WELCOME! To The Public Open House May 30 th, 2017 HARBOUR WEST PARKS
Vision Project Overview The City s vision for Port Credit Harbour West Parks is to develop a vibrant waterfront destination that integrates programmable and flexible multi-use civic spaces, continuous water s edge promenade, open green spaces and facilities that support waterfront recreational uses with the natural and cultural heritage features of the project area. Purpose of Project The purpose of this design and development plan is to refine the Class EA Large Block Concept Plan into a development plan with detailed costing for: Port Credit Memorial Park West Lakeshore Road bridge underpass Marina Park Rivergate Easement ***J.C. Saddington Park is excluded from scope of the current phase due to budget.
Background Policy Context There have been several policy documents which have led to the development of the Class EA which preceded this design study, they include: Old Port Credit Village Heritage Conservation District Plan - Update is currently underway Mississauga Waterfront Parks Strategy Mississauga Official Plan Lake Ontario Integrated Shoreline Strategy (CVC)
Evolution of the Project What s Happened So Far... Project is moving ahead from the PCHWP Environmental Study Report (2013). Many of the elements were determined during this process. We are moving forward with the design based on the Class EA. Details and refinements to the design will be determined during this process and your feedback will help to determine the final elements. Project Timing 2017 2018 2019 2020 2021 2022 Preliminary Design and Development Plan Detailed Design, Agency Consultation and Approvals Construction - subject to budget approval, phasing and outcome of the Region s Front Street Station Class EA
Tonight s Meeting Purpose of Meeting Explanation of Stations STAGE SCREEN The purpose of tonight s meeting is to give you an update on the status of the PCHWP project. We also would like to get your feedback on the 3 concept options being considered for Marina Park and Port Credit Memorial Park West. Each of the stations that have been set up in the room tonight represent one of the three options that have been proposed for Port Credit Memorial Park West & Marina Park. Each option is slightly different than the last. Every station will illustrate the layout of each option by having the following: Concept Station Seating for Presentation Concept Station We ask that you help us by providing Panel with Option Layout Plan your feedback at each of the Option Panel with Illustrative Cross Sections Stations on our Dot Matrix activity, Panel with Photosimulation Perspective Images drawing on the maps, providing Panel with Dot Matrix Activity. Chart containing information on sticky notes, and also elements within the option for rating with sticky by providing your thoughts on the dots. Feedback Forms provided when you A large format plan will be available on the table sign in. adjacent to the panels. Concept Station General Info STAIRS
