Elm Street Business District: Streetscape and Signage Plan

Similar documents
Elm Street Business District: Streetscape and Signage Plan

Agenda Item Executive Summary

Elm Street Business District: Streetscape and Signage Plan

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

Elm Street Business District: Streetscape and Signage Plan

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Village Board Presentation May 8, 2018 Teska Associates Christopher Burke Engineering

SOUTH UNIVERSITY Street Design Alternatives in Progress

Maplewood Avenue Downtown Complete Street Project

FOUNTAIN SQUARE RENOVATIONS JOINT WARD 1 & 4 PUBLIC MEETING EVANSTON PUBLIC LIBRARY JUNE 7, 2016, 7:00 PM

CHAPTER 6 URBAN DESIGN

Chapter 14 Streetscape Improvements

BUSINESS DISTRICT DESIGN GUIDELINES

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

I-70/71 Innerbelt Project

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

Project Consulting Team:

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Roanoke Rapids Streetscape Master Plan. City Council Presentation

open house 3 CITY OF SALEM Downtown Streetscape Plan

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

Lockport Streetscape Plan Primary Streetscape Design 10th Street to 9th Street

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

VEHICULAR AND PEDESTRIAN CIRCULATION

Streets Vision

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

COMPLETE GREEN STREET CHECKLIST

City of Burlington Downtown Street Design & Construction Standards

BRADENTON RIVERWALK EXPANSION MASTER PLAN

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Landscape and Streetscape Design 2.5

Scope of Work - Ogden Avenue Corridor Plan

FRONT STREET STREETSCAPE

Complete Streets Master Plan for Downtown New Britain CRCOG Transportation Committee Meeting Monday, December 9, 2013

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

FDOT D4 Complete Streets

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

urban design Introduction

Concept Design. The Midtown Blocks

TAC/CAC, TPO Project Update February 2016

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

CRA Five Year Capital Improvement Plan. September 2, 2015

Carlsbad Village Redevelopment Concept Summary of Features

Include new ideas developed during this planning process

Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

City of Dallas Complete Streets Program. SAME Infrastructure Forum February 2, 2018

Lambeth Main Street Streetscape Improvements

Lehigh Acres Land Development Regulations Community Planning Project

Streetscape Patterns. Design Guidelines, Ridgewood Village Center Historic District, Ridgewood, N.J. page 20

Downtown Revitalization Project. Public Meeting, June 15, 2016

Bethlehem Pike Streetscape Master Plan

4.9 Mendocino Avenue Corridor Plan Design Guidelines

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

III - design standards

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Technical Advisory Committee

5.0 WAYFINDING STREETSCAPE DESIGN MASTER PLAN 55

D ESIGN REVIEW COMMITTEE

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

Chapter 7: Streetscape & Design Elements

Urban Design 9Identity

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting

TURN TO THE RIVER CITY PLAZA LANDSCAPE DESIGN CONCEPT May 25, 2016

VISION AND GUIDING DESIGN PRINCIPLES

Potential Green Infrastructure Strategies May 6, 2015 Workshop

MASTER PLAN QUEEN ST. WEST BIA

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Cleveland Park Streetscape and Drainage Improvement Project 1

Pedestrian and Bike Bridge LOGO

DESIGN & GREEN INFRASTRUCTURE UPDATE December 13, 2016

Building Great Neighbourhoods. Strathcona

Parapet/Formliner/Fencing

3.1 community vision. 3.3 required plan elements

Corridor Identity. Section 9. Introduction. Corridor Guiding Principles

TREE GUARDS AND EDGING

Burlington Enhancement Plan

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

AGENDA ACTION ITEMS INFORMATION ITEMS

Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall

Johnson Street Bridge Public Realm Update

NOVEMBER 2016 AARP IN ST. LOUIS & CITIZENS FOR MODERN TRANSIT PLACEMAKING STRATEGIES FOR ST. LOUIS TRANSIT DRAFT

STUDY AREA. Tonight s Agenda. Project Tasks Completed. Next Steps. Town of Oyster Bay Eastern Waterfront Community Vision & Revitalization Plan

Town Center Design Guidelines

BUSINESS DISTRICT DESIGN GUIDELINES

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

Transcription:

