PROPOSED SITE IMPROVEMENTS

Similar documents
WESTERN ILLINOIS UNIVERSITY

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

Ringsend & Irishtown Local Environmental Improvement Plan

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

VEHICULAR AND PEDESTRIAN CIRCULATION

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

WESTERN ILLINOIS UNIVERSITY

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

Guiding Principles. People dance, and to share culture. Place consistency and internal connections. Management community for years to come

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

Community Design Plan

campus master plan VIRGINIA STATE UNIVERSITY

18 May 2016 CAMPUS MASTER PLAN UPATE

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

Ohlone College Measure G Project Scope Revisions

THE LANDMARK PROJECT: ST. GEORGE CAMPUS BEFORE AND AFTER

FROST CAMPUS MASTER PLAN SIR SANDFORD FLEMING COLLEGE

EXISTING CONDITIONS 41. Existing Conditions

REPORT TO BOARD ON PREFERENCES tbp/architecture CCSF Facilities Master Plan, October 23, 2016

BUSINESS DISTRICT DESIGN GUIDELINES

3.0 master plan concept

LANDSCAPE ARCHITECTURE - NEW JERSEY

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

AIRPORT BUSINESS PARK

section five BEAUTIFICATION PLAN

appendix and street interface guidelines

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016

CAMPUS MASTER PLAN UPDATE

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Town Center. Block 5 Existing multifamily residential units are expected to remain.

BUILDING DESIGN STANDARDS FACILITIES MANAGEMENT AND ANCILLARY SERVICES EXTERIOR IMPROVEMENTS DIVISION 32 Exterior Lighting

FRONT STREET STREETSCAPE

Design Considerations

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

DESIGN GUIDELINES. Seattle Children s Major Institution Master Plan. Approved May 7, 2010

Speedway Mall Project Frequently Asked Questions

DEVELOPMENT CONTROLS MEDICAL DISTRICT

Figure 3-1: Public Realm Plan

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing)

SOUTH UNIVERSITY Street Design Alternatives in Progress

UNIVERSITY OF DENVER. APPENDIX G Open Space Typologies

Part C. Main Campus Plan Frameworks PAGE 59 UNIVERSITY OF REGINA / CAMPUS MASTER PLAN 2011

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

UNIVERSITY TOWN NEIGHBOURHOODS 5.5 HOUSING MELBOURNE CAMPUS MASTER PLAN 2014

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Item PZ South Lindbergh Project Overview

3.13. Development Guidelines

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

FOCUS GROUP 3 Urban, Architectural & Landscape Design Guidelines

NJIT. New Jersey Institute of Technology LANDSCAPE MASTER PLAN

Industrial Development Permit Area

Pentagon Centre (SP#297) Phase I Site Plan Amendments SPRC #3

Sign System Recommendations

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

5.0 WAYFINDING STREETSCAPE DESIGN MASTER PLAN 55

CAMPUS LANDSCAPE AND OPEN SPACE

CHAPTER 3. Design Standards for Business, Commercial, Industrial, Recreational and Institutional Uses

5. Implementation. Challenges

East Side District Map. Pha s e 2 Report 19

C I T Y O F T O R O N T O L A W R E N C E A V E N U E E A S T S T U D Y. Northwest Corner of Birchmount Road and Lawrence Avenue East

Master Plan Presentation August 12, 2015

EXISTING VEHICULAR & PEDESTRIAN CIRCULATION

4.0 Design Guidelines For The Village Centre. South fields Community Architectural Design Guidelines Town of Caledon

10 February CAMPUS MASTER PLAN UPDATE Focus Group - Landscape & Hensel Park

Assessment of the Extent and Quality of the Landscape Features of the Campus.

