ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

Similar documents
MISSION STREETSCAPE PLAN. Neighborhood Commercial Streets handle continuous activity. Neighborhood Commercial STREET ROW: Main Design Treatments

DAY TO NIGHT. Extend the hours of activity along Water Street

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Transportation. Strategies for Action

Lambeth Main Street Streetscape Improvements

appendix and street interface guidelines

The Project. In 2013, construction was completed between 100 Street and 102 Street.

To ensure human scale design, the towers step back from the facade of the building after four stories.

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

38 Queen s University Campus Master Plan Part 1

WELCOME and introduction

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Town Center (part of the Comprehensive Plan)

The Master Plan Framework

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Hamilton Road Corridor Streetscape Master Plan. Open House October 4 th, 2017

CHAPTER 5: GUIDING PRINCIPLES

Roanoke Rapids Streetscape Master Plan. City Council Presentation

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

Lehigh Acres Land Development Regulations Community Planning Project

Community Design Guidelines. Port Wallace DRAFT

Carlsbad Village Redevelopment Concept Summary of Features

COMPLETE GREEN STREET CHECKLIST

Queensborough Eastern Neighbourhood Node. Community Open House

PUBLIC REALM DESIGN PLAN APRIL, 2012

Chapter 2, Section C: Urban Design and Visual Resources A. INTRODUCTION

THEMES, VISION, + PRINCIPLES

5.2 LAND USE AND ZONING

DRAFT MAJOR CORRIDORS 48 EAST BENCH MASTER PLAN

SOUTH UNIVERSITY Street Design Alternatives in Progress

This Review Is Divided Into Two Phases:

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Section4 Design Vision & Implementation Plan

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

The University District envisions, in its neighborhood

DRAFT. October Wheaton. Design Guidelines

A. INTRODUCTION B. NO ACTION ALTERNATIVE

Streets Vision

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Corridors. Re-vitalize our Corridors and Gateways

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

Pedestrian and Bike Bridge LOGO

Can urban design help address today s health epidemics?

Toronto Complete Streets Guidelines

1 Adapted from the Statewide Transit-Oriented Development Study by CalTrans, 2006

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

PLAN ELEMENTS WORKSHOP. April 5, 2016

DRAFT. 10% Common Open Space

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

Figure 3-1: Public Realm Plan

VEHICULAR AND PEDESTRIAN CIRCULATION

4- PA - LD - LIVELY DOWNTOWN. LD - Background

Chinatown. Green Street Demonstration Project. land + water. community

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

VISION AND GUIDING DESIGN PRINCIPLES

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

5.15 AESTHETIC RESOURCES

BUSINESS DISTRICT DESIGN GUIDELINES

Ann Arbor Downtown Street Design Manual. Ann Arbor DDA IDA 2015 Awards Planning Category

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

WEST LOOP DESIGN GUIDELINES CHECKLIST

Zoning Code Issues Prioritization

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

City of Hermosa Beach Administrative Policy #

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

Rapid Transit Implementation Working Group Transit Oriented Development and Transit Villages January 12, 2017

Sahuarita District & Phase 1 Master Plan. Town Council December 11, 2017

2.0 THE PLATINUM TRIANGLE VISION

Clairtrell Area Context Plan

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Dogpatch/22nd Street Greening

The Vision. Photo provided by The Minervini Group. 46 Vision, Objectives & Strategies

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

History: a Grand Urban Boulevard

Community Design Plan

Civic Center District

Public input has been an important part of the plan development process.

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

A Vision Statement. In Progress

THE NEIGHBORHOOD TODAY

The Baileys Planning District portion of the Comprehensive Plan contains site design recommendations for both the Baileys Crossroads Community

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

RESEDA - WEST VAN NUYS COMMUNITY PLAN

Preliminary Recommendations Tk Takoma/Langley Crossroads Sector Plan

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

4.9 Mendocino Avenue Corridor Plan Design Guidelines

Complete Neighbourhood Guidelines Review Tool

urban design Introduction

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

P A I N E S V I L L E D O W N T O W N P L A N

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

Anatomy of A Vibrant Downtown. Anatomy of a Vibrant Downtown

A Healthy Future Walkability Through Community Design. Fit Families North Carolina October 18, 2004

Town Center. Block 5 Existing multifamily residential units are expected to remain.

