1 Contents: 1. List of Changes to PSP Document 2. List of Changes to UGZ Schedule 3. Updated 2 (Future Urban Structure) Note: V6 Revisions are highlighted by red text / border. Revisions primarily relate to: Updating cross sections 3, 3e, 6a and 14 with additional wording Addition of Werribee Township Regional Park to PIP Inclusion of note to 8 regarding signalised intersection treatment, as agreed by Manor Commercial and Wyndham City Council Amendment C171 - Ballan Road Precinct Structure List of Document Changes for ning Panels Victoria 1 st November 2013 V6

2 Cross Cross Introduction 3 1 Delete "The Ballan Road Native Vegetation Precinct (NVPP) sets out requirements for the protection and management of native vegetation within the PSP area." MPA 3 1 Delete Draft Wyndham Precinct Structure s 40, 92, 1088 and 1091: Conservation mangement sets out the mangement requirements for areas protected for the GGF. MPA Add footnote: the biodiversity requirements in 3.4 must be included as shown in the PSP. 31A Delete section 20A Show all existing waterways as per marked up plan, colour in as existing dam, correct to to not go through the gully. Colour north eastern dam in as existing dam. (Changes as per marked up plan) 1 Refer exhibition document MPA Open space: Refer exhibition document Minor adjustments to P11 and P15 and reconfiguration of P1 to avoid existing dwelling P9- Slide north east slightly to achieve view line looking north from within the LTC into the park P11- Reduce park size from 0.9ha to 0.5ha subject 3% NDA of the PSP and make more regular in shape. P12- MPA to allow for discretion in table 4 and acknowledge existing meditation centre P14- maintain location- increase to close to 1ha and configure to a fit for purpose shape across property 27 and property 26 Add roads around all active open space Amend size of property 14 to be consistent with certificate of title Refer exhibition document Removal of housing density classifications Add 400 metre radius to the edge of Manor Lakes MTC and local town centre. Add 800 metre radius to train station. Amend "mixed use employment/commercial" along Ballan Road to indicate 120 metre frontage (no dimensions are shown on the plans) Amend boundary of GGF Conservation Area (proposed park) on property 2 in line with DEPI and Melbourne Water agreed changes Add shared user bridges at decided locations 2,4,6,7,7A,12,16,17, Remove key access street from properties 2,4 and 5 18,19,22,23,24A,29, Remove potential vehicle crossing on property 2 32,33A Make dry stone wall changes to the south of property 34 Shift P14 to the south to allow for 3.06% on both properties Increase size of community centre on property 8 from 0.4ha to 0.6ha All RRL legend notations to be changed to 'Regional Rail Link Corridor' Change legend to Growling Grass Frog Conservation Area (encumbered) Clearly show land required for Ballan Road widening Refer exhibition document Update RRL area and dimensions Amend 'proposed railway stabling yard' to purple with hash. Remove words rail corridor Add note to railway stabling yard to "indicative subject to confirmation by Public Transport Victoria/VicTrak" Fade all non-psp areas Update legend to rename all "key access streets" to "key local access" Notate area "suitable for non-residential uses" along Ballan Road Remove note Rename future railway station to "potential future Riverdale station" Remove words "major and "Ballan Road" from Major arterial road in legend Remove words "site (Aboriginal) from Heritage in legend Replace words "Breakaway Waterway" with Tributary in legend Replace words "community facility" to "community centre" Add "shared user bridge (indicative location)' to legend Update legend font 2,4,6,7,7A,12,16,17, 18,19,22,23,24A,29, 32,33A Outcomes O1 To create an attractive urban environment that has a strong sense of place O2 To provide a consistent landscape treatments along the length of Ballan Road and Hobbs / Armstrong Roads respectively O3 To ensure development positively addresses all public open spaces O4 To create streetscapes, parks and public spaces, with significant canopy tree cover O5 Promote greater housing choice through the delivery of a range of lots capable of accommodating a variety of dwelling typologies O6 To deliver a density of housing that underpins the viability of town centres, community services, and public infrastructure O7 To ensure medium and higher density residential development is prioritised in locations proximate to high amenity, such as public transport, community facilities, town centres and open space O8 To provide a broad range of retailing and business activities to meet the local retail and service needs of the future community. Amend to: "To deliver an overall average precinct density of a minimum of 17 dwellings per net developable hectare." 2,4,6,7,7A,12,16,17, 18,19,22,23,24A,29, 32,33A 1 of 21

3 Cross Cross O9 To provide opportunities for small office, mixed use and home based businesses within and on the periphery of the LTC O10 To ensure the LTC design integrates and prioritises public streets and open spaces as the primary pedestrian movement and activity spaces O11 To provide services and employment opportunities for new residents by facilitating the timely delivery of the LTC, commercial area, community hubs, schools and other community facilities O12 To facilitate commercial and retail development along the Ballan Road interface to Manor Lakes MTC to reflect the scale of Manor Lakes MTC and the arterial road location O13 To ensure community, educational and other public buildings are sited and designed as prominent features in the urban landscape O14 To provide a range of well located community and education facilities that efficiently delivers local infrastructure and services O15 To create an integrated open space network that delivers a diverse range of park sizes and designs O16 To plan for the long term conservation of significant heritage, vegetation and fauna habitat areas, including the Growling Grass Frog Conservation Area O17 To create an urban landscape that integrates with the existing biodiversity, cultural heritage, drainage and landscape values along the Werribee River and internal waterway corridors O18 To identify areas where bushfire hazard requires specified bushfire protection measures for subdivision and buildings and works to be implemented. Delete "To provide services and employment opportunites for new residents by facilitating the timely delivery of the LTC, commercial area, community hubs, schools and other community facilities." Remove words "along the Werribee River and internal waterway corridors" and replace with "within the precinct and along the Werribee River". Delete objective O19 To ensure that the location, design and construction of development consider the need to implement bushfire protection measures. Delete objective O20 To ensure development does not proceed unless the risk to life and property from bushfire can be reduced to an acceptable level. Delete objective O21 To create an excellent cycle and pedestrian network that ensures users can travel safely and directly by foot and bicycle throughout the Precinct and to key destinations such as the LTC, Wyndham Vale train station, schools, open space and community facilities O22 To recognise the strategic importance of the Hobbs / Armstrong Road crossing of the Werribee River and the need to provide this road reservation as early in the life of the development as practicable O23 To create a subdivision design that achieves an integrated, connected, legible and permeable street network and ensures excellent interparcel connections across cadastral (property) boundaries O24 To encourage non noise-sensitive land uses to be located adjoining the RRL corridor / public transport reservation. Replace words "to be located adjoining" with "adjacent" O25 To protect the amenity of residential areas adjacent to the RRL corridor / public transport reservation O26 To create an arterial and local road network that functions effectively as an easily navigable network with a clear and identifiable hierarchy O27 To deliver integrated water management systems that reduce reliance on reticulated potable water and increase the re-use of alternative water (storm and / or waste) and contribute to a sustainable and green urban environment O28 To ensure that development staging is co-ordinated with the delivery of key local and state infrastructure O29 To provide for a non-government school site to meet a strategically justified need for a Catholic primary school in the area Refer exhibition document Delete "Utilities" from heading Amend objective to: "To deliver Integrated Water Management (IWM) systems that reduce reliance on reticulated potable water, increase the use of alternative water (treated storm and/or waste), minimise flood risk, ensure waterway health and contribute to a liveable, sustainable and green urban environment." Delete "lot" in title Delete "summary lot" Local convenience centre to be retitled "mixed use employment/commercial" Remove key access street from properties 2,4 and 5 Remove potential vehicle crossing on property 2 Make dry stone wall changes to the south of property 34 Increase size of community centre on property 8 from 0.4ha to 0.6ha Remove 3 on the Riverdale side of the PSP All RRL legend notations to be changed to 'Regional Rail Link Corridor' Change legend to Growling Grass Frog Conservation Area (encumbered) Clearly show land required for Ballan Road widening Update RRL area and dimensions Fade all non-psp areas Rename future railway station to "potential future Riverdale station" Remove words "major and "Ballan Road" from Major arterial road in legend Remove words "site (Aboriginal) from Heritage in legend Replace words "Breakaway Waterway" with Tributary in legend Replace words "community facility" to "community centre" Add "shared user bridge (indicative location)' to legend Update legend font Delete "Werribee River" from legend Open space changes as per 2 Amend "mixed use employment/commercial" along Ballan Road to indicate 120 metre frontage (no dimensions are shown on the plans) Amend size of property 14 to be consistent with certificate of title Refer exhibition document Amend title to "Summary land use budget and yields" Change WRTP under open space to WTRP and "witihn" to "within" Remove dwelling yield and typologies Replace NRDA with NDAR Delete "passive open space (employment) percentage calculate on NEDA" Include major heading "Encumbered land for conservation purposes" 29 2 of 21

