Public Notice In Reply to Application Number CENAB-OPR-MN-(AA DPW/Beverly Triton Beach) M24

Size: px
Start display at page:

Download "Public Notice In Reply to Application Number CENAB-OPR-MN-(AA DPW/Beverly Triton Beach) M24"

Transcription

1 U.S. Army Corps of Engineers Baltimore District PN Public Notice n Reply to Application Number CENAB-OPR-MN-(AA DPW/Beverly Triton Beach) M24 Comment Period: March 23, 2018 to April 23, 2018 THE PURPOSE OF THS PUBLC NOTCE S TO SOLCT COMMENTS FROM THE PUBLC ABOUT THE WORK DESCRBED BELOW. THS TME, NO DECSON HAS BEEN MADE AS TO WHETHER OR NOT A PERMT WLL BE SSUED. The Baltimore District has received an application for a Department of the Army permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (33 U.S.C. 1344), as described below: APPLCANT: Anne Arundel County Department of Public Works c/o Masoud Ghatineh, P.E Riva Road Annapolis, Maryland WERWAY AND LOCON: n the Chesapeake Bay at Beverly Triton Beach, Anne Arundel County, Maryland. PROPOSED WORK AND PURPOSE: The applicant proposes to emplace 27,000 cubic yards of clean sand along 2,352 feet of shoreline as beach nourishment within a maximum of 82 feet channelward of the approximate mean high water shoreline. The purpose of the project is to provide shoreline erosion control and beach nourishment at Beverly Triton Beach. The beach nourishment area of 13,251 SF will be planted with Spartina patens plugs. The Corps originally permitted this project in 1998 (stone revetment, stone breakwaters and the placement of sand for beach nourishment). The permit received time extensions in 2000 and 2006, and the breakwaters were built. Most of the sand for beach nourishment was placed at the northern section of the project and very little was placed at the middle and southern sections, which is where the sand and marsh planting will be concentrated this time, and the erosion is greater. The proposed project is located within tidal waters in the Chesapeake Bay in Anne Arundel County. All work is to be completed in accordance with the attached plans dated November, f you have any questions concerning this matter, please contact Mrs. Mary Frazier at (410) or Mary.A.Frazier@usace.army.mil. As part of the planning process for the proposed project, steps were taken to ensure avoidance and minimization of impacts to aquatic resources to the maximum extent practicable based on the existing site conditions and previously authorized work. No compensatory mitigation is proposed since no wetland impacts are proposed.

2 -2- The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, and, in general, the needs and welfare of the people. The evaluation of the impacts of the work described above on the public interest will include application of the Clean Water Act 404(b)(1) Guidelines promulgated by the Administrator, U.S. Environmental Protection Agency, under authority of Section 404 of the Clean Water Act. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; ndian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental mpact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written comments concerning the work described above related to the factors listed above or other pertinent factors must be received by the District Engineer, U.S. Army Corps of Engineers, Baltimore District, [Attn : Mrs. Mary Frazier CENAB-OPR-M], 2 Hopkins Plaza, Baltimore, Maryland ormary.a.frazier@usace.army.mil, within the comment period specified above. ESSENTAL FSH HABT : The Magnuson-Stevens Fishery Conservation and Management Act (MSFCMA), as amended by the Sustainable Fisheries Act of 1996 (Public Law ), requires all Federal agencies to consult with the National Marine Fisheries Service (NMFS) on all actions, or proposed actions, permitted, funded, or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). The project site lies in or adjacent to the Potomac River complex for EFH as described under the MSFCMA for Scopthalmus aquosos (windowpane flounder) juvenile and adult; Pomatomus saltatrix (blue fish) juvenile and adult; Paralicthys dentatus (summer flounder) juvenile and adult; and the eggs, larvae, juvenile, and adult stages of Sciaenops ocel/atus (red drum), Scomberomorus cavalla (king mackerel), Scomberomorus maculatus (Spanish mackerel), and Rachycentron canadum (cobia), managed species under the MSFCMA. The project has the potential to adversely affect EFH or the species of concern by loss of spawning, nursery, forage and/or shelter habitat as described under the MSFCMA for the species and life stages identified above. The Baltimore District has made a preliminary determination that site-specific impacts would not be substantial and an abbreviated consultation will be conducted with NMFS. No mitigative measures are recommended to minimize adverse effects on EFH at this time. This determination may be modified if additional

3 -3- information indicates otherwise and would change the preliminary determination. The project area is not a Habitat Area of Particular Concern (HAPC). WER QUALTY CERTFCON: The applicant is required to obtain a water quality certification in accordance with Section 401 of the Clean Water Act from the Maryland Department of the Environment. Any written comments concerning the work described above which relate to water quality certification must be received by the Maryland Department of the Environment, Tidal Wetlands Division, Montgomery Park Business Center, 1800 Washington Blvd., Suite 430, Baltimore, Maryland within the comment period as specified above to receive consideration. MOE has a statutory limit of one year from the date of this public notice to make its decision. COASTAL ZONE MANAGEMENT PROGRAM: The applicant has certified in this application that the proposed activity complies with and will be conducted in a manner consistent with the Maryland Coastal Zone Management (CZM) Program. By this public notice, we are requesting the State concurrence or objection to the applicant's consistency statement. Public comments relating to consistency must be received by the Maryland Department of the Environment, Tidal Wetlands Division, Montgomery Park Business Center, 1800 Washington Blvd. Suite 430, Baltimore, Maryland , within the comment period specified above to receive consideration. MOE has a statutory limit of 6 months from the date of this public notice to concur or object to the applicant's consistency determination. The applicant must obtain any State or local government permits which may be required. ENDANGERED SPECES ACT: A preliminary review of this application indicates that the proposed work would have no adverse effect to any species listed as threatened or endangered, or their critical habitat, by the NMFS Protected Resource Division (PRO) under the ESA of 1973, as amended since the proposed work is located in water depths less than -3.0 feet mean low water (MLW). As the evaluation of this application continues, additional information may become available which could modify this preliminary determination. NONAL HSTORC PRESERVON ACT: Review of the latest published version of the ' National Register of Historic Places indicates that no registered properties listed as eligible for inclusion therein are located at the site of the proposed work. Ongoing coordination with the Maryland Historic Trust will determine if known archeological, scientific, prehistoric, or historical data may be affected by the work to be accomplished under the requested permit. Any person who has an interest, which may be adversely affected by the issuance of this permit, may request a public hearing. The request, which must be in writing, must be received by the District Engineer, U.S. Army Corps of Engineers, Baltimore District, [TN : Mrs. Mary Frazier], 2 Hopkins Plaza, Baltimore, Maryland 2'1201, within the comment period as specified above to receive consideration. Also, it must clearly state the interest that may be adversely affected by this activity and the manner in which the interest may be adversely affected.

