A D D E N D U M N O. 1 To The Contract Documents Date: Project: Facilities Development & Planning Portable Building Relocation

Similar documents
HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

April 4, 2013 Rana Ahmadi San Francisco Municipal Transportation Agency 1 South Van Ness Avenue, 7th Floor San Francisco, CA 94103

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

PARCEL EVALUATION DATA SUMMARY PHASE 2A SAMPLING ZONE 16: THE HOUSING ZONE PARCEL 181: MULTIPLE UNIT HOUSING ALAMEDA POINT ALAMEDA, CALIFORNIA

Former Truck Maintenance Garage Soil Remediation Report

New School Construction: Safe School Opening. OAR and IOR Joint Training February 17, 2005

SPECIFICATION SECTION:

ADDENDUM NO. 1 COPPER COMMUNICATIONS CABLE AND VOICE AND DATA EQUIPMENT MONITORING, TESTING, AND REPAIR DEPARTMENT OF WATER RESOURCES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

BID PROPOSAL-REVISED

MW-401B Area Soil Remediation Report

WATER QUALITY TESTING FOR SCHAUMBURG COMMUNITY CONSOLIDATED SCHOOL DISTRICT 54 HOOVER SCHAUMBURG, ILLINOIS OCTOBER 3, 2017 PROJECT NUMBER:

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

THIS ADDENDUM MUST BE ACKNOWLEDGED.

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

ATTACHMENT L. Provision C.3.c.i.(1)(b)(vi) Specification of soils for Biotreatment or Bioretention Facilities

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Specification of Soils for Biotreatment or Bioretention Facilities

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

BEACH AND INLET PROJECTS UPDATE

CITY OF SIMI VALLEY MEMORANDUM

REPORT TO COUNCIL City of Sacramento

SECTION SOIL PREPARATION

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

ADDENDUM NO. 1. PREPARED BY: Justin Scott DATE PREPARED: 05/25/2018. PROJECT: Centerville-Washington Park District Park Operations Facility

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

SECTION GENERATOR PARALLELING CONTROLS

associated environmental management

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

DESIGN & CONSTRUCTION GUIDELINES

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

Northwestern University Scope of BAS Contractor

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

WILSON PLACE FINAL DESIGN

LOS ANGELES UNIFIED SCHOOL DISTRICT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY PROCEDURE

REPORT TO COUNCIL City of Sacramento

Cherokee Nation

Transportation Improvements

DESIGN SCENE SUBJECT INDEX

5.07 Air Replenishment Systems

9 E. Scarborough Park Concession Stand and Restroom And / Or Lake Kirby Park Softball Fields Restroom Addition

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

[TEMPLATE FOR] STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. [date] [revision date]

The Road to Recovery. Mapping Advanced Sample Preparation Techniques for GC, GC-MS and HPLC Analysis

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

FIRE PREVENTION GUIDELINE

Under Section 608 of the CAA, EPA has established regulations (40 CFR Part 82, Subpart F) that:

ADDENDUM #3. Chauncey Wilmore Senior Procurement Officer March 22, 2016 ALL PROSPECTIVE FIRMS

GREENVILLE-SPARTANBURG AIRPORT DISTRICT REQUEST FOR PROPOSALS FOR DEVELOPMENT SERVICES FOR GSP AIR CARGO FACILITY PHASE 1

Orange County EMERGENCY POWER PLAN (EPP) CRITERIA FOR ASSISTED LIVING FACILITIES & NURSING HOMES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

SECTION PLANTING SOIL FOR SOIL CELLS (SILVA CELLS)

GUIDE FOR PROCESSING A SUPPLEMENTAL ZONING CLEARANCE

Indoor Air Quality Testing. Horry County Schools

SECTION 02230BP AGGREGATE BASE

Permitting and Licensing for Hazardous Material Use and Storage

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

CITY OF BERKELEY. Permit Service Center 2120 Milvia St Berkeley, CA 94704

Long Beach Unified School District Measure K Citizens' Bond Oversight Committee 2013 Annual Report

OPERATION & MAINTENANCE

KWA. Evaluation of the Morrison Bros. Co. Liquid Sensor, Adjustable Level Sensor and Multi-Level Sensor. Final Report

Tualatin Valley Fire & Rescue Finance Department SW 70 th Ave., Tigard, OR Phone: , Fax:

REQUEST FOR PROPOSAL. Grounds Maintenance

CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM. Bid # Addendum #1

ADDENDUM NO. 4. Changes to the Project Book, Specifications, Contract Drawings and Questions and Responses

