Demolition Permit Application (Please print and complete ENTIRE form)

Similar documents
1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

Fire Safety Plan Information. For Construction and Demolition Sites

FIRE SAFETY PLAN FOR CONSTRUCTION, RENOVATION AND DEMOLITION SITES

Guidelines for Fire Safety Plans at Construction or Demolition Sites

Chapter 12 HOT WORK OPERATIONS. Purpose:

FIRE SAFETY DURING CONSTRUCTION, ALTERATION AND DEMOLITION

2010 FIRE CODE OF NEW YORK STATE

1.2 To ensure the safety of all persons working in or occupying a building where a hot work operation is performed.

Safety Services. The pages are intended to be printed double-sided. If they are printed single-sided, blank pages can be discarded.

John Jay College of Criminal Justice HOT WORK PERMIT STANDARD OPERATING PROCEDURES

Progressive Safety Services LLC 2

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

Builders Risk - Fire Prevention Inspection Checklist

POLICY STATEMENT: Policy Number: Section 600 Physical Plant. Date Adopted: May 7, Date(s) Revised: September 4, 2012

HOT WORK OPERATIONS March 23, 2018

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

EXAMPLE FIRE PREVENTION AND PROTECTION PLAN WORKSHEET

Fire Prevention STANDARD. LME-12: Uen Rev A

HOT WORK SAFETY PROGRAM:

Safe Operating Procedure

INFORMATION BULLETIN

Fire Safety Plan (FSP) Review Checklist 1

Fire Safety Plan (FSP) Review Checklist 1

HOT WORK PERMIT PROCEDURES

CHAPTER 15: FIRE PREVENTION & AWARENESS POLICY

FIRE SAFETY MAINTENANCE INFORMATION for Agricultural Livestock Structures

Hot Work Program & Operational Guidelines. Environmental Health, Safety and Emergency Management (828)

Winnipeg Fire Department Fire Prevention Branch

WELDING, CUTTING, AND BRAZING SAFETY PROGRAM

Business License Pre-inspection Checklist

Comprehensive Fire Plan Post on Construction site

Hot Work Permit. Can this job be avoided? Is there a safer alternative? Permit No.:

TEN STEP PROCESS PREPARING FIRE SAFETY PLANS

ADMINISTRATIVE SERVICES MANUAL

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection

Fire Prevention Plan

TAMUCC Fire Safety Training

Savard Labor & Marine Staffing, Inc. Fire Prevention Program Rev3/14

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

CONSTRUCTION ENVIRONMENTAL HEALTH & SAFETY EXHIBIT FIRE PREVENTION AND PROTECTION

Fire Prevention Plan

OUTLINE FOR FIRE PREVENTION ACTIVITY

ADMINISTRATIVE SERVICES MANUAL

All temporary special events held within the City of Orlando must be approved and inspected by the Orlando Fire Department prior to holding the event.

FIRE PREVENTION IN THE USE OF CUTTING OR WELDING PROCESSES

FORM MUST BE SIGNED AND RETURNED FOR VENDOR PARTICIPATION

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services 575 E. Flamingo Road, Ls Vegas, NV (702) FAX (702)

CORPUS CHRISTI FIRE PREVENTION MOBILE FOOD VENDOR REQUIREMENTS

Steven Craft, PhD, P.Eng. FIRE SAFETY DURING THE COURSE OF CONSTRUCTION

- CONSTRUCTION FIRE SAFETY STANDARDS

CITY OF GREATER SUDBURY (CGS) ARENA EVENTS FIRE REGULATIONS

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Title: Fire Prevention During Welding, Cutting and Other Hot Work Plan (formerly the Cutting & Welding Policy)

THE FACTORIES A D OTHER PLACES OF WORK ACT (Cap 514)

30 DAY TEMPORARY TENT APPLICATION ON EXISTING COMMERCIAL PROPERTY

COUNCIL ORDER No

ATTACHMENT B FIRE CODE REQUIREMENTS FOR EXHIBITS AND SPECIAL EVENTS

Fire Safety. Presenter, Kevin V Coleman September 14 th 2016

- CONSTRUCTION FIRE SAFETY STANDARDS

JOINT CODE INTERPRETATION

FIRE SAFETY PRACTICES AND PROCEDURES

Department of Public Safety

BCIT FIRE SAFETY PROGRAM

REGULATIONS FOR OUTDOOR GATHERINGS AND EVENTS TENTS & MEMBRANE STRUCTURES

Procedure DESCRIPTION/OVERVIEW

Emergency Evacuation Plan South Patterson Building (SPB)

PLACES OF ASSEMBLY CHAPTER 17

Fire Safety Plan FOR. Business/Property Name: Address: Phone Number: Occupancy Classification. Approved by Fire Inspector: Date:

MULTI-LEVEL & COVERED BOOTH CONDITIONS

City of Chilliwack. Bylaw No A bylaw to regulate fire prevention and the protection of life and property

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 6

Date Issued: December 14, 2017 Revision: 2.1

Model Policy On Portable Fire Extinguishers (Ontario Version)

Dear Exhibitor, To assist in th. and safety issues that you may encounter with your booth.

