MURRAY CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis

Similar documents
CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

The transportation system in a community is an

Isabel Neighborhood Plan: Alternatives

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

Lambeth Main Street Streetscape Improvements

4.1.3 LAND USE CATEGORIES

Citizen Comment Staff Response Staff Recommended Revision Planning Committee

Asheville Design Center March 2010

PLAN ELEMENTS WORKSHOP. April 5, 2016

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

Town Center (part of the Comprehensive Plan)

SAFETY AND CONNECTIVITY IN A PLANNED COMMUNITY

FUTURE LAND USE ELEMENT

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

Status Report: MD 355 Project

Port Credit Local Advisory Panel October 20 th Meeting

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Speers Road Corridor Study. Livable Oakville (Official Plan) Council Sub Committee March 20, 2017

WELCOME and introduction

A Plan for the Heart of the Region: Tukwila, WA

1.0 VISION STATEMENT. December 6, PRINCIPLES

The Five Components of the McLoughlin Area Plan

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

DRAFT Land Use Chapter

EXISTING COMPREHENSIVE PLAN

THE 355/270 CORRIDOR:

4. INDUSTRIAL 53 CASTLE ROCK DESIGN

REGIONAL ACTIVITY CENTER

Hockessin Community Redevelopment Plan

5.1 Site Plan Guidelines

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

Chapter 1.0 Introduction

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

International Blvd. TOD Plan Public Workshop #1

C. Westerly Creek Village & The Montview Corridor

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

Policies and Code Intent Sections Related to Town Center

Clairtrell Area Context Plan

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Danvers High Street I-1 District Study

South Davis County COMMUNITY SPOTLIGHT

6. DOWNTOWN. The Downtown Element focuses on supporting and expanding the vitality and enhancement of Downtown Chico as the City s central core.

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Figure 1- Site Plan Concept

This Review Is Divided Into Two Phases:

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Downtown Streetscape Manual & Built Form Standards

Wadsworth Boulevard S TAT I O N A R E A P L A N

TRANSPORTATION ELEMENT

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

FDOT D4 Complete Streets

Urban Design Brief. 583, 585 and 589 OXFORD STREET EAST. Salt Clinic Canada Inc.

Small Area Plan. South Gateway

Laird in Focus Community Information Session

Transportation. Strategies for Action

WEST LOOP DESIGN GUIDELINES CHECKLIST

Sahuarita District & Phase 1 Master Plan. Town Council December 11, 2017

CHAPTER 2 VISION, GOALS, & CONCEPTS

Strategic Growth Area #1 Northampton Boulevard Corridor Area

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

Presentation August 6, 2018

The West Vaughan Employment Area Secondary Plan Policies

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN

Obey Creek July 17, Vicinity Map. Concept Plan Submittal. No

Taming Tysons Corner Transforming the Quintessential Edge City

Town Center. Block 5 Existing multifamily residential units are expected to remain.

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

St. Clair Avenue West Area Transportation Master Plan

Multimodal Station Planning Working Session Rebuilding a Better I-84 in Hartford. August 10, 2017

SECTION TWO: Urban Design Concepts

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

DRAFT Civic Center Station Area Plan. Executive Summary

DRAFT DRAFT DRAFT DRAFT

Bloor Street East Potential Ravine Portal Overlook and Access Passage to the Rosedale Valley and Don River Valley Ravine, Toronto, Canada

Phase I Redevelopment Plan. First Community Meeting

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

Urban Planning and Land Use

The University District envisions, in its neighborhood

appendix and street interface guidelines

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Mill Woods Town Centre Proposed Rezoning LDA

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

STREETSCAPE MANUAL ONLINE TRAINING SESSION 1: Background

Implementation Guide Comprehensive Plan City of Allen

Atlanta BeltLine. Subareas 9 & 10. Master Plan Updates. March 26, Washington Park Jamboree 1

Lynn Housing Authority and Neighborhood Development. Washington Street Gateway District Plan A p r i l

Welcome to the. Open House

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

Trafalgar Road Corridor Planning Study Open House

Transcription:

CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis OVERVIEW Planned Fire Station TAYLORSVILLE A thorough Site Analysis was conducted to ensure planning and design concepts are aligned with existing opportunities and constraints. The Site Analysis investigated the physical structure of the study area, as follow: Land Use and Zoning Natural Features such as creeks and open space corridors Man-made Features such as buildings and structures, infrastructure and utility lines, roadways and railways Environmental Conditions with particular emphasis on acknowledging the limitations of contaminated lands and remediation strategies, plans and requirements that are in place Planning and Design Concepts for Adjacent and Outlying Areas were documented to understand the influence of the Murray Central Station Area and how it relates to adjacent districts Site Impediments and Blockages such as rail embankments, freeway, fences and steep slopes 4800 S 4800 S CITY CENTER DISTRICT UTA Jo rd a nr ive r Murray Power Plant American International School of Utah (AISU) INTERSTATE 15 Multifamily Residential Post Office CITY OFFICES Planned Mixed Use 400 800 TAYLORSVILL E STATE ST DR M M CO 5300 S 1,600 Feet k 0 CE R E e re Newer Office Buildings County Ice Center dc TAYLORSVILLE PARK oo nw to Stevens Heneger INTERMOUNTAIN MEDICAL CENTER (IMC) ot gc TAYLORSVILLE Murray School District Offices CENTRAL STATION Bi Planned MedicalOffice Planned Office Planned Medical Office Key Findings/Considerations Murray Central Station is the heart of the project. Redevelopment of the station area is essential for creating a superlative Central Station District Contaminated lands have been remediated according to specific agreements. Change and modification is controlled by those decisions. No residential development is allowed in the remediated areas. Redevelopment with non-residential uses is possible in much of the remediated area, although it will come at higher costs than at clean sites. Specific segments of the remediated land cannot be modified or disturbed and must be incorporated into the planning and design concepts for the area. The IMC properties are controlled by a separate planning process. The master plan should maintain positive and mutually-beneficial relationships with the IMC properties as feasible. Significant projects have been developed or are planned in proximity to the station. Coordinating these projects and others yet to come is essential for creating a unified station district. Vine Street plays a critical role for linking Murray Central Station and the surrounding areas together as part of a discernible district. Adjacent neighborhoods and districts have significant residential and mixed use redevelopment potential EXISTING LAND USE & ZONING Commercial/Office Single-Family Residential Light Industrial Institutional Murray City Center Mixed Use District AISU Campus Multifamily Residential Parks and Open Space Costco 5300 S Library HIGH SCHOOL Hillcrest Junior High OTHER KEY CONDITIONS AND CONSIDERATIONS Remediation Zone - Contaminated land impacts opportunity to change or modify uses Gully Remediation Zone - No change or disturbance Planned Development Vacant Land Central Station Study Boundary IMC Boundary

CENTRAL STATION MASTER PLAN Areas of Focus and Planning Concept Diagram OVERVIEW After thoroughly analyzing the site and surroundings and determining the opportunities and challenges that presently exist, a preferred planning concept emerged that links a redeveloped and intensified Murray Central Station with other contributing uses along Vine Street as part of a Station Boulevard. TAYLORSVILLE The following diagram illustrates this concept and identifies Areas of Focus for realizing the vision. Key Concepts: Murray Central Station is the heart of the project. Redevelopment of the station area is essential for creating a superlative station district is at the core of this study. Vine Street is transformed into a linear boulevard, linking the station with supportive uses along and immediately adjacent to the roadway Realization of the vision will occur as part of Primary, Secondary and Tertiary projects. Because Vine Street links the various uses into a discernible linear district, it is essential that the roadway be planned and designed to support transit- oriented development and multi-modal traffic. 4800 S Murray Power Plant DEVELOPMENT ZONES rd a nr ive r Murray Central Station Redevelopment Area American International School of Utah (AISU) INTERSTATE 15 Jo Primary Redevelopment Area - Vine Street frontage properties and/or sites with a strong relationship to Murray Central Station Post Office Secondary Redevelopment Area - Sites in the Murray City Center District adjacent to Vine Street should merge the planning and design principles of both areas CITY OFFICES Secondary Redevelopment Area - Mixed use development area with a focus on higher density residential uses and transit-oriented development Secondary Redevelopment Area - AISU campus. Possible intensification of the campus and large parking lot for transit-oriented development INTERMOUNTAIN MEDICAL CENTER (IMC) STATE ST k 1,600 Feet e re 800 OTHER KEY CONDITIONS AND CONSIDERATIONS Projects Currently Planned or Under Development Vine Street - Links Murray Central Station and uses fronting the roadway to create a pedestrian friendly boulevard Central Station Study Boundary Library 400 dc County Ice Center 5300 S 0 oo nw to ot gc PARK Costco HIGH SCHOOL Tertiary Redevelopment Area - Future development to be aligned with the Murray Central Station District principles Bi Stevens Heneger Murray School District Offices Hillcrest Junior High IMC Properties - Planned and developed according to a long-term IMC Site Master Plan. The Murray Central Station Master Plan should strengthen and acknowledge the relationship that exists between the IMC site, the station and surrounding uses

CENTRAL STATION MASTER PLAN Station Concept One - Conceptual Rendering

CENTRAL STATION MASTER PLAN Station Concept One - Massing and Square Footage

CENTRAL STATION MASTER PLAN Station Concept Two - Conceptual Rendering

CENTRAL STATION MASTER PLAN Station Concept Two - Massing and Square Footage

CENTRAL STATION MASTER PLAN Station Concept One - Concept Illustrative American International School of Utah (AISU) INTERSTATE 15 Post Office CITY OFFICES Murray School District Offices INTERMOUNTAIN MEDICAL CENTER (IMC) Stevens Heneger STATE ST County Ice Center PARK Costco 5300 S N 0 200 400 800 PRECEDENT IMAGES N 0 100 200 400

CENTRAL STATION MASTER PLAN Station Concept Two - Concept Illustrative American International School of Utah (AISU) INTERSTATE 15 Post Office CITY OFFICES Murray School District Offices INTERMOUNTAIN MEDICAL CENTER (IMC) Stevens Heneger STATE ST County Ice Center PARK Costco 5300 S N 0 200 400 800 PRECEDENT IMAGES N 0 100 200 400

CENTRAL STATION MASTER PLAN Strategies to Create a Walkable Corridor

CENTRAL STATION MASTER PLAN Strategies to Create a Walkable Corridor (Cont.)