Attachment C Elm Street Business District: Streetscape and Signage Plan VILLAGE OF WINNETKA DOWNTOWN MASTER PLAN TASK FORCE MTG #4 Final Streetscape & Signage Planning Teska Associates 26 February 2018 2-26-18 DMP Task Force Agenda Packet - Page 11

Oct Nov Dec Jan Feb Mar Apr May PHASE 1 analysis tf 10. 30.17 PHASE 2 prelim master plan p tf tf vc PHASE 3 final master plan 12.04.17 01.15.18 02.06.18 p tf vc tf vc Task Public tf p vc Force Village Council 02.26.18 04.03.18 04.24.18 05.15.18 2-26-18 DMP Task Force Agenda Packet - Page 12

REPORTING BACK: VILLAGE COUNCIL MEETING (02/06/18) KEY THEMES AND COMMENTS 1. Interest in narrowing crosswalk at Green Bay Road emphasis on IDOT coordination and evaluation of traffic impacts; 2. Support for focus on trees and seating areas at bumps outs; 3. Support for separating specialty lighting (apart from tree plantings); 4. Concur with maintaining outdoor café spaces with clear sidewalk passing area; 5. Interest in incorporating community postings at kiosks; 6. Consider how community events may benefit from or be impacted by proposed streetscape; and 7. Address costs and budget concerns in planning. IDOT COORDINATION MEETING (02/23/18) KEY THEMES AND COMMENTS 2-26-18 DMP Task Force Agenda Packet - Page 13

SITE FURNISHINGS: ELEMENTS Standard Bike Rack custom graphics Bike Bollard Bike repair station Clustered seating at planters Precast Concrete Planters Benches 2-26-18 DMP Task Force Agenda Packet - Page 14

LIGHTING - PREVIOUS EFFORTS TO CARRY FORWARD Kim Roadway Fixture on 30 ht Valmont pole Sternberg Pedestrian Fixture on 11-3 fluted pole with Augusta base Sternberg Lighted Bollard 2-26-18 DMP Task Force Agenda Packet - Page 15

LIGHTING NEW ELEMENTS Decorative poles and festoon lighting Street light décor 2-26-18 DMP Task Force Agenda Packet - Page 16

LIGHTING HIERARCHY 7 Kim / Valmont Sternberg Roadway Pole Festoon (existing) Pole 2-26-18 DMP Task Force Agenda Packet - Page 17 Sternberg Combination Pole Sternberg Standard Pole (existing)

COMMUNITY IDENTITY GATEWAY & WAYFINDING SIGNAGE Gateway Sign Optional stone base Optional internal illumination Gateway Sign Optional internal illumination 2-26-18 DMP Task Force Agenda Packet - Page 18 Directional Sign 4 letter ht (IDOT ROW) Directional Sign 3 letter ht (local ROW)

COMMUNITY IDENTITY GATEWAY & WAYFINDING SIGNAGE Identity Banner Fabric or Metal Options Parking Identifier Custom bracket options Parking Directional Sign Business Directory Kiosk Bicycle Route Directional Sign 2-26-18 DMP Task Force Agenda Packet - Page 19

STREETSCAPE CHARACTER TYPOLOGIES Shopping / Dining Street Transitional Street Throughfare Street Bridge Crossing 2-26-18 DMP Task Force Agenda Packet - Page 20

SHOPPING AND DINING STREET TYPOLOGY Chestnut Street 13.5 MIN. 8 MIN. 2-26-18 DMP Task Force Agenda Packet - Page 21

SHOPPING AND DINING STREET TYPOLOGY Chestnut Street 2-26-18 DMP Task Force Agenda Packet - Page 22

SPRUCE ST BIRCH ST CHESTNUT ST 13 ELM LINCOLN AVE ST OAK ST 2-26-18 DMP Task Force Agenda Packet - Page 23 SHOPPING & DINING STREETS / ELM STREET BRIDGE

KIM / VALMONT ROADWAY POLE SPRUCE ST STERNBERG FESTOON POLE STERNBERG COMBINATION POLE BIRCH ST CHESTNUT ST 14 ELM LINCOLN AVE ST STERNBERG STANDARD POLE OAK ST LIGHTING HIERARCHY 2-26-18 DMP Task Force Agenda Packet - Page 24

