Implications in Station Data Availability (DA) and Performance Over Time (POT)

Similar documents
WLAC Facilities Committee Meeting. September 18, 2017

Flowering Behaviour of Helichrysum obconicum DC.

SOUTHEND CARELINE ANNUAL REPORT

FIADE EXPLORING THE FIELF OF INTERACTION IN ARCHITECTURAL DESIGN EDUCATION

Food Control Plans or National Programmes Cold Hold Records 2019

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Solar Plant Performance Monitoring

4/8/2015 Item #10D Page 1

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Analogue to Digital Telecare. Technical Advisory Board. 21 st June 2017 Work Stream 3 Procurement

WLAC Facilities Committee Meeting. May 15, 2017

Biosolids Dewatering, Monitoring, and Disposal Programs

The NBN and New Developments Bill Dimopoulos Regional Manager, New Developments

Irrigating Olives. Janet Caprile UCCE Farm Advisor Alameda & Contra Costa Counties

Welcome to the. Open House

Kimberly Rollins, Professor, Department of Economics, University of Nevada, Reno

The RPII s radon road shows. Hugh Synnott Scientific Officer Radon Advice Section

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

A New Plan For The Calgary Region June calgary.ca call 3-1-1

Remodeling Market. Kermit Baker. Remodeling Futures Conference November 9, Harvard University JOINT CENTER FOR HOUSING STUDIES

PTC Creo 2.0 Hardware Support Hewlett Packard

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Major Programme 1: International Monitoring System

January 2019 Courses Hours Section # Fee Dates Times* February 2019 Courses Hours Section # Fee Dates Times*

2018 MEDIA INFORMATION

General Plans. Tom Dansie, AICP Steve Pastorik, AICP

The blank report forms are enclosed. If additional blank forms are needed you may contact my office at (210) and ask for Maria Castoreno.

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017

Identification of Aberrant Railroad Wayside WILD and THD Detectors: Using Industry-wide Railroad Data. June 10, 2014

edmonton.ca/ribbonofgreen #ribbonofgreen

Unvented Roof Summary Article

2018 MEDIA INFORMATION

BEST-IN-CLASS PERFORMANCE 2015 Q3 SAME-STORE

Saskatchewan Piping Industry Joint Training Board January to October 2015 Training Schedule (Revised)

Bench Top Production Hydroponic Production

National Grid Residential & C&I Active Demand Reduction Demonstration Projects. MA EEAC March 15, 2017

Index. Premises Information 2 About This Log Book 3 Service and Maintenance Requirements 4 8. Fire Risk Assessments 9

Laboratory Evaluation of Hybrid and Advanced Water Heaters: Performance Overview in Hot Humid Climate

Auburn University Basketball Arena:

Agenda Parks Committee CITY of ROELAND PARK Wednesday September 12th, 2018; 6:00pm-8:00pm Roeland Park City Hall

Improving Service Sustainability of Electric Pump Systems in Rural Timor-Leste

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

International Monitoring System

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Nov. 2, 2017

Transfer Station Recycling Update SWANA Technical Session-Waste Diversion 4 2/24/2017 2/28/2017

Fire Drill Requirements Group E Occupancies

Asparagus Response to Water and Nitrogen

January 2018 Courses Hours Section # Fee Dates Times* February 2018 Courses Hours Section# Fee Dates Times* March 2018 Courses Hours

SOLAR HOT WATER AND HEAT PUMP BOOSTER ENERGY CALCULATION METHODOLOGY

Heat Consumption Assessment of the Domestic Hot Water Systems in the Apartment Buildings

Make gelato and more delicious things right in front of your customers Let the show begin!

Orange Solar Pump HD50

System Using Exhaust Heat from Residential GHPs

Vetiver System for Xinchang Railway Embankment Stabilization The First Vetiver Application for Railway in China

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

McQuay. Aircon Air Cooled Condenser. AMB, APB AMD, APD Vintage A. Last Manufacture: 1978

Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08

ENERGY CONSUMPTION OF HOUSES AND LIFESTYLE IN COLD CLIMATIC AREA OF JAPAN

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

TRAINING SCHEDULE. Peachtree City, Georgia Course Schedules for 2018

Water Heater Innovations Marathon Water Heater Limited Warranty Policies & Procedures

List of events. September October November Meeting of Secretaries General and Directors. Location : Brussels. Location : Brussels

Your 2017 Annual Account Summary: One more way that Sears MasterCard provides you with the tools to make smart decisions about your spending.

Boulder County Comprehensive Drilling Plan Surface Owner Meeting. Thursday, Oct. 19, 2017

The IMS Infrasound Network: Status and State-Of-The-Art Design

INEEL (1500) [45] 5.6 C 217 mm 60. Precipitation (mm) Temperature (oc) Month

India's First B2B Sourcing Guide for the Electronics Industry. Media Information

Equipment ATA 12 April 2016

Engineers and Contractors - Innovative Technologies to Achieve Highest GeoExchange System Efficiencies for Commercial Projects

Customer Feedback Summary

URBAN DESIGN LONDON TRAINING PROGRAMME UDL are pleased to present our programme for April 2013 to March 2014.