PLEASE NOTE! This plan must include: setback dimensions, gas meter location, any obstructions, well and septic

NOTICE TO ALL FIRMS. Bid RFI Questions and Answers

CONTENTS. B. System Design and Performance Requirements

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

National Grid / DG Installation Process Guide per NY SIR / July 2011 ver. 1.0

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Ventura County Community College District 761 E. Daily Drive, West Stanley Avenue, St. 200, Camarillo, CA Purchasing Department

Turf Removal Rebate Program Requirements

UNIFIED FACILITIES GUIDE SPECIFICATIONS

University of Texas Project Schedule Narrative February 17, 2009 Page 1

Standard PRC Transmission Relay Loadability

Lead Remediation/Abatement at Forest Blvd., Hugo, MN

DISPOSAL AND DECONTAMINATION OF HERBICIDE WASTE. Presenter: Ramdas Kanissery, PhD Weed Scientist, Southwest Florida REC

Leak Detection and Repair METHOD 21 AND OPTICAL GAS IMAGING

S000 SITE REVIEW APPR NO. FIRE CODE COMPLIANCE ITEM

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Revised Corrective Action Plan for RNA with MEMEs and Air Sparge

STTM INTERFACE PROTOCOL

Pinky Lewis Recreation Centre Interior Renovations in the City of Hamilton

SECTION INSPECTION AND TESTING OF WORK

MEMORANDUM. DATE: March 15, Chairman and Members Community Redevelopment Agency. Leif J. Ahnell, C.P.A., C.G.F.O. Executive Director

NOTICE TO CONTRACTORS

Landscape Documentation Package Review

SECTION AMENDED TOPSOIL

This policy has been adopted by UNC Health Care for its use in infection control. It is provided to you as information only. Infection Control Manual

Transcription:

LMA A D D E N D U M N O. 1 To The Contract Documents Date: 2-1-2018 Project: Facilities Development & Planning Portable Building Relocation Long Beach Unified School District Bid# FAC17-1718 The following changes, additions, deletions or corrections shall become part of the Contract Documents for the projects named above. All other conditions shall remain the same. Bidders shall be responsible for transmitting this information to all affected subcontractors and suppliers prior to the closing of bids. Acknowledge receipt of this Addendum on the appropriate Bid Form. GENERAL ITEMS Ad. Item Document Title Page Description 1 1 Soil Testing Results Waste Pre-Characterization Sampling All Analytical results for soil sampling, Refer to attachment. SPECIFICATIONS Ad. Item Section Title Page Description 1 2 014525 Environmental Export Materials Testing All Transportation, disposal and associated documentation of exported materials. Refer to attachment. DRAWING REVISIONS Architectural Drawings Ad. Item Drawing No. Det/ Drawing Ref. Delta Description 1 3 A-0.1 Cover Sheet Revise sheet index to include TMP ramp details 1 1 4 A-0.6 Sheet Spec 1 5 A-1.01 Detail 3 1 5 A-1.02 Detail 1 1 6 A-1.03 Detail 1 1 7 A-1.04 Detail 6 1 8 A-1.04 Detail 12 1 9 A-2.01 Detail 1 & 2 1 1 1 1 1 1 1 Added Site Class D "Stiff Soil" Summary Repot Add restroom directional signage. Add restroom directional signage. Revise demo note at bollards to read as follows: Demo concrete filled bollard. Sawcut at grade line, grind down below finish surface 2" and patch with concrete. Revised TMP ramp dimension. Revised signage heights. Revised accessory heights. 1 10 R-1 & R-2 Modtech Ramp Details Replace sheets R-1 and R-2 with TMP ramp sheets 1 through 4, 1 (5 through 8 N/A) 1 11 ES-1 Plan Notes 1 Added notes 5 through 7 Frontier Communication Minimum Radial Clearances Page 1 of 2