CENTRAL STATION MASTER PLAN Vine Street Corridor Corridor Overview.25 mile.5 mile Vine Street Segments.25 mile.5 mile COMMERCE DR. T WO STATE ST. 4500 S. 4800 S. COMMERCE DR. T WO STATE ST. 4500 S. 4800 S. Vine Street is the most critical street corridor for the Murray Central Station area, and it presents a range of conditions along the mile between Murray Boulevard and State Street. We have divided the corridor into four separate segments that share characteristics, constraints, and opportunities, such as right-of-way width, redevelopment opportunities, and traffic conditions. The following concepts show how Vine Street can integrate the strategies for walkable streets within these conditions and constraints. Currently, the Vine Street right-ofway ranges but is generally limited. In the long term, Murray City aims to have a 90-95 right-of-way on all segments. 4500 S..25 mile.5 mile R..25 mile.5 mile.25 mile.5 mile

CENTRAL STATION MASTER PLAN Vine Street Corridor (Cont.) Segment 1: Murray Boulevard to Commerce Drive Segment 2: Commerce Drive to Murray Central Station Constraints: Existing I-15 bridge restricts this segment to three general purpose lanes. Opportunities: Redevelopment opportunities on both sides of I-15 could create section shown below. Existing right-of-way: 45-60 Constraints: High traffic pressure because of Vine s crossing of rail tracks; Vine Street currently being reconfigured to 5 lanes and 90-foot right-of-way between new Murray Crossing and EMI developments with the cross section below. Opportunities: Within 5-lane configuration shown below, can add streetscape amenities and quality transit stops. Existing right-of-way: 60-70 Potential cross section for Vine Street between Murray Boulevard and Commerce Drive: On-street parking/ bulb-out/ Bus zone Center Median/ Turn 7 14-1 On-street parking/ bulb-out/ Bus stop 15 * Potential to extend the pedestrian relam in the private realm of new development 15 90-95 / Shared Marking / Shared Marking 90 Right-of-way 20 Center Turn / Median 7 14-1 Potential cross section for Vine Street between Commerce Drive and Murray Central Station: Right-of-way Segment 3: Murray Central Station REET ILLUSTRATIVE CONCEPT Constraints: Need to stack autos between and on either side of the rail tracks necessitates 4 general purpose lanes. Need for 10 20 REET Street ILLUSTRATIVE Segment 4: Cottonwood to StateCONCEPT Street Potential general cross section between Murray Boulevard and State Street bicyclist access to station and safety as well as pedestrian space and vehicle drop-off creates more elements than there is space for. Opportunities: Increased presence and pedestrian orientation of station on Vine Street creates directive for high quality pedestrian space where station meets street, with complementary pedestrian space on the north side of the street (would happen with redevelopment). space would have to occur on UTA property. Existing right-of-way: 70-85 cross section between Commerce Drive and Murray Central Station Constraints: Desire to maintain flexibility in existing asphalt width. Opportunities: Amount of traffic projected for this segment would allow a reconfiguration to three general purpose lanes, bike lanes, and a parking lane with occasional bulb-outs, within the existing asphalt. Future redevelopment along this segment could help implement a wider, high quality pedestrian realm, which would need an expansion to a 90-95 right-of-way. Existing right-of-way: 70-90 Potential cross section for Vine Street at Murray Central Station: Cross section options for Vine Street between Cottonwood Street and State Street: On-street parking/ bulb-out/ Bus zone Center Median/ Turn 7 14-1 On-street parking/ bulb-out/ Bus stop * Potential to extend the pedestrian relam in the private realm of new development 14-1 Center Median/ Turn On-street parking/ bulb-out/ Bus stop 7 14-1 14-1 90-95 Right-of-way 90-95 Right-of-way 10 10-12 Raised Sidewalk Kiss N-Ride (s) (s) Center Median/ Turn (s) (s) 10-12 Sidewalk Plaza Retail / Station entry 90-95 Right-of-way Murray Central Station Master Plan [DRAFT) REET ILLUSTRATIVE CONCEPT At Murray Central Station 10 20 20 REET ILLUSTRATIVE CONCEPT Potential general cross section between Murray Boulevard and State Street 10 20 REET ILLUSTRATIVE CONCEPT Potential general cross section between Murray Boulevard and State Street * Potential to extend the pedestrian relam in the private realm of new development