4 -4- t is requested that you communicate the foregoing information concerning the proposed work to any persons known by you to be interested and not being known to this office, who did not receive a copy of this notice. FOR THE DSTRCT ENGNEER: rj. 9:,lk Joseph P. DaVia Chief, Maryland Section Northern

5 ...,-- BEACH NOURSHMENT BEVERLY TRTON BEACH APPL BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS VCNTY MAP DE: November 2017 SHEET 1 OF 8 NQE: 1. CONTOURS AND ELEVONS ARE N FEET AND REFER TO MLW. 2. TW. RANCE S 0.94 FEET. 3. M50W' OOMPLED FROM ANNE ARUMDEl COUNTY 20U PlJHMETRCS AHO TOPOGMPHC SURVEY WAS P Rf'DRME> BY MYWD ON 10/17/ lllese ARE PERMT DRAWNGS ONLY AND SUBJECT TO a1anoe OORNC THE PERMT PROCESS. DESGNS ARE TO BE APPRMD SEPARELY. GRAPHC SCALE ( N FEET ) 1 NCH 2000 FEET a09 " '"'..,...-' T,._,; ( l*j... Nel --1 "'' r.. 1,,,..,..,..,...,,

6 PR<lPERTY Of: ROBERT fl USA lanostra 411 HOUY PONT RD EDQYA'D, MD PR. BEAQl F1U. 2,352 LF Of SHOAEUNE 'Z7,000 r:r F1U. SEE SECJlONS SHEETS 7 at EX. BREAKWER (m'.) "" / /'_. /. EX. SHORELNE (m'.) // N'PROX LF 10 AD..W:ENT PROP RTY. CONSfAHCE T..w&M 100 CWCFORD AVE. EDOEWAlER. MD 201J7 BEACH NOURSHMENT BEVERLY TRTON BEACH APPL. BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS KEY SHEET DE: November 2017 SHEET 2 OF 8 PREVOUSLY PERMTTED UNDER MOE WElANDS LCENSE NO. O&-WL AND U.S. NOit CORPS Of EHONEERS PERMrr COWH>P-R (M DPW/BEVERLY TRTON BEACH NOURSHMENT) N.QT: 1. CONTOURS AND ELEVONS ARE N f ET AND REFER TO MLW. 2. ll!w.. RANCE S 0.94 FEET. 3. BASEMAP COMPUD FROM ANNE ARUNDEL COUNTY 2018 P.ANllllETRCS ANO MAGERY. TOPOGRAPHC SURVEY WAS PERFORMED BY BAYLAND ON 10/17/ THESE ARE PERMT DRAWNGS ONLY ANO SUBJECT TO CHANGE DURNG THE PERMT PROCESS. DESGNS ARE TO BE APPRCM:D SEPAAaY. a GRAPHC SCALE t 2 SQ() looo onoou1n1s & Deoigntrs, nc. >i..,_.,...,_,& ( N FEET ) ''":!o!'_..,.,.... r..._: <UD>4N.t-U1 1 NCH 500 FEET 11-tt, )JMN Fu: <"Ol'-,.._Nl'S...,... _r..

7 ' ) / EX. SHORELNE y- EX. STONE GRON - 0.7! -.,1.0 - M -0.9 ( PR. BEACH FU!. ( LF Of E 27,000 CY Fill ',, SEE SEC1ON SHEET > EX. 8RtAKWER (TYP. LEGEND EX. MARSH PL>.HTNGS.:: :.:...,.: : PR. BEACH Flll AREA CHKSAPKAKE BAY PR. MARSH Pl.»lTNGS BEACH NOURSHMENT BEVERLY TRTON BEACH APPL. BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS STE PLAN DE: November 2017 SHEET 3 OF 8 PRf.'llOUSLY PERMrnm UNDER MOE WETANDS LCENSE NO. O&-WL-1838 AND U.S. MM'f CORPS Of' ENGNEERS PERMT CEW.8-<>P-R (AA DPW/BEVERLY TRTON BEACH NetRSHMENT) NQE: 1. CONTOURS N«> El.E:VONS ARE N FEET AND REFER TO MLW. 2. TDAL RANGE S 0.94 FEET. J. BASEMAP COMPLED FROM NE ARUNDEL COUNlY 2018 Pl»llMETRCS AND 2018 llmgery. 4. "TOPOGRAPHC SURVEY WAS PERF"ORMED BY 8'Yl.ND ON 10/17/ lhese ARE PERMT DRAWNGS ONLY AND SUBJECT TO CHANGE burng Tl. PERMT PROCESS. DESGNS ARE TO BE APPROVED SEPARUY. GRAPHC SCALE ( N FEET ) 1 NCH 100 FEET 200 ouullon11 & Daisnors, < 1.,,,...,-' 1 U!:"l f'lltllmf'tb9il.t "'-t: C-U'1 t.f."' 11_.n._ &.,,.._, Ut1' Fu: (Al., -..,,_,W ff.4...,