4 Cross Cross Refer exhibition document Replace housing categories with "residential" Move "note" to fit under "key unified landscape streetscapes" Remove potential vehicle crossing on property 2 Make dry stone wall changes to the south of property 34 Increase size of community centre on property 8 from 0.4ha to 0.6ha Remove 3 on the Riverdale side of the PSP All RRL legend notations to be changed to 'Regional Rail Link Corridor' Change legend to Growling Grass Frog Conservation Area (encumbered) Clearly show land required for Ballan Road widening Update RRL area and dimensions Fade all non-psp areas Rename future railway station to "potential future Riverdale station" Remove words "major and "Ballan Road" from Major arterial road in legend Remove words "site (Aboriginal) from Heritage in legend Replace words "Breakaway Waterway" with Tributary in legend Replace words "community facility" to "community centre" Add "shared user bridge (indicative location)' to legend Update legend font Delete "Werribee River" from legend Open space changes as per 2 Amend "mixed use employment/commercial" along Ballan Road to indicate 120 metre frontage (no dimensions are shown on the plans) Amend size of property 14 to be consistent with certificate of title Implementation Image, Character, Housing & Heritage R1 Canopy trees (native, indigenous and exotic) in parks and streets must be: Larger species wherever space allows (to facilitate continuous canopy coverage); Suitable for local conditions; and ted in modified and improved soil as required to support tree longevity R2 Street trees must be planted on both sides of all roads and streets (excluding laneways) at regular intervals appropriate to tree size at maturity and not exceeding: Interval Tree Size 8 10 metres Small trees (less than 10 metres) metres Medium trees (10 15 metres) metres Large trees (15 metres or greater) Replace requirement wording with: "Street trees must be planted on both sides of all roads and streets (excluding laneways) at regular intervals appropriate to tree size at maturity and not exceeding: Average Interval Tree Size 8 10 metres Small trees (less than 10 metres) metres Medium trees (10 15 metres) metres Large trees (15 metres or greater)" 16, 24A R3 Subdivision layout must maximise the number of streets perpendicular to, or with direct views to, the Werribee River and other waterways R4 Suitable street frontages must be provided on educational and community sites to allow buildings to front the street while allowing for vehicular access R5 A use or development that contains a bedroom and is located on land that is reasonably likely, in the opinion of the Responsible Authority, to be impacted by noise from the train operations in the RRL corridor / public transport reservation must be designed to ensure that internal noise levels in bedrooms is less than 65 db LAMAX and 40 db Leq9h(night) R6 A boulevard street treatment with a distinct, unified and consistent landscape treatment, with canopy trees within the central median, must be created along the connector road between the LTC and the Manor Lakes MTC G1 Opportunities for planting larger canopy trees within and beside arterial roads should be maximised G2 Streets should be oriented to maximise direct connections and views to key destinations including the LTC, Manor Lakes MTC, the Werribee River, schools, community facilities, public spaces and waterway corridors G3 Street furniture and public street lighting should have a unified (consistent) character across the Precinct, appropriate to the type and role of street or public space, unless otherwise approved by the Responsible Authority G4 Salvaged rocks should be incorporated in the design and construction of waterways, retaining structures, walls, fences and other landscape features G5 Where long term viability is likely, trees, windrows and dry stone walls with high integrity should be retained within public spaces and reserves including road reserves G6 Highlight planting should be utilised to accentuate the arrival and departure from civic elements within the Precinct and provide transition between different corridors and landscape treatments. Sites in prominent locations such as within and approaching the LTC or the Manor Lakes MTC and / or on street corners intersecting with G7 key arterial and connector roads of the Precinct, should be developed to respond to their strategic location and preferably have greater height, density and reduced setbacks G8 The selection of street trees and landscaping should reinforce the movement hierarchy and be consistent with the Wyndham Street Tree Species List G9 Front fences abutting open space areas and waterway corridors should be visually permeable and not more than 1.2m high. Remove "along the connector road between the LTC and the Manor Lakes MTC" and replace with "in accordance with the PSP" G10 Dwellings on corner lots should: provide a positive address to both frontages, and restrict boundary fencing forward of the front wall of the dwelling to not more than 1.2m in height. Add words after "lots"- "(including lots interfacing pedestrian links)" 29 3 of 21

5 Cross Cross G11 To provide sustainable and robust landscapes, with extensive tree canopy cover, Water Sensitive Urban Design (WSUD) initiatives should be implemented to direct runoff water into nature strips, medians and other planted areas. Add words at the end of guideline 11 "refer to 3.6 Integrated Water Management" G12 Where 2 shows residential land abutting the RRL corridor, consider provision for non-sensitive land use along the RRL corridor G13 High quality and cohesive landscape treatments should be provided throughout the Precinct, in particular: Across parcel boundaries Along Key Unified Landscape Corridor Along the entire length of the proposed rail stabling yards and the Hobbs/ Armstrong Road corridor to minimise the visual impacts of the RRL corridor and proposed metropolitan rail stabling facility. Roads immediately abutting and intersecting with the Werribee River corridor (including the Werribee Township Regional Park, GGF Conservation Area and the Werribee River breakaway waterway corridor), using indigenous species and where practical, matching the relevant Ecological Vegetation Class. Add dot point "Ballan Road" G14 The existing stand of Sugar Gums that runs from Ballan Road to the proposed Government primary school in the south of the Precinct should be retained and incorporated within the public realm and form part of the connector road reservation, where practical; subject to the expert advice of a qualified arborist and satisfaction of the Responsible Authority G15 Subject to the expert advice of a qualified arborist, the future subdivision and development of PSP Property 28 (Lot 9 LP126153, McGrath Road) should retain and incorporate significant trees within the public realm, where practical; subject to the expert advice of a qualified arborist and satisfaction of the Responsible Authority. Development applications should, for each stage, cater for the provision of three or more dwelling types listed in 2, as appropriate, or, demonstrate an alternative lot range that achieves the housing diversity objectives. Within the general boundary of each density category shown on 4, 2 and 1 a range of lot sizes should be provided. For example, lots less than 300sqm within the conventional density areas and lots greater than 500sqm in medium density areas. Subdivision of land close to town centres and or public transport routes should create a lot range suitable for the delivery of medium and higher density housing types listed in 2. Lots capable of supporting conventional and lower density housing are encouraged closer to the Werribee River. and the Werribee Township Regional Park. Updated to refer to "significant trees (non-native) as shown on plan 6, should be retained and inegrated into the public realm where practical etc G15 See above Amend "property 28" to "property 32" R7 Development must achieve a minimum average density of 17 dwellings per Net Developable Hectare (NDHa) across the Precinct. Replace requirement with "Provide a broad range of residential lot sizes within each neighbourhood described on 4a." R8 Development applications must demonstrate how they contribute to the achievement of the density target outlined in R7. Delete R9 Development applications must demonstrate how the proposal will contribute to delivery of a diversity of housing types. Delete R10 Subdivision applications must identify sites capable of delivering higher density housing adjacent to the LTC and within the primary Delete catchment (approximately 800 metres) of the Wyndham Vale train station R11 Dwellings with abuttal to the RRL / public transport reservation must front a road unless otherwise agreed by the Responsible Authority. Replace requirement with "Lots with abuttal to the RRL / public transport reservation, must front a road, as illustrated by X, unless otherwise agreed by the Responsible Authority." 29, X Include to demonstrate the above R12 Development abutting Hobbs / Armstrong and Hobbs Road north of the arterial road extension over the Werribee River must be directly Delete. fronted to those roads G16 Where a subdivision proposal represents a single stage or limited number of stages, proponents should demonstrate how the subdivision Delete will contribute to the eventual satisfaction of the guidance in the property specific yield table ( 1) G17 Update wording to "Residential subdivision stages should provide a broad range of lot sizes capable of accomodating a range of housing types described in 2." G G G G21 Specialised housing forms such as retirement living or aged care should be: Integrated into the wider urban structure. Located in close proximity to town centres and community hubs. Accessible by public transport. Delete Subidvision of land within a walkable distance of town centres, train stations and /or public transport routes should create a lot range suitable for the delivery of medium and higher density housing types listed in of 21

