MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

Similar documents
Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Plan Commission Presentation April 10, 2018 Teska Associates Christopher Burke Engineering

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

SOUTH UNIVERSITY Street Design Alternatives in Progress

Broadway Avenue Streetscape Project City of Albert Lea. Streetscape Design Committee Meeting October 29, 2012

VEHICULAR AND PEDESTRIAN CIRCULATION

Fifth and Detroit Street Design/South University Update Capital Improvement Committee Meeting

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

Lambeth Main Street Streetscape Improvements

BUSINESS DISTRICT DESIGN GUIDELINES

Maplewood Avenue Downtown Complete Street Project

open house 3 CITY OF SALEM Downtown Streetscape Plan

DESIGN GUIDELINES FOR LARGE SIDEWALK PATIOS ON CITY PROPERTY AND SAMPLE DRAWINGS

CENTERS AND CORRIDORS

Streets Vision

TREE GUARDS AND EDGING

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

Johnson Street Bridge Public Realm Update

Commercial Development Permit Area

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

Building and Site Design Standards

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Town Center Design Guidelines

TOWN CENTER DESIGN STANDARDS FOR THE CITY OF. August, MOUNTLAKE TERRACE TOWN CENTER DESIGN STANDARDS August,

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

COMPLETE GREEN STREET CHECKLIST

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Focus Group First Meeting Belfountain Community Centre Tuesday June 29, :00 p.m. to 9:00 p.m.

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Elm Street Business District: Streetscape and Signage Plan

Community Mixed Use Zone Districts (CMU)

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

THE CORPORATION OF THE CITY OF VAUGHAN MAJOR MACKENZIE STREETSCAPE STUDY

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

providing proof of liability insurance, indemnifying the City from any claims or liabilities arising from use of City property.

3.13. Development Guidelines

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

FREEWAY/TOURIST DISTRICT

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

appendix and street interface guidelines

Conceptual Design. Main Street Enhancement and Extension Project. Bothell, Washington. June 11, 2009

The Center Street Project

Streetscape Patterns. Design Guidelines, Ridgewood Village Center Historic District, Ridgewood, N.J. page 20

C I T Y O F T O R O N T O L A W R E N C E A V E N U E E A S T S T U D Y. Northwest Corner of Birchmount Road and Lawrence Avenue East

Highway 15 Project - Hutchinson

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

MAIN STREET DESIGN GUIDELINES CONTEXT

Prince William Street Project (Grant Avenue to Wellington Road)

Urban Design Brief 1576 Richmond Street City of London

Landscape and Streetscape Design 2.5

Monroe Street Reconstruction. Business Roundtable March 29, 2017

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

Arterial Mainstreets ottawa.ca

ELK GROVE TOWN CENTER DESIGN GUIDELINES

DRAFT. 10% Common Open Space

lakeway mixed use tract open space plan

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Chapter 4: Jordan Road Character District

Main Street Streetscape Plan. Downtown Redevelopment Plan Phase One

Chapter 14 Streetscape Improvements

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

180 ZONING 180. ARTICLE XLII STREETSCAPE ENHANCEMENT OVERLAY ( SEO ) DISTRICT [Added Ord. No. 1086]

ROCKTON DOWNTOWN STREETSCAPE MASTER PLAN. Village Board Presentation May 8, 2018 Teska Associates Christopher Burke Engineering

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

5.1 Commercial and Industrial Development. (Effective April 1, 2006)

Spring 2018 Construction Update

Charles P. Johnson and Associates. Annapolis Landscape Architects

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

built form design guidelines

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

The Lincoln Neighborhood Corridor Plan. The LiNC

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

Shell Beach Road Streetscape Frequently asked Questions

DOWNTOWN VISION FALL 2012

Chapter 5: Mixed Use Neighborhood Character District

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Technical Advisory Committee

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

ORDINANCE AN ORDINANCE TO ADD A NEW SECTION 4.N. IN THE ZONING CODE FOR THE TOWN OF MIDDLETOWN, RELATING TO MIXED-USE DEVELOPMENT

City of Redlands Architectural Guidelines for Non-Residential Development

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

LOCATION AND DESIGN DIVISION

FLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED)

Figure Example of out door dining in the public right-of-way.

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

Today We re Talking About:

Official Community Plan Bylaw No. 4360, 2004, Amendment Bylaw No. 4897, 2016 (Sewell s Landing)

BEMIDJI CITY COUNCIL Work Session Agenda Monday July 9, 2012

Transcription:

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION 7:00 P.M. TO 8:30 P.M. NOVEMBER 21 st, 2017 PENETANGUISHENE MEMORIAL COMMUNITY CENTRE BRIAN ORSER HALL (61 Maria Street) 1. Welcome/Introduction AGENDA 2. Main Street Reconstruction Scope 3. Preliminary Construction Schedule 4. Preliminary Traffic Control Protection Plan 5. Question & Answer Period

Main Street Beck Blvd. - Water St. Main St. Water St. Simcoe St.

Main Street: Beck Blvd. - Water St. BEFORE

Main Street: Beck Blvd. - Water St. tree & shrub planting at intersection bump-outs sidewalk & decorative splash strip AFTER

Water St. Robert St. Main Street Water St. - Robert St. Main St.

Main Street: Water St. - Robert St. BEFORE

Main Street: Water St. - Robert St. outdoor retail display zone awnings added (façade improvements) textured concrete walkway for uphill slip resistance tree & shrub planting at midblock rest area angled parking reduced to 38 deg. to improve visibility & increase boulevard space decorative paving to define parking AFTER

Robert St. Poyntz St. Main Street Robert St. - Poyntz St. Main St.