Note: The event coordinator is responsible for compliance of all regulations.

SafetyNet FIRE MARSHAL S OFFICE. Food Booth and Vendor Regulations

(h) Pesticide Application.

Fire Hazard Identification Checklist 1

Chapter 18 Welding Table of Contents

McCormick Place Fire Safety Regulations

Purpose: To establish procedures for identifying fire hazards and preventing fires. Scope: All Central New Mexico Community College (CNM) Community.

City of Cleveland. Division of Fire Fire Prevention Bureau 1645 Superior Avenue Cleveland, Ohio Standard Operating Procedure 18

FIRE SAFETY PLAN. Ceramics/Sculpture Building 47 Service Rd 1 S Winnipeg, MANITOBA. May / Prepared by: Chris Pancoe

FIRE MARSHAL REGULATIONS

Office of Risk Management EHS Hot Works Program

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

Tents and Temporary Membrane Structures Packet

City of Leduc Fire Services Indoor Special Event Requirements

This policy applies to all Hot Work jobs performed on the Calhoun mill property by AbitibiAbitibiBowater employees.

Flammable Liquids!!!!!

Event Comprehensive Fire Plan

Well managed building mean risk is normal. Fire action notices should be displayed by all alarm break glass call points.

Emergency Action and Fire Prevention

Hot Work Policy and Procedures

Fire Risk Assessment

Fire Safety Safety Program

REQUIREMENTS FOR EVENTS AND TEMPORARY STANDS AT FAIRS AND SHOWS

Combustibles - Gases, liquids or solid materials that will ignite in the continued presence of an ignition source.

Transcription:

Office Use Only Submission Date: Received By: Folder Number: Demolition Permit Application (Please print and complete ENTIRE form) DEMOLITION SITE INFORMATION Address of Demolition: Zoning: Type of Building to be Demolished: Is this site zoned Heritage or Historical? Yes No Demolition Materials Is it adjacent to a site Landfill Other Removed to: zoned Heritage or Historical? Yes No Is there a water or sewer service Date of Demolition: to the structure? Yes No NOTE: The City requires 45 days notice to evaluate any site designated Historical or Heritage. Section 7.6(2)(a)(ii) of the Land Use Bylaw. APPLICANT INFORMATION Do you require a City Hoarding Permit? Yes No Name: Address: Name: Address: Email: Phone: PROPERTY OWNER INFORMATION Email: Phone: Check Box if information is same as applicant Failure to comply with the conditions listed above may result in penalties being levied, as per the City of Red Deer Permit Bylaw. Agency Civic Address Phone Number Fax Signature Shaw Cable 4761 62 Street 780-490-3555 403-340-6414 R.C.M.P 4602 51 Avenue 403-406-2300 403-346-1365 ATCO Gas 7590 Edgar Industrial Dr. 403-357-5200 403-357-5219 Telus 4831 51 Street 403-341-8318 403-342-6202 **Please request your electrical retailer to remove meter prior to submitting a Demolition Permit Application** I understand, as the owner or agent, it is my responsibility to ensure the following conditions are met: 1. Ensure that all meters and service connections have been removed before demolition begins. 2. The services of the following agencies have been coordinated, and all authorized signatures have been obtained. 3. I have provided a Site Plan, a Letter of Intent, a Letter of Authorization, and a Fire Safety Plan to accompany the Demolition Permit Application, showing the structure to be demolished, as well as the fencing/barricades to be in place during demolition. 4. A site inspection will be conducted by a Building Safety Codes Officer prior to demolition. Signature of this document indicates your compliance with the Alberta Building Code and the Alberta Fire Code. Name of Applicant (please print) Signature of Applicant

Fire Safety Plan Demolition Division B, Section 5.6. of the Alberta Fire Code (AFC) applies to fire safety for buildings, parts of buildings, facilities, adjacent buildings or facilities, and associated areas undergoing construction, alteration or demolition operations. Please review completed demolition fire safety plan attached. This safety plan has been designed to meet the intent of the AFC for demolitions. If applicable a hot works safety plan must be included (see appendix C). If you are in agreement with the fire safety plan as laid out, nothing further is required. It is acceptable for your use. If you make changes to the safety plan please forward to prevention@reddeer.ca for review and approval. Prior to the commencement of demolition operations, the AFC requires the demolition fire safety plan to be on-site. It is the owner, developer or contractor s responsibility to ensure everyone involved with the demolition is familiar with the safety plan. It is unlawful to start demolition without a fire safety plan. Fire Safety Plans will apply to all inspectors, workers, suppliers and contractors on site so as to provide a safe environment for workers and outline emergency procedures at sites where demolitions are occurring. A Fire Prevention Officer may review demolitions to ensure the work site is safe and complies with the Alberta Fire Code.

