Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Similar documents
Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

Scarborough Waterfront Project

Ashbridges Bay Erosion and Sediment Control Project

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Lake Nokomis Shoreline Enhancement Project

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

APPENDIX L3. Table of Contents. SWP EA Information Sheets

Gibsons Foreshore & Seawalk Improvements

APPENDIX K WINDSOR OFFICIAL PLAN

Mississauga Waterfront. Parks Strategy - Draft

City of Kingston. North King s Town Secondary Plan Open House + Workshop #1 February 28, 2018

PRELIMINARY DESIGN + DEVELOPMENT PLAN

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

PORT UNION VILLAGE COMMUNITY SECONDARY PLAN

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Baselands Trails Master Plan Public Meeting. April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m.

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

Welcome to the. Open House

Improvement of the Atlantic Coast of New York City,

City of Tacoma Shoreline Master Program Update Stakeholder Advisory Committee Meeting September 10, 2009

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

BEACH AND INLET PROJECTS UPDATE

9: 204 & 240 Front Street, George Street Parkette & Dingle Park. 1. Description of Property. Name (if applicable) Legal Description

Goals and Strategies. Goals. Strategies. Long-term Beach and Shoreline Management Program

The Planning Partnership Baird + Associates TCI Management Consultants Ltd. Plan B Natural Heritage Wills Consulting Engineers Poulos & Chung Limited

Millburn, NJ, Residential Area Stormwater Analyses

APPENDIX F: EXTERNAL APPROVALS

Inspiration Port Credit. Exploring the Options Public Engagement March 26, 2013

Gibsons Foreshore & Seawalk Improvements

edmonton.ca/ribbonofgreen #ribbonofgreen

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

Village of Glenview Appearance Commission

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Rhode Island Shoreline Change Special Area Management Plan

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

Burloak Drive Grade Separation

WLAC Facilities Committee Meeting. September 18, 2017

6. DESCRIPTION OF THE PREFERRED ALTERNATIVE

WELCOME Tuesday, May 29th 6:30-9:00 p.m. Waterside Inn Port Credit, Mississauga

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

December 11, December 10, 2015

Sustainability, Health, Safety, Recreation & Open Space Working Group August 3, 2017

A TWENTY YEAR PLAN TO RESTORE NAPLES BAY. Natural Resources Manager

PUBLIC SPACE/AMENITY PROJECTS

TOWN COUNCIL / PLANNING COMMISSION

jmt.com MARINE Part of a diversified family of solutions

WELCOME TO THE PUBLIC INFORMATION CENTRE. Please Sign In

Baylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.

4/8/2015 Item #10D Page 1

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

Using a Citizen s Wetland Education Workshop As A Tool in Regulatory Compliance

Venice Pumping Plant Dual Force Main Project Draft EIR

Options for Managing Coastal Erosion. Presentation by: Ashley Sprague

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Monitoring and Maintenance Permit Process

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

Assessment of Landscape, Visual and Natural Character Effects

WELCOME TO PUBLIC INFORMATION CENTRE #2. Please Sign In

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Lilburn, GA STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. July 2013 Jill Stachura

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

Lawrencetown Beach & Rainbow Haven Beach

Stormwater BMP and Stream Restoration in a City Park. Jeff Herr P.E., D.WRE Jill Stachura

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

A. Selma Park, Davis Bay and Wilson Creek

Deb Grube, Sr. Zoning Officer

The purpose of tonight s PIC is to:

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Somers Point Master Plan

Restoring Water Ecosystems in NYC Parks

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

A New Plan For The Calgary Region June calgary.ca call 3-1-1

Jill Stachura STORMWATER BMP AND STREAM RESTORATION IN A CITY PARK. October 2013 Southeast Stormwater Association Annual Conference, Charlotte, NC

5: Cross Avenue Bridge, Sixteen Mile Creek Rail Bridge

A Cooperative Effort Between:

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

This Review Is Divided Into Two Phases:

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

Nick Sigmund, Sr. Zoning Officer

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

State of the State New Jersey. Steve Jacobus NJDEP 06/10/15

FEBRUARY 1, 2008 CONCEPT PLANNING SESSION #2

Southeast Extension to RidgeGate Parkway Scoping Booklet

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Tysons-Old Meadow Road Bike/Ped Improvements

Transcription:

Welcome Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment #1 6 pm to 8 pm

Why We Are Here Tannery and Waterworks Parks shorelines are in poor condition. The Town of Oakville is undertaking a Class Environmental Assessment (EA) for the Tannery and Waterworks Parks shoreline improvements. The purpose of the study is to provide shoreline improvements consistent with the Oakville Harbour West Shore Master Plan including shore stability, improved access to and along the shoreline, improved park function and an overall enhancement of the environmental conditions. The objectives of this PIC are: To present an overview of the project To present an overview of the Class EA process To present alternative solutions To present typical shoreline treatment alternatives To obtain your input and comments

The Municipal Class EA Process We Are Here Phase 1: Identify Problem or Opportunity Phase 2: Alternative Solutions Phase 3: Alternative Design Concepts for Preferred Solution Phase 4: Environmental Study Report Phase 5: Implementation Identify alternative solutions to problem or opportunity Identify alternative design concepts for preferred solution Complete environmental study report (ESR) Complete contract drawings and tender documents Review Agency & Public Consultation Inventory natural social economic environment Evaluate alternative solutions identify recommended solutions Review Agency & Public Consultation Identify impact of alternative designs on environment and mitigating measures Evaluate alternative designs, identify recommended design Environmental study report (ESR) placed on public record Notice of completion to review agencies and public Proceed to construction and operation Monitor for environmental provisions and commitments Select preferred solution Select preferred design Problem Statement Preferred Solution Preferred Design Environmental Study Report

Study Area Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment

Existing Conditions Reach 1 Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Reach 1 - Tannery Park East Features: Parking lot along crest of bank used for viewing lake and harbour No identified trail through parking lot or along shore Trail system access through west end of parking lot Lake shoreline protected t with randomly placed concrete rubble and stone and showing signs of damage from wave action Water s edge is inaccessible over rubble West Pier along shore of 16 Mile Creek Nearshore has exposed bedrock and scattered shingle

Existing Conditions Reach 2 Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Reach 2 - Tannery Park West Features: High steep bank along shore with trees and vegetation Shore has randomly scattered armour stone with large gaps between the stones Small accumulation of shingle material at west end of reach Trail system along top of bank with no access along the shoreline No access to the water s edge Sanitary sewer overflow outlet at west end of reach

Existing Conditions Reach 3 Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Reach 3 - Walker Street Promenade Features: High bank with berm at toe of bank Shore protected with armour stone revetment built in the late 1980 s and in good condition Narrow shingle beach with accumulation of timber debris at west end of reach Trail system along berm behind private residences. Access/Egress through Waterworks Park and timber stairs at Tannery Park Steps in revetment t provide access to the water s edge

Existing Conditions Reach 4 Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Reach 4 - Waterworks Park Features: Oakville s water intakes offshore of park Water Purification Plant and storm sewer outlet in park Park with manicured lawns and trail system Low bank shoreline with concrete rubble and stone along the shore; shore shows signs of erosion and wave overtopping Crescent bays with accumulation of timbers and debris mixed with some shingle Access to the water s edge over rubble and debris

Terrestrial & Aquatic Habitat Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Natural Heritage Features and Functions Terrestrial vegetation is a mixture of manicured landscape plantings and vegetation which has colonized naturally. Some vegetation is exotic and/or invasive. Trees in the study area provide nesting habitat for common birds. Nearshore aquatic atic habitat is dominated by cobble/gravel el substrates and scattered boulders. Offshore aquatic habitat is dominated by bedrock. No aquatic macrophytes (vascular plants) grow in the study area because of the high wave energy environment. Structural habitat (edge, cover, niche spaces, etc) for fish is sparse. Some benthic fish species (e.g. sculpin) likely spawn in the study area. Larger fish, including sportfish, would be expected to forage in the study area. Sixteen Mile Creek to the east provides a migratory corridor for trout and salmon. There are no records of any Species At Risk in the study area.

