Engineering and Operations Committee Item 6a December 10, 2018

Similar documents
Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

Alarm Summary. Alarm Summary MBR Aeration Basin #5 Alarms. MBR Blower Flow Alarm. MBR Blower Pressure Alarm

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

MBR Air Scour Blowers Operation

Planning and Permitting

4/8/2015 Item #10D Page 1

PG18.2 REPORT FOR ACTION. Eco-Roof Incentive Program application: 50 Drummond Street SUMMARY

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

Building Great Neighbourhoods. Strathcona

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

26/Old Dominion Task Force

Texas AgriLife Extension Service

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers.

HEADWORKS PERFORATED PLATE FILTER SCREEN ROTARY DRUM SCREEN IN CHANNEL PERFORATED DRUM SCREEN

Eco-Roof Incentive Program application: 6 Curity Avenue

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE Adopted April 16, 2016 Amended July 19, 2016

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Leadership This is currently a multi-disciplinary effort, led by the following students:

ANAEROBIC DIGESTERS HEATED BY DIRECT STEAM INJECTION: EXPERIENCE AND LESSONS LEARNED

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

Sacramento Public Library Authority

Client #: Dawson /91. NRCS Tract #(s): Location: Fleming Memorial Park Field #(s): Program(s): Urban Project Name: Date:

NASSAU COUNTY TOWN HALL NEW YORK & CONNECTICUT SUSTAINABLE COMMUNITIES. A Unique Bi-State Partnership to Improve Jobs, Housing and Transportation

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

ITS Concept Development Activity Descriptions

30% Design Technical Report

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

City of East Point Comprehensive Floodplain Management Program

Chapter 1.0 Introduction

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole.

REQUEST FOR PROPOSAL RFP PRESERVATION MASTER PLAN FOR THE ELAM MARTIN FARMSTEAD CITY OF WATERLOO RIM PARK TERMS OF REFERENCE

Remi Mendoza City Planning Academy March 13, 2017

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

PART 1. Background to the Study. Avenue Study. The Danforth

4. UTILITIES ELEMENT.

General Plans. Tom Dansie, AICP Steve Pastorik, AICP

Faversham Creek Neighbourhood Plan Steering Group Meeting Minutes Wednesday 23 rd May pm pm. The Guildhall, Faversham

SludgeHammer. Owner s Manual. Model S-400/600. The latest advance in wastewater treatment. NSF/ANSI Standard #40. nature called. we answered.

Planning and Growth Management Committee. Lou Di Gironimo, General Manager, Toronto Water. P:\2007\Cluster B\TW\pg07016 (AFS# 3677)

Thank you! Events and Entertainment in Northeast False Creek. Tuesday, March 7, 2017

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

Majis Industrial Services SAOC TENDER NO. MISCP/09/2014

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

The Community and Transportation Linkage Planning Program

State Parks and Wildlife Conservation Trust Fund Act

FINAL REPORT Elvenia J. Slosson Endowment Fund Grant

EXIDE CLEANUP PROJECT Update

6.1. East Bay Regional Conservation Investment Strategy (RCIS) Regional Advance Mitigation Planning (RAMP) Alameda County Technical Advisory Committee

City of Richland Stormwater Management Plan

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Ashbridges Bay Erosion and Sediment Control Project

BEACH AND INLET PROJECTS UPDATE

Sherwood Forest Park REVITALIZATION PLAN. Public Meeting (P.I.C) # 3 JUNE / 25 /2015

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Standard Development Timeline

Baseline Data Required for AS

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

Presentation Overview

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Pier 70 Master Plan. Port of San Francisco

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Welcome to the Oakridge Centre Open House

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

California s Enhancement of Public and Firefighter Safety Through Codes and Standards The New Fire Triangle

c. DTAH Toronto Complete Streets Guidelines

City Council Special Meeting AGENDA ITEM NO. C.

Request for Qualifications For Administration of the 2016 Summer Sprout Program

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

SMITHSONIAN INSTITUTION SOUTH MALL CAMPUS MASTER PLAN PUBLIC SCOPING REPORT. June Prepared by:

URBAN DESIGN ACTION PLAN. Community Design and Environmental Services Committee April 20, 2009

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

SMITHSONIAN INSTITUTION SOUTH MALL CAMPUS MASTER PLAN PUBLIC SCOPING REPORT. June Prepared by:

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

NYC Green Infrastructure Program

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

SCTPO Project Summary September 2014

Planning and Growth Management Committee

ATTACHMENT A. Town of Lebanon Village Center Study Proposal Cover Sheet (to be included with Proposal) Contract shall not exceed $48,500.