6 Cross Cross Remove and replace with amended table 2 Title renamed "Housing Type and Lot Size Guide" Refer exhibition document Housing types that may be supported Less than 300m2 Lot Size 300m2 to 600m2 More than 600m2 Small Lot Housing including townhouses and attached houses and detached houses Dual occupancies, duplexes Detached houses Multi-unit housing sites including terraces, row houses and villas Stacked housing including apartments and walk up flats R13 Retained dry stone walls must: Be situated within public open space or road reserve to the satisfaction of the Responsible Authority Have a suitable landscape interface to minimise maintenance requirements (for example mulch, garden bed or gravel) and which does not encourage public access immediately adjacent the retained walls. Be checked by a professional craftsperson for any loose stones. Any loose stones are to be reinstated in the wall in secure positions. Retain post and wire or post and rail fences situated within the walls, with any wire protruding beyond the vertical face of the wall reinstated to its original position or removed. Be incorporated into subdivision design to minimise disturbance to the walls (e.g. utilisation of existing openings for vehicle and pedestrian access). Remove words "retained dry stone walls must" and replace with "Dry stone walls which are retained must" R14 Installation of services across the alignment of retained dry stone walls is to be undertaken by boring rather than open trenching. If open trenching or disturbance to the wall is unavoidable, a minimum section of wall may be temporarily removed and then reinstated to original condition. Any reinstatement or repair of walls is to be undertaken by a professional craftsperson and is to be consistent with the construction style of the original wall. Reinstatement is to use stone from (in order of priority): The original wall in that location (including fallen stone adjacent to the wall). A nearby section of the wall approved to be removed From the adjacent paddock From walls approved to be removed in the nearby area (including stone stockpiled by Council) A list of professional craftspeople can be obtained by Council and the Dry Stone Walls Association of Australia. Split requirement into separate requirements Wording for R14: "Installation of services across the aligment of retained dry stone walls is to be undertaken by boring rather than open trenching. If open trenching or disturbance to the wall is unavoidable, a minimum section of wall may be temporarily removed and then reinstated to original condition." Wording for R15: "Any reinstatement or repair of walls is to be undertaken by a professional craftsperson and is to be consistent with the construction style of the original wall. Reinstatement is to use stone from (in order of priority): The original wall in that location (including fallen stone adjacent to the wall). A nearby section of the wall approved to be removed From the adjacent paddock From walls approved to be removed in the nearby area (including stone stockpiled by Council) A list of professional craftspeople can be obtained by Council and the Dry Stone Walls Association of Australia." G22 Where retention of dry stone walls in their current state is not feasible, walls (or parts of walls) in high profile and / or strategic locations Delete should be re-built by a master craftsperson to integrate with the development and subject to the satisfaction of the Responsible Authority G23 Where existing dry stone walls are to be removed, land owners should consult with Council to determine whether the material may be used Delete internally within the Precinct or transferred for landscaping purposes. The dry stone wall located on the southern boundary of PSP Property 34 (Lot 1, LP , 575 McGrath Road, Wyndham Vale) should be Delete G24 integrated into the future subdivision design of the land and retained within a median within the future road reserve as demonstrated on Cross 12 in 4 to the satisfaction of the Responsible Authority. The dry stone wall located on the eastern boundaries of PSP properties 32 and 33 (Lot 9 LP126153, McGrath Road and Lot 10 Delete G25 LP126153, McGrath Road, Wyndham Vale) should be integrated into the future subdivision design of the land and ensure that the integrity of the structure is retained, where practical, to the satisfaction of the Responsible Authority. Town Centres & Employment Refer exhibition document Amend "key circulation" in legend to "key pedestrian and/or circulation" R15 Subdivision and development within the Local Town Centre must respond to the relevant concept plan shown in R16 Subdivision and development within the Local Town Centres must address the design principles and performance criteria outlined in 2. 5 of 21

7 Cross Cross G26 Retail floorspace should be limited to approximately 5,000sqm with additional allowance for ancillary uses including office and service industry G27 Footpaths in the main street should be a minimum width of 4.0 metres G28 Large expanses of blank walls along streets should be avoided. Blank walls should be treated to discourage graffiti G29 ning permits should address and resolve the management of local roads and town squares to ensure appropriate management outcomes R17 Land use and development of the Southern Local Convenience Centre (LCC) must be generally in accordance with the Local Convenience Centre Concept shown in R18 Subdivision and development within Local Convenience Centres must address the design principles and performance criteria outlined in G30 Retail floor space should be limited to approximately 500sqm with additional allowance for ancillary uses including office and service industry G31 Footpaths should allow for increased pedestrian activity and on-street dining G32 Large expanses of blank walls along streets should be avoided. Blank walls should be treated to discourage graffiti G33 Development of the LCC should create opportunities for the long term development of high and medium density housing Refer exhibition document Refer exhibition document R19 Land use and development must be generally in accordance with the Ballan Road Commercial Area Concept shown in R20 Key locations within the Ballan Road Commercial Area must incorporate features of interest into the built form and surrounding landscape (refer to 4). Features of interest include: Minimum two storey construction or elements of two storey construction (such as higher floor to ceiling heights, parapets, awnings, shade structures or roof elements); Sculptured facades which include recesses and projections to provide variation and segmentation to the building facade; Strong vertical elements; Balconies; Roof and/or wall articulation; and/or Feature colours and materials which are sympathetic to the sites surrounds. Extend key circulation along frontage to Hobbs Road of the Local Convenience Centre Amend legend to ensure words not cut off Amend to indicate 120 metre consistent frontage (noting no dimensions are shown on the plans) and annotate the concept plan to highlight flexibility in the lot depth to be allowed by the responsible authority as suitable to the application). 6,17,19,21,32, R21 Vehicular access to properties fronting Ballan Road to the Employment Area must be from service lanes, internal loop roads or rear laneways R22 Water tanks, service infrastructure and other structures that are not part of a building must be located behind the building line; or where this is not possible behind constructed screening using durable and attractive materials to the satisfaction of the Responsible Authority R23 Development proponents must consider Crime Prevention Through Environmental Design (CPTED) and Safer Design s when designing employment areas R24 Land uses must complement the role and function of the Manor Lakes MTC R25 Buildings must be setback no more than 22 metres from the Ballan Road road reserve and comply with the Ballan Road Commercial Area Concept shown in R26 All buildings must provide an active frontage and primary access from Ballan Road to the building R27 Articulated frontages must address all side and / or rear streets R28 Secondary access points to buildings from side and / or rear streets may be considered in addition to primary access to the building from Ballan Road R29 Provide a Local Access Level 2 interface road adjacent to residential development G34 Fencing to the Ballan Road interface should be visually permeable and no greater than 1.2 metres in height G35 Preferred land uses are office, commercial, restricted retail, allied health and food and drink premises. Medium and higher density dwellings may be considered as part of a mixed use development. Replace "employment area" with "commercial area" "Vehicular access to arterial or sub-arterial roads must be provided from local road or rear lanes only. Service roads may be considered in exceptional circumstances, subject to agreement of the coordinating road authority." 6 of 21

8 Cross Cross Open Space & Community Facilities Refer exhibition document Add native vegetation information from the NVPP to 5, distinguish what is to be retained and what may be removed Update legend font Increase size of P14 to the south Amend plans to show Shared Use Bridge (indicative location) over the Werribee River connecting to the Riverdale PSP 91 to the north east of Wollahra Rise; and nearby GGF wetland 19 in the north. Remove potential vehicle crossing on property 2 Make dry stone wall changes to the south of property 34 Increase size of community centre on property 8 from 0.4ha to 0.6ha Remove 3 on the Riverdale side of the PSP All RRL legend notations to be changed to 'Regional Rail Link Corridor' Change legend to Growling Grass Frog Conservation Area (encumbered) Clearly show land required for Ballan Road widening Update RRL area and dimensions Fade all non-psp areas Rename future railway station to "potential future Riverdale station" Remove words "major and "Ballan Road" from Major arterial road in legend Remove words "site (Aboriginal) from Heritage in legend Replace words "Breakaway Waterway" with Tributary in legend Replace words "community facility" to "community centre" Add "shared user bridge (indicative location)' to legend Update legend font Delete "Werribee River" from legend Open space changes as per 2 Amend "mixed use employment/commercial" along Ballan Road to indicate 120 metre frontage (no dimensions are shown on the plans) Amend size of property 14 to be consistent with certificate of title Refer exhibition document Amend size of P15 from 0.1 to 4.4 Add P18 to the table (0.20ha- Neighbourhood Passive Recreation Node-Anchored to the Werribee River Breakaway Waterway Corridor- Wyndham City) Check size of P15 is it 1.0ha or Describe Park P12 shape and configuration within 4 Other Attributes column to allow for some discretion. Amend P6, P7 and P8 classification to Urban Park in 4 to accord with of 21