Main Street: Robert St. - Poyntz St. BEFORE

Main Street: Robert St. - Poyntz St. lighting & public amenity zone (seating, bike racks, trash recycling receptacles, etc.) sidewalk in-boulevard parking stone veneer seating wall & planter for ornamental seasonal plantings mountable curb AFTER

Main Street: Robert St. - Poyntz St. patio/ outdoor retail patios set on temporary levelling platforms secondary walkway seating wall provides patio frontage to hide levelling platform removable bollards to prevent parking AFTER

Poyntz St. Jeffery St. Edward St. Main Street Poyntz St. - Edward St. Main St.

Main Street: Poyntz St. - Edward St. BEFORE

Main Street: Poyntz St. - Edward St. street trees sidewalk & decorative splash strip AFTER

O.L. Dubeau Dr. Thompson Rd. Edward St. Main Street Edward St. - Thompson Rd. Main St.

Main Street: Edward St. - Thompson Rd. BEFORE

Main Street: Edward St. - Thompson Rd. decorative light standards added to existing hydro poles sidewalk & decorative splash strip street trees AFTER

Water St. Bump-out Amenity Areas Main St.

Main Street: Bump-out Amenity Areas

Main Street: Bump-out Amenity Areas

Water St. Robert St. Robert St. Crossroads Main St.

Main Street: Robert St. Crossroads bike parking shade trees low stone seating walls with mounted bench seating information kiosk tactile warning plates decorative planting concrete crosswalk trash/ recycling receptacle decorative paving in intersection

Main Street: Robert St. Crossroads

Water St. Robert St. Harbour Lookout Main St.

Main Street: Harbour Lookout decorative planting trash/ recycling receptacle bike parking low stone seating wall public art low stone seating walls with mounted bench seating

Main Street: Harbour Lookout public art visible from intersection sightline

Main Street: Harbour Lookout public art also visible travelling uphill

Main Street: Harbour Lookout

Water St. Robert St. Hillside Rest Area Main St.

Main Street: Hillside Rest Area

Main Street: Hillside Rest Area

TOWN OF PENETANGUISHENE MAIN STREET RECONSTRUCTION PRELIMINARY SCHEDULE 11/17/2017 Mobilization Description of Works MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER Block 1 - Beck Blvd to Brock St Dewatering Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 2 - Brock St to Simcoe St/Water St Dewatering Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 3 - Simcoe St/Water St to Robert St Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 4 - Robert St to Poyntz St Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 5 - Poyntz St to Edward St Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Block 6 - Edward St to Thompson Rd Temporary Water System - As Required Underground Servicing Roads including Curb and Asphalt Restoration including Sidewalk, Unistone, etc Final Clean Up and Demobilization

John Bravakis Enterprises Ltd. 551 Bryne Drive, Unit P Barrie, ON L4N 9Y3 October 12, 2017 TOWN OF PENETANGUISHENE MAIN STREET RECONSTRUCTION PRELIMINARY TRAFFIC CONTROL PROTECTION PLAN ROADWAY OPERATION SIGNAGE Example of Rolling Closure on below Figure 1. All traffic control signage to conform to Ontario Traffic Manual, Temporary Conditions, Book 7. Figure TL42 (Figure 2) to be used for closures and detours and TL20 (Figure 3) and/or TL33 (Figure 4) depending on width of roadway. All affected intersection(s) and/or work areas will have all appropriate signage to detour traffic as easily as possible. If existing traffic signals (Thompson Road, Edward St, Poyntz St, Robert St W) within work areas, traffic signals to be set to coordinate with construction work and traffic. PEDESTRIAN ACCESS / LOCAL BUSINESSES All existing sidewalks to remain in place for duration of works within immediate work area until placement of base asphalt. Temporary fence, example shown in Figure 5, will be erected between sidewalk and work area for pedestrian safety. Once base asphalt is placed, removal and replacement of sidewalks will commence. Advertisement Boards will be created and posted for all businesses within affected work area and/or intersections displaying sidewalk access open. These boards will be placed at all affected intersections. An example shown below (Figure 6) would be placed at the Main Street and Robert Street Closure. The Public Relations Officer (PRO) and/or the Flag Persons to also assist general public, employees, business owners and property owners with access through work areas. ROLLING CLOSURE EXAMPLE BROCK ST SIMCOE ST ROBERT ST E SIDEWALK SIDEWALK SIDEWALK SIDEWALK ROAD REINSTATEMENT WORKS MAIN ST SEWER, UNDERGROUND, ROAD TO BASE ASPHLAT WORKS NEXT STAGE PREPERATION SIDEWALK SIDEWALK SIDEWALK SIDEWALK TESSIER DR WATER ST ROBERT ST W POYNTZ ST FLOW OF WORK LEGEND TEMPORARY FENCE - PLACED BETWEEN WORK AREA & SIDEWALK SIDEWALK ROAD CLOSURE SINGLE LANE CLOSURE WITH FLAGGERS SEWER BYPASS SETUP N.T.S Figure 1 P a g e 1 3

John Bravakis Enterprises Ltd. 551 Bryne Drive, Unit P Barrie, ON L4N 9Y3 Figure 2 Figure 3 Figure 4 P a g e 2 3

John Bravakis Enterprises Ltd. 551 Bryne Drive, Unit P Barrie, ON L4N 9Y3 Figure 5 Temporary Fence Figure 6 Business Advertisement Board P a g e 3 3