Coastal Conditions Tannery and Waterworks Parks Shoreline Improvements, Environmental Assessment Coastal Environment Wave hindcast using 40 years of Toronto Island wind data. Deepwater design wave height of 5.7 m and wave period of 10 seconds Lake Ontario Hydrograph, Mean Monthly Lake Levels Water Level (m, cha art datum) 2.0 1.5 1.0 0.5 0.0-0.5 Maximum, 1918-2012 Minimum, 1918-2012 Average 1918-2012 Recorded 2011/2012 76.2 75.7 75.2 74.7 74.2 73.7 Elevation (m, IGLD1 1985) -1.0 73.2 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2011 2012

Existing Conditions Land Use Land Use Old Oakville community west of 16 Mile Creek Study site designated as Waterfront Open Space Oakville s water intake offshore of Waterworks Park Site adjacent to medium density residential Major commercial hub centered on Lakeshore Road Study area

Alternative Solutions 1) Do Nothing No capital cost Existing appearance and views will be unchanged Unprotected shore or inadequate shore protection resulting in continued erosion and flooding Existing shore protection will require maintenance in the future. Limited it access to the water s edge. Lost opportunity to provide connectivity between the parks, accessible access, and new views and vistas Lost opportunity to enhance terrestrial and aquatic habitat 2) Protect the shoreline Maintains or improves existing shoreline protection where feasible Provides shoreline protection to reduce erosion and flooding where required Provides access to the shore and extends the trail system along the shoreline Provides accessible connectivity to the existing parks Opportunity to incorporate features that will enhance the park and provide views and vistas of Lake Ontario and 16 Mile Creek. Opportunity to enhance terrestrial and aquatic habitat High capital cost Loss of existing appearance 3) Provide park at alternative location (relocate) Existing parks have 3.0 ha of waterfront property. Large waterfront property not available for development in Oakville Very high capital cost Not considered a practical solution

Preferred Alternative Solution Preferred Alternative Solution is to protect the shoreline. Maintains or improves existing shoreline protection where feasible Provides shoreline protection to reduce erosion and flooding where required Provides access to the shore and extend the trail system along the shoreline Provides accessible connectivity to the existing parks Opportunity to incorporate features that will enhance the park and provide views and vistas of Lake Ontario and 16 Mile Creek Opportunity to enhance terrestrial and aquatic habitat High capital cost Loss of existing appearance Potential change to littoral drift and wave climate

What Happens Next Receive and consider public comments Develop evaluation criteria Develop alternative designs to protect the shoreline, such as Armour stone wall, Armour stone revetment, Boulder protection, Headland/cobble beach system, Offshore breakwaters, and Other shoreline treatments as required. Develop alternative site plans and sections that address the site conditions and desired features Evaluate alternatives Select Preliminary Preferred Alternative to protect the shoreline Next will be held to present the Preferred Alternative Design and to get your comments

Typical Shoreline Treatments Armour stone wall Vertical wall Occupies small foot print Trail along back of wall Access to water s edge via steps Armour stone revetment Sloped structure Occupies larger foot print Trail along back of revetment t Access to water s edge via steps

Typical Shoreline Treatments Nearshore Boulder Protection Round boulders Occupies larger foot print Trail along back of protection Access to water s edge via steps

Typical Shoreline Treatments Headland/Cobble Beach System Armour stone headlands updrift and downdrift Occupies large foot print Waterfront trail land ward of beach Provides access to water s edge

Typical Shoreline Treatments Offshore Breakwaters Armour stone breakwaters Occupies large foot print in the nearshore Existing access to water s edge

Oakville Harbour West Shore Master Plan Concept Statement To create a distinct and unified identity to the area To visually and functionally simplify and unify the area To eliminate redundant elements To develop each park in the system to have a more individual character and identity while maintaining the intention of a whole system that is linked and related. This will be accomplished by making: Shipyard Park more of a marina and boating friendly facility Tannery Park more of an accessible urban waterfront park Walker St. Promenade actually be a promenade Waterworks Park more of what it currently is a terrific naturalized neighbourhood park

Thank you for attending Before you leave: Please take a copy of the handout from the information table Sign the attendance sheet Discuss any questions you may have about this project with one of our team members. We would like to hear from you: Comment sheets are available at the sign in table. Please provide your thoughts, ideas, concerns and questions about this project. If you would like to be included in our mailing list, please provide us your contact information on the comment sheet and/or sign in sheet. Contact Information Kasia Piskorz Town of Oakville 1225 Trafalgar Road Oakville, Ontario L6H 0H3 Phone: 905.845.6601x3533 Fax: 905.338.4159 Email: kpiskorz@oakville.ca Jane Graham Shoreplan Engineering i Limited it 55 Eglinton Avenue East, Suite 800 Toronto, Ontario M4P 1G8 Phone: 416.487.4756 x223 Fax: 416.487.5129 Email: jgraham@shoreplan.com