8 ANNE ARUNDEL COUNTY TRTON BEACH RD ""' "o /.,.,., T.M. eo P. 2 DEED: 03844/657 PL: N/A NC, "' ' )...-./ --- / r / ( r 'o ) '-... LO ti w :: Cl) 0,... w..., t" ' /.... z...,-o.; -:.: -...: J J CH.fi'SAP.fi'AK.fi' BAY BEACH NOURSHMENT BEVERLY TRTON BEACH APPL. BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS STE PLAN DE: November 2017 SHEET 4 OF 8 NQE: 1. CONTOURS AND ELEVONS ARE N FEET AND REFER TO MLW. 2. 'T1W. RANGE S 0.94 FEET. J. WiOW' COMPLED FROM ANNE ARUNDEL COUNTY 2018 Pl»llolETRCS AND 2018 MAGERY. 4. TOPOGRAPHC SUNEY WAS PERFORMED BY MYWD ON 10/17/ THESE ARE PERMT DRAWNGS ONLY AND SUBJECT TO CHANCE burllc n PERMT PROCESS. DESGNS ARE TO BE APPROYEO SEPARAlELY. GRAPHC SCALE ( N FEET ) 1 NCH FEET ha... & De!sntn. lnr..,_,,...,.-'.....,..,., 1U......_, -.N,t.-' --.. ftilm: f'to,m- t,.. (,....,.

9 ) / _/ -._...,,, ' ANNE ARUNDEL COUNTY 1202 "TRTON BEACH RD Ht 60 P. 2 DEED: /657 PL: N/fl AC., "' '., -,<..._...,,., "-./ ' ' " "' EX. SHOR UNE TO E SWllLZED LEGEND. :... EX. MARSH PLANTWGS.:...:.,:.; PR. ll Aal FLL NtEA CHKSAPEAKK BAY PR. MARSH PlNfTlm BEACH NOURSHMENT BEVERLY TRTON BEACH APPL BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS STE PLAN DE: November 2017 SHEET 5 OF 8.NQE: 1. CONTOURS AND ElEVONS ARE N rtet 11«1 REFER TO MlW. 2. Tl:W.. RANGE S Fl:ET. 3. COMPlEO FROM ANNE ARUNDEL COUNTY PLNUMETRCS MAGER'f. 4. TOPOCRAPHC SURVEY W PERFORMED BY BAYJoND ON 10/17/ lliese ARE PERMT DRAWNGS ONLY N«> SUBJECT TO CHANGE burng THE PERMT PROCESS. DESGNS ARE 10 BE APPR<MD SEPARAlUY. GRAPHC SCALE ( N FEET ) 1 NCH 100 FEET TW!lf'llllNtt... T,.._: c.n lllto&-,_l J)fH,,.,, lll D'l *'-NllS...,t.Mlw...

10 - -..._ t:i LaJ (/) / (.. -- ' '-...,_ "' / '" "' "'-. / / --- / -,_,,/.J, / / "' /,...-- '- /... / ANNE ARUNDEL COUNTY, 1202 TRrTON 8EACH RO T.t.. 60 P. 2 DEED: 03844/657 PL: N/A , AC "' " ".. " ' /._ -... o- "' EX. MARSH {TO RElilAN),, / '.j //./ ROBERT E. & LSA L landstra 4249 HOLLY PONT RD T.t P. 13 DEED: 22834/42 PL: N/A 1.49 AC J LEGEND EX. MARSH PlAHTNGS CH.fi'SAPfi'AKfi' BAY PR. MARSH Pl»TNGS BEACH NOURSHMENT BEVERLY TRTON BEACH APPL. BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS STE PLAN DE: November 2017 SHEET 6 OF 8 y P RMrrm> UNDER MDE WETANDS UCEMSE NO. 08-WL AND U.S. NOif CORPS OF ENGNEERS PERMT CENAS-OP-R (!A DPW/lllVERLY 1RfTON B ACH NOURSHMENT) NQT: 1. CONTOURS AND ELEVONS ARE N F[ET ANO REF R TO MLW. 2. TQ.6.l W4GE S 0.94 FEET. 3. B.l.SEMAP COMPLED FROM ANNE ARUNDEL COUNlY 2018 Pl.ANMF:TRCS AND MACERY. TOPOORAPHC SURllEY WM5 PERFORMED BY YLAND ON 10/17 / THESE ARE PERMT DRAWNGS ONLY AND SUBJECT TO CHANGE burng THE PERMT PROCESS. DESGNS ARE TO BE APPROVED SEPARELY GRAPHC SCALE l1/.... >; onsultlnb & Dni&ntrs, nc. ( N FEET ) 1 NCH 100 F ET...,._.._ 7 -RMttlll... SlllU T,._., {41t]ff.f.'411 u - n, :bt)tl f'n : Hl'l ff.4. 'MH

11 0 BEACH FLL SECTON "A" '.l.';'-M PR. i- (SPARTll6' PAlENS) _ BEACti 20'. TOP aey. - +S.O' ":f"i"'"::::::=::=:::=-r:pr ;GRADE - il_j'."'::0:::::,-::::0!!!_! '' '& PR. SAND FU _,,,. _ ' +o. WHW Q.!J9'...!!!:!. f '.WC. EHCROoCHMENT -, BEACH FLL SECTON "B" 1-20'... CX. C'RA1l BEACH FLL SECTON "C" 1"c20' BEACH NOURSHMENT BEVERLY TRTON BEACH APPL. BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS STE DETALS DE: November 2017 SHEET 7 OF 8 PRet10USl..Y NOURSHMENl) OS PERMTED UNDER MOE wrnands UCENSE NO. oe-wl-1838 AND u.s.il NWf CORPS Of' ENGNEERS PERMT CEMAB-OP-R (M DPWY TRTON BEACH NOTE: 1. CONTOURS AND ELEVONS ARE N FE T AND REFER TO MLW. 2. TCW. RANGE S 0.94 FEET. 3. BASEMAP COMPLED FROM ANNE ARUNDEL COUNTY 2016 PL.ANMETRCS AND 2016 MAGERY. 4. TOPOGRAPHC SURVEY W>S PERFORMED BY YV.ND ON 10/17/ THESE ARE PERMT DRAWNGS ONLY ANO SUBJECT TO CHANGE burng THE PERMT PROCESS. DESGNS ARE TO BE APPROVED SEPARELY. onsolta n :s t Dcsicnen. nt. "' lu5s 1 ::.:..Mw..J:.. H l OJ M) f U.- u.l.f)lllm :.!,_._... C'.1 : 14U))ff.t.N05 l:"' ' L 'N 1 1