MILK DEVELOPMENT COUNCIL

Heat Pumps and Public Swimming Pools, a Perfect Match

FUEL TYPE relating to UK deaths from unintentional carbon monoxide poisoning from to

Abstract. Cuvinte cheie: caisa, radacina, profil de sol Keywords: apricot, root, cavity. 1. Introduction

MSP WRAP-AROUND MULTIPLE SMALL PLATE DEHUMIDIFICATION TECHNOLOGY VS. CONVENTIONAL DEHUMIDIFICATION IN DEDICATED OUTDOOR AIR SYSTEMS (DOAS)

How increased prices in bananas show people will move store for produce January Kantar Worldpanel

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

Microirrigation of Young Blueberries in Florida 1

TOWN OF NEW CASTLE - Master Plan Update

MEASURED PERFORMANCE DATA FOR

Home Improvement. Sarasota/Bradenton/Venice Market

/Mar/2014 Rev A

Paul Vossen University of California Cooperative Extension Farm Advisor. Dealing with Drought

Agenda Parks Committee CITY of ROELAND PARK Wednesday, February 13th, 2019; 6:00pm-8:00pm Roeland Park City Hall

Refrigeration and Boil Off Compression Systems for NGL Export Facilities

Efficient Irrigation, Smart Controllers and Climate Appropriate Shade Trees. Clovis Community College Center Clovis, CA

BEACH AND INLET PROJECTS UPDATE

Practical and Effective Approaches to Residential Ventilation for Production Builders

Consumer price index (CPI) December 2013

announcements 4/10/08

QUALITY. Task Force. Shifting from Corn Drying to Corn Storage. Dirk E. Maier, Agricultural Engineering. Average Temperature F

Special Topics on Residential HVAC

Monthly Report for July 2015

2 Safety valve. 3 Pressure gauge. 4 Thermometer. 8 Ball valves

Heritage Park Irrigation System Inspection Review of Water Use Estimated Water Budget Potential for Savings

Village of Glenview Appearance Commission

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Resolution Plan for GI-AP1000-IH-01 Internal Fire Safety Case Substantiation.

Hot Water a Hot Commodity Better Buildings by Design, February 2012 Burlington, VT

Irrigation management in a drought year. What drought means to the tree, and how best to deal with it

Transcription:

IS42-Graciosa 2011-2015 O&M and interaction with the PTS: Nicolau Wallenstein 1 & Flávio Soares 1,2 1 Centro de Vulcanologia e Avaliação de Riscos Geológicos, Universidade dos Açores (nicolau.mb.wallenstein@azores.gov.pt) 2 Fundação Gaspar Frutuoso (flavio.s.soares@azores.gov.pt)

Wallenstein, N. & Soares, F. - IS42-Graciosa 2011-2015 O&M and interaction with the PTS: IMS Network http://www.ctbto.org/map/

The Azores islands 9 Volcanic islands ~2,300 km 2 of land ~1,400 km to Lisbon ~243,000 inhabitants ~618 km PDL-TER ~30-40 min. TER-GRA ~15 m Transit: 40 min. to 6 h TER-GRA 1 flight/day 2 (2x/week)

~61 km 2 4,393 inhabitants (2011) Winter - 13 C Summer 24 C Mild, Wet weather Occasional hurricanes

Contracts Contract NO. 2007-1270 Liaison, Support Services and Initial Testing for IS42, Graciosa, Azores, Portugal 28 November of 2007 Jan 2008 - Bidders conference Need to redesign the energy and intrasite communications infrastructures project

IS42 (I42PT) location

IS42 (I42PT) Geometry

I42H1 to I42H8 Layouts 28 30 12 14 26 10 9 11 13 27 29 15 16 32 25 39 5 8 4 1 3 2 6 7 31 33 40 24 23 21 37 35 19 17 18 34 22 20 38 36

Energy 7x independent Grid energy points 25-KVA power transformer 25-KVA CRF Generator

IS42 (I42PT) intrasite Optical fibre trace

Optical Fiber intrasite communications Communications Cable trace: 76 Poles 26 visit boxes

CRF (August 2010)

Array Elements (August 2010)

Official inauguration by the Regional Government of the Azores (June 2011)

Official visit of the President of Portugal (September 2011)

Contracts Amendment of Liaison Contract NO 2007-1270 for IS42 to Cover Additional Costs 17 December of 2010 Amendment NO. 2 to Contract NO. 2007-1207 7 December of 2011 Provisional Post-Certification Activities, already with a O&M plan on the 2011 PTS template Contract NO. 2012-1694 Post-Certification Activities 03 December of 2012 Amendment NO. 1 to Contract NO. 2012-1694 May 2015 Budget revision (lowering costs) with a One-Time Costs annexe.