GATEWAY SIGN SPRUCE ST NEW COMMUNITY EVENTS SIGN BUSINESS DIRECTORY KIOSK SCULPTURE PAD BIRCH ST CHESTNUT ST 15 ELM LINCOLN AVE ST OAK ST GATEWAY SIGNS, BUSINESS DIRECTORY KIOSKS & SCULPTURE PADS 2-26-18 DMP Task Force Agenda Packet - Page 25

SPRUCE ST NW QUADRANT NE QUADRANT BIRCH ST CHESTNUT ST 16 ELM LINCOLN AVE ST SW QUADRANT SE QUADRANT OAK ST 2-26-18 DMP Task Force Agenda Packet - Page 26

SPRUCE ST CHESTNUT ST ELM ST NW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 27

The Hudson Company Chamber of Commerce PARKING EXISTING PROPOSED SPRUCE ST Chestnut St (north of Elm) 44 37 {-7} Starbucks Elm St (east of Chestnut) 23 18 {-5} Scissors Edge Marian Michael Avli Estiatorio Elm St (west of Chestnut) 15 11 {-4} Avli Rotisserie Classic Kids Marlene s Nail Fred s Garage Emporium Caffe Buon Giorno Doyle Optician 18 Neopolitan Zia Gallery Sparkly Nails Little Ian s CHESTNUT ST Denim & Soul Bleachers Sports & Training Kaehler Luggage True Juice Classic Stitch Crystal Cleaners Botanic Nails & Spa Ellens on Elm Athene Noahs Ark Pet Supply Berkshire Hathaway Chestnut Florist Peet s Coffee Book Stall Village Toy Shop Michelle s Cleaners Chase JP Morgan NW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 28

Planter Pots / Bollards SPRUCE ST Kim/Valmont Pole Business Directory Kiosk In Ground Planter (Existing Tree, Benches, Starbucks Litter/Recycling, Bike Racks) Café Seating Decorative Paving CHESTNUT ST Fred s Garage Sidewalk with Paving Ribbon NW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 29

True Juice Berkshire Hathaway CHESTNUT ST Peet s Coffee Combination Sternberg Light / Festoon Pole Seating Cluster (Optional Sculpture Pad or Fireplace) Bike Racks In Ground Planter Michelle s Chase JP (Ex Tree, Benches, Cleaner Litter/Recycling, Bike Racks) Morgan Alley Café Seating Business Directory Kiosk ELM ST Planter Pots / Bollards Kim/Valmont Light Pole Decorative Paving ELM ST Bliss Salon Citibank Christian Science Reading Room Lakeside Foods Alley NW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 30

ELM ST CHESTNUT ST OAK ST SW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 31

22 Post Office CHESTNUT ST Bliss Salon Citibank Heffernan Christian Science Reading Room Lakeside Foods BMO Harris OAK ST SW QUADRANT H Gary Frank Architects Good Grapes Hair Couture Bellas Day Spa Trifecta Grill PARKING EXISTING PROPOSED Chestnut St (south of Elm) 26 18 {-8} Winnetka Village Hall Spynergy Home Ice Bratschii Plumbing 2-26-18 DMP Task Force Agenda Packet - Page 32 CHESTNUT CT

Sternberg Light Good Grapes Seating Cluster Café Seating 23 CHESTNUT STREET CHESTNUT CT Sidewalk / Curb Replacement Existing trees in open pits New Benches Business Directory Kiosk Sculpture Pad Decorative Paving Sidewalk with Paving Ribbon SW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 33

Sternberg Light / Planter Pots 24 Combination Light / Planter Pots Garden Wall & Plantings Trifecta Grill Bench Planter Pot Litter/Recycling Crosswalk OAK STREET SW QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 34

ELM ST GREEN BAY ROAD LINCOLN AVE SE QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 35

LINCOLN AVE 26 GREEN BAY ROAD Metra Station SE QUADRANT Future One Winnetka Site Café Aroma Maize Home New Trier Township Elm Cleaners Trueman Catering One Winnetka Office (pending) Winnetka Dental Group Arborvitae Park PARKING EXISTING PROPOSED Elm St (east of Lincoln) 38 31 {-7} Lincoln Ave (south of Elm, east side) 20 15 {-5} 2-26-18 DMP Task Force Agenda Packet - Page 36

