Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Similar documents
VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Briar Crest Elementary

Master Facility Planning Update School Board Meeting May 26, 2016

Forest Hills Facilities Plan

2014 Bond Project Guide

Design Presentation. Chief Operations Officer Willie Burroughs

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Genevieve Melody Elementary School

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

Tillamook High School Bond Projects

Calmeca Academy of Fine Arts and Dual Language

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

REPORT CARD TO THE COMMUNITY MAY 15, 2018

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

5 Year Capital Improvement Plan Update

Edward Jenner Elementary Academy of the Arts

Josefa Ortiz De Dominguez Elementary School

John Palmer Elementary School

Oxford Hills School District Capital Renewal Plan Updated March 2017

Master Project List Report

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Richard Henry Lee Elementary School

Alessandro Volta Elementary School

New High School Concept

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

George B Swift Elementary Specialty School

Washington Irving Elementary School

Joseph Brennemann Elementary School

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

Proposed Bond Construction Projects

Oscar DePriest Elementary School

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

DeWitt Clinton Elementary School

Florence High School / Middle School Page 1 of 3 Florence, WI

Agustin Lara Elementary Academy

Design Review of Facility Improvement Projects

Francis M McKay Elementary School

NYC Department of Education

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

School District of Milton 5- Year Capital Maintenance and Improvement Plan

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

Greater Albany Public Schools May 2017 Ballot Measure for School Repairs, Crowding and Job Training

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

Charles W Earle Elementary School

GARCIA GALUSKA DESOUSA Consulting Engineers

Ashland School District Facility & Capacity Assessment Report 2005

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Appendix E: Photo Documentation

Facilities Management Services

Ohlone College Measure G Project Scope Revisions

DOCUMENT TABLE OF CONTENTS

Sidney Sawyer Elementary School

EXISTING CONDITIONS SUMMARY

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

Final Report from the Measure N Bond Oversight Committee February 5, 2014

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

2014 Bond District-wide Facility Repairs

Mt. Diablo Unified School District 2010 Measure C Facilities Improvement Program

CITY OF TULSA PUBLIC FACILITIES & INFRASTRUCTURE

NYC Department of Education

West Hartford Public School District

Facility Improvements

Massachusetts School Building Authority

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Alternative Parking Spaces + 80 under building. Bike Path Access. New Toilet Facility. Pre-school. Drop-off. Drop-off. mbta Mass Ave.

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

2014 Bond District-wide Facility Repairs

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

Educate Challenge. LONG RANGE FACILITIES PLAN Long Range Facilities Plan Committee. June 11, :30 pm 7:30 pm

PLAN REVIEW SUBMITTAL GUIDE

Cherry Hill Public Schools BUILDING A SOLID FUTURE

PROPOSED SCOPE OF WORK

Measure R Summary Through February 28, 2015 Board Meeting March 17, 2015

Measure R Summary Through April 30, 2015 Board Meeting May 19, 2015

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

NYC Department of Education

Custom Report // Priorities 1+2

SPLOST I, II, III,IV

Arena Elementary School 314 Willow St. Arena, WI 53503

RECAPP Facility Evaluation Report

PROCTOR TERRACE ELEMENTARY SCHOOL

Transcription:

Health & Safety 1,399,000 Academics & Program 17,140,800 Physical Education & Athletics 5,922,000 Building Infrastructure 3,103,800 Site Infrastructure 1,049,600 TOTAL SCOPE OF WORK 28,615,200 PROPOSED ENERGY PERFORMANCE CONTRACT (1,500,000) TOTAL PROPOSED REFERENDUM 27,115,200

PROPOSED PROJECT FINANCIAL ALLOCATION Site Infrastructure 3% Health & Safety 5% Bldg. Infrastructure 11% PE & Athletics 21% Academics & Program 60%

CAT-BLDG-# HEALTH & SAFETY PHASE 1 HS-HS-01 Provide Security Glazing Film at Entry Vestibule 3,900 HS-HS-02 Provide Security Transaction Window & Drawer 16,100 HS-HS-03* Interior- Replace Wood Doors & Hardware in 100, 200 & 300-Wing, including Safety Glass 165,600 HS-MS-01 Provide Security Glazing Film at Entry Vestibule 900 HS-MS-02 Provide Security Transaction Window & Drawer 16,100 HS-MS-03 Enclose/Secure Cafeteria 104,300 HS-MS-04* Replace Windows at Offices 69,100 HS-MS-05* Mechanical- Update Exhaust on the Existing Dust Collection System (no make up air) 22,800 HS-MS-07* Replace Asphalt Sidewalks with Conc. at Bus Loop & South Lot 357,700 HS-MS-08* Replace Asphalt Sidewalks with Conc. at East of Bldg to Playfields 84,700 HS-MS-09* Replace Basketball Equipment at Playground 53,300 HS-MS-10* Provide Handicapped Parking with Signage at South Parking Lot 6,000 HS-MS-11* Provide Accessible Sidewalks to Playfields 34,800 HS-MS-12 Electrical- Replace Fire Alarm System w/ Addressable System 189,600 Primary School HS-PS-01 Provide Security Glazing Film at Entry Vestibule 3,000 HS-PS-02 Provide Security Transaction Window & Drawer 14,400 HS-PS-03* Interior- Provide Renovations to Nurse Toilet Rooms for ADA Compliance 32,400 HS-PS-05 Provide Handicapped Parking with Signage at Main and North Parking Lots 4,800 HS-PS-06 Electrical- Replace Fire Alarm System w/ Addressable System 97,600 Maintenance Building HS-MB-01* Interior- Replace Ceramic Tile Flooring 4,800 HS-MB-02* Interior- Replace Door Hardware 10,800 Bus Garage HS-BG-01* Exterior- Replace Windows 15,100 HS-BG-02* Interior- Replace Lockers 4,800 HS-BG-03* Interior- Renovate Toilet Rooms for ADA-Compliance 86,400 HS-BG-04 Provide Handicapped Parking with Signage. Provide Accessible Sidewalks to Playfields 15,600 SUBTOTAL - HEALTH & SAFETY 1,399,000