12 t PR. 10' HGH MARSH PR. "'],: =" ' 2,.,.. (" filv, -;:... 20' -1,.. ::::--,;:-..:==:=::::: ==:"'--=:::::==:,;;:==- PR.!i'MO :J ==-.-ENC--MEHT-. BEACH FLL SECTON "D" 1-20 :-.94' o,gg:_w. EX. GRADE EX. MARSH PR. 21' PlANT!NGS ---it--- B ACH TOP ELEY. +4.;M' - EX. G:1- =1--: =--- /';--;:;:! 9!'+o.94' M.H!.o.00' MLW Tll:-NTO EX. GfW)E PR. SAND FLL _/ ' EDGE OF EX. MAASti i ' KMENT ----i BEACH FLL SECTON "E" 1-20 EX. MARSH PLANTNGS STABLE BEACH SECTON "F" ,, ==-- +o'.....!olb!.: -- BEACH NOURSHMENT BEVERLY TRTON BEACH APPL. BY: ANNE ARUNDEL COUNTY DEPARTMENT OF PUBLC WORKS STE DETALS DE: November 2017 SHEET 8 OF 8 PR&'OUSLY PERMTlm UNDER MDE Wtn.Nm UCEMSE NO. oe-wl AND U.S. Nttl:f CORPS OF ENGNEERS PERlilT cewl-op-r fla DPW/BEVERLY 1RTON ll.ot NOURSHMENT) NQE: 1. CONTOURS ANO ELE.VONS ARE N FEET ANO REnR TO MLW. 2. TCW. RANGE S 0.94 feet. 3. BASEMAP COMPL D FROl. ANNE ARUNDEL COUNTY 2016 PLANll.ETRCS ANO CAGERY. 4. TOPOGRAPHC SURVEY W PERFORMED BY BAYl..AND ON 10/17/2017. S. n SE ARE PERMT DRAWNGS ONLY ANO SUBJECT TO CHANCE burng THE PERMT PROCESS. DESGNS ARE TO BE APPROVED SEPARELY. onsul11n11 & D.. ian n, <..,_.,,,...,--' 7U!.....w,....,,..._ 1410),,..., tr. lar)lil.. U.,.. f'11 j.tlo) Ut.aO --...,.-._

Public Notice. CENAB-OP-RMN (Anne Arundel County DPW/Thomas Point Park Shoreline Stabilization) M18

Public Notice. CENAB-OP-RMN (Anne Arundel County DPW/Thomas Point Park Shoreline Stabilization) M18 of Engineer Baltimore District U.S. Army Corps of Engineers Baltimore District Public Notice In Reply to Application Number: CENAB-OP-RMN (Anne Arundel County DPW/Thomas Point Park Shoreline Stabilization)

More information

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015 Public Notice U.S. Army Corps In Reply Refer to US Army Corps of Engineers, Pittsburgh District of Engineers Notice No. below 1000 Liberty Avenue Pittsburgh District Pittsburgh, PA 15222-4186 Application

More information

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana JOINT PUBLIC NOTICE 26 June 2017 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services 7400

More information

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3640 January 18, 2019 Regulatory Branch SAS-2009-00770 JOINT PUBLIC NOTICE Savannah District/State

More information

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015

Joint Public Notice. Public Notice Date: February 9, 2015 Expiration Date: March 11, 2015 US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

October 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

October 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 October 5, 2016 Regulatory Division SAS-1998-00190 JOINT PUBLIC NOTICE Savannah District/State

More information

Jack Creek Park Capital Improvement Project

Jack Creek Park Capital Improvement Project Jack Creek Park Capital Improvement Project Public Information Meeting October 2, 2017 Consultants & Designers, Inc. Integrating Engineering and Environment 7455 New Ridge Road, Suite T Phone: (410) 694-9401

More information

PUBLIC NOTICE. us Anny Corps CENAE-R-A FILE NO. NAE

PUBLIC NOTICE. us Anny Corps CENAE-R-A FILE NO. NAE CENAE-R-A FILE NO. NAE-2007-02926 PUBLIC NOTICE us Anny Corps of Engineers s. New England District 696 Virginia Road Concord, MA 01742-2751 Comment Period Begins: January 15, 2019 Comment Period Ends:

More information

Monitoring and Maintenance Permit Process

Monitoring and Maintenance Permit Process Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary April 9, 2010 Living Shorelines for Contractors and Project

More information

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY DEPARTMENT OF THE ARMY SAVANNAH DSTRCT, CORPS OF ENGNEERS 1 W. OGLETHORPE AVENUE SAVANNAH, GEORGA 3141-364 JANUARY 1 2 217 Regulatory Division SAS-24-37 4 JONT PUBLC NOTCE Savannah DistrictState of Georgia

More information

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall Dauphin Island s East End Beach and Barrier Island Restoration Project Town of Dauphin Island, Alabama April 16, 2015 6:00 PM Dauphin Island Sea Lab, Shelby Hall Team Introduction South Coast Engineers

More information

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Kevin M. Rampe, President -- Lower Manhattan Development Corporation For Internal Use Only: Date Received: WRP no. DOS no. NEW YORK CITY WATERFRONT REVITALIZATION PROGRAM Consistency Assessment Form Proposed actions that are subject to CEQR, ULURP or other local, state

More information

Chesapeake Bay Critical Area Conservation Plan

Chesapeake Bay Critical Area Conservation Plan The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