Fire Safety Plan Demolition Sites THIS PLAN MUST BE POSTED AT EACH JOB SITE AND EMPLOYEES ARE EXPECTED TO BE TRAINED IN AND HOW TO FOLLOW ITS PROVISIONS This plan is designed in conformance with Division B Section 5.6. of the Alberta Fire Code Permit # Address: Building Name/Site Name: Description of Project: Emergency Contact Person / 24 hr.# Emergency Contact Person / 24 hr.# Muster Point: Building Owner/Contractor Print Name: Signature: Date: Contact # The Owner and/or Representative of the Owner are responsible for the Fire Safety Plan until completion of Demolition

FIRE SAFETY PLAN DEMOLITION A designate must be appointed and account for all people expected to be on site An on-site warning system must be in place A method of notifying the fire department shall be available at all times Upon Discovery of Fire or Other Emergency Leave fire area immediately Close doors behind you where practical Turn off equipment if safe to do so Notify occupants verbally or sound horn or activate fire alarm system Call the Fire Department 9-1-1 (from a safe location) Use nearest exit, do not use man lifts or elevators Go to mustering point, stay there until instructed to do otherwise A supervisor must await the arrival of the Fire Department at the main access point Fighting a Fire Attempting to extinguish a fire is a voluntary act. Only use a fire extinguisher if safe to do so and you know how to use it Prior to fighting a fire, notify persons in the immediate area Be calm and use good judgment at all times. Never attempt to fight a fire alone unless the fire is small and you feel confident that you can extinguish or isolate the fire by using a portable fire extinguisher When you have exhausted the extinguisher, back away if unable to totally extinguish the fire Ensure you have an exit at your back. Do not get trapped Emergency Response Numbers: FIRE/POLICE/AMBULANCE: 9 1 1 POWER (City of RD ELP) 403-348-5700 WATER (City of RD Environmental Dept.) 403-342-8750 GAS (Atco Gas 24 Hr) 1-800-511-3447

Measures for controlling fire hazards in and around the building Outdoor Refuse Containers shall be kept at least 3 meters from a combustible building and any building overhang or opening. Combustible waste materials in and around buildings shall not be permitted to accumulate in quantities or locations that will constitute a fire hazard. Burning of waste material at demotion sites is NOT PERMITTED. Combustible liquids and flammable liquids shall be stored and used in a safe manner. Fire Department Access Fire Department Access is to be maintained at ALL times from start to completion of demolition. Blocking or obstruction of access roads or hydrants with construction materials, equipment or excavation materials is not permitted. Security If demolition is longer than one day the area must be secured by a fence or a watchman service. Address Street address of the site is to be posted and clearly visible at all times for all emergency response personnel including police, fire and ambulance. Address numbers should be affixed in a visible location at a level of about 2 m from the ground, or taped to the inside of a front facing window. Hot Works Hot works shall be performed in conformance with Section 5.2. of the AFC. See Appendix C for more information. Protection of Adjacent Buildings Protection shall be provided for adjacent buildings and facilities that would be exposed to fire originating from buildings, parts of buildings, facilities and associated areas undergoing demolition operations. Methods and materials used to protect adjacent buildings and facilities can range from active to passive systems such as spatial separation, installing water curtains, using construction methods and materials that include gypsum sheathing, or erecting a temporary fire barrier such as a fire tarpaulin. Fire Separations in Partly Occupied Buildings Where part of a building continues to be occupied, the occupied part shall be separated from the part being demolished by a fire separation having a fire-resistance rating of not less than 1 h.

Portable Extinguishers Portable extinguishers shall be provided in unobstructed and easily accessible locations in areas a) where hot work operations are carried out, b) where combustibles are stored, c) near or on any internal combustion engines, d) where flammable liquids and combustible liquids or gases are stored or handled, and e) where temporary fuel-fired equipment is used. As a minimum two portable extinguishers shall be on-site that has a minimum rating of a) 2A-10BC on moveable equipment, and b) 4A-40BC in all other locations. Ignition Sources Construction Heaters shall be connected so as to minimize danger of mechanical damage and upset and be installed on a solid level base. Temporary heaters must be placed at least 5 m from combustible tarpaulins or similar coverings. Piping, tubing, hose and fittings shall be supported, secured and protected from damage and strain. Propane regulators shall be properly fastened within the protective cover. Temporary Enclosures Fabrics and films used to temporarily enclose buildings shall be securely fastened to prevent them from being blown against heaters or other ignition sources. Fuel Supply Installation 1) Fuel supplies for heating equipment and internal combustion engines shall conform to a) CSA B139, Installation Code for Oil-Burning Equipment, or b) gas regulations made pursuant to the Safety Codes Act. Smoking Restrictions Smoking shall not be permitted in areas where conditions are such as to make smoking a fire or explosion hazard. Where smoking is permitted, an adequate number of ash trays shall be provided. Provision for Egress In areas of a building where construction, alteration or demolition operations are taking place, at least one exit shall be accessible and usable at all times.

