range: 3 to 15 psig (21 to 103 kpa) or 2. Output signal: 4 20 ma 3 to 30 psig (21 to 207 kpa) 3. Accuracy: + 1% of full scale (+ 0.3 psig) J. Control Valves: 1. Steam applications: Control Valves shall be Normally Open (N/O); Fail State shall be N/O. i. Belimo or Siemens Globe Valve with stainless steel trim. 2. Floor-level Control: Specify Siemens Pressure-Independent Control Valves (PICV); no exceptions. 3. Energy Valves: Specify ONICON, including temperature and flow sensing to calculate BTU/h, inlet and outlet temperature, delta T, and water flow rates. 4. Globe / Characterized Ball Valves: 2-6 : i. Range: 40:1(minimum)

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and other equipment. B. See Division 23 Section

More information

Integrated Automation Instrumentation & Terminal Devices

Integrated Automation Instrumentation & Terminal Devices Sections Included In This Standard: 1.1 Building Systems Control 1.2 Building Aumotation Systems (BAS) 1.1 BUILDING SYSTEMS CONTROL A. HVAC CONTROLS: 1. General: Temperature control zones shall not combine

More information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS SECTION 23 09 93 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes control sequences for HVAC systems, subsystems, and equipment. B. See Division 23 Section

More information

Feature Summary. I. System

Feature Summary. I. System I. System A. Supports up to 60 VAV HVAC Units 1. Each HVAC Unit Can Support up to 59 VAV Boxes 2. Constant Volume Units Can Be Integrated With VAV Units 3. System Can Support Over 3000 Controllers B. Fill-in

More information

Virginia Tech Standards for Building Automation System

Virginia Tech Standards for Building Automation System March 1, 2016 Virginia Tech Standards for Building Automation System A. Existing Conditions: The Campus Building Automation System is Siemens Apogee and controls all significant campus facilties. Virginia

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL SECTION 15910 SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment. SECTION 23 09 93 - SEQUENCE OF OPERATIONS FOR HVAC CONTROLS PART 1 - GENERAL 1 WORK INCLUDES A. Base Bid: Heating Contractor provide: Control sequences for HVAC systems, subsystems, and equipment. B. Alternate

More information

Building Automation System

Building Automation System University of New Hampshire University of New Hampshire Scholars' Repository Division 25 Integrated Automation Chapter 5 Technical Construction and Renovation Standards 8-1-2014 250000 - Building Automation

More information

Hydronic & HVAC Control Systems

Hydronic & HVAC Control Systems tekmar 218 Full Line Catalog Hydronic & HVAC Control Systems HVAC Multi-Staging Alternative Energy Zoning Snow Melting Setpoint tekmarcontrols.com tekmarcontrols.com Better Design, Better Control, Better

More information

Building Automation System (BAS) Design Criteria

Building Automation System (BAS) Design Criteria 25 0520 Building Automation System (BAS) Design Criteria 1. Design Statement a. During the various design phases of this project, the Engineer will develop options and strategies for selection of the appropriate

More information

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana ADDENDUM NO. 2 RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana TO: All Bidders Gentlemen: This Addendum

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES To qualify the upgrade must add or substantially modify 3 or more sequences/system capabilities. Also, all sequences and items listed under the required section are needed in

More information

HVAC Controls Upgrades: Requirement Details ( )

HVAC Controls Upgrades: Requirement Details ( ) REQUIRED CONTROLS/FEATURES HVAC non CENTRAL PLANT 1) Zone Level Scheduling & Override for all air handlers (supply and exhaust) to match occupied hours by zone DDC or occupancy sensors (OS) allowed. (403.2.4.3,

More information

Digital Precise Air Control - DPAC

Digital Precise Air Control - DPAC Digital Precise Air Control - DPAC Mode Enable Sensor Options The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during Occupied operation. The following options