PN Comment Period: October 30, 2015 to November 19, 2015

PN Comment Period: October 30, 2015 to November 19, 2015 Public Notice U.S. Army Corps n Reply to Application Number of Engineers CENAB-OP-RMS (DELMARVA POWER & LGHT/CHURCH Baltimore District SUBSTATON TO STEELE SUBSTATON) 214-289 PN 15-72 Comment Period: October

More information

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary March 20, 2009 Low-Impact Shoreline Stabilization Cumulative

More information

Information for File # MHK

Information for File # MHK Information for File #2014-03555-MHK Applicant: Corps Contact: Wimmer Communities Marie Kopka Address: 250 N. Sunnyslope Road, Suite 296 Brookfield, Wisconsin 53005 E-Mail: Marie.H.Kopka@usace.army.mil

More information

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines Proactive By Design. Our Company Commitment Jesse Baldwin Coastal Geologist Project Manager GZA GeoEnvironmental,

More information

Improvement of the Atlantic Coast of New York City,

Improvement of the Atlantic Coast of New York City, Improvement of the Atlantic Coast of New York City, Rockaway Inlet to Norton Point Project at Sea Gate Meeting Purpose The U.S. Army Corps of Engineers, the New York State Department of Environmental Conservation,

More information

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15 State of the State New Jersey Steve Jacobus NJDEP 06/10/15 1980s Living shorelines term coined in MD 2003 North Carolina passes Living Shoreline Law (HB 1028) early 2000s Delaware puts no bulkhead policy

More information

Chapter WAC SHORELINE MASTER PROGRAM GUIDELINES. Table of Contents WAC AUTHORITY, PURPOSE AND EFFECTS OF GUIDELINES.

Chapter WAC SHORELINE MASTER PROGRAM GUIDELINES. Table of Contents WAC AUTHORITY, PURPOSE AND EFFECTS OF GUIDELINES. Chapter 173-26 WAC SHORELINE MASTER PROGRAM GUIDELINES Table of Contents WAC 173-26-171 AUTHORITY, PURPOSE AND EFFECTS OF GUIDELINES. 5 WAC 173-26-176 GENERAL POLICY GOALS OF THE ACT AND GUIDELINES FOR

More information

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA Welcome Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA May 3, 2012 Study Area Cherry Beach neighbourhood is located in lower Stoney Creek on Lake Ontario, east of Millen

More information

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 7, 2015 RFP NO. 16-02 POPES CREEK RAIL TRAIL DESIGN ADDENDUM NUMBER ONE TO: All

More information

Hunts Point Landing, Bronx, New York

Hunts Point Landing, Bronx, New York Hunts Point Landing, Bronx, New York Sustainable Shorelines in an Urban Environment John Roebig, PhD. HDR Engineering, Inc. John.Roebig@hdrinc.com Promoting Resilient Shorelines along the Hudson River

More information

Severn River Sub-Watershed: BMP 09-Retrofit

Severn River Sub-Watershed: BMP 09-Retrofit Project ID: BMP_09 Total Treated Drainage Area: 4.57 acres Total Treated Impervious Area: 2.9 acres Total Water Quality Volume (WQv): ~10,300 cubic feet; 0.236 acre-foot Rainfall Depth Treated (Pe): 1

More information

PUBLIC NOTICE. The District Engineer has received a permit application to conduct work in waters of the United States as described below.

PUBLIC NOTICE. The District Engineer has received a permit application to conduct work in waters of the United States as described below. US Army Corps of Engineers,R, New England District 696 Virginia Road Concord, MA 01742-2751 PUBLC NOTCE Comment Period Begins: 8/13/2013 Comment Period Ends: 9/11/2013 File Number: NAE-2011-1969 n Reply

More information

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts August 27, 2015 US Army Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Attn: Phillip W. Nimeskern Dear Mr. Nimeskern, Sierra Club Comments on ACOE Public Notice NAE-2014-259

More information

CHAPTER Committee Substitute for Senate Bill No. 1472

CHAPTER Committee Substitute for Senate Bill No. 1472 CHAPTER 2007-99 Committee Substitute for Senate Bill No. 1472 An act relating to beaches and shores; amending s. 161.021, F.S.; amending a definition; amending s. 161.085, F.S.; restricting the use of

More information

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility. SUMMARY THE I-69 LOCATION STUDY The proposed I-69 Location Study from El Dorado to McGehee, Arkansas, represents one section (Section of Independent Utility No. 13) of the nationally designated I-69 Corridor

More information

Virginia s Tidal Wetlands: Managing for Resilience. Pam Mason

Virginia s Tidal Wetlands: Managing for Resilience. Pam Mason Virginia s Tidal Wetlands: Managing for Resilience Pam Mason Image: Skip Stiles, Wetlands Watch PAST: City of Norfolk shallow water and wetlands Fill. Maersk Nauticus Chrysler Museum Mc Arthur Mall Opera

More information

Shoreline Master Program Town of La Conner, Washington

Shoreline Master Program Town of La Conner, Washington Shoreline Master Program Town of La Conner, Washington Department of Ecology approval effective Adopted September 24, 2013 by Town of La Conner Ordinance No.1106 Amended May 13, 2014 by Town of La Conner

More information

LEGAL NOTICE. City of Tacoma Determination of Environmental Nonsignificance. Fred Wagner, Wagner Development. Demolition of Manitou school buildings

LEGAL NOTICE. City of Tacoma Determination of Environmental Nonsignificance. Fred Wagner, Wagner Development. Demolition of Manitou school buildings LEGAL NOTICE City of Tacoma Determination of Environmental Nonsignificance Lead Agency: Applicant: Proposal: Location: City of Tacoma Fred Wagner, Wagner Development Demolition of Manitou school buildings

More information

PUBLIC NOTICE. Attn: Kim Williams 3805 Wrightsville Avenue, Suite 15 Wilmington, North Carolina 28403