Concept 1 Layout RETAIN EXISTING NATURALIZED SLOPE IMPROVED STREETSCAPE NON-MOTORIZED LAUNCH RAMP CAR-TRAILER PARKING FRONT STREET SOUTH IMPROVED STREETSCAPE PARKING/EVENT SPACE LAKESHORE ROAD WEST PARKING FRONT STREET NORTH LAWN NATURALIZATION LAWN LOOKOUT THE DON ROWING CLUB OF MISSISSAUGA RAMP NATURALIZATION IMPROVED COASTAL EDGE MISSISSAUGA CANOE CLUB RAMP LAWN CIVIC PLAZA CREDIT RIVER SHADE STRUCTURE CREDIT RIVER SECURED CHARTER BOAT DOCKS FISH CLEANING STATIONS LOOKOUT CONCEPT 1: BUILDING ON THE EA PORT CREDIT HARBOUR WEST PARKS - PRELIMINARY CONCEPTS
Concept 1 Perspective
Concept 1 Cross Section PRESERVED TREE SHADE STRUCTURE IMPROVED COASTAL EDGE GRANULAR LAUNCH RAMP OFFLINE ZONE PARKLAND QUEING BIOSWALE CAR-TRAILER EXIT CAR-TRAILER ANGLED PARKING CAR-TRAILER ENTER IMPROVED STREETSCAPE/ WATERFRONT TRAIL PARALLEL PARKING N BOUND S BOUND EXISTING STREETSCAPE 2.5 m 3.5 m 3.5 m FRONT STREET S 9.5 m SOUTH SECTION - WEST PARKS MARINA PARK: CONCEPT 1
Concept 1 - Table of Features What do you think? Concept Elements Example Image Please indicate your support. Concept Elements Example Image Please indicate your support. Lookout Naturalization Shade Structure Improved Coastal Edge River Promenade Improved Streetscape Fish Cleaning Stations Non-motorized Launch Ramp Secured Charter Boat Docks Car-Trailer Parking Civic Plaza Parking / Event Space
Concept 2 Layout RETAIN EXISTING NATURALIZED SLOPE SMALL INFORMAL AMPHITHEATRE ELEVATED LANDING AND BRIDGE REORIENTATION NON-MOTORIZED LAUNCH RAMP IMPROVED STREETSCAPE PARK GATEWAY PARKING/EVENT SPACE LAKESHORE ROAD WEST IMPROVED STREETSCAPE FRONT STREET NORTH LAWN LAWN NATURALIZATION MISSISSAUGA CANOE CLUB RAMP FRONT STREET SOUTH LOOKOUT IMPROVED COASTAL EDGE THE DON ROWING CLUB OF MISSISSAUGA RAMP LAWN CIVIC PLAZA PLANTED TERRACING NATURALIZATION CREDIT RIVER CHARTER BOAT ACCESS ROUTE WAVE BREAK FISH CLEANING STATION SECURED CHARTER BOAT DOCKS CREDIT RIVER LOOKOUT CONCEPT 2: CHARTER BOATS RELOCATED SOUTH & MOTORIZED BOAT LAUNCH REMOVED PORT CREDIT HARBOUR WEST PARKS - PRELIMINARY CONCEPTS
Concept 2 Perspective
Concept 2 Cross Sections PRESERVED TREES LAKESHORE WEST BRIDGE CREDIT RIVER IMPROVED COASTLINE EDGE STEPS CIVIC PLAZA STEPS IMPROVED STREETSCAPE/ MULTIUSE TRAIL PARALLEL PARKING 2.5 m N BOUND 3.25m 3.25 m RIGHT TURN 3 m EXISTING SIDEWALK PC MEMORIAL PARK WEST - WEST PARKS CIVIC PLAZA: CONCEPT 2 FRONT STREET N PRESERVED TREE PRESERVED TREE PRESERVED TREE SHORELINE PROTECTION EDGE RIVER PROMENADE PLANTED TERRACING TERRACED PATH UPPER LAWN IMPROVED STREETSCAPE/ MULTIUSE TRAIL PARALLEL PARKING N BOUND 2.5 m 3.5 m S BOUND 3.5 m EXISTING STREETSCAPE NORTH SECTION - WEST PARKS MEMORIAL PARK: CONCEPT 2 FRONT STREET N 9.5 m
Concept 2 Cross Sections IMPROVED COASTAL EDGE PEDESTRIAN ZONE/CHARTER BOAT ACCESS PLANTED TERRACING CONCRETE PATH RAISED NATURALIZED PLANTER IMPROVED STREETSCAPE/ WATERFRONT TRAIL PARALLEL PARKING N BOUND 2.5 m 3.5 m S BOUND 3.5 m EXISTING STREETSCAPE FRONT STREET S 9.5 m SOUTH SECTION - WEST PARKS MARINA PARK: CONCEPT 2 SECURED CHARTER BOAT DOCKS RIVER PROMENADE DECKED SEATING EDGE PEDESTRIAN ZONE/CHARTER BOAT ACCESS ROUTE SHADED PEDESTRIAN TERRACE ANGLED PARKING PARKING ACCESS WAY ANGLED PARKING IMPROVED STREETSCAPE/ WATERFRONT TRAIL PARALLEL PARKING N BOUND S BOUND EXISTING STREETSCAPE NORTH SECTION - WEST PARKS MARINA PARK: CONCEPT 1 5.5 m 6 m PARKING/MULTI USE EVENT AREA 17 m 5.5 m 2.5 m 3.5 m 3.5 m FRONT STREET S 9.5 m