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

Scope of Work - Ogden Avenue Corridor Plan

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

City of Fort Wayne Six-Month Status Report Consent Decree Case # 2:07 cv 00445

HOW TO ORGANIZE AN OPERATION AND MAINTENANCE PROGRAM TABLE OF CONTENTS MODULE INTRODUCTION.,... UNIT I. OVER VIEW

Fire Safety Account Financial Report for Fiscal Year 2018

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

2 USE OF KRAFT BAGS FOR COLLECTION OF YARD WASTE MUNICIPAL RESPONSES

Stream Corridor Management Plan

Town Centre Park Master Plan Update - Terms of Reference

SMOevo Ozone Systems MAXIMIZE THE OZONE. MINIMIZE THE ENERGY.

Transcription:

Engineering and Operations Committee Item 6a December 10, 2018

Demonstration project Status of construction Near-term regulatory testing Potential future testing for process optimization & development of design criteria Full-scale program planning E&O Committee Item 6a Slide 2 December 10, 2018

Chemical Feed Systems Reverse Osmosis UV Light/Advanced Oxidation Process MBR Membrane Modules MBR Aerobic and Anoxic Tanks E&O Committee Item 6a Slide 3 June 11, 2018

Contract amount: $13,856,000 Capital budget: $17M 2-yr O&M budget: $9.8M Construction contract approximately 85% complete Construction complete: December 2018 Start-up and commissioning: Jan/Feb 2019 E&O Committee Item 6a Slide 4 December 10, 2018

RO & UV/AOP Equipment MBR Aeration & Anoxic Basins Chemical Storage & Unloading Electrical Building E&O Committee Item 6a Slide 5 December 10, 2018

Chemical Storage & Unloading RO & UV/AOP Equipment MBR Systems Operations Trailer Outreach Trailer Pad Substation E&O Committee Item 6a Slide 6 December 10, 2018

Membrane Modules Anoxic Basin Aeration Basin Drum Screen Membrane Scour Blower Aeration Blowers E&O Committee Item 6a Slide 7 December 10, 2018

MBR-1 (GE/Suez) MBR-2 (Evoqua) E&O Committee Item 6a Slide 8 December 10, 2018

Chemical Feed Skids RO Skid Motor Control Center E&O Committee Item 6a Slide 9 December 10, 2018

Air Diffuser Bubble Testing E&O Committee Item 6a Slide 10 December 10, 2018

Provide data for regulatory acceptance Confirm viability of membrane bioreactor (MBR) process Optimize full-scale treatment process design Establish cost clarity for treatment Confirm operational dependencies/ interfaces with LACSD Provide vehicle for public outreach and acceptance INITIAL TESTING PERIOD FUTURE TESTING PERIOD ONGOING E&O Committee Item 6a Slide 11 December 10, 2018

MBR Regulatory Acceptance Primary focus Demonstrate pathogen removal Achieve regulatory acceptance of MBR Water quality from all unit processes will be monitored to ensure treatment goals are met LACSD will characterize JWPCP source water & brine/waste streams from the AWT process E&O Committee Item 6a Slide 12 December 10, 2018

Draft plan submitted in early October Plan incorporated input from Independent Scientific Advisory Panel Regulatory approval of final plan anticipated in early 2019 January 2019 meeting scheduled to review final plan Testing to begin in March 2019 for 15-month duration E&O Committee Item 6a Slide 13 December 10, 2018

Process Optimization/Design Criteria Development Follows initial MBR regulatory testing Future Board funding request Similar to use of ODP for Oxidation Retrofit Program Key areas of investigation Nitrogen management Source control Product water stabilization Brine and residuals management E&O Committee Item 6a Slide 14 December 10, 2018

Construction/Commissioning Facility Opening Event MBR Regulatory Testing Process Optimization & Design Criteria Development Construction (funded) Completion Initial Operations and Regulatory Acceptance (funded) Process Optimization and Design Criteria (future funding required) E&O Committee Item 6a Slide 15 December 10, 2018

Feasibility Report (completed Nov. 2016) Determined that 150 MGD program could be implemented Did not answer questions: how or should program be implemented Conceptual Report (scheduled Feb. 2019) Examines and refines approaches as to how program could be implemented Update to Board in March 2019 E&O Committee Item 6a Slide 16 December 10, 2018

Refines approach to overall program configuration Examines potential options for phasing program Presents cost estimate in 2018 dollars, and cost comparison between alternatives Provides early assessment of potential future opportunities for DPR E&O Committee Item 6a Slide 17 December 10, 2018

Conceptual Planning Studies Report Assessment of IRP, Rates, and Terms Board Workshops on RRWP Studies Assessment Board Workshops Completion Board Action Board Update E&O Committee Item 6a Slide 18 December 10, 2018

Outreach trailer for visitors Exhibits & displays Facility opening event on March 21, 2019 Tours for public & stakeholders E&O Committee Item 6a Slide 19 December 10, 2018