More information

Window Replacements & HVAC Upgrade (Eastern Middle School) Bid Opening Date: 3/15/18 Opening Time: 11:00 a.m. RFB #

Window Replacements & HVAC Upgrade (Eastern Middle School) Bid Opening Date: 3/15/18 Opening Time: 11:00 a.m. RFB # ADDENDUM NO. 3 March 22, 2018 Window Replacements & HVAC Upgrade (Eastern Middle School) Bid Opening Date: 3/15/18 Opening Time: 11:00 a.m. RFB # 2195-18 This Addendum No. 3 is being issued to make changes

More information

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

November 11, City of Sparks 215 S. 21 st St. Sparks, NV November 11, 2014 City of Sparks 215 S. 21 st St. Sparks, NV 89432-0857 Attn: Brian Cason Re: Sparks City Hall HVAC Upgrade Project-Alerton Direct Digital HVAC Control System to Match Existing City of

More information

Better Design, Better Control, Better Systems.

Better Design, Better Control, Better Systems. Product Catalog Better Design, Better Control, Better Systems. At tekmar Control Systems, we believe the indoor comfort of a building depends on the performance of its heating, ventilating & air conditioning

More information

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC PART 1 GENERAL SECTION 23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 1.01 RELATED WORK UNDER OTHER SECTIONS: A. In addition to the general building construction, work directly related to the automatic

More information

Technical Report #3 Mechanical Systems Existing Conditions Evaluation

Technical Report #3 Mechanical Systems Existing Conditions Evaluation Mechanical Option Technical Report #3 Technical Report #3 Mechanical Systems Existing Conditions Evaluation Instructor: Dr. Bahnfleth 11.15.04 Building Sponsor: CCG Facilities Integration Table of Contents

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Mechanical. Environmental Control Systems. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Mechanical. Environmental Control Systems. Basis of Design Basis of Design University of Washington Specific Controls Features The following items are specific to the University of Washington: The goal is to move from pneumatic to DDC controls. This goal shall

More information

Architectural and Engineering Specification for a Security Management System. StarNet 2

Architectural and Engineering Specification for a Security Management System. StarNet 2 Architectural and Engineering Specification for a Security Management System StarNet 2 Jan 2, 2018 Page 1 of 12 AE-S2-IN-R1-EN-01/18 This document is intended to provide performance specifications and

More information

opti-visor ultra-efficient chiller plant automation Typical specification

opti-visor ultra-efficient chiller plant automation Typical specification opti-visor ultra-efficient chiller plant automation Typical File No: 90.893 Date: february 9, 2015 Supersedes: 90.893 Date: april 20, 2012 contents 1.0 Chilled water plant 4 1.1 General system requirements

More information

SECTION BUILDING AUTOMATION SYSTEM

SECTION BUILDING AUTOMATION SYSTEM SECTION 25 10 00 BUILDING AUTOMATION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Work hereunder includes a complete and operational, fully-tested, distributed logic, direct digital control system for control

More information

SECTION INTEGRATED AUTOMATION FACILITY CONTROLS

SECTION INTEGRATED AUTOMATION FACILITY CONTROLS PART 1: GENERAL 1.01 SCOPE OF WORK A. General Contractor shall furnish and commission a fully integrated building automation system (BAS), incorporating direct digital control (DDC) for energy management,

More information

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

I/O ZONE 560/583 USERS GUIDE

I/O ZONE 560/583 USERS GUIDE I/O ZONE 560/583 USERS GUIDE 641-224 641-242 641-237 1 Table of Contents Hot Gas Re-Heat Valve On/Off:... 15 THE ZONE CONTROLLER...4 Modulating Re-Heat Valve:... 16 SPECIFICATIONS...5 CONTROLLER COMPONENTS...6

More information

Job Name Control Systems Description Date

Job Name Control Systems Description Date Job Name Control Systems Description Date Project Overview The project is a describe the building and its major HVAC systems (e.g. three-story office building, served by a rooftop unit VAV system ). In