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Transcription:

ANCHOR TO ANCHOR Rescale the street to create an iconic boulevard. UR NE ER UV GO NE LA

OBJECTIVES 1. Maintain appropriate traffic flow and prioritize commercial curb access 2. Mark gateways at the street s northern and southern limits 3. Create a pedestrian-oriented environment and facilitate north-south movement 4. Reinforce connections from adjacent transportation modes En route from the Battery to the Seaport, Water Street fulfills two critical functions: a vital commercial corridor and a link between two key Lower Manhattan nodes. Instead of an impressive boulevard, however, the street evokes a traditional windswept mid-century downtown. The street is too wide and its sterile, corporate atmosphere is generally unwelcoming to pedestrians. These challenges can be addressed by rescaling the street to create a more pedestrian-oriented boulevard that maintains appropriate traffic flow and curb access. The street reconfiguration can also build a stronger link between the anchors at each end of Water Street. Clockwise from top left: Water Street looking north from Broad Street; South Street Seaport at Fulton Street; Staten Island Ferry Terminal at Whitehall Street; Water Street looking south from Fulton Street Alliance for Downtown New York 13

STREET CONFIGURATION AND PLANTED MEDIAN The key recommendation for transforming Water Street is to reallocate the roadway by narrowing the street from four standard lanes to two wide moving lanes. This presents the opportunity to add a planted median with turn-bays through the length of the street. A median would reduce traffic speeds and provide pedestrian refuge while accommodating necessary curb access, the planned Select Bus Service and shared bike route. Landscaping in the median could create a more attractive and inviting street designed to address the experience of pedestrians. The median would give Water Street an organizing design element that becomes the basis for a new street identity. The traffic volume on Water Street simply does not require the four moving lanes that exist today. With the exception of the block between John and Fulton, two lanes of free-flowing traffic can handle the current volume. Analysis of rush hour trends on Water Street shows that peak traffic volumes range from 154 to 944 vehicles per hour per direction, as shown on the right. However, the potential traffic capacity for Water Street in its current configuration is about 1,570 vehicles per hour per direction, far in excess of existing vehicle volumes. This suggests that all four travel lanes are not required. Vehicle volumes are well below Water Street s capacity, indicating that four lanes are not necessary to maintain current traffic flow. Source of data: New York City Department of Transportation, 2004 With consideration to these factors, the recommended design includes one 14-foot-wide lane of traffic in each direction plus left-hand turning bays at all critical intersections. Replacing the additional moving lanes with turning lanes creates an opportunity to install a 10-foot-wide The traffic volume on Water Street simply does not require the four moving lanes that exist today. 14 Water Street Vision Plan

planted median in the captured spaces between turning zones. Curbside lanes are reserved for buses, loading and unloading, black cars and taxis. The extra-wide travel lane provides enough space to accommodate the constant starting and stopping of commercial uses and to paint sharrows adjacent to the curbside lane to guide cyclists. This type of demarcation creates space for bikers and raises awareness among drivers of 60 42 potential bike activity. 15 8 10 12 10 12 8 15 15 6 8 14 10 14 8 15 The reallocation of the roadway can establish a new identity for Water Street, heightening pedestrian safety and providing new green space while maintaining traffic mobility. STREET CONFIGURATION GOALS 1. Maintain traffic flow 2. Prioritize curb access for vehicle loading and unloading 3. Install traffic calming measures 4. Reallocate public space 5. Reinforce new street identity Existing street configuration Proposed street configuration Alliance for Downtown New York 15

Proposed streetscape design for Water Street and Old Slip The reallocation of public space can establish a new identity for Water Street. Existing conditions at Water Street and Old Slip In re-imagining Water Street, the Design Workshop participants were inspired by images of Park Avenue, as shown above 16 Water Street Vision Plan

zones could yield many environmental benefits. In addition to sustaining healthy trees, the increased permeable surface area and subsurface soil volume will reduce stormwater runoff. Kiosk Bus Shelter Benches Cafe Seating The west side of the street provides opportune conditions for an animated sidewalk extension owing to its ample sunlight and smaller storefronts, more conducive to attracting ground-floor retail and cafés. Combined with the median and corner neckdowns, the sidewalk extension reduces the crossing distance from 59 feet to as little as 42 feet. With such amenities Water Street can become narrower, greener, and more engaging to pedestrians. AMENITY STRIP AMENITY STRIP GOALS The 10-foot amenity strip on the west side of the street allow spaces for seating, kiosks, bus shelters and planting. A single row of trees line the east side of the street. Top to bottom: Prototypical sidewalk plans; Plan of Water Street at Pine Street. To complement the median and take full advantage of the new space generated by the lane reduction, a six-foot sidewalk extension should be added on the west side of Water Street. Including four feet from the existing side walk, this extension allows a 10-foot amenity strip for café seating, benches, and bike racks. And it offers an opportunity to address the enduring scarcity and poor condition of trees on Water Street by creating generous soil zones for improved root growth in locations unimpeded by infrastructure. A 10-foot soil zone provides space for dense clusters of trees and sidewalk plantings at available locations; the east side would have a continuous five-foot soil zone, wherever possible, for a single row of trees. The design of these soil 1. Additional sidewalk space 2. Ten-foot soil zone for stormwater management and clusters of healthy trees 3. Narrower street width to prioritize pedestrians 4. Pedestrian space with ample sun exposure Alliance for Downtown New York 17

