MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION 7:00 P.M. TO 8:30 P.M. NOVEMBER 21 st, 2017 PENETANGUISHENE MEMORIAL COMMUNITY CENTRE BRIAN ORSER HALL (61 Maria Street) 1. Welcome/Introduction AGENDA 2. Main Street Reconstruction Scope 3. Preliminary Construction Schedule 4. Preliminary Traffic Control Protection Plan 5. Question & Answer Period
Main Street Beck Blvd. - Water St. Main St. Water St. Simcoe St.
Main Street: Beck Blvd. - Water St. BEFORE
Main Street: Beck Blvd. - Water St. tree & shrub planting at intersection bump-outs sidewalk & decorative splash strip AFTER
Water St. Robert St. Main Street Water St. - Robert St. Main St.
Main Street: Water St. - Robert St. BEFORE
Main Street: Water St. - Robert St. outdoor retail display zone awnings added (façade improvements) textured concrete walkway for uphill slip resistance tree & shrub planting at midblock rest area angled parking reduced to 38 deg. to improve visibility & increase boulevard space decorative paving to define parking AFTER
Robert St. Poyntz St. Main Street Robert St. - Poyntz St. Main St.
Main Street: Robert St. - Poyntz St. BEFORE
Main Street: Robert St. - Poyntz St. lighting & public amenity zone (seating, bike racks, trash recycling receptacles, etc.) sidewalk in-boulevard parking stone veneer seating wall & planter for ornamental seasonal plantings mountable curb AFTER
Main Street: Robert St. - Poyntz St. patio/ outdoor retail patios set on temporary levelling platforms secondary walkway seating wall provides patio frontage to hide levelling platform removable bollards to prevent parking AFTER
Poyntz St. Jeffery St. Edward St. Main Street Poyntz St. - Edward St. Main St.
Main Street: Poyntz St. - Edward St. BEFORE
Main Street: Poyntz St. - Edward St. street trees sidewalk & decorative splash strip AFTER
O.L. Dubeau Dr. Thompson Rd. Edward St. Main Street Edward St. - Thompson Rd. Main St.
Main Street: Edward St. - Thompson Rd. BEFORE
Main Street: Edward St. - Thompson Rd. decorative light standards added to existing hydro poles sidewalk & decorative splash strip street trees AFTER
Water St. Bump-out Amenity Areas Main St.
Main Street: Bump-out Amenity Areas
Main Street: Bump-out Amenity Areas
Water St. Robert St. Robert St. Crossroads Main St.
Main Street: Robert St. Crossroads bike parking shade trees low stone seating walls with mounted bench seating information kiosk tactile warning plates decorative planting concrete crosswalk trash/ recycling receptacle decorative paving in intersection
Main Street: Robert St. Crossroads
Water St. Robert St. Harbour Lookout Main St.
Main Street: Harbour Lookout decorative planting trash/ recycling receptacle bike parking low stone seating wall public art low stone seating walls with mounted bench seating
Main Street: Harbour Lookout public art visible from intersection sightline
Main Street: Harbour Lookout public art also visible travelling uphill
Main Street: Harbour Lookout
Water St. Robert St. Hillside Rest Area Main St.
Main Street: Hillside Rest Area
Main Street: Hillside Rest Area
TOWN OF PENETANGUISHENE MAIN STREET RECONSTRUCTION PRELIMINARY SCHEDULE 11/17/2017 Mobilization Description of Works MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER Block 1 - Beck Blvd to Brock St Dewatering Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 2 - Brock St to Simcoe St/Water St Dewatering Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 3 - Simcoe St/Water St to Robert St Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 4 - Robert St to Poyntz St Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 5 - Poyntz St to Edward St Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 6 - Edward St to Thompson Rd Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Final Clean Up and Demobilization
John Bravakis Enterprises Ltd. 551 Bryne Drive, Unit P Barrie, ON L4N 9Y3 October 12, 2017 TOWN OF PENETANGUISHENE MAIN STREET RECONSTRUCTION PRELIMINARY TRAFFIC CONTROL PROTECTION PLAN ROADWAY OPERATION SIGNAGE Example of Rolling Closure on below Figure 1. All traffic control signage to conform to Ontario Traffic Manual, Temporary Conditions, Book 7. Figure TL42 (Figure 2) to be used for closures and detours and TL20 (Figure 3) and/or TL33 (Figure 4) depending on width of roadway. All affected intersection(s) and/or work areas will have all appropriate signage to detour traffic as easily as possible. If existing traffic signals (Thompson Road, Edward St, Poyntz St, Robert St W) within work areas, traffic signals to be set to coordinate with construction work and traffic. PEDESTRIAN ACCESS / LOCAL BUSINESSES All existing sidewalks to remain in place for duration of works within immediate work area until placement of base asphalt. Temporary fence, example shown in Figure 5, will be erected between sidewalk and work area for pedestrian safety. Once base asphalt is placed, removal and replacement of sidewalks will commence. Advertisement Boards will be created and posted for all businesses within affected work area and/or intersections displaying sidewalk access open. These boards will be placed at all affected intersections. An example shown below (Figure 6) would be placed at the Main Street and Robert Street Closure. The Public Relations Officer (PRO) and/or the Flag Persons to also assist general public, employees, business owners and property owners with access through work areas. ROLLING CLOSURE EXAMPLE BROCK ST SIMCOE ST ROBERT ST E SIDEWALK SIDEWALK SIDEWALK SIDEWALK ROAD REINSTATEMENT WORKS MAIN ST SEWER, UNDERGROUND, ROAD TO BASE ASPHLAT WORKS NEXT STAGE PREPERATION SIDEWALK SIDEWALK SIDEWALK SIDEWALK TESSIER DR WATER ST ROBERT ST W POYNTZ ST FLOW OF WORK LEGEND TEMPORARY FENCE - PLACED BETWEEN WORK AREA & SIDEWALK SIDEWALK ROAD CLOSURE SINGLE LANE CLOSURE WITH FLAGGERS SEWER BYPASS SETUP N.T.S Figure 1 P a g e 1 3
John Bravakis Enterprises Ltd. 551 Bryne Drive, Unit P Barrie, ON L4N 9Y3 Figure 2 Figure 3 Figure 4 P a g e 2 3
John Bravakis Enterprises Ltd. 551 Bryne Drive, Unit P Barrie, ON L4N 9Y3 Figure 5 Temporary Fence Figure 6 Business Advertisement Board P a g e 3 3