9 Cross Cross R30 Open space design and delivery must have regard to 3 and R31 The open space network must: Provide flexible recreational opportunities that allow for the anticipated range of active and passive recreational needs of the community. Maximise the amenity and value of encumbered open space, in particular waterway, heritage and habitat conservation open spaces R32 All public land, including streets, must be designed to provide robust and attractive landscaping, that can be viably maintained, to the satisfaction of the Responsible Authority R33 Parks and open spaces must contain extensive planting of large canopy scale trees, native, indigenous and exotic, that are suitable for urban environments, the local climate, soil conditions, and to the satisfaction of the Responsible Authority R34 Open space (including active, passive, encumbered land and waterways) must be separated from development either by a road interface or lots with rear laneway access and a 3m wide shared path unless otherwise agreed in writing by the Responsible Authority R35 The town square must be delivered via the Clause passive open space contributions R36 Development abutting open space must be designed to provide passive surveillance, through the appropriate siting of windows, balconies and pedestrian access points R37 Fencing of parkland must be low scale and/or visually permeable to facilitate public safety and surveillance R38 Design and construction of any infrastructure or trails located within the Werribee River open space corridor must be consistent with: The Werribee River CMP. The Werribee River Shared Trail Strategy Any relevant approved Cultural Heritage Management. Amend wording to "parks, open spaces and paths must contain"... Replace requirement with "Where fencing of open space is required, it must be low scale and/or visually permeable to facilitate public safety and surveillance." R R40 If local parks interface with a waterway corridor or encompass remnant native vegetation the design of that open space must demonstrate integration of the relevant environmental and waterway values. A planning permit application involving the Werribee River or tributaries must be accompanied by the following information (as appropriate): A summary of the Aboriginal cultural heritage implications related to the development of the Corridor within the specific permit area. An analysis of the ecological, landscape and geomorphic values of the Corridor within the specific permit area. A plan clearly demonstrating the recreation facilities to be provided within the Corridor within the specific permit area. A plan demonstrating the stormwater facilities to be provided in the Corridor within the specific permit area and how this is compliant with the approved drainage strategy. A plan identifying the retention of vegetation and re-vegetation proposed within the corridor. Where appropriate, the development proponent may be required to prepare an Environmental Management for the Corridor within the specific permit area prior to the commencement of works R41 Where single passive parks are located across multiple existing property parcels, the first development proponent to lodge a permit application must undertake a master plan for the entire park to the satisfaction of the Responsible Authority, or unless otherwise approved by the Responsible Authority G36 Active recreation reserves should be designed to maximise co-location opportunities between complementary sports and adjoining school facilities G37 The design and layout of open space should maximise water use efficiency, storm water quality and long term viability of vegetation through the use of Water Sensitive Urban Design (WSUD) initiatives G38 Passive parks should cater for a broad range of users and support both structured and informal recreation activities G39 The design of waterways, wetlands (other than GGF wetlands), retarding basins and other encumbered land should maximise the potential for passive and / or active recreation uses where this does not conflict with the primary function of the land G40 Passive parks within and adjacent to the Werribee River corridor should provide clear delineation of areas of conservation or cultural heritage significance G41 Design of sporting reserves should orientate playing fields in a generally north / south direction to minimise interference to play by direct sun G42 The indicative layout of schools and open space as illustrated in 4 and 5 may be altered to the satisfaction of the Responsible Authority G43 In addition to the pedestrian crossings shown on 10, development proponents should provide waterway crossings at intervals no greater than 400m G44 The proponent delivering a master plan for a local passive park that traverses multiple property parcels, should consult with the landowners of parcels also covered by the park, to ensure an integrated design G45 Design and construction of any infrastructure or trails located within the Werribee River open space corridor should be guided by the Desktop and Standard Aboriginal Cultural Heritage Assessment (Aboriginal Affairs Victoria project number 11896). 8 of 21

10 Cross Cross 28 R42 Further to the public open space contribution required by Clause of the Wyndham ning Scheme, this provision sets out the amount of land to be contributed by each property in the Precinct and consequently where a cash contribution is required in lieu of land. All land owners must provide a public open space contribution equal to 2.61% of NDA upon subdivision of land in accordance with the following: Where the passive open space shown on the lot in 5 of this Precinct Structure is equal to 2.61% of the lot s NDA that land must to be transferred to Council at no cost to Council. Where the passive open space shown on the lot in 5 of this Precinct Structure is equal to 0% or less than 2.61% of the lot s NDA: o the relevant land must be transferred to Council at no cost to Council o a cash contribution must to be made to Council to bring total open space contribution (land and cash) to a value equal to 2.61% of NDA. The cash contribution is to be made at a rate of $630,000 per NDHa (as at July , indexed annually to All Groups CPI; Melbourne ABS 6401, 5). Where the passive open space shown on the land in 5 of this Precinct Structure is greater than 2.61% of NDA, Council will pay to the subdivider, at a time to be agreed, $630,000 per net NDHa (as at July , indexed annually to All Groups CPI; Melbourne ABS 6401, 5) for the relevant land in excess of 2.61% of NDA where the land is provided in accordance with this Precinct Structure. Refer to the Property Specific Land Use Budget ( 4.1) for detailed individual property open space land areas and percentages specified by this Precinct Structure. The Responsible Authority may alter the distribution of passive open as shown in this Precinct Structure provided the relevant vision and objectives of this Precinct Structure are met. A subdivider may provide additional passive open space in a subdivision to the satisfaction of the Responsible Authority. There is no onus on Council, the Responsible Authority or any other party to provide compensation for open space provided above that required by Clause and this Precinct Structure. Replace wording with: "Further to the passive open space contribution required by Clause of the Wyndham ning Scheme, this provision sets out the amount of land to be contributed by each property in the Precinct and consequently where a cash contribution is required in lieu of land. All land owners must provide a passive open space contribution equal to 3% of the land s NDAR upon subdivision of the land except in the case of employment land (as shown on 6) where the contribution is 2% of the land s NDAE. The contribution must be made as follows: Where the passive open space shown on the lot in 6 of this Precinct Structure is equal to 3% (or 2% for employment land) of the lot s NDAR (NDAE) that land must to be transferred to Council at no cost to Council. Where the passive open space shown on the lot in 6 of this Precinct Structure is equal to 0% or less than 3% (or 2% for employment land) of the lot s NDAR (NDAE): the relevant land must be transferred to Council at no cost to Council a cash contribution must to be made to Council to bring total open space contribution to a value equal to 3% (or 2% for employment land) of NDAR (NDAE). Where the passive open space shown on the land in 6 of this Precinct Structure is greater than 3% (or 2% for employment land) of NDAR (NDAE), the relevant land must be transferred to Council at no cost to Council. In this case Council will compensate the landowner, at a time to be agreed, for the amount of land provided in excess of 3% (or 2% for employment land) but no greater than difference between 3% (or 2% for employment land) and the amount of land shown as passive open space on 6. Refer to the Property Specific Land Budget ( 1) for detailed individual property open space land areas and percentages specified by this Precinct Structure. The Responsible Authority may alter the distribution of passive open as shown in this Precinct Structure provided the relevant vision and objectives of this Precinct Structure are met. A subdivider may provide additional passive open space in a subdivision to the satisfaction of the Responsible Authority. There is no onus on Council, the Responsible Authority or any other party to provide compensation for passive open space provided above that required by Clause and this Precinct Structure." 29 4 Refer exhibition document 29 5 Refer exhibition document Replace P15 with P16 Show the shared path Replace P16 with P17 Show Local Access Level 1 Streets on interace between residential areas and open space areas Increase 'community facility' size from 0.4ha to 0.6ha. Decrease passive open space by 0.2ha and active open space by 0.03ha R43 Community and education facilities must provide efficiency through the co-location of: shared buildings, car parking and other infrastructure active open space and associated facilities. Replace with: "Community facilities, schools and active recreation reserves which are co located should to maximise efficiencies through the sharing of car parking and other complementary infrastructure." R R R46 The siting and design of community facilities must ensure a strong street address to their primary street frontage and any adjoining public spaces or other public uses. Where the Responsible Authority is satisfied that land shown as a non-government school site is unlikely to be used for a non-government school, that land may be used for an alternative purpose which is generally consistent with the surrounding land uses and the provisions of the applied zone. Schools and community centres must be designed to front and be directly accessed from a public street with car parks located to the side and / or rear of the allotment G46 Community facility sites should be provided with at least two street frontages G47 Schools should be provided with three street frontages, where practicable G48 Community facilities should be planned and designed with the flexibility and capacity to meet the changing needs of the community and provide for a range of community uses G49 Community, education and commercial buildings should incorporate design and construction measures to minimise resource use G50 Any private childcare, medical, or similar facility should be located proximate to any Local Town Centre, Local Convenience Centre or nominated community hub as appropriate G51 Where a community centre is co-located with public open space, efficiency of land use should be maximised through the sharing and overall reduction of car parking. X X Amend to: "Schools and community centres must be designed to front, and be directly access from, a public street with car parks located away from the main entry." Any connector road or access street abutting a school must be designed to achieve slow vehicle speeds and provide designated pedestrian crossing points as requried by the responsible authority. Where appropriate, non-government community services to integrate with Council community centres and/or town centres. 9 of 21

