Subject: Expo Light Rail - Revision of the Terminus Station North Entrance Design

Similar documents
Planning Commission Report

THE GREEN VISION WORKSHOP Friday, November 6, 2009

ALTERNATIVE STATION AREA -

Pedestrian and Bike Bridge LOGO

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

California Environmental Quality Act (CEQA) Environmental Review Process

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Cleveland Mall / North Coast Harbor Land Bridge Proposal. "Achieving the Ultimate Goal of Merging the Lakefront with Downtown"

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Johnson Street Bridge Public Realm Update

The University District envisions, in its neighborhood

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

A. INTRODUCTION B. PROJECT LOCATION

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Cleveland Park Streetscape and Drainage Improvement Project 1

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

Future Proposed Development

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

South th E ast Communit ity Centre (SECC)

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Public input has been an important part of the plan development process.

Town Center (part of the Comprehensive Plan)

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Dallas CBD Second Light Rail Alignment (D2)

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

Though functionally a part of the Ocean Avenue Neighborhood Commercial

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Maplewood Avenue Downtown Complete Street Project

The Auburn Plan Designing the Future of Auburn February 28, 2005

appendix and street interface guidelines

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

Request Alternative Compliance to the prescribed criteria of the Oceanfront Resort District Form- Based Code. Staff Recommendation Approval

SOUTH UNIVERSITY Street Design Alternatives in Progress

CITY OF FARGO PARKING RAMP SITE EVALUATION

Toronto Complete Streets Guidelines

Downingtown Station Relocation Plan Site Selection Memo June 12, 2012

Official Plan Review: Draft Built Form Policies

DRAFT PLAN PRESENTATION

WINDSOR GLEN DESIGN GUIDELINES

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Sacramento Public Library Authority

Dallas CBD Second Light Rail Alignment (D2)

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

STAFF REPORT TO COUNCIL PLANNING AND DEVELOPMENT

Mix of Uses Guide for Transit-Oriented Development MIX OF USES

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

TRANSIT-ORIENTED DEVELOPMENT POLICY DRAFT. City Planning and Development Department Kansas City, Missouri

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

The transportation system in a community is an

ELK GROVE GENERAL PLAN VISION

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Capital Projects in and near Odenton Town Center

Walnut Creek BART Station

Oroville Area Urban Greening Plan. Second Communitywide Workshop

Attachment D Eastside Transit Corridor Phase 2 Technical Study Route Options Screening Analysis and Community Outreach Executive Summary April 2017

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

Chapter 1.0 Introduction

Transportation Committee

B. PROPOSED REFINEMENTS POTENTIALLY AFFECTING URBAN DESIGN AND VISUAL RESOURCES

8implementation. strategies

Shift Rapid Transit Public Participation Meeting May 3, 2017

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

This Review Is Divided Into Two Phases:

Evaluation Criteria. Detailed Evaluation Criteria

Policies and Code Intent Sections Related to Town Center

BeltLine Corridor Environmental Study

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING May 21, :00 PM

Adoption of the Rosslyn Sector Plan Site Plan Review Committee (SPRC) Meeting October 26, 2015

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

STEERING COMMITTEE MEETING # 5 SEPTEMBER 18, 2018

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

BUSINESS DISTRICT DESIGN GUIDELINES

The Atlanta BeltLine. Quarterly Briefing March @atlantabeltline. Reynoldstown Senior Affordable Housing

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Transportation. Strategies for Action

City of Hermosa Beach Administrative Policy #

V. Gateways GATEWAYS / V-1

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

Mississippi Skyway Preliminary Engineering Report

CHAPTER 7: Transportation, Mobility and Circulation

Transcription:

Information Item Date: June 12, 2012 To: Mayor and City Council From: David Martin, Director, Planning & Community Development Martin Pastucha, Director, Public Works Kathryn Vernez, Deputy City Manager Subject: Expo Light Rail - Revision of the Terminus Station North Entrance Design Introduction The north entrance design of the Expo Light Rail Downtown Station/4th Street has been revised since the September 13, 2011 City Council meeting to address comments raised by Metro, the City and local stakeholders. Reconfiguring the north station entrance to enhance the ramp and replace the amphitheater seating element with garden terraces will address Metro Design Criteria compliance and maintenance concerns, will reduce the overall betterment cost of the station upgrades to the City, and will provide an improved universal access arrival and departure experience for light rail patrons. The City of Santa Monica has consistently prioritized strong access and connectivity to the Expo Light Rail stations to encourage walking, bicycling, transit use and to support the City s sustainable transportation and greenhouse gas reduction goals. Background On September 13, 2011, the City Council received the final track alignment and alternative station concept for the Downtown Station/4 th Street. The revised alignment softens the curvature of the tracks enabling faster train speeds across the intersection of 5th Street/Colorado Avenue, reducing the potential wheel noise, improves connections to the future Colorado Esplanade, and improves the resulting opportunities for use of the remainder of the Sears automotive and adjacent City-owned sites, including preserving the 4th Street tunnel access. 1

Final Alignment Concept Reviewed by City Council September 13, 2011 The Alternative Station Concept shown here provides plaza entrances to the north and south. Other features of the final Downtown Station/4 th Street alignment design include: Two center platforms that meet Metro preferences Two station entrances and space for pedestrian queuing from the north and south A continuous sidewalk on south side of Colorado between 4th and 5th Streets One westbound vehicle lane and one westbound left turn lane at 4th Street Integrated stairs and street-level plaza interface to the north and south The City Council directed City staff to continue to work with the Construction Authority and Metro on several key issues, to be developed during final design. The change to the north entrance addresses the following direction from Council: Refine station entrances/exits at 4 th Street to carefully address grade changes, and create a seamless and gradual transition to the Downtown through City-controlled plazas. 2