PUBLIC NOTICE. Attn: Kim Williams 3805 Wrightsville Avenue, Suite 15 Wilmington, North Carolina 28403 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: October 15, 2015 Comment Deadline: November 16, 2015 Corps Action ID Number: SAW-2014-01338 The Wilmington District, Corps of Engineers

More information

Pine Flat Lake Master Plan Update FACT SHEET September 2014

Pine Flat Lake Master Plan Update FACT SHEET September 2014 Pine Flat Lake Master Plan Update FACT SHEET September 2014 PURPOSE AND OBJECTIVE The U.S. Army Corps of Engineers Sacramento District is revising the 1976 Pine Flat Lake Master Plan and is seeking public

More information

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle. Agenda Item D-2 City of Tacoma Planning and Development Services To: Planning Commission From: Stephen Atkinson, Planning Services Division Subject: Open Space Corridors Project Meeting Date: March 1,

More information

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Exemption Requests for Special Nuclear Material License SNM-362,

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Exemption Requests for Special Nuclear Material License SNM-362, This document is scheduled to be published in the Federal Register on 04/13/2012 and available online at http://federalregister.gov/a/2012-08917, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER

ALL SECURE SELF STORAGE SEPA APPEAL RECOMMENDATION TO THE HEARING EXAMINER KITSAP COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 619 DIVISION STREET MS-36, PORT ORCHARD WASHINGTON 98366-4682 LOUISA GARBO, DIRECTOR (360) 337-5777 FAX (360) 337-4415 HOME PAGE - www.kitsapgov.com ALL

More information

[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife

[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife Surname Billing Code: 4310 55 Deputy RD ARD Refuges DEPARTMENT OF THE INTERIOR Fish and Wildlife Service Solicitor Refuge Supervisor Asst. Refuge Supervisor Ch. Natural Resources Project Leader [FWS R8

More information

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060 May 12, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: May, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

North Carolina Coastal Federation

North Carolina Coastal Federation North Carolina Coastal Federation Erosion Control: Non-Structural Alternatives A Shorefront Property Owner s Guide Shoreline erosion and landward migration of marshes are natural processes, and are important

More information

Appendix E Section 4(f) Evaluation

Appendix E Section 4(f) Evaluation Appendix E Section 4(f) Evaluation Appendix E Draft Section 4(f) Evaluation E.1 Introduction This appendix addresses a federal regulation known as Section 4(f), which protects parks, recreation areas,

More information

Legal Authority, Roles & Responsibilities of Local Wetlands Boards. Workshop Objectives & Logistics Karen Duhring Workshop Moderator

Legal Authority, Roles & Responsibilities of Local Wetlands Boards. Workshop Objectives & Logistics Karen Duhring Workshop Moderator Legal Authority, Roles & Responsibilities of Local Wetlands Boards Workshop Objectives & Logistics Karen Duhring Workshop Moderator May 5, 2016 Tidal Wetlands Workshop This PDF version includes web site

More information

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River Astoria, May 16, 2012 1 Outline I. Nature of Project/Background II. Approach to

More information

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio SR 46 (Niles Cortland Road) and SR 82 Proposed Improvements Howland Township, Trumbull County, Ohio

More information

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary Commercial Launch Site Addendum to Wetland Mitigation Plan Revision 2 April 25, 2017 SpaceX Proprietary Contents 1.0 Project Information... 1 1.1 Background... 1 2.0 Compensatory Mitigation... 2 2.1 Goals

More information

ii

ii PURPOSE Freshwater tidal marshes were once extensive along the Coastal Plain rivers of the mid- Atlantic region of the United States. After thousands of years of relatively low-impact use by Native Americans

More information

7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC

7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC 7 May 9, 2012 Public Hearing APPLICANT AND PROPERTY OWNER: COASTAL ENTERPRISES, LLC REQUEST: Variance to Section 5B of the Site Plan Ordinance (Floodplain Regulations) ADDRESS / DESCRIPTION: 601 Sandbridge

More information

Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017

Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017 Draft Environmental Assessment Appendix A. SHPO Correspondence, January 19, 2017 Rosecrans/Marquardt Grade Separation Project April 2018 Federal Railroad Administration U.S. Department 1200 New Jersey

More information

Environmental Consulting & Restoration, LLC Specializing in Wetland and Coastal Resource Area Delineation & Permitting

Environmental Consulting & Restoration, LLC Specializing in Wetland and Coastal Resource Area Delineation & Permitting Brad Holmes, Manager Professional Wetlands Scientist & Massachusetts Certified Arborist ECR is a small environmental consulting firm specializing in wetland and coastal project permitting and resource

More information

Information for File #MVP DAS

Information for File #MVP DAS Information for File #MVP201702209DAS Applicant: HyVee, Inc. Corps Contact: David Studenski Address: 1114 South Oak Street, La Crescent, Minnesota 559471560 EMail: david.a.studenski@usace.army.mil Phone:

More information

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY Mobile Bay National Estuary Program 4172 Commanders Drive Mobile, AL 36615 Phone: 251-431-6409 Fax: 251-431-6450 Contact: Tom Herder, Watershed Protection Coordinator Email: therder@mobilebaynep.com July

More information

Purpose of Tonight s Meeting

Purpose of Tonight s Meeting Location Map 3 Purpose of Tonight s Meeting Explain to you the Alternatives considered Provide information about these Alternatives Engineering Environmental Present the Project Schedule Obtain your input

More information

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA INTRODUCTION The Coastal Management and the Conservation Elements required by Chapter 9J-5.012 and 5.013, F.A.C., respectively, have been combined into one

More information

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI Project supported via financial assistance provided by the Coastal Zone Management Act of 1972, as amended, administered by the Office of the Ocean

More information

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION Site Development Plan Submittal Application Requirements Project Name: Project Site Plan # C: Date: Instructions: All submissions

More information

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR COASTAL MANAGEMENT ELEMENT Last amended December 6, 2016 as part of the 2016 EAR Table of Contents Objective Page 7.1 Development and redevelopment of waterfront properties...7-1 7.2 Agency coordination

More information

Ashbridges Bay Erosion and Sediment Control Project

Ashbridges Bay Erosion and Sediment Control Project Ashbridges Bay Erosion and Sediment Control Project Project Brief Overview Toronto and Region Conservation Authority, in partnership with the City of Toronto, intends to carry out remedial erosion control

More information

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS TO: FROM: APPLICANT: AGENT: Shore Protection Committee: Commissioner Mark Williams, Chairman Mr. Richard Gardner Mr. Henry Morgan Mr. Zach Harris

More information

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS.