More information

DX-9100 Applications from Engineering Services

DX-9100 Applications from Engineering Services System 9100 Technical Manual 636.4 Application Examples Section Technical Bulletin Issue Date 0896 DX-9100 Applications from Engineering Services Introduction Page 3 Overview 3 Air Handling Unit Applications

More information

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION Page 1 of 7 25 00 00 25 10 00 NETWORK EQUIPMENT Standby Power 1. Consider whether the controls system should be on standby/emergency power, or UPS when central applications are controlled or the equipment

More information

American University Design Standards

American University Design Standards 25 95 00 CONTROL SEQUENCES FOR HVAC PART 1. GENERAL 1.01 SECTION INCLUDES A. Description of Work B. Control Sequences General Requirements C. System Specific Control Sequences 1.02 RELATED DOCUMENTS A.

More information

SECTION INSTRUMENTATION AND CONTROLS FOR HVAC

SECTION INSTRUMENTATION AND CONTROLS FOR HVAC SECTION 230923 INSTRUMENTATION AND CONTROLS FOR HVAC PART 1: GENERAL... 2 1.1 Related Sections... 2 1.2 Description... 2 1.3 Approved Control Systems... 2 1.4 Quality Assurance... 3 1.5 Codes and Standards...

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma Objectives and Requirements For the Creative and Performing Arts High School (CAPA), the main objective of the mechanical design is to provide an energy efficient system that is easily maintainable and

More information

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES SECTION 23 09 00 AUTOMATIC TEMPERATURE CONTROLS SYSTEM (ATCS) PART 1 GENERAL REQUIREMENTS WORK INCLUDED General Requirements: Section 23 09 00 shall be bid direct to the Mechanical Contractor. The existing

More information

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 23 0993 SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS A. This section defines the manner and method by which controls function. Requirements for each type of

More information

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN

SECTION : CAMPUS CENTRAL METERING SYSTEM DESIGN Brown University Department of Facilities Management Design & Construction Standards 26 09 01 Campus Central Metering System Design SECTION 26 09 01: CAMPUS CENTRAL METERING SYSTEM DESIGN 1. GENERAL A.

More information

Selected Laboratory Energy Efficiency Measures

Selected Laboratory Energy Efficiency Measures Selected Laboratory Energy Efficiency Measures These are some of the most effective energy efficiency measures for laboratories 1. Reduce (optimize) air changes per hour in lab space 2. Design to the proper

More information

FUNCTIONAL DESIGN SPECIFICATION

FUNCTIONAL DESIGN SPECIFICATION Issue Date: Issued To: Revision: FUNCTIONAL DESIGN SPECIFICATION Specification Number: SP-XXXX Company Name Signature Date Issued By: Manutec Ltd. Approved By: Approved By: Approved By: Approved By: Authorised

More information

FACILITY CONTROLS BUILDING AUTOMATION SYSTEM (BAS) DESIGN AND CONSTRUCTION STANDARD

FACILITY CONTROLS BUILDING AUTOMATION SYSTEM (BAS) DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. The design guidelines contained herein include the requirements for integrated automation facility controls at The University of Texas at Austin. It is the intention of

More information

A. GENERAL - Building Automation System (BAS) Contractor shall provide and install:

A. GENERAL - Building Automation System (BAS) Contractor shall provide and install: 11-01-2011 PART 1 GENERAL 1.01 Work Included: A. GENERAL - Building Automation System (BAS) Contractor shall provide and install: 1. A fully integrated Building Automation System (BAS), incorporating direct

More information

i-vu CCN 4.0 Owner s Guide

i-vu CCN 4.0 Owner s Guide i-vu CCN 4.0 Owner s Guide CARRIER CORPORAION 2007 A member of the United echnologies Corporation family. Stock symbol UX. 11-808-377-01 07/07 able of Contents ACCESSING YOUR SYSEM... 3 YOUR SYSEM DEAILS...

