Drexel, Barrell & Co.

Similar documents
Drexel, Barrell & Co.

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Green Gables. April 24, 2013

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

CONSENT CALENDAR CITY PLANNING COMMISSION AGENDA ITEM NO: A.1, A.2 STAFF: LARRY LARSEN

11605 JUDGE ORR ROAD PUD (PLANNED UNIT DEVELOPMENT) PLAN LETTER OF INTENT:

The TimberRidge. Letter of Intent. April 2017

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

CHECKLIST FOR PHASE II DRAINAGE REPORT

When planning stormwater management facilities, the following principles shall be applied where possible.

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

Overall Drainage Report

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

Asbury Chapel Subdivision Sketch Plan

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

SHEFFIELD PARK Paulding County, GA DRI #588

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

City of Fort Lupton Administrative Site Plan Process

Ten Mile Creek Planning Area

THE CITY OF MOBILE, ALABAMA

ARTICLE 6: Special and Planned Development Districts

Major Subdivision Sketch Plan Checklist

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

SUBDIVISION PLANNED UNIT DEVELOPMENT & REZONING STAFF REPORT Date: May 5, 2016


PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

PLANNING COMMISSION. Submitted

City Development Department 9500 Civic Center Drive Thornton, Colorado FAX

9 th Street Sub Area Plan

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

SEMSWA s Role in the Land Development Process

CITY PLANNING COMMISSION AGENDA ITEMS: 11, 12, 13 STAFF: RYAN TEFERTILLER

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

City of Fort Lupton Site Plan Process

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. October 22, 2010

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

COMMUNITY DEVELOPMENT SERVICES PLANNING AND BUILDING DEPARTMENT PLACERVILLE OFFICE:

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651) Fax: (651)

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

The Development Review Process. Presentation to the GSSC IAC

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

OP Council Resolution June 16, Planning and Development Services

SECTION 4(f) DE MINIMIS DOCUMENTATION

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

KEIZER STATION PLAN INTRODUCTION

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

Re: Thorncreek Commons Commercial Response to Pre-Application Meeting held September 24, 2014 Comments

Planning Commission Staff Report June 5, 2008

USA Addition of South & East Side Residential Parcels. USA Deletion of a Town of Christiana Parcel. Conversion from USA to Limited Service Area

SUBMITTAL REQUIREMENTS

Wake County Parcel Identification Number (PIN) (10-digit) Total Area 0.48

Tucson Koi & Water Gardens

Staff Report and Recommendation

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

CITY COUNCIL STUDY SESSION MEMORANDUM

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

TENTATIVE MAP CHECKLIST


TOP TEN LIST OF COMMUNITY CONCERNS REGARDING PROPOSED AMENDMENTS TO CHAPTER 42

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

PDR /21/15 Noah Beals 1/7/15 xx

PLANNING AND DEVELOPMENT DEPARTMENT SITE PLAN REVIEW SECTION / CURRENT PLANNING APPLICATION FOR PRELIMINARY SITE DEVELOPMENT PLAN APPROVAL

include playgrounds, sports fields, community gardens and picnic areas.

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

CHAPTER 22 Rural Open Space Community Developments

4 LAND USE DESIGNATIONS

Planning & Zoning Commission Planning & Development Department February 17, 2014

ARTICLE 17 SITE PLAN REVIEW

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

City of Waco Stormwater Management Regulations

PLANNED UNIT DEVELOPMENT PUD For The Proposed Antietam Subdivision Escambia County, Florida. Introduction

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

COLVER ROAD INDUSTRIAL CONCEPT PLAN

CITY OF ZEELAND PLANNING COMMISSION

SYRINGA VALLEY SPECIFIC PLAN NARRATIVE

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

HOLLY WILLIAMS MARK WALLER (CHAIR) STAN VANDERWERF LONGINOS GONZALES (VICE-CHAIR)

RRW Stonebrook, LLC Tentative Map Findings

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Application for Site Plan Review

4. UTILITIES ELEMENT.

SECTION 6 - LAND USE - RURAL RESIDENTIAL

North Metro Natural Gas Pipeline Project Routing Study. Exhibit I: Comment and Response Document

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

CONCEPTUAL DEVELOPMENT PLAN REVIEW - CITY OF MARYLAND HEIGHTS

Transcription:

Drexel, Barrell & Co. December 21, 2018 Engineers/Surveyors Boulder Colorado Springs Greeley 3 South 7 th Street Colorado Springs, Colorado 80905-1501 719 260-0887 719 260-8352 Fax El Paso County Planning and Community Development 2880 International Circle Colorado Springs, CO 80910 719-520-6300 Attn: Kari Parsons, Project Manager/Planner II RE: Ms. Parsons, Letter of Intent and Justification Statement for: Falcon Marketplace Final Plat Please accept this letter of intent and the enclosed supplemental materials as Drexel, Barrell & Co s. application and request for approval of the Final Plat for Falcon Marketplace. Location / Zoning / Land Use The 35.7 acre site is located at the northwest corner of the intersection of E. Woodmen Road and Meridian Road, in Falcon, CO. The property is currently addressed as 11680 E. Woodmen Road, and zoned as Commercial Regional (CR). A Preliminary Plan for Falcon Marketplace was approved by El Paso County Board of County Commissioners on October 9 th, 2018. The site development is proposed to consist of eleven total commercial lots and two tracts. The lot count is comprised of one large commercial anchor lot and multiple smaller outlying lots and associated parking, drive aisles and landscaping. The northernmost and largest tract is proposed for public drainage and utility use and will include a sub-regional public detention pond that will be constructed by the developer. In accordance with El Paso County Drainage Board procedures and upon County acceptance, reimbursement for construction of the pond is anticipated from the drainage fee program. A smaller tract along the southern project boundary adjacent to E. Woodmen Road is proposed for private drainage facilities and public utility infrastructure. Public right-of-way is being created for Falcon Market Place and Eastonville Road and associated round-a-bouts and improvements. Additional public right-of-way is being dedicated along Meridian Road to accommodate future expansion to a six lane roadway. The Final Plat encompasses the entire site that is to be constructed in one phase from an infrastructure standpoint, providing for multiple commercial pad sites to be accessed from a public roadway with public utilities. Surrounding zoning includes CR to the south and southeast across Woodmen Road with a variety of existing commercial development. To the east across Page 1 of 7

Meridian Road and to the west of the site is PUD zoning of higher density singlefamily residential A minimum 15 foot buffer will be provided on the west side of the site plus an existing 30 foot buffer that exists on the property to the west. A 6 opaque wall will also be provided on the west property line of the site adjacent to the commercial pad sites. To the north of the site is RR-5 zoning with 5 acre lots that will likely be redeveloped into higher density residential or commercial use in the future. The sub-regional detention pond and road right-of-way will serve as a significant buffer between the developments. These roadway and landscape buffer zones will ensure mitigation from adjacent land uses and provide continuity in design. Utility Service Providers Water and Wastewater service will be provided by the Woodmen Hills Metropolitan District. Electric service will be provided by Mountain View Electric Association and Colorado Springs Utilities will provide natural gas service. Sewer and water service lines will be maintained by each individual lot owner. The communications provider will be as contracted by the developer, likely to include Century Link and Comcast. Existing Utilities A 12" sanitary sewer main runs along the west side of Meridian Road in an easement parallel to the ROW. A 10" sanitary sewer main, 10" water main, 6" raw water main, and high-pressure petroleum line are located along the south property boundary adjacent to E. Woodmen Road. Existing electric facilities are located along the south, east and north boundaries of the site. Communications connections will be made through existing facilities adjacent to the site. Proposed Utilities/Relocations Several utilities will be relocated with the proposed development to include: Most of the raw water line and domestic water line on the south end of the site; they will be re-routed into the site and along a portion of Falcon Market Place. The electric facilities along Woodmen and Meridian Roads are also proposed to be relocated into the site and along Falcon Market Place. There are no plans to relocate the petroleum pipeline along the southern and eastern end of the site. Access / Roadways A proposed public road (Falcon Market Place) will provide access continuity through the site from the frontage road on the north side of Woodmen Road in the southwest corner of the site to Meridian Road at Eastonville Road in the northeast corner of the site. The Meridian Road/Eastonville Road intersection is proposed to be signalized as part of the initial phase of this development. A right-in/right-out is also proposed on the west side of Meridian Road midway between Woodmen Road and Eastonville Road. Additional right-of-way is being granted along Meridian Road to accommodate future expansion to a six lane roadway. Page 2 of 7