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS. ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION FINAL PLAN - SUBMITTAL APPLICATION REQUIREMENTS Subdivision Name: Subdivision # S: Project # P: Date: Instructions: All submissions

More information

Broward County Shore Protection Project Segment II. Physical Monitoring Plan

Broward County Shore Protection Project Segment II. Physical Monitoring Plan Broward County Shore Protection Project Segment II USACE File No. SAJ-1999-05545 Broward County Shore Protection Project -Segment II Submitted To: Florida Department of Environmental Protection Office

More information

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 4 To conserve, manage, appropriately use and protect the natural resources of the City ensuring continued resource availability and environmental

More information

INTER-AGENCY COORDINATION MEETING

INTER-AGENCY COORDINATION MEETING Virginia Department of Transportation INTER-AGENCY COORDINATION MEETING Joint Permit Application DEQ COE VMRC I. VDOT PROJECT INFORMATION PERMIT #: PRE-APP#: Route: VDOT Project Number: City/County: Contract

More information

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION THURSTON COUNTY DEVELOPMENT SERVICES OPEN SPACE TAX PROGRAM ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION Use this checklist to help you determine whether your property is eligible for open

More information

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements.

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements. ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION Final Plan Submittal Application Requirements Subdivision Name: Subdivision # S: Project # P: Date: Instructions: All submissions

More information

Yes Local NOAA Marine Fisheries (expertise and assistance)

Yes Local NOAA Marine Fisheries (expertise and assistance) Proj # Bay PRP 2014-042 Project Name Restoration of St. Andrew Bay Submerged Grass Beds Project Proposer, affiliation, web site BEST Inc./Friends of St. Andrew Bay 501(c)3 not-for-profit organization Under

More information

HAZARD MITIGATION GOALS AND OBJECTIVES

HAZARD MITIGATION GOALS AND OBJECTIVES SEWRPC Community Assistance Planning Report No. 282, 2nd Edition CITY OF MILWAUKEE ALL HAZARDS MITIGATION PLAN UPDATE Chapter IV HAZARD MITIGATION GOALS AND OBJECTIVES [NOTE: Throughout this plan update

More information

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB 6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB REQUEST: Conditional Use Permit (outdoor recreational facility) STAFF PLANNER: Faith Christie ADDRESS / DESCRIPTION:

More information

March, 2016 Wetlands Board Applications

March, 2016 Wetlands Board Applications March 16, 2016 TO: Wetlands Board Members FROM: Richard W. Scarper RE: March, 2016 Wetlands Board Applications Attached are the Planning Department's administrative comments for the following wetlands/dunes

More information

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project USACE Workshop November 21 st, 2013 By: Jenna Phillips Emphasis on Green or Nature-Based Engineering

More information

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011) Description The Corps of Engineers, Rock Island District (District) and the Illinois

More information

DRAFT MAP AMENDMENT FLU 04-4

DRAFT MAP AMENDMENT FLU 04-4 DRAFT MAP AMENDMENT FLU 04-4 SW 24 TH AVENUE ROADWAY CORRIDOR The University of Florida participates with the Metropolitan Transportation Planning Organization (MTPO) in its responsibilities for the continuing,

More information

NORTH EAST ELEMENTARY SCHOOL PAVING EXPANSION CECIL COUNTY, MARYLAND

NORTH EAST ELEMENTARY SCHOOL PAVING EXPANSION CECIL COUNTY, MARYLAND SITE ANALYSIS TOTAL SITE AREA AREA TO BE DISTURBED AREA TO BE VEGETATIVELY STABILIZED AREA TO BECOME IMPERVIOUS EXISTING IMPERVIOUS (NOT TO BE DISTURBED) ESTIMATED CUT VOLUME ESTIMATE FILL VOLUME ESTIMATE

More information

JOI NT PUBLIC NOTICE

JOI NT PUBLIC NOTICE JOI NT PUBLIC NOTICE CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean and Coastal

More information

Date of Advertisement: January 14, 2019 Deadline for Receipt of Qualification Statements and Priced Proposal: February 12, :00 pm.

Date of Advertisement: January 14, 2019 Deadline for Receipt of Qualification Statements and Priced Proposal: February 12, :00 pm. MARYLAND COASTAL BAYS PROGRAM REQUEST FOR PROPOSALS TO PROVIDE PROFESSIONAL ENGINEERING AND TECHNICAL SERVICES FOR TIZZARD ISLAND COASTAL RESILIENCY PLANNING AND DESIGN Date of Advertisement: January 14,

More information

September 26, Ms. Elizabeth Hughes State Historic Preservation Officer Maryland Historical Trust 100 Community Place Crownsville MD

September 26, Ms. Elizabeth Hughes State Historic Preservation Officer Maryland Historical Trust 100 Community Place Crownsville MD September 26, 2018 Ms. Elizabeth Hughes State Historic Preservation Officer Maryland Historical Trust 100 Community Place Crownsville MD 21032-2023 Dear Ms. Hughes: Introduction and Project Description

More information

Wetlands Board Hearing Procedures

Wetlands Board Hearing Procedures Wetlands Board Hearing Procedures The Virginia Beach Wetlands Public Hearing is held at 10:00 a.m. in the Council Chamber of the City Hall Building, Municipal Center. A staff briefing is held at 8:45 a.m.