Proposed amenity strip between John Street and Fletcher Street Water Street can become narrower, greener, and more engaging to pedestrians. Existing conditions at John and Fletcher Streets Inspiration from the Via Veneto, Italy 18 Water Street Vision Plan

Pearl Street Playground and Titanic Park designs provided by New York City Department of Parks and Recreation 199 Water St 200 Water St Gateway Art Art in POPS The drastic scale of buildings on the south side of Fulton Street serves as a dramatic portal onto Water Street; engaging public art will further signify the start of the commercial boulevard and draw visitors down the street GATEWAYS: FULTON STREET Water Street is a direct and obvious route from the Staten Island Ferry and Battery Park to the Seaport and Front Street, yet few people make this connection. Reinforcing gateways at these distinctly Lower Manhattan destinations can drive foot traffic along a renewed Water Street. This can also lessen the perceived distance between these two centers of activity, encouraging more movement between them. Redefining Water Street to engage these gateways will strengthen pedestrian connectivity and help define an important corridor in Lower Manhattan. Fulton Street, with the South Street Seaport at its terminus, serves as the northern gateway of Water Street. Over 20,000 people cross this intersection daily while commuting to work, visiting the Seaport, or returning home to nearby residential buildings. The intersection is marked by a sharp break in architectural character. On the south side, 199 Water Street and 200 Water Street, built in 1984 and 1973 respectively, are both over 30 stories of sheer vertical glass and masonry, in stark contrast to the early 19th century federalist buildings that characterize the Seaport area. Public art precedents, from left to right: Tony Cragg, Taipei, Taiwan; Roxy Paine, Madison Square Park, NY Lighting schemes can play up this transition and more effectively announce it as the beginning of a distinctive commercial corridor. The start of the planted median and public art at this intersection, both in the median and in the adjacent POPS, will engage passersby and draw them further along the street. Moreover, the current reconstruction of the Pearl Street Playground and Titanic Park on the north side of Fulton Street will improve the link between the Seaport and Lower Manhattan. Alliance for Downtown New York 19

GATEWAYS: WHITEHALL STREET Broad St The southern gateway presents an opportunity to announce a transition to Water Street and complement Peter Minuit Plaza in front of the Staten Island Ferry Terminal. At its southern end, Water Street terminates at Whitehall Street. Over 3,000 people cross this intersection during morning rush hour, traveling to and from the Staten Island Ferry and nearby subway stations. Tourists and visitors also use this intersection going to and from Battery Park. This pattern will grow with the opening of the new carousel, playground and improvements to Peter Minuit Plaza that include a visitor kiosk and food service concession. Whitehall St Water St Between Whitehall and Moore Streets there is a separated right-hand turn lane, a remnant of Water Street s pre-1960 alignment. This roadway and its adjacent island can be added as pedestrian space to the adjacent sidewalk to create a new public space. With good solar exposure and partly sheltered from winter winds, the new public space will encourage activity and events across the seasons and be an identifying feature for Water Street. Unnecessary street pavement (red outline) at Whitehall Street can be transformed into an engaging pedestrian place. Placemaking precedents from left to right: Meatpacking District, Pedestrian Plaza; P.S. 1, Architectural Installation; World Financial Center, Information Kiosk 20 Water Street Vision Plan

Proposed design for Whitehall and Water Street gateway intersection WHITEHALL SOUTHERN GATEWAY GOALS 1. Provide significant public plaza at Whitehall Street 2. Install large-scale art in median 3. Plant street trees on sidewalks and low plantings in median Existing conditions at Whitehall and Water Street Inspiration from the 23rd Street pedestrian plaza Alliance for Downtown New York 21