Bump Outs / Mid Block Crossing Planter Pots Little Ricky s Rib Joint LINCOLN AVENUE SE QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 37 Festoon Light Bollards / Planter Pots Bike Racks Sculpture Pad / Plantings Benches

Little Ricky s Rib Joint LINCOLN AVENUE Café Aroma Business Directory Kiosk Festoon Light ALLEY Kim / Valmont Pole Seating Cluster (Optional Fireplace or Sculpture Pad) Combination Pole / Festoon Decorative Paving ELM STREET Future One Winnetka Site SE QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 38

29 LINCOLN AVE NE QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 39

PARKING EXISTING PROPOSED Lincoln Ave (north of Elm) 70 58 {-12} Jameson/Sotheby s International Realty Brady & Ford Orthodontics North Shore Community Bank and Trust S&A Chiropractic Beauty Lash Elm St Pediatrics Coldwell Banker TJ Cullen Jeweler N Shore Frugal Fashionista Blow Dry Boutique Your Loss Your Gain Body Gear Physical Therapy LINCOLN AVE Donald Stuart Antiques M. Stephanich Antiques Mirani s at Home J. McLaughlin Conlon Christies Real Estate Sara Campbell KMK Consignment Optique AJ Retreat Oui Madame Spa Nail City Fitness Together Bake 425 Face Forward Spa Little Ricky s Rib Joint Orrington Jewelers Stacked & Folded Mark Beard LTD Café Aroma Maize Home Elm Cleaners Truman Catering Arborvitae Park NE QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 40 ELM ST

Decorative Paving at Crosswalk Planter / Seating Cluster Combination Pole / Planter Pots Jameson/ Sotheby s International Realty North Shore Community Bank and Trust LINCOLN AVENUE Planter / Bike Racks Brady & Ford Orthodontics S&A Chiropractic NE QUADRANT 2-26-18 DMP Task Force Agenda Packet - Page 41

PARKING SUMMARY PARKING EXISTING PROPOSED {#} represents existing parking spaces converted to landscaped bump out / seating areas. Chestnut St (north of Elm) 44 37 {-7} Chestnut St (south of Elm) 26 18 {-8} Elm St (east of Chestnut) 23 18 {-5} Elm St (west of Chestnut) 15 11 {-4} Elm St (east of Lincoln) 38 31 {-7} Lincoln Ave (south of Elm, east side) 20 15 {-5} Lincoln Ave (north of Elm) 70 58 {-12} TOTALS 236 188 {-48} Conceptual parking quantities are calculated for Shopping and Dining Street areas only and are based on aerial photography and past planning studies. 2-26-18 DMP Task Force Agenda Packet - Page 42

TREE IMPACT AREAS SPRUCE ST TOTAL TREE IMPACTS Tree plantings are relocated from sidewalks to landscaped bump out / seating areas WEST 1 Tree preservation Tree removals 3 20 New trees 18 WEST 2 Tree preservation 0 WEST 3 WEST 1 CHESTNUT ST 33 ELM Tree preservation 19 Tree removals 90 New trees 59 Net decrease 31 WEST 2 EAST 2 LINCOLN AVE ST EAST 1 EAST 1 Tree preservation Tree removals 0 23 New trees 14 EAST 2 Tree preservation 1 Tree removals 13 Tree removals 22 New trees 5 WEST 3 Tree preservation 15 WEST 3 GREEN BAY ROAD New trees 8 Tree removals 12 New trees 14 OAK ST 2-26-18 DMP Task Force Agenda Packet - Page 43

STREETSCAPE BUDGET COSTS: PROJECT CATEGORIES & ELEMENTS Roadway & Drainage Site mobilization; curb & gutter remove and replace; pavement resurfacing; tree protection & removals; pavement marking; detectable warning plates; drainage allowance. Lighting & Support Infrastructure Hardscape & Furnishings Signage Plantings Kim/ Valmont pole remove and replace, Sternberg standard poles; Sternberg combination poles, Sternberg festoon poles, fest and décor elements; bollards; underground utility allowance. Clay brick pavers, jointed concrete sidewalk, benches, planter pots, litter & recycling. Gateway signs (not illuminated), business directory kiosks, community events sign. Trees, shrubs, perennials/groundcover, soils, mulches. Streetscape budget costs are provided for Village planning purposes. Costs are derived based on past planning efforts, aerial photography and site reviews. Final design and engineering is required to produce final cost estimates. 2-26-18 DMP Task Force Agenda Packet - Page 44