11 Cross Cross Biodiversity, Threatened Species & Bushfire Management Refer exhibition document R47 Development within the Conservation Management area must be in accordance with the approved Werribee River CMP to the satisfaction of Melbourne Water and the Department of Sustainability and Environment R48 Design, baffle and locate adjoining lighting to prevent light spill and glare adjacent to Growling Grass Frog wetlands (as described in the Werribee River CMP) G52 Where appropriate co-locate public recreation and open space areas to assist in buffering significant conservation reserves and waterways G53 Landscaping adjacent to the Werribee River, waterway corridors and retained indigenous vegetation should be complementary to the natural environment and should use indigenous planting, where appropriate G54 Where practical, subdivision applications should have regard to the Wyndham City Council Landscape Context s G55 Where located adjacent or nearby each other, maximise the integration of linear and conservation open space with local parks G56 Street trees and public open space landscaping should contribute to habitat for indigenous fauna species, in particular arboreal animals and birds R49 Unless a subdivision meets the standards set out in either G71 or G72, it must provide defendable space between a fire threat edge identified on 5 in this Precinct Structure and a dwelling to the satisfaction of the Country Fire Authority (CFA) R50 Where a lot contains defendable space the following applies: Before the statement of compliance is issued under the Subdivision Act 1988 the owner must enter into an agreement with the Responsible Authority under 173 of the ning and Environment Act 1987 and make application to the Registrar of Titles to have the agreement registered on the title to the land under 181 of the Act. The agreement must set out the following matters: A building envelope and that a building must not be constructed outside of the building envelope. That a building must not be constructed on the lot unless it is constructed to 12.5 BAL. The area of defendable space applicable to the lot with the following restrictions on vegetation during a declared fire danger period: Within 10 metres of a building, flammable objects (such as plants, mulches and fences) must not be located close to the vulnerable parts of the building (such as windows, decks and eaves). Grass must be no more than five centimetres in height. Trees must not overhang or touch any part of a building. Leaves and vegetation debris must be removed at regular intervals. Shrubs must not be planted under trees. ts greater than ten centimetres in height at maturity must not be placed directly in front of a window or other glass feature. A tree canopy must not be closer than two metres to another tree canopy. Total tree canopies must cover no more than 15% of the area of the lot at maturity. That the agreement ends upon the issue of a certificate of occupancy for a building on the lot. This does not apply where the CFA states in writing that a 173 agreement is not required for the subdivision or lot. Replace with Map 2 of the NVPP Show all GGF wetland ID pullouts Update RRL area and dimensions Name for plan changed Remove potential vehicle crossing on property 2 Make dry stone wall changes to the south of property 34 Increase size of community centre on property 8 from 0.4ha to 0.6ha All RRL legend notations to be changed to 'Regional Rail Link Corridor' Change legend to Growling Grass Frog Conservation Area (encumbered) Clearly show land required for Ballan Road widening Update RRL area and dimensions Rename future railway station to "potential future Riverdale station" Fade all non-psp areas Remove words "major and "Ballan Road" from Major arterial road in legend Remove words "site (Aboriginal) from Heritage in legend Replace words "Breakaway Waterway" with Tributary in legend Delete "Werribee River" from legend Open space changes as per 2 Amend size of property 14 to be consistent with certificate of title Delete "Sustainability and Environment" and replace with "Department of ning and Environment" Add "and the Responsible Authority" Delete "wetlands" and replace with "conservation area" Delete "prevent" and replace with "minimise" Update wording "Tree planting and landscaping adjacent to the Werribee River, waterway corridors and retained indigenous vegetation should be indigenous species". Deleted - note bushfire management reverts to Bushfire Prone Area provisions under the Building Regulations 2006 (regs 810 & 811) Deleted - note bushfire management reverts to Bushfire Prone Area provisions under the Building Regulations 2006 (regs 810 & 811) 1,18, R51 Provide a road network that enables at least two safe egress routes away from the fire hazard R52 For the purposes of Clause , the requirements of the relevant fire authority are, unless otherwise approved by the CFA: Constructed roads must be a minimum of 7.3m trafficable width where cars park on both sides, or: A minimum of 5.4m in trafficable width where cars may park on one side only. A minimum of 3.5m width with no parking and 0.5m clearance to structures on either side, and if this width applies, there must be passing bays at least 20m long, 6m wide, and located not more than 200m apart. Roads must be constructed so that they are capable of accommodating a vehicle of 15 tonnes for the trafficable road width. The average grade of a road must be no more than 1 in 7 (14.4% or 8.1 ). The steepest grade on a road must be no more than 1 in 5 (20% or 11.3 ) with this grade continuing for no more than 50 metres at any one point. Dips in a road must have no more than a 1 in 8 grade (12.5% or 7.1 ) entry and exit angle. Constructed dead end roads more than 60 m in length from the nearest intersection must have a turning circle with a minimum radius of 8 m (including roll-over curbs if they are provided). Deleted - note bushfire management reverts to Bushfire Prone Area provisions under the Building Regulations 2006 (regs 810 & 811) R53 ting in streets and public spaces within defendable space must be designed to take into account impact on fire risk. Deleted - note bushfire management reverts to Bushfire Prone Area provisions under the Building Regulations 2006 (regs 810 & 811) 10 of 21

C176. Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria. Version th November 2013

C176. Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria. Version th November 2013 C176 Amendment C176 Riverdale Precinct Structure Plan List of Document Changes for Planning Panels Victoria Version 1.0 18 th November 2013 Amendment C176 Riverdale Precinct Structure Plan List of Document

More information

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan SCHEDULE 10 TO THE URBAN GROWTH ZONE Shown on the planning scheme map as UGZ10 Truganina Precinct Structure Plan 1.0 The Plan Map 1 shows the future urban structure proposed in the Truganina Precinct Structure

More information

TABLE OF CONTENTS. Human Habitats, 155 Dorcas St South Melbourne, Victoria 3205

TABLE OF CONTENTS. Human Habitats, 155 Dorcas St South Melbourne, Victoria 3205 TARNEIT JUNCTION Town Planning Report DECEMBER 2013 TABLE OF CONTENTS Table of contents... 1 1 Introduction... 2 2 SIte context and surrounds... 4 2.1 Site Features... 4 2.2 Surrounding land uses... 4

More information

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles Keystone Business Park Precinct Structure Plan North East Industrial Precinct Part 2 Design Principles Context Issues Services Landform Issues Geotech and contamination Ecology Traffic and access Issues

More information

Cardinia Creek South

Cardinia Creek South Cardinia Creek South Precinct Structure Plan March 2018 Your partner in planning great places for a growing Victoria Contents 1.0 INTRODUCTION 5 1.1 How to read this document 7 1.2 Land to which this PSP

More information

Introduction How to read this document Land to which this Precinct Structure Plan applies Background information...

Introduction How to read this document Land to which this Precinct Structure Plan applies Background information... Introduction... 4 How to read this document... 6 Land to which this Precinct Structure Plan applies... 6 Background information... 6 Shepparton North East Development Contributions Plan... 7... 8 OUTCOMES...

More information

Outcomes. Cross Section (Exhibition) Appendix (Exhibition) Requirement (Exhibition) Guideline (Exhibition) Table (Exhibition) Objective (Exhibition)

Outcomes. Cross Section (Exhibition) Appendix (Exhibition) Requirement (Exhibition) Guideline (Exhibition) Table (Exhibition) Objective (Exhibition) AMENDMENT C198 - Craigieburn North Employment Area Precinct Structure Plan Document changes matrix with reference to relevant submissions Version: 0.1 - Prepared for initial distribution October 2015 Note:

More information

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to: AUGUST 29, 2017 12.15 Northeast Quadrant of Kipling Avenue and Highway 7 12.15.1 Goals 12.15.2 Land Use The goals of this Plan are to: 12.15.2.1 General Provisions: a) Ensure the development of a compact

More information

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN Official Plan Amendment XX to the Official Plan for the City of Ottawa 1 INDEX THE STATEMENT OF COMPONENTS PART A THE PREAMBLE PAGE Purpose...

More information

Appendix H: Easement cross sections

Appendix H: Easement cross sections Appendix H: Easement cross sections SHARED PATH 1.5m FOOTPATH NATURE STRIP 7.3m CARRIAGEWAY 2.7m NATURE STRIP EXISTING PIPELINE 150mm DIA 5.0m (approx.) LOCAL ACCESS ROAD EXISTING PIPELINE 500mm DIA 2.7m

More information

Part 9 Specific Land Uses - Housing on Small and Narrow Lots

Part 9 Specific Land Uses - Housing on Small and Narrow Lots 19 HOUSING ON SMALL AND NARROW LOTS This section of the DCP applies where development for the purpose of a dwelling house, attached dwellings, or semi-detached dwellings is or are proposed in the R2 Low

More information

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN DD/MM/YY Proposed C120 SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY Shown on the planning scheme map as DDO12. GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN 1.0 Design objectives DD/MM/YY Proposed

More information

PORT WHITBY COMMUNITY

PORT WHITBY COMMUNITY PORT WHITBY COMMUNITY SECONDARY PLAN UPDATE COMMUNITY IMPROVEMENT PLAN URBAN DESIGN GUIDELINES September 2015 DRAFT PROPOSED AMENDMENT NUMBER # to the Whitby Official Plan PURPOSE: The intent of this Amendment

More information

Shepparton North East Precinct Structure Plan. February 2018

Shepparton North East Precinct Structure Plan. February 2018 Shepparton North East Precinct Structure Plan February 2018 Contents 1.0 INTRODUCTION 5 1.1 How to read this document 7 1.2 Land to which this Precinct Structure Plan applies 7 1.3 Background information

More information

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE DD/MM/YY SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO3 EASTERN GOLF COURSE KEY REDEVELOPMENT SITE 1.0 A permit may be granted before a development plan has been

More information

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018 DESIGN BRIEF CONTENTS PART A 1.0 INTRODUCTION 2.0 DESCRIPTION & ANALYSIS OF SITE CONTEXT 3.0 DESIGN CONSTRAINTS AND OPPORTUNITIES

More information

Retain high quality habitat for the Growling Grass Frog along the Merri Creek corridor, and support other environmental habitat value.