More information

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO. PURCHASING SECTION 6645 148 th Street, Surrey, B.C. V3S 3C7 Tel: 604-590-7274 Fax: 604-599-0956 E-mail: purchasing@surrey.ca ADDENDUM NO. 2 REQUEST FOR QUOTATIONS (RFQ) NO.: 1220-040-2014-001 TITLE: DISTRICT

More information

Cultivator & Hybrid Cultivator

Cultivator & Hybrid Cultivator Cultivator & Hybrid Cultivator Precision Temperature & Humidity Packaged Unit INTRODUCTION The Cultivator Series package unit is the industry s MOST ENERGY EFFICIENT and HIGHEST capacity dehumidifier on

More information

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available. PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2 Architectural & Engineering Specifications Control Panel 1.0 GENERAL... 2 1.1 SCOPE OF WORK... 2 1.1.1 Introduction... 2 1.2 GENERAL CONDITIONS... 2 1.2.1 After-Sales Support... 2 1.2.2 Quality assurance...

More information

Integrated Automation

Integrated Automation Revision 04/27/2017 Purpose: The Architect and/or Engineer shall incorporate the Rice specific requirements indicated in this standard s section into their design. The Architect and/or Engineer shall further

More information

- Data Brochure Universal Reset Module 422

- Data Brochure Universal Reset Module 422 - Data Brochure Universal Reset Module 422 D 422 08/07 1 Information Brochure Choose controls to match application Application Brochure Design your mechanical applications 2 3 Rough-in Wiring Rough-in

More information

Computing Services Center

Computing Services Center Continuous Commissioning Report for the Computing Services Center Building #516 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

SECTION INTEGRATED AUTOMATION COMMISSIONING

SECTION INTEGRATED AUTOMATION COMMISSIONING SECTION 25 08 00 INTEGRATED AUTOMATION COMMISSIONING PART 1. GENERAL 1.01 SECTION INCLUDES: A. BAS and equipment testing and start-up B. Validation of proper and thorough installation of BAS and equipment

More information

SEQUENCE OF OPERATIONS

SEQUENCE OF OPERATIONS SEQUENCE OF OPERATIONS DDC CONTROLLER: Controller with integral LCD readout for changing set points and monitoring unit operation. Provided with required sensors and programming. Factory programmed, mounted,

More information

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION PACKAGED HEAT TRANSFER SYSTEM PACKAGED HEAT TRANSFER SYSTEM Page 1 of 6 SECTION PACKAGED HEAT TRANSFER SYSTEM 1 GENERAL 1.1 SUMMARY A. Packaged steam-to-water heat transfer system 1.2 REFERENCES A. ASHRAE American Society of Heating,

More information

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS PART 1 - GENERAL 1.01 General: A. Laboratory ventilation system will ensure the health and safety of laboratory occupants. B. Room pressurization control will utilize airflow tracking to vary the volume

More information

Section PERIMETER SECURITY SYSTEMS

Section PERIMETER SECURITY SYSTEMS Section 28 16 43 PERIMETER SECURITY SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide and install a perimeter security system as herein specified for the purpose of detecting entry into a designated security

More information

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. SECTION 239950 MECHANICAL COMMISSIONING SYSTEMS PART 1 - GENERAL 1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process. B. Commissioning

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS A. Minimum lighting control (base scope of work) shall include all corridors. The lighting in all the corridors shall be turned on (if not already on) if

More information

RPM1600 Series Room Pressure Monitors

RPM1600 Series Room Pressure Monitors RPM1600 Series Room Pressure Monitors Technical Bulletin LB-RPM1611-0, LB--0 Code No. LIT-12012228 Issued October 2017 Refer to the QuickLIT website for the most up-to-date version of this document. How

More information

Suggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s)

Suggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s) Furnish and install as shown on AERCO International plans and operation and maintenance manuals, with all applicable codes and authorities having local, state and federal jurisdiction, Benchmark Series