Drainage The site currently lies within the Falcon Watershed, a portion of the Black Squirrel Creek Drainage Basin. Two tributaries join on the site and flow to pair of culvert systems under Woodmen Road on the south end of the site. The north end of the site is to include a sub-regional detention pond (SR4) per the Falcon Drainage Basin Planning Study (DBPS). The pond is proposed to be constructed by the developer and turned over to El Paso County for maintenance upon acceptance. Two further private water quality ponds will be constructed at the south end of the site and maintained by the proposed Business Association for the site. A Conditional Letter of Map Revision (CLOMR) has been prepared and submitted to FEMA (Case No. 17-08-0074R) for modification of the 100 year floodplain on the site. A Letter of Map Revision (LOMR) will be prepared upon completion of the site improvements. Drainage improvements will be constructed in accordance with the approved CLOMR, Final Drainage Report and Construction Documents as applicable, including full-spectrum detention and water quality for the site. Drainage fees and credits will be determined as applicable for the proposed improvements at the time of Final Plat recording. Schools The project is located within Falcon School District No. 49. No land dedication or fees are required as the site is proposed to be developed as a commercial land use. The proposed public through road will be utilized by school buses and D49 staff going to and leaving the D49 administration facility and bus yard located on the Woodmen Road Frontage Road to the west of the Falcon Marketplace site Parks / Open Space No land dedication or fees are required. All on-site landscape and irrigation will be provided in accordance with County land use requirements. An overall master landscape plan for this development provides for consistent and coordinated landscaping and irrigation across all lots. Waiver and Deviation Requests It is proposed that the County vacate the excess right-of-way at the east end of the Woodmen frontage road at the southwest corner of the site as it would not be needed once the public roadway connection from the frontage road to Eastonville Road is constructed. Page 3 of 7

Approval Criteria This Final Plat is in general conformance with the Criteria for approval established in Section 7.2.1.D.3.F of the El Paso County Land Development Code as follows: The proposed subdivision is in general conformance with the goals, objectives, and policies of the Master Plan. The site is located within an area of the Falcon/Peyton Small Area Master Plan recommended for urban density and in a node of activity/density for providing centralized community services and amenities which this proposed commercial development will provide. The subdivision is in substantial conformance with the approved preliminary plan. The final plat is in substantial conformance with the approved preliminary plan. The subdivision is consistent with the purposes of this Code. The proposed subdivision is consistent with the El Paso County Land Development Code and the existing Commercial Regional (CR) zoning of the property. The subdivision is in conformance with the subdivision design standards and any approved sketch plan. The subdivision is in conformance with the El Paso County design standards (with the exception of a few requested roadway deviations). There is no approved sketch plan for this site. A sufficient water supply has been acquired in terms of quantity, quality, and dependability for the type of subdivision proposed, as determined in accordance with the standards set forth in the water supply standards [C.R.S. 30-28- 133(6)(a)] and the requirements of Chapter 8 of this Code. A sufficient water supply has been acquired from the Woodmen Hills Metropolitan District, of which the proposed development is a part. The State Engineer s Office and the County Attorney are in concurrence. A public sewage disposal system has been established and, if other methods of sewage disposal are proposed, the system complies with state and local laws and regulations, [C.R.S. 30-28-133(6) (b)] and the requirements of Chapter 8 of this Code. The site will utilize the Woodmen Hills Metropolitan District sewage disposal system. The proposed development is already in the District and sewage pipeline facilities are already in or adjacent to the site. All areas of the proposed subdivision, which may involve soil or topographical conditions presenting hazards or requiring special precautions, have been identified and the proposed subdivision is compatible with such conditions. [C.R.S. 30-28-133(6)(c)]. The site is subject to potentially seasonally high groundwater and existing floodplain. Mitigation measures will be taken for the potentially seasonally high groundwater and the floodplain is being formally modified with FEMA to remove that potential site hazard. Adequate drainage improvements complying with State law [C.R.S. 30-28- 133(3)(c)(VIII)] and the requirements of this Code and the ECM are provided by the design. The site is providing adequate drainage improvements to include a large sub-regional detention facility (Pond SR4 as identified in the Falcon Page 4 of 7