CAT-BLDG-# ACADEMICS & PROGRAM PHASE 1 AP-HS-01 STEAM (Science) Renovations 2,909,200 AP-HS-02 STEAM (Technology/Engineering) Renovations, incl. Corridor 1,017,600 AP-HS-03 STEAM (Art) Renovations 456,000 AP-HS-04 STEAM (Math) Renovations 1,206,000 AP-HS-05 STEAM (Technology) Addition 1,123,200 AP-HS-06 Guidance/Counseling Suite Renovations 270,000 AP-HS-07 Replace Doors & Hardware at HS Auditorium 25,200 AP-HS-08 Replace Wood/Masonite Stage Floor at HS Auditorium 27,400 AP-HS-09 Provide New Sound Booth at HS Auditorium, Update ADA Seating 44,200 AP-MS-01 Renovate/Update 100-Wing Classroom "Pod" Area 3,648,000 AP-MS-02 Renovate/Update 200-Wing Classroom "Pod" Area 3,072,000 AP-MS-03 Renovate/Update 300-Wing Classroom "Pod" Area 3,072,000 AP-MS-05 Music Suite Improvements- Improve Acoustics and Replace Instrument Storage Only 270,000 SUBTOTAL - ACADEMICS & PROGRAM 17,140,800 CAT-BLDG-# PHYSICAL EDUCATION & ATHLETICS PHASE 1 PE-HS-02 Provide Bleachers at Multi-Purpose Field 389,400 PE-MS-03 Renovate/Expand Gyms within Bldg Footprint, inc. Raised Roof, Floors, Backstops, Scroreboard 5,532,600 SUBTOTAL - PHYSICAL EDUCATION & ATHLETICS 5,922,000 CAT-BLDG-# BUILDING INFRASTRUCTURE PHASE 1 IN-HS-09 Exterior- Roof Replacement- Replace Wet Areas and Re-Coat at 100-Wing 360,000 IN-HS-11 Exterior- Roof Replacement at Auditorium 230,000 IN-HS-16 Interior- Replace Lockers at 300-Wing 87,600 IN-HS-19 Mechanical- Replace Unit Ventilators at 300-Wing, Include Controls Replacement 145,300 IN-HS-20 Mechanical- Replace Steam Boiler with Natural Gas/Propane, High Efficiency Boilers 564,900 IN-HS-21 Mechanical- Replace Failing Heat Exchangers 60,000 IN-HS-25 Mechanical- Upgrade HVAC Controllers, Replace Pneumatic at 300 & 400-Wing & Main Office 16,100 IN-HS-26 Mechanical- Replace Pneumatic Controls at 300 & 400-Wing 80,700 IN-HS-39 Plumbing- Replace Galv. Water Main From Meter, Crawlspace Under 100-Wing 412,800 IN-HS-40 Plumbing- Replace Valves with Ball Valves 18,000 IN-MS-14 Replace 2x4 Suspended Grid ACM Ceilings in Kitchen with New Ceiling System 28,800 IN-MS-23 Mechanical- Replace Oil Fired Cast Iron Boiler with Natural Gas/Propane, High Efficiency Boilers 564,900 IN-MS-26 Mechanical- Upgrade HVAC Controllers- Replace Network, Backnet & Network Devices 316,300 IN-MS-31 Plumbing- Provide Backflow Preventer at Water Service 16,100 IN-MS-32 Plumbing- Replace Valves with Ball Valves 12,000 Primary School IN-PS-04 Exterior- Replace FRP Doors & Frames 36,000 IN-PS-05 Interior- Replace Ceiling at Kitchen 10,000 IN-PS-11 Mechanical- Upgrade Controls for RTU at Kitchen and Cafeteria 16,100 IN-PS-14 Mechanical- Upgrade Controllers 15,600 IN-PS-16 Electrical- Replace Circuit Breaker Panels 54,000 Bus Garage IN-BG-02 Exterior- Replace All Exterior Doors & Hardware 36,000 IN-BG-07 Plumbing- Provide Backflow Preventer at Water Service 16,100 IN-BG-08 Plumbing- Provide ADA-Compliant Drinking Fountains 6,500 SUBTOTAL - BUILDING INFRASTRUCTURE 3,103,800

CAT-BLDG-# SITE INFRASTRUCTURE PHASE 1 SW-HS-10 Provide Site Reconfiguration- Connection Drive Thru Entire Campus 414,000 SW-MS-02 Replace Stormwater Management System 180,800 SW-MS-03 Asphalt Pavement Improvements/Re-Configuration at Main Parking Lot, Light Duty 360,000 SW-MS-04 Asphalt Pavement Improvements/Re-Configuration at Secondary Lot/BB Court, Light Duty 94,800 SUBTOTAL - SITE INFRASTRUCTURE 1,049,600 PHASE 1 28,615,200