CRF ( Sep 2015)

Array Elements (2015)

September 2010 November 2010 January 2011 March 2011 May 2011 July 2011 September 2011 November 2011 January 2012 March 2012 May 2012 July 2012 September 2012 November 2012 January 2013 March 2013 May 2013 July 2013 September 2013 November 2013 January 2014 March 2014 May 2014 July 2014 September 2014 November 2014 January 2015 March 2015 May 2015 July 2015 September 2015 PRs/Month Interaction with PTS 79 PR (12 open) 55 MR 32 OR 1 CCR 27 CCN 8 825 e-mail messages (support tickets included) Undetermined number of phone calls Several meetings at the IDC 7 6 5 4 3 2 PRs Open PRs 1 0 Month Year

Interaction with PTS Communication with PTS is being very frequent, using IRS reporting, Support tickets, e-mails and phone calls; PTS officers have been always very supportive and the personal contact (mainly during the station installation and the training in Vienna), allowed us to establish very cordial relations that facilitate to overcome many difficulties felt by the SO in dealing with processual issues; PTS responsiveness has been variable along the time but, according with our own experience, it looked that the communication levels decreased during the last year; The processes associated with equipment replacement and USM, both by direct PTS supply or by P.O., tend to be slower than the desirable to keep always a good DA and to not extend non-mission capability situations.

Operation: Remote access to the station to daily O&M Dec. 2010 - Initially we performed SoH with Waveform, NaqsView & ConfigUi Very slow connection with a PC using a token; No access to IDC data

Operation: Remote access to the station to daily O&M Nov 2012 - Use of Web SoH A great improvement for online monitoring of the station SoH; No access to IDC data

Remote access to the station to daily O&M Feb 2012 - Installation of a workstation for remote operation VPN access only operational in Nov 2013 and started receiving IDC data in Jan. 2014. Data not received between: - Sep and Oct 2014 and not backfilled - April 2015 to present

Remote access to the station to daily O&M Actually we are using basically waveform, Web SoH Data integrity and data coherency is being surveyed with Geotools Deeper analysis is being tentatively performed with WinPMCC.

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 Main events that affected DA and POT of the station 100% IS42 D.A. (%) 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% DA Month/Year Mission Capability

Main events that affected DA and POT of the station Feb 2012 - Installation of SSI on the same Workstations that were running Naqserver H8 & H2 elements with very frequent data cuts and backfill data, lowering significantly the POT Solved in Sep 2014 with the replacement of the new workstations.

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 Main events that affected DA and POT of the station 100% IS42 D.A. (%) 90% 80% 70% 60% 50% Aug 2012 - Error in the SSI configuration filling up the harddisk. 40% 30% 20% 10% 0% DA Month/Year Mission Capability

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 Main events that affected DA and POT of the station 100% IS42 D.A. (%) 90% 80% 70% 60% 50% Aug 2013 - Error in the SSI configuration 40% 30% 20% Aug 2013 - Problems with the OF converters power supply 10% 0% DA Month/Year Mission Capability

Main events that affected DA and POT of the station February 2012 to July 2013- recurrent problems with the H6 digitizer not sending data Digitizer had to be reset in 7 occasions, being more recurrent after May 2013.

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 Main events that affected DA and POT of the station 100% IS42 D.A. (%) 90% 80% 70% 60% 50% 40% 30% Mar. 2014 Bad SSI configuration in Ws2 20% 10% 0% DA Month/Year Mission Capability

Main events that affected DA and POT of the station March 2014 to present H1 and H6 Serious SNR problems

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 Main events that affected DA and POT of the station 100% IS42 D.A. (%) 90% 80% 70% 60% 50% 40% 30% Aug 2014 Problems with the OF converters power supply 20% 10% 0% DA Month/Year Mission Capability

Main events that affected DA and POT of the station November 2014- H5 not sending data Faulty Grid energy box. Repaired in July 2015

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 DA: always meaningful measurement o POT? 100% IS42 D.A. (%) 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% DA Month/Year Mission Capability

Jan/11 Mar/11 May/11 Jul/11 Sep/11 Nov/11 Jan/12 Mar/12 May/12 Jul/12 Sep/12 Nov/12 Jan/13 Mar/13 May/13 Jul/13 Sep/13 Nov/13 Jan/14 Mar/14 May/14 Jul/14 Sep/14 Nov/14 Jan/15 Mar/15 May/15 Jul/15 DA: always meaningful measurement of POT? 100% IS42 D.A. (%) 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% DA Month/Year Mission Capability

Conclusions With the support of the Azores Regional Government, the Graciosa Municipality and the CVARG, the PTS designed, built and installed the station IS42 with robust durable CRF, accesses, energy and intrasite communications infrastructures; IS42 started to operate on August 2010, being certified on December of the same year; Not free from occasional problems, the station operation presented an average of almost 100% of DA in the aprox. first 2.5 years of operation since certification; Migration to SSI in obsolete workstations and later problems in other equipment (power supply units, digitizers and MBs) decrease the DA and POT significantly in the last two years, with some periods of non mission capability status; Improvement in the interaction with the PTS, leading to quicker processes of troubleshooting, equipment replacement and USM are desirable to avoid long non mission capability periods; We look forward to have access to SSI and data analysis training.

Thank you for your attention