Drainage Basin Planning Study), an on-site water quality pond and other associated storm water pipe and open channel systems. Legal and physical access is or will be provided to all parcels by public rights-ofway or recorded easement, acceptable to the County in compliance with this Code and the ECM. The site is providing a public collector roadway through the site to connect Eastonville Road to the Woodmen Frontage Road as well as providing a right-of-way stub to the north for future public connectivity as requested by the County. The proposed subdivision has established an adequate level of compatibility by (1) incorporating natural physical features into the design and providing sufficient open spaces considering the type and intensity of the subdivision; The site will provide open spaces in the form of major drainage facilities to include an approximate 7 acre sub-regional detention pond on the north end of the site and an open drainage channel and water quality pond on the south end of the site. A landscape buffer will be provided along the east end of the site and landscape setbacks will be provided along Woodmen and Meridian Roads. (2) incorporating site planning techniques to foster the implementation of the County s plans, and encourage a land use pattern to support a balanced transportation system, including auto, bike and pedestrian traffic, public or mass transit if appropriate, and the cost effective delivery of other services consistent with adopted plans, policies and regulations of the County; The site is planned for major retail/commercial hub store with multiple outlying pad sites for commercial and retail use. This is in conformance with the Falcon/Peyton Small Area Master Plan as it recommends this area for urban density and in a node of activity/density for providing centralized community services and amenities which this proposed commercial development will provide. (3) incorporating physical design features in the subdivision to provide a transition between the subdivision and adjacent land uses; The site will provide open spaces in the form of major drainage facilities to include an approximate 7 acre sub-regional detention pond on the north end of the site and an open drainage channel and water quality pond on the south end of the site. A landscape buffer will be provided along the east end of the site and landscape setbacks will be provided along Woodmen and Meridian Roads. (4) incorporating identified environmentally sensitive areas, including but not limited to, wetlands and wildlife corridors, into the design; The site contains no environmentally sensitive areas, but the development will be adding major drainage facilities to include an approximate 7 acre sub-regional detention pond on the north end of the site and an open drainage channel and water quality pond on the south end of the site that will foster wildlife; and (5) incorporating public facilities or infrastructure, or provisions therefore, reasonably related to the proposed subdivision so the proposed subdivision will not negatively impact the levels of service of County services and facilities. The site is providing a public collector roadway through the site to connect Eastonville Road to the Woodmen Frontage Road as well as providing a right-of-way stub to Page 5 of 7

the north for future public connectivity as requested by the County. The development will also widen Meridian Road along the site frontage and install a traffic signal at Meridian Road and Eastonville Road. The installation of the subregional detention pond and channel will alleviate existing and future downstream flooding issues. The additional connectivity and roadway and drainage improvements should provide an overall positive impact to County facilities and service, not to mention the additional commercial tax base to be provided. Necessary services, including police and protection, recreation, utilities, open space and transportation system, are or will be available to serve the proposed subdivision. The site will be served by the El Paso County Sheriff and will provide alternate emergency access routes to adjacent developments through this site. Utilities will be extended through the development, open space will be provided with the stormwater facilities and landscape buffers. Sidewalks and bike lanes will be provided. The subdivision provides evidence to show that the proposed methods for fire protection comply with Chapter 6 of this Code. The site will be served by the Falcon Fire Protection District. The District welcomes the development and is eager to obtain alternate emergency access routes to adjacent developments through this site. The proposed subdivision meets other applicable sections of Chapter 6 and 8 of this Code. The subdivision is in conformance with the development standards for CR zoning and associated land uses as identified in Chapter 6 of the Land Development Code. The subdivision is in conformance with the subdivision design, improvement and dedication standards for CR zoning and associated land uses as identified in Chapter 8 of the Code (with the exception of a few requested roadway deviations). Page 6 of 7

Contact Information Drexel, Barrell & Co., a full service engineering and surveying firm, represents Hummel Investments, LLC. Following is the contact information for the involved parties. Owner: Name: LG HI Falcon, LLC Contact: Mr. Steve Meier Address: 2301 Cedar Springs, Suite 200 Dallas, TX 75225 Phone Number: 214-416-9824 Applicant/Developer: Name: Hummel Investments, LLC Contact: Mr. Steve Meier Address: 8117 Preston Road, Suite 120 Dallas, TX 75225 Phone Number: 214-416-9824 Consultant: Name: Drexel, Barrell & Co. Contact: Mr. Tim D. McConnell, P.E. Address: 3 S. 7 th Street Colorado Springs, CO 80905 Phone Number: 719-260-0887 We trust you find our application and request for the approval of the Final Plat for Falcon Marketplace acceptable. We look forward to working with the County in processing the application and submittal. Please call if you have any questions or require any additional information. Respectfully, Drexel, Barrell & Co. Tim D. McConnell, P.E. Senior Associate, Regional Manager Page 7 of 7