More information

LG ELECTRONICS Air Conditioning Technologies LG Guide Specifications Controls

LG ELECTRONICS Air Conditioning Technologies LG Guide Specifications Controls LG ELECTRONICS Air Conditioning Technologies LG Guide Specifications Controls 1 Article I. General Section 1.01 Section 1.02 Section 1.03 System Description Quality Assurance Storage and Handling Article

More information

0 C to 50 C ( 32 F to 122 F ) 0% to 95% R.H. non-condensing. 30 to 95% R.H. Dry contact across terminal BI1, BI2 & UI3 to Scom

0 C to 50 C ( 32 F to 122 F ) 0% to 95% R.H. non-condensing. 30 to 95% R.H. Dry contact across terminal BI1, BI2 & UI3 to Scom Viconics VT7350 Series PIR Ready Fan-coil Controllers General The VT7350 series are PIR Ready low-voltage microprocessor-based fan-coil controllers. Models are available controlling single speed and multi-speed

More information

SECTION BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE

SECTION BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE SECTION 23 0900 - BUILDING AUTOMATION AND AUTOMATIC TEMPERATURE PART 1 - GENERAL 1.1 DESCRIPTION A. The work described under this division is for all labor, materials, and equipment required for the construction

More information

Civil Engineering Building

Civil Engineering Building Continuous Commissioning Report For the Civil Engineering Building Building 492 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

DATA SHEET CHEETAH XI 50 INTELLIGENT SUPPRESSION CONTROL SYSTEM DESCRIPTION APPROVALS: SYSTEM OPERATION. Form No. D

DATA SHEET CHEETAH XI 50 INTELLIGENT SUPPRESSION CONTROL SYSTEM DESCRIPTION APPROVALS: SYSTEM OPERATION. Form No. D DATA SHEET CHEETAH XI 50 INTELLIGENT SUPPRESSION CONTROL SYSTEM DESCRIPTION Fike s Cheetah Xi 50 (P/N 10-071) is a state-of-the-art true intelligent digital peer-to-peer modular suppression control system.

More information

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01915 - FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION PART 1 GENERAL 1.1 Section includes:

More information

- Data Brochure Universal Reset Module 423

- Data Brochure Universal Reset Module 423 - Data Brochure Universal Reset Module 423 D 423 08/07 1 Information Brochure Choose controls to match application Application Brochure Design your mechanical applications 2 3 Rough-in Wiring Rough-in

More information

Samsung SDS BMS Ver.2.0. Technical Specification

Samsung SDS BMS Ver.2.0. Technical Specification Samsung SDS BMS Ver.2.0 Technical Specification Technical Specifications All rights and title, including all intellectual property rights to Samsung SDS BMS" is retained by Samsung SDS Co, Ltd. ("SDS"),

More information

LMV52 Control. Specifications. Document No. LV February 3, Product Description. Sample Specification

LMV52 Control. Specifications. Document No. LV February 3, Product Description. Sample Specification LMV52 Control Product Description February 3, 2017 The LMV52 is a microprocessor-based burner management system with matching system components for the control and supervision of forced draft burners.

More information

CAREL heatersteam Electric Element Steam Humidifiers

CAREL heatersteam Electric Element Steam Humidifiers Suggested Engineering Specifications Section 23 84 13 CAREL heatersteam Electric Element Steam Humidifiers 1. GENERAL SCOPE 1. Furnish and install as indicated on the drawings and plans, in-duct [space]

More information

HIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER

HIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER This manual must be left with owner and should be hung on or adjacent to the boiler for reference. US HIGH EFFICIENCY FIRETUBE CONDENSING GAS BOILER MODELS CHS-85 through CHS-399 APPENDIX A CONTROLLER