Retain high quality habitat for the Growling Grass Frog along the Merri Creek corridor, and support other environmental habitat value. AMENDMENT C183 - ENGLISH STREET Document changes matrix with reference to relevant submissions Version: 0.1 - Prepared for initial distribution 31 August 2015 2 Contents 1.0 Introduction 4 P1 Local Access

More information

I615. Westgate Precinct

I615. Westgate Precinct I615. Westgate Precinct I615.1. Precinct Description The Westgate Precinct is located approximately 18km west of the Auckland city centre. There are seven Sub-precincts in the Westgate Precinct: Sub-precinct

More information

1 4 2 Dry stone wall along the boundary of property 7 and 9

1 4 2 Dry stone wall along the boundary of property 7 and 9 AMENDMENT GC28 - Donnybrook / Woodstock Precinct Structure Plan Document changes matrix with reference to relevant submissions Version: 3.0 - Conclusion Submission - June 2016 Note: where a change has

More information

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN 76 Conservation area boundary. Low Fence to exclude vehicles but allow pedestrian access Front boundary of allotment 5.0m MINIMUM SETBACK Path providing public access to dwellings fronting Conservation

More information

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES Created September 2013 Penihana North Subdivision Design Criteria GUIDELINES TO THE RULES This part of the Plan sets out the design criteria for subdivision in Penihana North. The criteria will be considered

More information

The West Vaughan Employment Area Secondary Plan Policies

The West Vaughan Employment Area Secondary Plan Policies Part 2: The West Vaughan Employment Area Secondary Plan Policies 2.1 General Policies It is the policy of Council: 2.1.1. That the West Vaughan Employment Area (the WVEA), identified on Schedule 1, will

More information

Barwon Heads Road. REGIONAL ACTIVE PUBLIC OPEN SPACE - Indicative Concept Only FIGURE C. Armstrong Creek East Precinct Structure Plan

Barwon Heads Road. REGIONAL ACTIVE PUBLIC OPEN SPACE - Indicative Concept Only FIGURE C. Armstrong Creek East Precinct Structure Plan 0 50 150 metres KEY Arterial Road (existing) Walking / Cycling link Residential Conventional Mixed Use Residential Medium Density Farming Drainage and Floodway Public Open Space Armstrong Creek Watercourse

More information

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling

Proposed for Vic West Neighbourhood Plan. Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Proposed for Vic West Neighbourhood Plan Design Guidelines for Intensive Residential Development - Townhouse and Attached Dwelling Design Guidelines for Intensive Residential Development - Townhouse and

More information

Altona North. Comprehensive Development Plan

Altona North. Comprehensive Development Plan Altona North Comprehensive Development Plan June 2017 CONTENTS 1 Introduction... 2 1.1 How to read this document... 2 1.2 Land to which the Plan applies... 4 1.3 Background information... 5 1.4 Altona

More information

MASTER PLAN NO. 60 (SITE DEVELOPMENT PLAN EASTBANK/REGATTA NORTH PRECINCTS 2 4) 2008

MASTER PLAN NO. 60 (SITE DEVELOPMENT PLAN EASTBANK/REGATTA NORTH PRECINCTS 2 4) 2008 Page 2 TABLE OF CONTENTS PAGE 1 PRELIMINARY... 5 1.1 CITATION... 5 1.2 TYPE OF MASTER PLAN... 5 1.3 LEGAL REQUIREMENT FOR MASTER PLAN... 5 1.4 LEGAL EFFECT OF THE MASTER PLAN... 5 2 DESCRIPTION OF LAND...

More information

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS

CONTENTS 8.0 LAND USE 8.1 GENERAL LAND USE 8.2 RESIDENTIAL 8.3 MIXED USE 8.4 COMMERCIAL 8.5 EMPLOYMENT LANDS 8-2 Land Use 8.0 LAND USE CONTENTS 8.1 GENERAL LAND USE 8.1.1 Uses provided for in all Land Use Designations 8.1.2 Uses prohibited in Hazardous Lands, Hazardous Sites and Special Policy Areas 8.1.3 Uses

More information

Contents of Part 6. Part 6 Zones

Contents of Part 6. Part 6 Zones Contents of Part 6 Part 6 Zones... 6-1 6.1 Preliminary... 6-1 6.2 Zone codes... 6-3 6.2.1 Low density residential zone code... 6-3 6.2.1.1 Application... 6-3 6.2.1.2 Purpose and overall outcomes... 6-3

More information

I403 Beachlands 1 Precinct

I403 Beachlands 1 Precinct I403. Beachlands 1 I403.1. Precinct Description Beachlands is a rural and coastal village located on the eastern side of Auckland, adjoining the Tamaki Strait coastline. The original Beachlands village

More information

Section 5 (S5) - Sneydes Parade

Section 5 (S5) - Sneydes Parade EAST WERRIBEE EMPLOYMENT PRECINCT PRECINCT STRUCTURE PLAN 15m High Large Canopy Tree encouraged 41.4 6.0 4.2 2.0 0.3 300mm Kerb 3 Lane incl. dedicated bus lane 6m median (Trees at 25m spacing) 3 Lane incl.

More information

Complete Neighbourhood Guidelines Review Tool

Complete Neighbourhood Guidelines Review Tool Complete Neighbourhood Guidelines Review Tool Prepared By: City of Regina Planning Department October 2014 Page 1 of 14 Community Development Review Checklist for Secondary Plans and Concept Plans The

More information

22.15 OUTDOOR ADVERTISING SIGNAGE POLICY

22.15 OUTDOOR ADVERTISING SIGNAGE POLICY 22.15 OUTDOOR ADVERTISING SIGNAGE POLICY This policy applies to all land where a planning permit is required to construct or display a sign under the provisions of the Kingston Planning Scheme. 22.15-1

More information

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas Chapter 13 Residential Areas: Appendices Page 1 Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas Design Code for Intensive Housing INTRODUCTION DESIGN ELEMENTS A NEIGHBOURHOOD DESIGN

More information

LOW DENSITY RESIDENTIAL

LOW DENSITY RESIDENTIAL LOW DENSITY RESIDENTIAL Corner lots with coach houses to increase diversity, provide unity to the streetscape and increase eyes on the street. Garages and ancillary units accessed via rear lanes. Parking

More information

LAND AT DALESTON, MAMBOURIN

LAND AT DALESTON, MAMBOURIN LAND AT DALESTON, MAMBOURIN Planning Report in Support of s96a Application Application for Subdivision Daleston, Mambourin October 2014 Daleston, Mambourin Our ref: 01486 Client: Phileo Australia Limited

More information

3.2 Employment and Town Centres

3.2 Employment and Town Centres 3.2 Employment and Town Centres 3.2.1 Major Town Centre The Major Town Centre (MTC) is located at the cross roads between the historic Beattys Road Reserve and new extensions to two arterial roads, forming

More information

4 Residential and Urban Living Zones

4 Residential and Urban Living Zones 4 Residential and Urban Living Zones Refer to Chapters 11 to 20 for additional rules that may apply to these zones. 4.1 OBJECTIVES AND POLICIES Objective Res1 Policy 1 Policy 2 Policy 3 Policy 4 Policy

More information

I539. Smales 2 Precinct

I539. Smales 2 Precinct I539. Smales 2 Precinct I539.1. Precinct Description The Smales 2 Precinct applies to a 4.8 hectare block of land located on the southern side of Northcote Road and fronting Lake Pupuke, Takapuna. The

More information

Clyde Creek & Casey Fields South PRECINCT STRUCTURE PLAN

Clyde Creek & Casey Fields South PRECINCT STRUCTURE PLAN Clyde Creek & Casey Fields South PRECINCT STRUCTURE PLAN Major Town Centre at Clyde with potential future rail station, conservation of heritage and environmental values, diverse residential community,