Appendix C Hot Works AFC 5.2.1.1. Application 1) This Section shall apply to hot works involving open flames or producing heat or sparks, including, without being limited to, cutting, welding, soldering, brazing, grinding, adhesive bonding, thermal spraying and thawing pipes. 2) Except as provided in this Section, hot works described in Sentence (1) shall conform to CAN/CSA- W117.2, Safety in Welding, Cutting and Allied Processes. 5.2.1.2. Training 1) Hot works shall be performed only by personnel trained in the safe use of equipment in conformance with this Section. 5.2.2. Hot Work Equipment 5.2.2.1. Maintenance 1) Hot work equipment shall be maintained in good operating condition. 5.2.2.2. Inspection 1) Hot work equipment shall be examined for leakage or defects prior to each use. 2) Leaks or defects found in hot work equipment shall be repaired prior to use. 5.2.2.3. Equipment Not in Use 1) All valves shall be closed and gas lines bled when Class 2 gas hot work equipment is not in use. 2) Electric hot work equipment shall be de-energized when not in use. 5.2.2.4. Compressed Gas Equipment 1) The design and installation of oxygen-fuel gas equipment shall conform to NFPA 51, Design and Installation of Oxygen-Fuel Gas Systems for Welding, Cutting, and Allied Processes. 2) Unalloyed copper piping shall not be used for acetylene gas. 3) Oil or grease shall not be used with equipment for oxygen. 4) Cylinders of Class 2 gases shall conform to Part 3. 5.2.3. Prevention of Fires 5.2.3.1. Location of Operations 1) Except as provided in Sentence (2), hot work shall be carried out in an area free of combustible and flammable contents, with walls, ceilings and floors of non-combustible construction or lined with noncombustible materials.

2) When it is not practicable to undertake hot work in an area described in Sentence (1), a) combustible and flammable materials within a 15 m distance from the hot work shall be protected against ignition in conformance with Article 5.2.3.2., b) a fire watch shall be provided during the hot work and for a period of not less than 60 min after its completion in conformance with Article 5.2.3.3., and c) a final inspection of the hot work area shall be conducted 4 h after completion of work. 3) When there is a possibility of sparks leaking onto combustible materials in areas adjacent to the area where hot work is carried out, a) openings in walls, floors or ceilings shall be covered or closed to prevent the passage of sparks to such adjacent areas, or b) Sentence (2) shall apply to such adjacent areas. 5.2.3.2. Protection of Combustible and Flammable Materials 1) Any combustible and flammable material, dust or residue shall be a) removed from the area where hot work is carried out, or b) protected against ignition by the use of noncombustible materials. 2) Combustible materials or building surfaces that cannot be removed or protected against ignition as required in Sentence (1) shall be thoroughly wetted where hot work is carried out. 3) Any process or activity that produces flammable gases or vapours, combustible dusts or combustible fibers in quantities sufficient to create a fire or explosion hazard shall be interrupted and the hazardous conditions shall be removed before any hot work is carried out. 5.2.3.3. Fire Watch 1) The exposed areas described in Sentences 5.2.3.1.(2) and (3) shall be examined for ignition of combustible materials by personnel equipped with and trained in the use of fire extinguishing equipment. 5.2.3.4. Work on Containers, Equipment or Piping 1) Hot work shall not be performed on containers, equipment, or piping containing flammable liquids, combustible liquids or Class 2.1 flammable gases unless a) they have been cleaned and tested with a gas detector to ascertain that they are free of explosive vapours, or b) safety measures are taken in conformance with good engineering practice (see Appendix A). 2) Hot work shall not be performed on a totally enclosed container. 3) Hot work shall not be performed on metal objects that are in contact with combustible materials unless safety precautions are taken to prevent their ignition by conduction.

5.2.3.5. Work Adjacent to Piping 1) When hot work is to be carried out near piping containing a Class 2.1 flammable gas, the piping shall a) conform to Sentence 5.2.3.4.(1), or b) be protected by a thermal barrier against the passage of heat. 5.2.3.6. Fire Extinguishing Equipment 1) At least one 4A-40BC portable fire extinguisher shall be provided in the hot work area.