On December 13, 2011, the City Council authorized agreements with the Exposition Metro Line Construction Authority (Construction Authority) to perform preliminary engineering services at the Downtown/4 th Street Station. The Skanska-Rados Joint Venture team has since completed the preliminary engineering on the station and station plaza integration with the Esplanade based on City input and in coordination with Peter Walker Partners, designer of the Colorado Esplanade Project. On January 24, 2012 the City Council authorized an agreement with the Construction Authority in an amount not-to-exceed $8,850,000 to perform engineering services and construction of betterments at the Downtown/4 th Street Station. The City is currently working with the Construction Authority and Skanska-Rados Joint Venture to refine the design and associated costs within the not-to-exceed betterment price. Discussion The Downtown Station must be capable of handling a high level of activity and serving as the gateway to multiple destinations in Downtown, the Civic Center and the Oceanfront. Every rider exiting the train will become a pedestrian, and access to/from the train must be designed in a way that will accommodate the expected crowds. Working in coordination with Peter Walker Partners (PWP) schematic design for the Downtown station plaza, City staff has coordinated with the Construction Authority, Metro and Skanska-Rados Joint Venture to refine the station design to address key issues of access, maintenance and costs. The PWP schematic design for the Downtown Station/4 th Street achieves a sense of arrival, at the edge of the continent, to a place that feels uniquely Santa Monica. Along the station site, the ground naturally slopes toward the west creating views from the station to the Pacific Ocean, the Pier sign, Downtown, the future Palisades Garden Walk Park and the Colorado Esplanade. 3

PWP Design for Santa Monica Downtown Station Oblique View Looking West Typical Metro station platforms are raised 3-1/2 feet above grade, but due to the natural slope of Colorado, the platform level is raised approximately 11 feet above grade near 4 th Street which creates views and orientation to the Oceanfront, Pier and Downtown. Original entrance design studies for the Downtown Station/4 th Street included both ramp-only and combination ramp-and-stair entrance alternatives to address the change in grade. A ramp-only configuration is typically preferred by Metro but was not feasible because there is not enough room between the station platform and the Colorado Avenue roadway to fit the length of the ramp needed to address the grade changes while also providing the width of ramp needed to accommodate the anticipated volume of patrons. Of the multiple access configurations studied, the only configuration that would fit on site while meeting the egress requirements and access goals included: The wide north-facing stair which fulfills the egress requirements and provides strong orientation up 4 th Street, leading pedestrians in the direction of Downtown. The north ramp facing east which meets the sidewalk grade where the topography is higher, resulting in a shorter ramp. A switchback ramp was first pursued but deemed infeasible to descend the required 11 to meet the sidewalk close to 4 th Street. The south ramp and south stair which provide additional required egress, direct pedestrians to the High School and the Civic Center, and strengthen the northsouth axis along 4 th Street. 4

PWP Original Design for the north entrance The original design for the north entrance included amphitheater seating. The final north ramp-and-stair configuration creates a triangular space between the ramp and the stairs. Within this triangular space, the original Peter Walker Partners design included an amphitheater seating element, in wood or composite wood, to visually connect the station plaza to the Pier, to connect the experience of arriving in 5

Santa Monica with arriving at the water s edge, and to provide seating that contributes to a sense of place. However, based on material restrictions in Metro s Design Criteria, maintenance concerns from Metro and the City, and concerns from the Recreation and Parks Commission about universal access to the amphitheater, Peter Walker Partners redesigned the triangular space between the ramp and stairs based on a different concept, one focused on creating a shared arrival experience for all pedestrians, whether they use the ramp or stairs. The new design for the north entrance reconfigures the triangular space into three garden terraces flanked on one side by a garden ramp and the west side by the stairs. The new north entrance design simplifies materials and form while enhancing the north ramp with a tall garden or art wall that will engage ramp users with the garden terraces. The garden terraces are designed with a combination of bold and iconic landscaping, featuring fragrant and colorful plants that announce the sea air and signal arrival. Whether alighting from the ramp or stairs, the pedestrian will step out of the station directly onto the Colorado Esplanade, where additional visual cues of planned ripplepatterned pavers and festive string lights create a dramatic yet uniquely Santa Monica arrival experience and a palpable connection to the water s edge. PWP Revised Design for the north entrance The revised design for the north entrance includes garden terraces and an enhanced garden or art wall 6

The new north entrance design for the Downtown Station/4 th Street is designed to comply with Metro Design Criteria approved materials, addresses the maintenance and betterment cost concerns associated with the amphitheater seating element, and creates an improved universal access and arrival experience by replacing the amphitheater seating with garden terraces and an enhanced north ramp. Staff is currently negotiating with Expo/ Metro and the design builder to realize this improved design. Attachment: Site Plan - Downtown Station/4 th Street Prepared by: Joanna Hankamer, Senior Planner 7

ATTACHMENT A 4TH COURT EXPO DOWNTOWN STATION SITE PLAN BANK OF THE WEST MIDAS ESPLANADE STREET TREE IN ACCENT PAVING COLORADO AVENUE ART WALL PAVING TO MATCH ESPLANADE PAVERS STRING LIGHTS TERRACED PLANTER -WITH SHRUBS AND PALM TREES PLANTER -WITH SHRUBS AND PALM TREES PLANTER -WITH SHRUBS AND PALM TREES VINE WALL ICONIC WALL -WITH VINES AND SUPER GRAPHICS 4TH STREET STANDARD METRO PAVER WITH CUSTOM COLOR TO MATCH ESPLANADE PAVING CONCRETE SIDEWALK TPSS FUTURE TOD SITE