More information

5.1 Site Plan Guidelines

5.1 Site Plan Guidelines 5. Community Core Guidelines Development of the Community Core will take place by plan of subdivision and site plan approval. It will occur in a phased manner that will reflect the timing of residential

More information

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas 111111 PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction The ION rapid transit system will link Waterloo, Kitchener and Cambridge through a central transit corridor (CTC). There are a number

More information

GREENBANK DEVELOPMENT MASTERPLAN

GREENBANK DEVELOPMENT MASTERPLAN DEVELOPMENT MASTERPLAN POTENTIAL TRAIN STATION COMMUNITY CENTRE Greenbank will be a connected masterplanned community providing easy access to local and surrounding amenity. Affordable quality homes, green

More information

CANOPY AT AMSTEL (THE AMSTEL GOLF COURSE REDEVELOPMENT)

CANOPY AT AMSTEL (THE AMSTEL GOLF COURSE REDEVELOPMENT) CANOPY AT AMSTEL (THE AMSTEL GOLF COURSE REDEVELOPMENT) 1000 CRANBOURNE FRANKSTON ROAD, CRANBOURNE The former Amstel Golf Course was rezoned to a General Residential Zone in 2015 to facilitate its redevelopment

More information

RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS

RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS Preferred Options Consultation Q&A Sheet RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS What are the key goals for managing the design of residential buildings in the Second Generation Plan (2GP)? The key

More information

EAST WERRIBEE EMPLOYMENT PRECINCT PRECINCT STRUCTURE PLAN

EAST WERRIBEE EMPLOYMENT PRECINCT PRECINCT STRUCTURE PLAN 3.2 East Werribee Town Centre East Werribee Town Centre Vision The East Werribee Town Centre will complement the Werribee City Centre in providing an employment, service, retail and entertainment focus

More information

THREE PARKS ZONE Three Parks Special Zone The process of applying for resource consents in the zone.

THREE PARKS ZONE Three Parks Special Zone The process of applying for resource consents in the zone. .25 Three Parks Special Zone The purpose of this zone is to provide for growth and to give effect to the Wanaka 2020 Community (2002) and the more recent Wanaka Structure (2007) and Wanaka Transport Strategy

More information

Northern Territory Compact Urban Growth Policy

Northern Territory Compact Urban Growth Policy Northern Territory Compact Urban Growth Policy A Reference Policy Document to clause 2.7 (Reference to Policy) of the NT Planning Scheme May 2015 Table of Contents 1 Policy Setting... 3 1.1 Context for

More information

Nelson Residential Street Frontage Guideline

Nelson Residential Street Frontage Guideline DRAFT 22-06-2012 Nelson Residential Street Frontage Guideline June 2012 1317273 Contents and purpose Residential s are important Residential s are much more than corridors which move traffic. Streets allow

More information

H9. Business Metropolitan Centre Zone

H9. Business Metropolitan Centre Zone H9. Business Metropolitan Centre Zone H9.1. Zone description The Business Metropolitan Centre Zone applies to centres located in different subregional catchments of Auckland. These centres are second only

More information

DAREBIN PLANNING SCHEME AMENDMENT C137

DAREBIN PLANNING SCHEME AMENDMENT C137 Who is the planning authority? Planning and Environment Act 1987 DAREBIN PLANNING SCHEME AMENDMENT C137 EXPLANATORY REPORT This amendment has been prepared by the Darebin City Council, who is the planning

More information

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods DRAFT - September 2016 Contents 1. Introduction 1 2. Policy Context 3 3. Characteristics

More information

39 WALLACEVILLE STRUCTURE PLAN

39 WALLACEVILLE STRUCTURE PLAN 39 WALLACEVILLE STRUCTURE PLAN PRECINCT DESCRIPTIONS, INTENTIONS AND OUTCOMES Wallaceville Living Precinct Area A At approximately 13.4ha, this precinct is the largest precinct and the precinct provides

More information

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials Wide asphalt driveway abutting school property incompatible fencing materials garage built with incompatible materials, too close to park Lack of plantings as a buffer between private property and open

More information

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville URBAN DESIGN BRIEF 2136&2148 Trafalgar Road Town of Oakville Prepared By: METROPOLITAN CONSULTING INC For 2500674 Ontario Inc November 2016 TABLE OF CONTENTS Page No. 1.0 Introduction/Description of Subject

More information

East Bayshore Road Neighbourhood

East Bayshore Road Neighbourhood East Bayshore Road Neighbourhood Northridge Property Management Urban Design Brief 3195 East Bayshore Road City of Owen Sound January 2016 East Bayshore Road Neighbourhood Northridge Property Management

More information

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1

INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 INCREMENTAL CHANGE AREA REVIEW March 2015 Page 1 Table of Contents Introduction... 3 Background to Review... 3 Comparison of the Schedules to the General Residential Zone... 7 Methodology... 7 Policy Context...

More information

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES Attachment C: Draft QLDC Subdivision Design Guidelines QUEENSTOWN LAKES DISTRICT COUNCIL DESIGN GUIDELINES A DESIGN GUIDE FOR AND DEVELOPMENT IN THE URBAN ZONES QUEENSTOWN OFFICE 10 Gorge Road Queenstown

More information

Appendix D: Rockbank Major Town Centre key design principles

Appendix D: Rockbank Major Town Centre key design principles Appendix D: Rockbank Major Town Centre key design principles ATTRACTING INVESTMENT & SUPPORTING THE COMMUNITY Principle 1 Create a focal point for a diverse range of uses within the town centre that are

More information

Clairtrell Area Context Plan

Clairtrell Area Context Plan Clairtrell Area Context Plan March 2005 Urban Development Services City Planning Contents 1. Introduction... 4 2. Development Structure... 6 2.1 Streets... 7 2.1.1 Sheppard Avenue and Bayview Avenue...

More information

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT FEBRUARY 2013 TABLE OF CONTENTS 1.0 BACKGROUND... 1 1.1 Amendment... 1 2.0 LOCATION & CONTEXT... 2 2.1 Land Ownership... 2 3.0 POLICY CONTEXT... 3 3.1 Municipal Development Plan... 3 3.2 Capital Region

More information

CASEY PLANNING SCHEME AMENDMENT C188

CASEY PLANNING SCHEME AMENDMENT C188 Who is the planning authority? Planning and Environment Act 1987 CASEY PLANNING SCHEME AMENDMENT C188 EXPLANATORY REPORT This amendment has been prepared by the Growth Areas Authority (now known as the

More information

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions. 6. Land Use 6.0 Preamble A healthy and livable city is one in which people can enjoy a vibrant economy and a sustainable healthy environment in safe, caring and diverse neighbourhoods. In order to ensure

More information

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507

URBAN DESIGN BRIEF Gordon Street City of Guelph. Prepared on behalf of Ontario Inc. March 25, Project No. 1507 URBAN DESIGN BRIEF 1131 Gordon Street City of Guelph Prepared on behalf of 1876698 Ontario Inc. March 25, 2016 Project No. 1507 423 Woolwich Street, Suite 201, Guelph, Ontario, N1H 3X3 Phone (519) 836-7526

More information

Authority. any changes required as a result of the approved CHMP.

Authority. any changes required as a result of the approved CHMP. PLANNING PERMIT Permit No. Planning Scheme Responsible Authority../2013 Greater Geelong Planning Scheme Greater Geelong City Council ADDRESS OF THE LAND 5, 15, 21, 23, 1/23, 25, 33, 40 and 50 Caddys Road;

More information

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan Notes: This document is provided for information purposes

More information

8.0 Design and Form of Development 43/

8.0 Design and Form of Development 43/ 42/ 8.0 Design and Form of Development 43/ Rothwells Farm, Golborne/ Development Statement Figure 7. Site Constraints Key 44/ Site Boundary 360 Bus Route/Stops Existing Trees Underground Water Pipe Sensitive

More information

(DC1) Direct Development Control Provision DC1 Area 4

(DC1) Direct Development Control Provision DC1 Area 4 . General Purpose (DC) Direct Development Control Provision DC Area 4 The purpose of this Provision is to provide for an area of commercial office employment and residential development in support of the

More information

Part 10 Other plans

Part 10 Other plans Contents of Part 10 Part 10 Other plans... 10-1 10.1 Preliminary... 10-1 10.2 Palmview Structure Plan... 10-2 10.2.1 Preliminary... 10-2 10.2.2 Master Strategic Framework... 10-6 10.2.3 Master Precincts

More information

Development Control Plan

Development Control Plan Development Control Plan Liberty Grove Development Control Plan Date of Adoption: 4 September 2007 Effective Date: 7 March 2008 Index 1 INTRODUCTION... 3 1.1 NAME OF PLAN... 3 1.2 AREA TO WHICH THIS PLAN