More information

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

SIMPLICITY BY DESIGN M52 CONTROLLER

SIMPLICITY BY DESIGN M52 CONTROLLER SIMPLICITY BY DESIGN M52 CONTROLLER CO-WORK TM CONNECTIVITY Our controller is at the heart of all of ClimateWorx product intelligence. Co-Work TM is based on a unique multi-master network system designed

More information

VAV Thermostat Controller Specification and Installation Instructions. Model TRO24T4XYZ1

VAV Thermostat Controller Specification and Installation Instructions. Model TRO24T4XYZ1 Model TRO24T4XYZ1 Description The TRO24T4XYZ1 is a combination controller and thermostat. The VAV Thermostat Controller is designed for simple and accurate control of any variable air volume box in a number

More information

MEPF SPECIFICATIONS SECTION ELECTRICAL GENERAL PROVISIONS SECTION BASIC MATERIALS AND METHODS. MFE MEPF Specification Index Index - 1

MEPF SPECIFICATIONS SECTION ELECTRICAL GENERAL PROVISIONS SECTION BASIC MATERIALS AND METHODS. MFE MEPF Specification Index Index - 1 MEPF SPECIFICATIONS SECTION 15010 - MECHANICAL GENERAL PROVISIONS SECTION 15150 - SUPPORTS AND ANCHORS SECTION 15190 - MECHANICAL IDENTIFICATION SECTION 15250 - MECHANICAL INSULATION SECTION 15510 - HYDRONIC

More information

Operation Manual Fighter ProVision Software. Version: 0.0 Revision: 1

Operation Manual Fighter ProVision Software. Version: 0.0 Revision: 1 Operation Manual Fighter ProVision Software Version: 0.0 Revision: 1 TABLE OF CONTENTS 1. Introduction 5 2. Software Installation 5 3. PC Users 6 3.1 Introduction 6 3.2 Default Code 6 3.3 Edit PC User

More information

Instrumentation and Control for HVAC

Instrumentation and Control for HVAC 23 09 00 Instrumentation and Control for HVAC 1. All controls to be corporate Trane or Honeywell, no substitutes. 2. Factory Mounted controls to be Trane only, otherwise provide terminal strips for TC

More information

Trinity Tft/Lx Model #s: Tft60-399/Lx Version Date:

Trinity Tft/Lx Model #s: Tft60-399/Lx Version Date: Trinity Tft/Lx Model #s: Tft60-399/Lx150-800 Version Date: 2013-07-26 NEW FEATURES Second Central Heat Input Internal Lead-Lag Control System Sensor Modulation Sensor Alternatives Warm Weather Shutdown

More information

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge ESL-TR-99/12-04 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University-Corpus Christi (TAMU-CC) Corpus Christi, Texas Submitted to Texas

More information

DATA SHEET CYBERCAT 254 INTELLIGENT FIRE ALARM CONTROL SYSTEM DESCRIPTION APPROVALS: SYSTEM OPERATION. Form No. D

DATA SHEET CYBERCAT 254 INTELLIGENT FIRE ALARM CONTROL SYSTEM DESCRIPTION APPROVALS: SYSTEM OPERATION. Form No. D DATA SHEET CYBERCAT 254 INTELLIGENT FIRE ALARM CONTROL SYSTEM DESCRIPTION Fike s CyberCat 254 (P/N 10-066) is a state-of-the-art true intelligent digital peer-to-peer modular fire alarm control system.

More information

Laboratory Enclosed Scroll Air Compressor System with Premium NFPA Controls

Laboratory Enclosed Scroll Air Compressor System with Premium NFPA Controls Laboratory Enclosed Scroll Air Compressor System with Premium NFPA Controls Specification General The Powerex Laboratory Scroll Enclosed Air Compressor System is designed to provide clean, dry air for

More information

CARD ACCESS CONTROL SYSTEM

CARD ACCESS CONTROL SYSTEM SECTION 13851 CARD ACCESS CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete, operable, tested, integrated proximity access control system, to operate on a proximity principle where

More information

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog H3/V3 Series Horizontal and Vertical Indoor Air Handling Units Engineering Catalog Table of Contents AAON H3/V3 Series Features and Options Introduction... 6 H3/V3 Base Model Description... 7 Unit Size...

