Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Similar documents
Oconomowoc Area School District Facility Construction Update August 25, 2017

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

Ohlone College Measure G Project Scope Revisions

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

campus master plan VIRGINIA STATE UNIVERSITY

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

SAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Master Plan Presentation August 12, 2015

Oxford Hills School District Capital Renewal Plan Updated March 2017

Briar Crest Elementary

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

Design Presentation. Chief Operations Officer Willie Burroughs

Forest Hills Facilities Plan

Master Facility Planning Update School Board Meeting May 26, 2016

ROSLINDALE BRANCH, BPL COMMUNITY PRESENTATION #2 MARTIN J. WALSH, MAYOR CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT 02/07/2018

New High School Concept

NYC Department of Education

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Update on University Avenue Study. September 21, 2015

Fall 2017 Construction Update

Avon Board of Education. Capital Improvement Plan Presentation to Board of Education October 17, 2017

2014 Bond Project Guide

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

NYC Department of Education

REPORT CARD TO THE COMMUNITY MAY 15, 2018

UPDATE ON ESTATES AND FACILITIES PROJECTS APRIL Projects Completed within last 24 months. 1. Richmond and Workshop Cladding ( 6.

Facilities Management Services

Exhibit CC BALTIMORE COUNTY PUBLIC SCHOOLS

DOWNTOWN VISION FALL 2012

Master Project List Report

TABLE OF CONTENTS. Tables Table UC Davis Park and Open Space Resources

Scope Of Work: Single Family, La Mesa, CA

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

Imagine RBC 2010 The Plan

Architectural Drawings

4. Name the room designed specifically for washing, drying, folding, and ironing clothes.

Emergency Action Plans

University of Wisconsin-Stevens Point REQUEST FOR ARCHITECTURAL & ENGINEERING DESIGN SERVICES NEALE RESIDENCE HALL RENOVATION PROJECT.

NARRATIVE REPORT. Engineering Administration was originally constructed in 1965; the building has had no major renovations.

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

Schematic Design Presentation December 15, 2006 David Smith

NYC Department of Education

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION

Proposal: Outdoor Basketball Court Renovation

Planning Board Hearing October 20th, 2016

The work also involved determining the extent of existing stone damage and foundation settlement, and a recommendation on its repair.

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA

Speedway Mall Project Frequently Asked Questions

C a m p u s I d e n t i t y

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

UMBC Facilities Management. UMBC Facilities Master Plan Update

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Design Review of Facility Improvement Projects

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

Grand River Ravines Georgetown Township

Johnson Street Bridge Public Realm Update

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

The community is now 10+ years old and 2000 plus residents.

Jason Greer Lighting / Electrical L/E Consultant: Dr. Mistrick. Villanova University: School of Law Villanova, PA

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008

LEARNING RESOURCE CENTRE CASE STUDIES. alkizim muneeer khalid b02/52599/2012 project 1 the learning resource centre

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to:

Bringing the Community Together. TOWN SQUARE UPDATE November 1, 2017

Charles P. Johnson and Associates. Annapolis Landscape Architects

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

WESTERN ILLINOIS UNIVERSITY

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

EXISTING CONDITIONS 41. Existing Conditions

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

Cherry Hill Public Schools BUILDING A SOLID FUTURE

West Hartford Public School District

Community Response Buchanan Elementary. December 13, 2016

DUNCAN STUDENT CENTER. Emergency Action Plan

Custodial- General Cleaning Duties

Tillamook High School Bond Projects

Butler Junior High School

Scope of Work - Single Family, Escondido, CA

Administration & Finance Campus Facilities Planning Committee Agenda Item Description Form

THE 2016 ANNUAL FIRE SAFETY REPORT. Including Statistics for the 2015 Calendar Year. Prepared by: Ron Crane Director of Safety & Security

3. Flexibility of changing use of technology needs should be an integral part of the design of learning spaces. Walls that are easily reconfigured.

Australian National University

CAMPUS MASTER PLAN UPDATE

NARRATIVE REPORT. Underlayment Paper for Linoleum. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

Transcription:

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Binghamton University Construction Summer 2012 Large and small construction projects were completed during the summer 2012 construction season. Completed projects include: Chenango Room renovation/addition Library Courtyard Addition Lecture Hall Concourse Phase 2 Renovation Athletic Fields Upgrades Sidewalk Upgrades in several locations Water Line Replacement University Downtown Center Restoration Library Corridor Upgrades

Chenango Room Renovation/Addition The project included: Complete renovation of the dining area with serving stations Construction of an Einstein Bros Bagels restaurant addition The Chenango Room kitchen was relocated and the private conference dining areas were relocated and renovated A glass and insulated panel wall was constructed along the east side of the Chenango Room New mechanical systems were also part of the project.