More information

EXAMPLE. Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay

EXAMPLE. Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay EXAMPLE Bushfire Management Statement Construction of a single dwelling in a Bushfire Management Overlay

More information

Development Control Plan

Development Control Plan Development Control Plan Rhodes Corporate Park (Also known as the Digital Site) Development Control Plan Date of Adoption: 4 September 2007 Effective Date: 7 March 2008 Index 1 INTRODUCTION... 3 1.1 LAND

More information

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239 Bylaw 17672 A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239 WHEREAS City Council at its meeting of February 22, 2001, gave third reading to Bylaw 12800, as amended;

More information

medium desnity housing

medium desnity housing This section updated September 2013 This part of the Plan sets out the assessment criteria for medium density housing. The criteria are designed to give designers and builders flexibility and to provide

More information

Part 12 Precinct Area Plans - Wyee West

Part 12 Precinct Area Plans - Wyee West TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 EXTENT OF AREA PLAN... 1 1.3 EXISTING CHARACTER... 2 1.4 ENVIRONMENTAL ATTRIBUTES AND CONSTRAINTS... 2 1.5 DESIRED FUTURE CHARACTER... 3 1.6

More information

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon 4.0 Design Guidelines For The Village Centre 4.0 Design Guidelines for the Village Centre The Village Centre is the focal point of the entire South Fields Community and is designed as a traditional commercial

More information

Urban Design Guidelines

Urban Design Guidelines Urban Design Guidelines These Urban Design Guidelines comprise the Key Design Objectives below, the Roads Design Guidelines overleaf and Neighbourhood Framework Plans. Together with Section 3: Urban Design

More information

appendix and street interface guidelines

appendix and street interface guidelines appendix five: building and street interface guidelines appendix 5 building and street interface guidelines BOULEVARDS Boulevards are generally characterized by higher levels of traffic movement at higher

More information

sm` Planning Report in support of s96a application KINGFISHER ESTATE - FIRST DEVELOPMENT STAGES June 170 LANCEFIELD ROAD, SUNBURY

sm` Planning Report in support of s96a application KINGFISHER ESTATE - FIRST DEVELOPMENT STAGES June 170 LANCEFIELD ROAD, SUNBURY sm` Planning Report in support of s96a application June 2015 KINGFISHER ESTATE - FIRST DEVELOPMENT STAGES 170 LANCEFIELD ROAD, SUNBURY TPG Ref: 1595 Client: Wincity Development Pty Limited ADVISE I PLAN

More information

Manor Lakes - Development Contributions Plan

Manor Lakes - Development Contributions Plan BALLAN RD FUTURE PSP RURAL CONSERVATION ZONE INVESTIGATION AREA Active Open Space Government Primary School P-6 AREA E EUREKA DRIVE Active Open Space MANOR LAKES BOULEVARD P-12 School and Special College

More information

I609. Penihana North Precinct

I609. Penihana North Precinct I609. Penihana North Precinct I609.1. Precinct description The Penihana North Precinct is located south of the Swanson Railway Station, adjacent to the Rural Urban Boundary (RUB) and Waitakere Ranges Heritage

More information

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM PUBLIC RIGHT-OF-WAY This section provides design guidelines for improvements in the public right-of-way. The public right-of-way refers to streets, sidewalks, non-vehicular thoroughfares, parks and greenways

More information

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014 [PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue May 23, 2014 Contents 1.0 Introduction... 2 2.0 Site Context... 2 2.1 Adjacent Uses... 2 Figure 1: Site

More information

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables 4.13.1 Local Business and Industry Buffer Zone The provisions in this division relate to the Local Business

More information

Ensure that development within the Arrowtown Urban Growth Boundary provides:

Ensure that development within the Arrowtown Urban Growth Boundary provides: URBAN DEVELOPMENT 4 4.2.5.2 Ensure that development within the Arrowtown Urban Growth Boundary provides: an urban form that is sympathetic to the character of Arrowtown, including its scale, density, layout

More information

Sawtell Town Centre Development Control Plan

Sawtell Town Centre Development Control Plan Sawtell Town Centre Development Control Plan ABN 79 126 214 487 CONTENTS INTRODUCTION... 1 PREAMBLE... 1 HOW TO USE THIS DCP... 1 LAND TO WHICH THIS PLAN APPLIES... 1 MASTERPLAN... 2 VISION... 2 CHARACTER

More information

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising overview What is today about? In July 0, the City of Fremantle resolved that the be advertised for public comment. Today is about: Understanding the history and context of the site Having your say on the

More information

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--:: Cit of Kitchener Ur 6 an Design Manual Date PARTA Year ) Desi n for k Nodes Corridors _--:: Section Page 01 of 12 2 INTRODUCTION Purpose & Application Nodes and Corridors have been identified as key intensification

More information

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

Memorial Business Park Site. Proposed Future Development. Design guidelines. August Memorial Business Park Site Proposed Future Development Design guidelines August 2014 www.designenvironment.co.nz 0064 3 358 3040 Contents 1.0 Background 1.1 Introduction 3 1.2 Objectives 4 2.0 Context

More information

Trafalgar Road Corridor Planning Study Open House

Trafalgar Road Corridor Planning Study Open House Trafalgar Road Corridor Planning Study Open House June 24, 2013 6:30-8:30 p.m. Oakville & Trafalgar Rooms Overview The Livable Oakville Plan identifies the lands along Trafalgar Road, between the QEW and

More information

QUEEN-RIVER SECONDARY PLAN

QUEEN-RIVER SECONDARY PLAN 34 QUEEN-RIVER SECONDARY PLAN 34. QUEEN RIVER SECONDARY PLAN 1. INTRODUCTION The Queen-River area is approximately 6.4 hectares and is located at the eastern edge of the Downtown as shown on Map 34-1.

More information

Section 3b: Objectives and Policies Rural Environment Updated 19 November 2010

Section 3b: Objectives and Policies Rural Environment Updated 19 November 2010 Page 1 of Section 3b 3b RURAL ENVIRONMENT 3b.1 Introduction The Rural Environment comprises all the land outside of the Residential, Town Centre and Industrial Environments. Most land within the District

More information

ARTICLE 6: Special and Planned Development Districts

ARTICLE 6: Special and Planned Development Districts ARTICLE 6: Special and Planned Development Districts 6-10 Traditional Neighborhood Development (TND) District 6-10.10 Purpose and Intent The Traditional Neighborhood Development (TND) District provides

More information

H10. Business Town Centre Zone

H10. Business Town Centre Zone H10. Business Town Centre Zone H10.1. Zone description The Business Town Centre Zone applies to suburban centres throughout Auckland, the satellite centres of Warkworth and Pukekohe, and the rural towns

More information

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development Urban Design Brief Watson Parkway North & Watson Road North Guelph, Ontario Prepared by Coletara Development December, 2013 Urban Design Brief, Coletara Development 1 Introduction This Urban Design Brief

More information

Duplex Design Guidelines

Duplex Design Guidelines Duplex Design Guidelines Adopted by Council May 29, 2006 Prepared By: Table of Contents 1.0 Application and Intent 1 2.0 Areas of Application 2 3.0 Design Principles 3 4.0 Design Guidelines 4 4.1 Site

More information

MASTER PLAN NO. 62 (SITE DEVELOPMENT PLAN BIRTINYA VILLAGE CENTRE) 2009

MASTER PLAN NO. 62 (SITE DEVELOPMENT PLAN BIRTINYA VILLAGE CENTRE) 2009 Development Agreement, Development Control Plan 1 - Kawana Waters and Section 6.1.45A (Development Control Plans under Repealed Act) of the Integrated Planning Act 1997 MASTER PLAN NO. 62 (SITE DEVELOPMENT

More information

DAVENPORT VILLAGE SECONDARY PLAN

DAVENPORT VILLAGE SECONDARY PLAN 27 DAVENPORT VILLAGE SECONDARY PLAN 27. DAVENPORT VILLAGE SECONDARY PLAN 1. VISION FOR THE DAVENPORT VILLAGE SECONDARY PLAN Davenport Village, municipally known as 830, 940, 980 and 1100 Lansdowne Avenue,

More information

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013 MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013 TABLE OF CONTENTS 1.0 ADMINISTRATION... 5 1.1 Preliminary... 5 1.2 Location and Description... 6 1.3 Zoning Map Description...

More information

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard

Edward R. Sajecki Commissioner of Planning and Building. Land Use Review- Former Parkway Belt West Lands- Fieldgate Drive and Audubon Boulevard Corporate Report Clerk s Files Originator s Files CD.04.FOR DATE: November 15, 2011 TO: FROM: SUBJECT: Chair and Members of Planning and Development Committee Meeting Date: December 5, 2011 Edward R. Sajecki

More information

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting. N HIGHWAY OFF RAMP 2.5 Roads A legible road network with a clear hierarchy will help create a connected community, both within and surrounding the Milton Heights. The following section outlines the proposed

More information