City of Vaughan Urban Design Guidelines for Infill Development in Established Low-Rise Residential Neighbourhoods

TOWN CENTER DESIGN STANDARDS FOR THE CITY OF. August, MOUNTLAKE TERRACE TOWN CENTER DESIGN STANDARDS August,

ILLUSTRATIVE MASTERPLAN

Alamo Architects with SWA Group Facility Programming & CNG Engineering DRAFT CAMPUS MASTER PLAN 2009 VOLUME I. for the San Antonio Campus

BUSINESS DISTRICT DESIGN GUIDELINES

FREEWAY/TOURIST DISTRICT

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Appendix D North Road/N. Leroy Street Subarea Plan

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

Georgeson Botanical Garden Master Plan

4.9 Mendocino Avenue Corridor Plan Design Guidelines

East Bayshore Road Neighbourhood

open house 3 CITY OF SALEM Downtown Streetscape Plan

DEVELOPMENT DESIGN GUIDELINES

C a m p u s I d e n t i t y

5th and Idaho. August 31, th and Idaho LLC Application for Certificate of Appropriateness (Project #DRH )

Design Guidelines April 12, 2016

City of La Palma Agenda Item No. 5

CAMPUS MASTER PLAN. Steering Committee Meeting. July 29, 2014 CAMPUS MASTER PLAN UPDATE

38 Queen s University Campus Master Plan Part 1

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

CHAPTER FOUR: DEVELOPMENT AND DESIGN

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

City of Kelowna Consolidated Zoning Bylaw No. 8000

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

City of Yelm. Tahoma Terra Final Master Plan Development Guidelines. Table of Contents

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

Creating a sense of arrival at campus entrances and at the primary entrances to the Campus Core.

UMBC Facilities Management. UMBC Facilities Master Plan Update

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

QUINCE ORCHARD/FIRSTFIELD CORRIDOR CITY OF GAITHERSBURG MTAP 2017

Charles P. Johnson and Associates. Annapolis Landscape Architects

OBJECTIVE 1.1: To develop and adopt a Landscape Master Plan for the University of Central Florida campus by 2015.

Transcription:

PROPOSED SITE IMPROVEMETS This section is an excerpt from the San José City College Landscape Study - for use in reference to the Campus Facilities Committee Presentation, April, 0.

B A D I H M H D K L J J G J F D C E SUMMARY Taking into account the 0 Facilities Master Plan s goals and a thorough evaluation of existing site conditions, there are multiple opportunities for site improvements. These landscape improvement projects shall use the guidelines outlined in the Landscape Typologies section of this document for the purpose of creating a cohesive campus environment. By taking a conceptual look at the design of these areas, campus representatives can assess general costs and prioritize future campus improvements. Safety and security, as well as long term sustainability apply to all recommended improvements. A. Connect vehicular traffic with Central Campus. B. Enhance campus frontage and entry points. C. Improve visibility to pedestrian entrance on corner. D. Provide pedestrian drop-off zone. E. Clarify future loop road location. F. Enhance connection between Student Services and Physical Education quads. G. Develop plaza design. H. Design quad expansion. I. Design drop-off and entry plaza. J. Develop orth-south pedestrian spines. K. Renovate parking lot with bio-swales and pedestrian pathways. L. Improve entrance and increase visibility from South Bascom Avenue. M. Extend and complete Pedestrian Promenade.

MOORPARK AVEUE SOUTH BASCOM AVEUE LEIGH AVEUE KIGMA AVEUE

ORTHWEST CAMPUS SOUTH BASCOM AVEUE MOORPARK AVEUE. Provide new vehicular connection through High Tech Center parking lots.. Eliminate redundant vehicular entry/exit on Moorpark Avenue.. Provide vehicular access to SJCC campus parking and loop road from High Tech Center parking lots.. Simplify vehicular entry points along Moorpark Avenue.. Enhance parking with additional tree planting and bio-swales.. Simplify Moorpark Avenue frontage and remove visual barriers of large trees. Create clean and simple streetside image.. Create orth-south pedestrian spine linking Multidisciplinary Art/Science quad to South Campus and student parking.. Enhance planting on west side of parking lot at property boundary.