October 12, 2017 Project No. 11375.020 Long Beach Unified School District Facilities Development and Planning Branch 2425 Webster Avenue Long Beach, California 90810 Attention: Ms. Talitha Crain Subject: Waste Pre-Characterization Sampling 2-Story Modular Office Project 2425 Webster Avenue, Long Beach, California 90810 Leighton Consulting, Inc. (Leighton Consulting) provides this memorandum to the Long Beach Unified School District (the District or LBUSD) to convey analytical results for soil samples collected at the District facility offices located at 2425 Webster Avenue, Long Beach, California ( Site ). Samples were collected per the District s request in order to provide analytical results for waste pre-characterization purposes in support of construction activities at the Site. Leighton Consulting understands that the project will consist of the removal of the existing 1-story portable buildings to make room for a new 2-Story Modular Office Building. The project is expected to generate approximately 100 cubic yards (CY) of excess soil for disposal from the upper 5 feet during grading and compaction operations. On September 28, 2017, Leighton Consulting collected four soil samples from two borings at depths between 0.5 and 2.5 feet below ground surface (bgs), approximate locations are shown on the attached map. The soil samples were collected in laboratory-supplied glass jars, appropriately labelled, placed in an iced cooler, and transported to Advanced Technology Laboratories under standard chain-of-custody protocol. Soil samples were analyzed for Total Petroleum Hydrocarbons (TPH) by EPA Method 8015B, Organochlorine Pesticides (OCPs) by EPA Method 8081, Volatile Organic Compounds (VOCs) by EPA Method 8260B, and Title 22 Metals by EPA Method 6010B/7471A. The laboratory analytical report is included in Attachment A. 17781 Cowan Irvine, CA 92614-6009 949.250.1421 Phone 949.250.1114 Fax

LMA Attachements Sheets A-0.1, A-0.6, A-1.01, A-,04, A-2.01, Ramp Drawings 1 through 4 END OF ADDENDUM Page 2 of 2

LMA Attachements Sheets A-0.1, A-0.6, A-1.01, A-,04, A-2.01, Ramp Drawings 1 through 4 END OF ADDENDUM Page 2 of 2

LMA END OF ADDENDUM Page 2 of 2

The purpose of this report is for waste pre-characterization of at least 100 CY of soil from the school. Four samples are generally sufficient in order to profile up to 500 CY of soil. It is Leighton s understanding that waste profiling and coordination with appropriate waste disposal facilities will be completed by a LBUSD contractor. Based on a comparison of soil analytical results to federal and state waste characterization criteria, the samples will likely be classified as non-hazardous, petroleum affected soil. TPH analysis included gasoline range organics (GRO, C6- C12), diesel range organics (DRO, C13-C22), and oil range organics (ORO, C23-C40). GRO was not detected in the samples. DRO was detected in two samples at maximum concentration of 6.4 milligrams per kilogram (mg/kg) and ORO was detected in the four samples at a maximum concentration of 6,200 mg/kg. The concentration of petroleum hydrocarbons detected will likely preclude the soil from being accepted at many Class III landfills, but should be accepted at some that allow petroleum hydrocarbons, such as Simi Valley Landfill. Low levels of OCPs were detected in the samples. VOCs were not detected with the exception of a trace concentration of toluene in one sample. Title 22 metals were not detected above hazardous waste criteria. Some landfills may require segregation of soil or additional analyses for acceptance and the contractor should verify acceptance criteria with the individual landfill prior to transport. The laboratory report attached to this memorandum should be utilized to prepare a waste profile for submittal to a disposal facility for acceptance. Alternatively, samples could be collected and analyzed from the stockpile generated from the utility installation project to be utilized for waste profiling. In general, observations should be made during any future site development/construction for areas of possible contamination such as, but not limited to, the presence of underground facilities, buried debris, waste drums, tanks, stained soil or odorous soils. Should such materials be encountered, further investigation and analysis may be necessary at that time. - 2

11375.019 If you have questions and/or comments regarding this report, please contactt the undersigned at our Irvine office at (949) 6-1421, ext. 4208. Respectfully submitted, LEIGHTON CONSULTING, INC. Meredith Church, PG 8326 Associate Geologist Attachments: Boring Location Map Attachment A Laboratory Analytica Report Distribution: (1) Addressee via email 3

ATTACHMENT A Laboratory Analytical Report

Page 1 of 44

Page 2 of 44

Page 3 of 44

Page 4 of 44

Page 5 of 44

Page 6 of 44

Page 7 of 44

Page 8 of 44

Page 9 of 44

Page 10 of 44

Page 11 of 44

Page 12 of 44

Page 13 of 44

Page 14 of 44

Page 15 of 44

Page 16 of 44

Page 17 of 44

Page 18 of 44

Page 19 of 44

Page 20 of 44

Page 21 of 44

Page 22 of 44

Page 23 of 44

Page 24 of 44

Page 25 of 44

Page 26 of 44

Page 27 of 44

Page 28 of 44

Page 29 of 44

Page 30 of 44

Page 31 of 44

Page 32 of 44

Page 33 of 44

Page 34 of 44

Page 35 of 44

Page 36 of 44

Page 37 of 44

Page 38 of 44

Page 39 of 44

Page 40 of 44

Page 41 of 44

Page 42 of 44

Page 43 of 44

Page 44 of 44