More information

Intergovermental Coordination

Intergovermental Coordination Intergovermental Coordination CITY OF WINTER PARK CHAPTER 8: INTERGOVERNMENTAL COORDINATION ELEMENT INTERGOVERNMENTAL COORDINATION ELEMENT GOAL 8-1: PROVIDE FOR IMPROVED INTERGOVERNMENTAL COORDINATION

More information

Appendix C Agency Correspondence

Appendix C Agency Correspondence Appendix C Agency Correspondence Appendix C: Correspondence TRAFFIC From: The City of White Plains, Department of Traffic To: Metro-North Railroad Date: March 3, 2009 Subject: Describes the basis for determining

More information

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 September 14, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE Presentation Highlights Background of Grant Award What are the County s grant requirements? Maryland Stormwater

More information

Information for File # RMM

Information for File # RMM Information for File #2015-00067-RMM Applicant: New Ulm Public Schools Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: ryan.m.malterud@usace.army.mil

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION To: All Interested Parties Subject: Notice of Preparation of an Environmental Impact Report From: City of Petaluma Address: 11 English Street, Petaluma, CA 94952-2610 Contact: Heather

More information

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001 STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP 2014-0030 FEBRUARY 26, 2015 CPA - 1 OWNER/APPLICANT: AGENT: REQUEST: HANS HEIM PO BOX 238 APTOS, CA 94001 JAMES HAY PO BOX 762 MENDOCINO, CA 95460

More information

Protecting Farmland. The Future of Agriculture in Prince George s County

Protecting Farmland. The Future of Agriculture in Prince George s County Protecting Farmland As demonstrated in the previous section, farmland in Prince George s County is disappearing at a rapid pace. If the loss of farmland continues at this rate, no farmland will be left

More information

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept TO: FROM: SUBJECT: April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept RECOMMENDATION A. THAT the Vancouver

More information

WEATHER IT TOGETHER Building Resilience. The Annapolis Model for Cultural Resource Hazard Mitigation Planning

WEATHER IT TOGETHER Building Resilience. The Annapolis Model for Cultural Resource Hazard Mitigation Planning WEATHER IT TOGETHER Building Resilience The Annapolis Model for Cultural Resource Hazard Mitigation Planning Weather It Together A Public / Private Partnership Weather It Together is the Annapolis model

More information

Attachment A Description of Project

Attachment A Description of Project Attachment A Description of Project Arkansas River Flood Levee Trail and Multimodal Connections This application requests funding in 2018 to assist with the construction of the improvements including 1,200'

More information

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement Ohio Department of Transportation District 2 317 East Poe Rd. Bowling Green, Ohio 43402 (419) 353-8131 John R. Kasich, Governor Jerry Wray, Director Todd Audet, P.E., District Deputy Director Project Description

More information

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS TO: FROM: Shore Protection Committee: Commissioner Mark Williams, Chairman Mr. Richard Gardner Mr. Henry Morgan Mr. Zach Harris Mr. Bill Hodges Department

More information

Note: Staff reports can be accessed at Zone: I-3. Tier:

Note: Staff reports can be accessed at  Zone: I-3. Tier: The Maryland-National Capital Park and Planning Commission Prince George s County Planning Department Development Review Division 301-952-3530 Note: Staff reports can be accessed at www.mncppc.org/pgco/planning/plan.htm.

More information

Using a Citizen s Wetland Education Workshop As A Tool in Regulatory Compliance

Using a Citizen s Wetland Education Workshop As A Tool in Regulatory Compliance Using a Citizen s Wetland Education Workshop As A Tool in Regulatory Compliance (A Driver s Safety Course for Wetland Violators) Kevin R. Du Bois, P.W.S. ASWM Wetlands 2007 National Symposium August 28-30,

More information

138 ATTACHMENT 17. DEPARTMENT OF THE ARMY WlLMlNGTON DISTRICT, CORPS OF ENGINEERS

138 ATTACHMENT 17. DEPARTMENT OF THE ARMY WlLMlNGTON DISTRICT, CORPS OF ENGINEERS 138 ATTACHMENT 17 DEPARTMENT OF THE ARMY WlLMlNGTON DISTRICT, CORPS OF ENGINEERS B. EVERETT JORDAN DAM AND LAKE P.O. Box 144 MONCURE, NORTH CAROLINA 27559 April 11, 2007 Mr. Scott Radway Radway Design

More information

Neptune Center JSP14-10

Neptune Center JSP14-10 Neptune Center JSP14-10 Neptune Center, JSP14-10 Approval of the request of Dorchen/Martin Associates, nc. for Neptune Center for same side and opposite side driveway spacing waivers. The subject property

More information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION Suite 900 - James K. Polk Building 505 Deaderick Street Nashville, Tennessee 37243-0334 MEMORANDUM TO: FROM: Files Joe W. Matlock,

More information

Gadsden County Planning Commission Agenda Request

Gadsden County Planning Commission Agenda Request Date of Meeting: November 16, 2017 To: From: Through: Subject: Gadsden County Planning Commission Agenda Request Honorable Chairperson and Members of the Board Jill A. Jeglie, AICP, Senior Planner Clyde

More information

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015 MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015 Vice Chair Mr. Jester, called to order the Chesapeake Bay Preservation Area Board meeting in the City Council Chambers,

More information

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson DR- COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 00 Legislative Session Bill No. CB--00 Chapter No. Proposed and Presented by Introduced by Co-Sponsors The Chairman

More information

jmt.com MARINE Part of a diversified family of solutions

jmt.com MARINE Part of a diversified family of solutions jmt.com MARINE Part of a diversified family of solutions Services Marine & Coastal Engineering Modeling Coastal Initiatives & Techniques Port, Harbor, & Marine Consultancy Small Craft Design Permitting

More information

Caler Cove Lobster Company

Caler Cove Lobster Company File No.: 199800920 City and State: Addison, ME Caler Cove Lobster Company General Impacts: 0.17 acre tidal emergent Functions and Values Lost: Production Export Nutrient Exchange Sediment Filtration Fishery

More information