ORTH CAMPUS FROTAGE MOORPARK AVEUE ETRY ETRY DROP-OFF. Provide safe pedestrian sidewalks and access points along Moorpark Avenue.. Create clear, simple, and limited vehicular access points from Moorpark Avenue.. Enhance public face of campus along Moorpark Avenue with new fencing, signage, simplified planting, and limited evergreen trees.. Protect existing healthy trees in parking lots where appropriate.. Enhance parking with bio-swales and tree planting to minimize run-off and heat gain.. Create new student drop-off and arrival plaza with access points to Central and South Campuses.. Provide easy-to-find short-term parking and create entry plaza central to orth Campus. Create simplified contemporary planting at campus entry to reflect updated technology image.. Establish a clear entry plaza and connections to orth- South pedestrian spines. Reinforce with planting, accent paving, lighting, and signage.. Reinforce accent plantings at main entry.

ORTHEAST CAMPUS ETRY 0 MOORPARK AVEUE. Create orth-south pedestrian spine connections between plazas and Physical Education quad.. Establish new entry to Physical Education Building accomodating existing grades. Provide outdoor use spaces at Physical Education Building.. Create a new multi-use outdoor quad flanking Student Services Building.. Update existing planted lawn with terraced seating and additional tree planting. LEIGH AVEUE. Add outdoor use spaces designed to reflect and support the Physical Education curriculum.. Extend Pedestrian Promenade.. Add student drop-off point.. Provide short-term and police parking.. Selectively remove redwoods at corner and vehicular entry points to allow for campus visibility. 0. Enhance entry with additional accent planting. ETRY. Add raised pedestrian crossing points to slow vehicular traffic and reinforce safe access.

ATHLETIC FIELDS. Identify entry to loop road. ETRY. Create loop road through South Campus alongside Leigh Avenue.. Add raised pedestrian crossing points to allow for safe access to and from campus athletic events.. Install orth-south pedestrian spine to connect Physical Education quad and athletic fields to Central Campus.. Connect loop road with Kingman Avenue to complete inter-campus connection. LEIGH AVEUE. Enhance tree planting along athletic fields on east side of fields. Thin tree planting on south side of fields. KIGMA AVEUE

CETRAL CAMPUS. Maintain existing mature trees as campus element and structure for new pathways and plazas.. Create new entry plaza and connection to orth-south pedestrian spine.. Update and enhance existing quad, extend boundary, and provide additional paths and lawn.. Maintain and protect existing mature Memorial Tree Grove.. Extend and complete Pedestrian Promenade.. Create new outdoor-use spaces to support and provide connection to athletic fields and sports program.. Create new orth-south pedestrian spines linking entry plazas, South Campus entry points and Pedestrian Promenade.. Connect loop road at Kingman Avenue to provide inter-campus loop and allow for vehicular access within campus boundaries. KIGMA AVEUE

WEST CAMPUS 0. Complete remaining section of Pedestrian Promenade.. Create orth-south pedestrian spine linking campus entry points with Central Campus circulation. Enhance with decorative paving, lighting, signage, and planting.. Establish a South Campus student drop-off and entry plaza. Connect to orth-south pedestrian spine.. Create temporary quad with pedestrian pathways in location of future building.. Protect existing mature trees.. Remove existing redwoods at Business Education Building. Replace with planting and paving.. Design simplified contemporary planting at campus entry to reflect updated technology image.. Create new entry plaza and student drop-off.. Add raised pedestrian crossing points to slow vehicular traffic and reinforce safe access. 0. Site of future development. 0

WEST CAMPUS ETRACE. Establish an identity along South Bascom Avenue entrance with accent planting, lighting, and improved signage. SOUTH BASCOM AVEUE. Simplify entry and reinforce a clear linear entry route to parking areas. Provide clear lines of sight at vehicular access route.. Update parking lots with tree planting and bio-swales to minimize run-off and heat islands.. Create student drop-off point and entry plaza at South Campus.. Create safe pedestrian access points from parking lots to campus.. Enhance planting along Kingman and Laswell Avenues.. Add raised pedestrian crossing points to slow vehicular traffic and reinforce safe access.