Chenango Room Renovation/Addition Before After

Library Courtyard Addition This project added 750 square feet of space Seating for 45 New landscaping and outdoor seating

Library Courtyard Addition January 2012 July 2012

Lecture Hall Concourse Renovation Phase 2 of the Lecture Hall Concourse renovation upgraded spaces on the north side of the Lecture Hall and Lecture Hall 7 The project included new flooring, seating, lighting, and wall treatments

Lecture Hall Concourse Renovation Lecture Hall 7 before Lecture Hall 7 after

Athletic Fields Upgrades The project included the following: 12 tennis courts, six handball courts and two basketball courts A new varsity baseball field with new dugouts, bleachers and press box A women's varsity softball field on the west fields Replacement of the tennis courts on the east side of campus, which are open for use at this time

Athletic Fields Upgrades

Sidewalk Improvements Sidewalks in a number of locations were replaced summer 2012 East and West entrance areas of the old University Union Sidewalk in front of Lecture south entrance Sidewalk near the Student Wing Sidewalk near Academic A Sidewalk on West Drive near Academic B Sidewalks around Physical Facilities Sidewalk near the Science 3 service drive will be replaced

Sidewalk Improvements UU west entrance before UU west entrance after

Sidewalk Improvements Lecture Hall south before Lecture Hall south after

Water Line Replacement Project Completed replacement of 3,200 lineal feet of the water line The project included work in a number of buildings to replace valves and other plumbing infrastructure

University Downtown Center UDC was re-opened on schedule in August In the re-design of building systems, some key equipment including the electrical transformer and emergency generator are no longer be located in the basement. Other equipment in the basement was installed in racks above the floor. The height of an exterior brick wall around the new transformer and generator will be increased in the coming months for aesthetic reasons

Library Corridor Refurbishment The renovation included new floor tiles, ceilings, improved lighting, fresh paint and new or refurbished doors to the hallways. Before After

New and Continuing Projects University Union Renovations Central Campus Quad East Campus Housing Dickinson Hall Renovation HTHW Replacement Center of Excellence

University Union Renovations Construction is underway on the north side of the UU The renovated space will house some key student services such as the Career Development Center, the Center for Civic Engagement, Tutoring Center, Educational Opportunity Program and TRIO Completion in August, 2013

University Union Renovations Construction will soon be underway in the Susquehanna and food court area as well The spaces will be merged to create an open marketplace-type venue with a variety of food options A 5,500 square-foot addition is part of the scope of work Work is scheduled for completion in 2013

Central Campus Quad The contractor focused on the east side of the Quad and the area in front of Fine Arts throughout the summer A number of trees that were diseased were removed from in front of the Fine Arts Building New trees along with other landscaping will take place in September and October and the project will be complete in November

East Campus Housing Work underway in Johnson and O'Connor Halls includes construction of wall studs, dry wall along with electrical and other utility work The buildings are nearly fully enclosed, windows are installed and roof work is almost complete Interior work will continue through the fall semester On Rafuse and Digman Halls, exterior panels are being put in place and roof work is underway. This project will be complete for the fall 2013 semester

Asbestos abatement and demo is underway in Dickinson Hall The project will transform the former dining hall into a one-stop student services center for the University Offices for student accounts, the registrar, financial aid and admissions recruiting will be located in Dickinson Hall Completion in spring 2014 Dickinson Hall

HTHW Replacement A new high-temperature hot water line will be put in place in the grass area between Science 2 and Science 3 Significant excavation and utility work underway Work includes a new high temperature hot water line, new electrical duct bank, and removal of above ground high temp hot water lines Other work involves removal of the concrete wall and bench along Science 3, resetting pavers along Science 3 and landscaping Substantial completion in fall 2012 Landscaping and walkway restoration in spring,2013

Center of Excellence Work on Phase 2 is underway The second phase entails constructing the shell (metal panel, glass, stone), green roof, mechanical and electrical systems, fire protection and interior fit out The project is due for completion in 2013

Continuing Projects Renovations in Science III basement area Laboratory Renovations Heath Services Renovations HVAC Rehab of Iroquois Commons/Tuscarora Office Building

Other Projects There were many other smaller projects to improve facilities around campus including: Upgrades to kitchen counters, baths and breezeways in Hillside Steel stair replacement in the Susquehanna Community Repair of sidewalks and pavers Connector Road Paving Refurbishment of doors

Other Projects Library Door Upgrades Paver Repairs

Other Projects Sundial Repair Engineering Ramp Painting