SPRUCE ST WEST 1 EAST 2 WEST 3 CHESTNUT ST 35 ELM WEST 2 BRIDGE LINCOLN AVE ST EAST 1 WEST 3 OAK ST 2-26-18 DMP Task Force Agenda Packet - Page 45 STREETSCAPE BUDGET COSTS: PROJECT AREAS

WEST 1 Roadway & Drainage $456,000 SPRUCE ST Lighting & Support Infrastructure $862,000 Hardscape & Furnishings $655,000 WEST 1 Signage $ 80,000 Plantings $ 54,000 TOTAL $2,107,000 WEST 3 CHESTNUT ST 36 WEST 2 WEST 2 Roadway & Drainage $223,000 Lighting & Support Infrastructure $315,000 Hardscape & Furnishings $183,000 Signage -- Plantings $ 23,000 TOTAL $744,000 WEST 3 WEST 3 Roadway & Drainage $244,000 Lighting & Support Infrastructure $498,000 Hardscape & Furnishings $524,000 Signage $115,000 OAK ST 2-26-18 DMP Task Force Agenda Packet - Page 46 Plantings $ 48,000 TOTAL $1,429,000

BRIDGE Roadway & Drainage $ 90,000 Lighting & Support Infrastructure $ 5,000 Hardscape & Furnishings $199,000 Signage $ 50,000 Plantings $ 6,500 TOTAL $350,500 EAST 1 Roadway & Drainage $610,000 Lighting & Support Infrastructure $795,000 EAST 2 LINCOLN AVE STREETSCAPE SUMMARY WEST 1 $2,107,000 WEST 2 $ 744,000 WEST 3 $1,429,000 BRIDGE $ 350,500 EAST 1 $2,197,000 EAST 2 $1,161,000 TOTAL $7,988,500 Hardscape & Furnishings $659,000 Signage $ 65,000 BRIDGE ELM ST EAST 1 Plantings $ 68,000 TOTAL $2,197,000 EAST 2 Roadway & Drainage $356,000 Lighting & Support Infrastructure $374,000 Hardscape & Furnishings $380,000 GREEN BAY ROAD Signage $ 15,000 Plantings $ 36,000 TOTAL $1,161,000 2-26-18 DMP Task Force Agenda Packet - Page 47

COMMUNITY IDENTITY WAYFINDING SIGNAGE WAYFINDING SIGNAGE Roadway Directional Signs $155,000 Bike Route Directional Signs $100,000 Parking Identifiers & Directional Signs $130,000 Fabric Banners $8,000 TOTAL $393,000 Gateway signs, business directory kiosks & community events signs accounted for in the streetscape budgets 2-26-18 DMP Task Force Agenda Packet - Page 48

IMPLEMENTATION PRINCIPLES 1. Streetscape should live within a budget & funding sources to be determined by the Council; 2. Streetscape improvements that benefit Winnetka s residents should be higher priority; 3. Streetscape improvements to shopping/dining streets & intersections should be higher priority; 4. Streetscape improvements should coordinate public & private improvements with proposed streetscape improvements to maximize implementation efficiency; 5. Streetscape improvements should be phased so as to minimize disruption to businesses; 6. When phasing streetscape improvements, minimize disruption to streetscape improvements made in previous phases. 2-26-18 DMP Task Force Agenda Packet - Page 49

SPRUCE ST WEST 1 EAST 2 WEST 3 CHESTNUT ST 40 ELM WEST 2 BRIDGE LINCOLN AVE ST EAST 1 ONE WINNETKA DEVELOPMENT FUTURE POST OFFICE REDEVELOPMENT WEST 3 OAK ST PHASING DISCUSSION 2-26-18 DMP Task Force Agenda Packet - Page 50

NEXT STEPS: Teska advances the Final Streetscape & Signage Plan March 31 Public Outreach - Egg Hunt Event April 3 Village Council Meeting April 24 Task Force Meeting May 15 Village Council Meeting Help us spread the word! WWW.WINNETKADOWNTOWNPLAN.COM 2-26-18 DMP Task Force Agenda Packet - Page 51