Concept 2 - Table of Features What do you think? Concept Elements Example Image Please indicate your support. Concept Elements Example Image Please indicate your support. Lookout Civic Plaza Charter Boat Access Route Planted Terracing / Raised Naturalized Planter Wave Break Small Informal Amphitheatre Fish Cleaning Station Improved Streetscape Secured Charter Boat Docks Elevated Landing and Bridge Reorientation River Promenade Parking / Event Space Park Gateway Lawn Non-Motorized Launch Ramp Motorized Boat Launch Removed Charter Boats Relocated South
Concept 3 RETAIN EXISTING NATURALIZED SLOPE SMALL INFORMAL AMPHITHEATRE ELEVATED LANDING AND BRIDGE REORIENTATION IMPROVED STREETSCAPE PARK GATEWAY PARKING/EVENT SPACE FRONT STREET SOUTH LAKESHORE ROAD WEST IMPROVED STREETSCAPE FRONT STREET NORTH LAWN LAWN LOOKOUT NATURALIZATION IMPROVED COASTAL EDGE MISSISSAUGA CANOE CLUB RAMP THE DON ROWING CLUB OF MISSISSAUGA RAMP LAWN PLANTED TERRACING NATURALIZATION CREDIT RIVER CIVIC PLAZA SHORT TERM PUBLIC DOCKING NON-MOTORIZED LAUNCH RAMP CREDIT RIVER LOOKOUT CHARTER BOATS RELOCATED ACROSS RIVER FOR IMPROVED WATER SAFETY AND SECURITY CONCEPT 3: CHARTER BOATS & MOTORIZED BOAT LAUNCH RAMP REMOVED PORT CREDIT HARBOUR WEST PARKS - PRELIMINARY CONCEPTS
UTILITIES APPROX. 12 M HIGH Concept 3 Cross Sections PRESERVED TREE IMPROVED STREETSCAPE/ WATERFRONT TRAIL PARALLEL PARKING 2.5 m NORTH BOUND 3.5 m SOUTH BOUND 3.5 m EXISTING SIDEWALK PROPOSED ROADWAY 9.5 m SOUTH SECTION - WEST PARKS ROADWAY AND WATERFRONT TRAIL EXISTING ROADWAY 12 m FRONT STREET S IMPROVED COASTAL EDGE GRASS TERRACES WITH CONCRETE SEAT WALLS CONCRETE PATH IMPROVED STREETSCAPE/ WATERFRONT TRAIL PARALLEL PARKING N BOUND S BOUND EXISTING STREETSCAPE PLANTED TERRACING 2.5 m 3.5 m 3.5 m FRONT STREET S 9.5 m SOUTH SECTION - WEST PARKS MARINA PARK: CONCEPT 3
Concept 3 Front Street - Street View Perspective
Service Access Naturalization Parking/Large Event Flex Space Parking Area Open Green Space Multi-use Civic Space Existing Building Most Recent Sediment Removal Sculling Boats Rowing Club MARINA PARK PORT CREDIT MEMORIAL PARK (WEST) N t S Potential Conflict Zone Motorized Boat Traffic Non-Motorized Boat Traffic Canoe Club t n Fro Motorized Boat Launch Non-Motorized Boat Launch Rivergate Easement Natural Shore Edge Hard Shore Edge Streetscape Enhancement Lookout Project Boundary Vehicular Circulation On-Road Cycling Waterfront Trail Trail LEGEND Rivergate apartment Lighthouse Non-Motoized Boats Credit River Motor Boats Charter Boats Lakeshore Rd W Seasonal + Vistor Motor Boats Circulation HARBOUR WEST PARKS Front St S
Concept 3 - Table of Features What do you think? Concept Elements Example Image Please indicate your support. Concept Elements Example Image Please indicate your support. Lookout Improved Streetscape Relocated Charter Boats Parking / Event Space River Promenade Elevated Landing and Bridge Reorientation Non-Motorized Launch Ramp Park Gateway Short Term Public Docking Small Informal Amphitheatre Civic Plaza Lawn Planted Terracing Naturalization