More information

Corrigo E. Second generation which contains all applications and languages

Corrigo E. Second generation which contains all applications and languages revision 05 2009 Corrigo E Second generation which contains all applications and languages The controllers in the Corrigo E series are intended for applications within heating, boiler and ventilation control

More information

Architectural and Engineering Specification for a Real-Time Locating System Flare

Architectural and Engineering Specification for a Real-Time Locating System Flare Architectural and Engineering Specification for a Flare AE-T1-IN-R3-E-0617 Page 1 of 14 This document is intended to provide performance specifications and operational requirements for the Flare. It is

More information

L CONNECTION NETWORK Commercial Controls

L CONNECTION NETWORK Commercial Controls L CONNECTION NETWORK Commercial Controls SIMPLIFIED, CENTRAL CONTROL Simplified Control for Your Facility The L Connection Network not only enhances comfort and energy-efficiency throughout your facilities,

More information

AirTrak. Digital Control System. User Manual. Touchscreen Systems

AirTrak. Digital Control System. User Manual. Touchscreen Systems AirTrak Digital Control System User Manual Touchscreen Systems Rev. 10-29-15 1 2 Table of Contents OVERVIEW... 8 NETWORKING... 9 AIRTRAK DEFAULT SETTINGS... 9 Unit Operating Modes... 10 MRT Controls...

More information

ThermoControl 0 C - 10 C - 20 C - 30 C

ThermoControl 0 C - 10 C - 20 C - 30 C ThermoControl Product and Quality Reliability Alarm Functions & Documentation Global Monitoring 0 C - 10 C - 20 C - 30 C Global monitoring: global temperature measurement and real-time monitoring using

More information

MicroTech Self-Contained Air Conditioning System

MicroTech Self-Contained Air Conditioning System Open Protocol Data Information Packet Version 2.3 Group: Controls Date: October 1999 MicroTech Self-Contained Air Conditioning System Open Protocol Data Communications t 2002 McQuay International - C O

More information

BACnet PTEC Controller VAV 0 to 10V Series Fan and 3- Stage Electric Heat, Application 6657

BACnet PTEC Controller VAV 0 to 10V Series Fan and 3- Stage Electric Heat, Application 6657 BACnet PTEC Controller VAV 0 to 10V Series Fan and 3- Stage Electric Heat, Application 6657 140-1158 Building Technologies Table of Contents Overview... 5 BACnet 14 Hardware Inputs... 14 Room Unit Identification...

More information

MYRIAD TRIPLEX PUMP CONTROLLER INSTRUCTION MANUAL

MYRIAD TRIPLEX PUMP CONTROLLER INSTRUCTION MANUAL MYRIAD TRIPLEX PUMP CONTROLLER INSTRUCTION MANUAL MYRIAD TPC VISIT OUR WEBSITE SIGMACONTROLS.COM MYRIADI&O062705 2 TABLE OF CONTENTS INTRODUCTION 3 Ordering Information Specifications Features WIRING 7,8

More information

DACC - NMDA BUILDINGS

DACC - NMDA BUILDINGS A PROJECT FOR: LAS CRUCES, NEW MEXICO PROJECT LOCATION LOCATION MAP INDEX OF DRAWINGS: CV001 - COVER SHEET M101 - OVERALL CAMPUS STEAM UTILITY PLAN M102 - DACC DAMA 341 PLAN M103 - DACC LRC & CLASSROOM

More information

Instruction manual MTL process alarm equipment. October 2016 CSM 725B rev 2 MTL RTK 725B. Configuration Software Manual

Instruction manual MTL process alarm equipment. October 2016 CSM 725B rev 2 MTL RTK 725B. Configuration Software Manual Instruction manual MTL process alarm equipment October 2016 CSM 725B rev 2 MTL RTK 725B Configuration Software Manual SECTION 1 - INTRODUCTION... 5 Basic Requirements... 5 SECTION 2 - SOFTWARE INSTALLATION...

More information

TEC Controller Terminal Box Controller (VAV) - Series Fan Powered with Hot Water Reheat, Application Application Note

TEC Controller Terminal Box Controller (VAV) - Series Fan Powered with Hot Water Reheat, Application Application Note TEC Controller Terminal Box Controller (VAV) - Series Fan Powered with Hot Water Reheat, Application 2025 Application Note 140-1054 Building Technologies Table of Contents Overview... 4 Hardware Inputs...

More information

Table of Contents. i-vu CCN Standard 4.2

Table of Contents. i-vu CCN Standard 4.2 i-vu CCN Standard 4.2 Owner's Guide CARRIER CORPORATION 2009 A member of the United Technologies Corporation family Stock symbol UTX Catalog No. 11-808-381-01 7/13/2009 Table of Contents Accessing your

More information

WebStat Temperature Control System WITH WEB-BASED BUILDING MANAGEMENT

WebStat Temperature Control System WITH WEB-BASED BUILDING MANAGEMENT WebStat Temperature Control System WITH WEB-BASED BUILDING MANAGEMENT ENGINEERING GUIDE SPEC 1. GENERAL 1.1 SUMMARY A. Furnish all labor, materials, equipment, and service necessary for a complete and

More information

ModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers.

ModSync Sequencing System Installation & Operation Manual. For use with Fulton Steam Boilers. ModSync Sequencing System Installation & Operation Manual For use with Fulton Steam Boilers. Revision 3.0 8/21/2008 - 2 - Table of Contents Introduction Page 4 Features Page 4 Sequence of Operation Page

More information

MicroTech Rooftop/RMC

MicroTech Rooftop/RMC Open Protocol Data Communications Packet Version 4.1 Group: Controls Date: March 1999 MicroTech Rooftop/RMC Data Information Packet for Open Protocol 1999 McQuay International Revision History Version

More information

STEAMPAK Series BurnerPAK BMS Burner Management Systems

STEAMPAK Series BurnerPAK BMS Burner Management Systems BurnerPAK BMS Burner Management Systems Sequence of operation, ignition and control of burners Meets NFPA 85 safety standard MFT alarming with manual reset, first-out indication Optional enhanced alarming

More information

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER PART 1 GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 American National Standard for Gas-Fired Low Pressure Steam and Hot Water Boilers B. ASME Section

More information

Advanced Facility Air-Management Technology

Advanced Facility Air-Management Technology Internet-Enabled HVAC Monitoring & Control Maximum Digital Precision & Total Configuration Flexibility Pure and Simple Solutions Advanced Facility Air-Management Technology AbsolutAire s Facility Air-Management

More information

MicroTech Series 200 Centrifugal Chiller

MicroTech Series 200 Centrifugal Chiller Protocol Data Information Packet Version 2.2 Group: Controls Date: March 1999 MicroTech Series 200 Centrifugal Chiller Data Communications Packet for Protocol 2002 McQuay International Revision History

More information

96% AFUE Efficiency CONDENSING RESIDENTIAL GAS BOILERS CONTROL WITH ADVANCED USER FEATURES MODELS FROM 80,000 TO 285,000 BTU/HR

96% AFUE Efficiency CONDENSING RESIDENTIAL GAS BOILERS CONTROL WITH ADVANCED USER FEATURES MODELS FROM 80,000 TO 285,000 BTU/HR CONDENSING RESIDENTIAL GAS BOILERS CONTROL WITH ADVANCED USER FEATURES MODELS FROM 80,000 TO 285,000 BTU/HR 5:1 FIRING RATE MODULATION LESS THAN 20 ppm NOx DIRECT VENT FLEXIBILITY TO 100 FEET 96% AFUE

More information